Debris Flow & Shallow Landslide Protection

Size: px
Start display at page:

Download "Debris Flow & Shallow Landslide Protection"

Transcription

1 Debris Flow & Shallow Landslide Protection REST AND BE THANKFUL - A83 RABT, GB

2 REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Street Place Country/Region Rest and Be Thankful - A83 RabT A83 Arrochar United Kingdom Year of installation 2012 Customer Engineering Contractor Transport Scotland Geobrugg / BAM Ritchies BAM Ritchies / BAM Nuttall Ltd. Situation The A83 at Rest and Be Thankful (RabT) in Argyll and Bute, Scotland, has been subject to a number of landslide or mudslide events that have caused major disruption to the traffic that regularly uses this key trunk road. The road was closed for several weeks in October 2007 when around 400 tonnes of material were deposited on the road when one such event occurred. Then in September 2009 the road was again closed for 48 hours after 1070 tonnes of material was deposited after a more significant event. Description BAM Ritchies, working closely with Geobrugg and Scotland Transerv, developed a solution of an eighty meters long, 4 m high shallow landslide barrier and 15.0 m wide VX in-channel barrier nearby. These were installed in In 2012 a second phase of works saw the installation of a further 83.0 m of shallow landslide barrier at 3.5 m high. Another channel saw the instalation of both 25.0 m by 5.0 m UX debris flow barrier above 9.0 m by 2.0 m VX debris flow barrier. Incident of Saturday 5th December, 2015 During storm Desmond that affected most parts of the UK a substantial landslide occurred at the A83 Rest and be Thankful. This is an area that has suffered numerous large landslide over the years and as such has numerous landslide and debris flow barriers have been installed. During the daytime on the 5th an event estimated at 150m3 struck a Geobrugg SL-150 barrier, the barrier successfully held the landslide and there was no need to close the road. A further 100m3 event struck the barrier overnight and over the next few days residual small movement led to a total of ~300 m³ being held by the barrier. The barrier held all of this material without failure or damage, brake rings were activated as designed and the posts and bases suffered no damage. Thanks to the Geobrugg SL-150 barrier the A83, a major transport route in this area remained open. Protected object Systems Road VX, UX, SL-150 Corrosion protection Galvanized, GEOBRUGG SUPERCOATING Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 2/8

3 System height System length 2.0 m, 3.5 m, 4.0 m, 5.0 m 9 m - 83 m Number of barriers 5 Retention capacity - m³ Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 3/8

4 SL-150 type shallow landslide barrier installed in 2010 Another view of SL-150 type shallow landslide barrier installed in 2010 View from the road at the SL-150 type shallow landslide barrier installed in 2010 Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 4/8

5 UX barrier installed above VX barrier in protection against landslips SL-150 shallow landslide barrier installed in 2012 Another view of the UX type debris flow barrier installed in 2010 Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 5/8

6 UX type debris flow barrier installed above VX type debris flow barrier in 2012 On Saturday 5th December 2015 during storm Desmond a substantial landslip occurred at the A83 Rest and be Thankful Thanks to the Geobrugg SL-150 barrier the A83, a major transport route in this area remained open Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 6/8

7 150m³ struck a SL-150 barrier A further 100m³ event struck the barrier overnight and over the next few days residual small movements led to a total of ~300m³ being held by the barrier Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 7/8

8 For questions please contact our Geobrugg specialist at your side Alexander Bittendorfer Project Manager Germany South Phone Mobile Geobrugg AG Aachstrasse Romanshorn Switzerland A company of the BRUGG Group Certified to ISO 9001 Debris Flow & Shallow Landslide Protection Rest and Be Thankful - A83 RabT, GB 8/8

LENK, BERNESE ALPS, CH

LENK, BERNESE ALPS, CH Debris Flow & Shallow Landslide Protection LENK, BERNESE ALPS, CH LENK, BERNESE ALPS Debris Flow & Shallow Landslide Protection Project Lenk, Bernese Alps Zip code 3775 Place Lenk Seiten Country/Region

More information

OLT VALLEY, KM , RO

OLT VALLEY, KM , RO Slope Protection OLT VALLEY, KM 239+500 246+500, RO OLT VALLEY, KM 239+500 246+500 Slope Protection Project Olt Valley, km 239+500 246+500 Project number 080212RO Street National Road no. 7 DN7 Zip code

More information

EASTSIDE CATCHMENTS GIBRALTAR, GI

EASTSIDE CATCHMENTS GIBRALTAR, GI Steinschlagschutz EASTSIDE CATCHMENTS GIBRALTAR, GI EASTSIDE CATCHMENTS GIBRALTAR Steinschlagschutz Projekt Projektnummer Strasse PLZ Ort Land/Region Eastside Catchments Gibraltar 160919-GI Sir Herbert

More information

Consolidamento di versanti

Consolidamento di versanti Consolidamento di versanti A1 HIGHWAY PYRZOWICE-PIEKARY ŚLĄSKIE, PL A1 HIGHWAY PYRZOWICE-PIEKARY ŚLĄSKIE Consolidamento di versanti Progetto Luogo Paese / Regione A1 Highway Pyrzowice-Piekary Śląskie A1

More information

Protection systems against debris flows

Protection systems against debris flows Safety and Security Engineering II 73 Protection systems against debris flows R. Luis Fonseca 1, C. Raïmat Quintana 1, L. Laguna Megal 1 & A. Roth 2 1 Geobrugg Ibérica, S.A. Spain 2 Geobrugg Fatzer AG,

More information

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response AASHTO Committee on Maintenance 2018 Annual Meeting July 25, 2018 Hurricane Irma- Preparation and Response Rudy Powell Director, Office of Maintenance Satellite Aerial Image (September 10, 2017) Hurricane

More information

Summary of Wind Turbine Accident data to 30 September 2010

Summary of Wind Turbine Accident data to 30 September 2010 Summary of Wind Turbine Accident data to 30 September 2010 These accident statistics are copyright Caithness Windfarm Information Forum 2010. The data may be used or referred to by groups or individuals,

More information

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd. Landslides along National Roads in Central Highland in Sri Lanka: Review on Current Situation and Suggestion for Further Development of Landslide Mitigation along Highways in Sri Lanka Yoshinori KAWAMURA,

More information

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish

More information

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016 White River Update Jeanne Stypula, Supervising Engineer Advisory Committee Meeting April 26, 2016 Department of Natural Resources and Parks Water and Land Resources Division River and Floodplain Management

More information

Empowering water/wastewater network management with GIS

Empowering water/wastewater network management with GIS Empowering water/wastewater network management with GIS Ioannis Kavouras_GIS Manager Surveying Engineer, MSc, MBA The Company responsible for fresh water distribution & sanitation serving 1.500.000 citizens

More information

Active Flow Technology Understanding How the Flow Rate Profile Affects the Chromatographic Efficiency

Active Flow Technology Understanding How the Flow Rate Profile Affects the Chromatographic Efficiency Active Flow Technology Understanding How the Flow Rate Profile Affects the Chromatographic Efficiency Anthony Edge, 1 Luisa Pereira, 1 Dafydd Milton 1 and Andrew Shalliker 2 1 Thermo Fisher Scientific,

More information

7.3 Magnitude Earthquake Strikes Iran-Iraq Border

7.3 Magnitude Earthquake Strikes Iran-Iraq Border 7.3 Magnitude Earthquake Strikes Iran-Iraq Border KEY POINTS A magnitude 7.3 earthquake has struck the Iran-Iraq border with at least 348 fatalities reported. Thousands more have been injured and many

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu Modeling Great Britain s Flood Defenses AIRCurrents Editor s note: AIR launched its Inland Flood Model for Great Britain in December 2008. The hazard module captures the physical processes of rainfall-runoff

More information

Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first event analysis

Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first event analysis Monitoring, Simulation, Prevention and Remediation of Dense and Debris Flows IV 187 Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first

More information

SEVERE WEATHER PLAN FOR INSTITUTE OF TECHNOLOGY TALLAGHT

SEVERE WEATHER PLAN FOR INSTITUTE OF TECHNOLOGY TALLAGHT SEVERE WEATHER PLAN FOR INSTITUTE OF TECHNOLOGY TALLAGHT I. GENERAL A. This plan identifies IT Tallaght s response to severe weather warnings or conditions as experienced on campus or as communicated by

More information

Arizona Department of Transportation Extreme Weather Vulnerability Assessment

Arizona Department of Transportation Extreme Weather Vulnerability Assessment Arizona Department of Transportation Extreme Weather Vulnerability Assessment Kris Gade, PhD ADOT Environmental Planning Group February 6, 2015 Presentation to PAG Environmental Planning Advisory Council

More information

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Hurricane Florence Recovery Report 4:00 PM October 31, 2018 Hurricane Florence Recovery Report 4:00 PM October 3, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 2 road closures on primary and secondary routes due to damage or flooding throughout

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared September 1, 2013 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 Overview of Methodology Dayton Power and Light (DP&L) load profiles will be used to estimate hourly loads for customers without

More information

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842 Speed Limit Review Montague Road, West End CEB06842 CEB06842 Prepared for Brisbane City Council 2 November 2016 Speed Limit Review Montague Road, West End Document Information Prepared for Brisbane City

More information

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007 Photo E003 0+000 Viewing looking upslope at Site 4 from highway. Conditions unchanged from 2006. Photo E018 0+000 Localized erosion within road fill on upslope side of highway. Photo E022 0+250 Looking

More information

Report of a Complaint Handling Review in relation to Police Scotland

Report of a Complaint Handling Review in relation to Police Scotland Report of a Complaint Handling Review in relation to Police Scotland independent and effective investigations and reviews independent and effective investigations and reviews Index 1. Role of the PIRC

More information

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN LOCATIOS OF SELECTED MITIGATIO SITES I JAPA Hyogo prefecture near Kobe, Japan Hyogo province Gifu province Osaka Kobe Gifu prefecture near Takayama, Japan akao Kamikochi ational Park Mount Yake Tateyama

More information

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018 ASX Announcement ASX & NSX: DYL / OTCQX: DYLLF 23 October 2018 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018 HIGHLIGHTS REPTILE PROJECT New zone of significant uranium mineralisation

More information

Time allowed: 1 hour 30 minutes

Time allowed: 1 hour 30 minutes SPECIMEN ASSESSMENT MATERIAL: SET 2 GCSE GEOGRAPHY Paper 1 Living with the physical environment Specimen Materials For this paper you must have: a pencil a ruler. Time allowed: 1 hour 30 minutes Instructions

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 Prepared by: Northern Geotechnical Engineering, Inc. d.b.a. Terra

More information

Cold Weather Preparation

Cold Weather Preparation 0-0.0 January 2012 Country of Origin: United Kingdom Cold Weather Preparation Introduction In addition to the freezing of sprinkler pipes and general water pipes, low temperatures can damage boilers, compressors,

More information

TOWN OF GRAND FALLS WINDSOR

TOWN OF GRAND FALLS WINDSOR TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned

More information

Deep Trouble! Common Problems for Ocean Observatories - Eos

Deep Trouble! Common Problems for Ocean Observatories - Eos Deep Trouble! Common Problems for Ocean Observatories Ocean Observing Infrastructure and Sensing Technical Lessons Learned and Best Practices; Moss Landing, California, 23 25 September 2016 Members of

More information

Ben Hogben. RRLC October 12, 2016

Ben Hogben. RRLC October 12, 2016 Ben Hogben RRLC October 12, 2016 What is your procedure for handling books that are returned damaged? 1. Meet with other staff who may be involved with the process 2. Talk about processes 3. Develop a

More information

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014 Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)

More information

Measurement of effective stress shear strength of rock

Measurement of effective stress shear strength of rock Measurement of effective stress shear strength of rock R. A. Failmezger, P.E., F. ASCE In-Situ Soil Testing, L.C., Lancaster, Virginia USA D. J. White, Ph. D., P.E. Iowa State University, Ames, Iowa USA

More information

Glenridding, Patterdale and neighbouring valleys

Glenridding, Patterdale and neighbouring valleys Glenridding, Patterdale and neighbouring valleys Flood Investigation Report Glenridding Village Centre, 6 th December Goldrill Bridge on 6 th December 2015 Flood Events 5 th -6 th, 9 th -10 th and 21 st

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert

More information

Lyme Regis. Environmental Improvements Phase 2. Securing the future of Lyme Regis

Lyme Regis. Environmental Improvements Phase 2. Securing the future of Lyme Regis Lyme Regis Environmental Improvements Phase 2 Securing the future of Lyme Regis Wave attack on Marine Parade The spectacular scenery around Lyme Regis is a result of erosion by the sea and landsliding

More information

Threat Modeling and Analysis Studying Disasters on Paper

Threat Modeling and Analysis Studying Disasters on Paper Threat Modeling and Analysis Studying Disasters on Paper Flood Hazard and Management Fred May Eastern Kentucky University Homeland Security Program FEMA Independent Study Course, IS 230, Principles of

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Landslide lesson plan

Landslide lesson plan Landslide lesson plan The landslide lesson plan provides teachers and students with an opportunity to investigate the elements that contribute to shaping landforms and the effects of landslides. ITEMS

More information

Flooding and Climate Change APSE Seminar, 9 February 2017

Flooding and Climate Change APSE Seminar, 9 February 2017 Flooding and Climate Change APSE Seminar, 9 February 2017 Local Roads Maintenance 1 Department for Transport OFFICIAL Preparations for Winter Important the transport sector, including local highway authorities,

More information

Physical landscapes River landscapes in the UK

Physical landscapes River landscapes in the UK Physical landscapes River landscapes in the UK The shape of river valleys change s as rivers flow downstream - PROCESSES Erosion Abrasion or corrasion Attrition Hydraulic Action Solution or corrosion Deposition

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

LUSTROUS GREEN TECHNOLOGY OF LIGHTING

LUSTROUS GREEN TECHNOLOGY OF LIGHTING Technical Datasheet LS 72 High Power Solid-State LED Light Source Introduction For a brighter solid-state light source, Lustrous Technology is proud to release the new. Ideal for your high lumen output

More information

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800) Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,

More information

FLOOD/SCS EVENT, APRIL 28 MAY 4

FLOOD/SCS EVENT, APRIL 28 MAY 4 REPORT DATE: May 4, 2017 EVENT DATE: April 28-May 4, 2017 FLOOD/SCS EVENT, APRIL 28 MAY 4 Event Summary General Significant Flood Outlook. SOURCE: National Weather Service. A significant severe thunderstorm

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Climate Change Adaptation

Climate Change Adaptation Climate Change Adaptation Adriána Hudecz, Technical University of Denmark ROADEX Final Seminar Inverness, 22 May 2012 Climate Change Adaptation Outline: 1. Background/global climate change 2. Climate change

More information

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria June 2018 Revised 8/3/2018 2017 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Snow Plow Safety Quick Reference Guide

Snow Plow Safety Quick Reference Guide PUBLIC WORKS INITIATIVE Snow Plow Safety Quick Reference Guide INTRODUCTION This quick reference guide highlights snow removal/snow plow safety practices. Its purpose is to help prevent personal injury

More information

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering SHORELINE AND BEACH PROCESSES: PART 2 Implications for Coastal Engineering Objectives of the lecture: Part 2 Show examples of coastal engineering Discuss the practical difficulties of ocean engineering

More information

Hilti North America Installation Technical Manual Technical Data MI System Version

Hilti North America Installation Technical Manual Technical Data MI System Version MIC-SA-MAH 174671 Hilti North America Installation Technical Manual Technical Data MI System Version 1. 08.017 Terms of common cooperation / Legal disclaimer The product technical data published in these

More information

Water Scarcity Situation Report 14 th September 2018

Water Scarcity Situation Report 14 th September 2018 Water Scarcity Situation Report 14 th September 2018 HEADLINE Parts of North East Scotland are still at Significant Scarcity due to evidence of ecological impacts resulting from an exceptionally prolonged

More information

Dozens Killed after Earthquake in Lombok, Indonesia

Dozens Killed after Earthquake in Lombok, Indonesia Dozens Killed after Earthquake in Lombok, Indonesia KEY POINTS 91 people have been killed and hundreds injured after a 6.9-magnitude earthquake struck Lombok, Indonesia on 05 August 2018. Widespread damage

More information

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria June 2017 Revised 10/3/17 2016 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Poisson Processes and Poisson Distributions. Poisson Process - Deals with the number of occurrences per interval.

Poisson Processes and Poisson Distributions. Poisson Process - Deals with the number of occurrences per interval. Poisson Processes and Poisson Distributions Poisson Process - Deals with the number of occurrences per interval. Eamples Number of phone calls per minute Number of cars arriving at a toll both per hour

More information

NSG 4070C APPLICATION FOR MIL-STD 461G CS 114

NSG 4070C APPLICATION FOR MIL-STD 461G CS 114 out < +0 meter ch. < +0 ch. < +0 ch. < +7 M nd NSG 0C APPLICATION FOR MIL-STD G CS Test parameter Equipment Standard: MIL-STD G CS Frequency range: to 00 M Curve to : see diagrams Modulation: pulse modulation,

More information

Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast ***

Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast *** Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast *** The following information is to provide the public, local residents, businesses and community officials

More information

Husky Oil Operations Limited

Husky Oil Operations Limited Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) 298-6111 Box 6525, Station D Fax: (403) 298-6378 Calgary, Alberta, Canada T2P 3G7 October 31, 2014 Sahtu Land &Water Board SLWB File: S13L1-005

More information

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France) FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 1 FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 2 FORM OSE POST-GRADUATE COURSE Landslide vulnerability and risk 3 Christophe

More information

Thursday, November 1, :30 a.m. EDT

Thursday, November 1, :30 a.m. EDT Thursday, November 1, 2018 8:30 a.m. EDT Significant Activity Oct 31- Nov 1 Significant Events: Tropical Cyclone Yutu Response Tropical Activity: Atlantic Hurricane Oscar (CAT 1) FINAL; no new tropical

More information

Hurricane Irma. City of Cocoa Beach September 8 12, 2017

Hurricane Irma. City of Cocoa Beach September 8 12, 2017 Hurricane Irma City of Cocoa Beach September 8 12, 2017 Monitoring prior to landfall Expected effects What happened What went well What didn t go well Changes and improvements After Action Outline Storm

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

EUROCONTROL Seven-Year Forecast 2018 Update

EUROCONTROL Seven-Year Forecast 2018 Update EUROCONTROL Seven-Year Forecast 2018 Update Flight Movements and Service Units 2018-2024 STATFOR 23 October 2018 This update replaces the February 2018 forecast This update uses: The recent traffic trends

More information

PRODUCT SPECIFICATIONS

PRODUCT SPECIFICATIONS FEATURES AND BENEFITS* Up to 14 year DC life 56V DC working voltage Resistive cell balancing Overvoltage outputs High power density 4U, half-rack package UL registered TYPICAL APPLICATIONS UPS systems

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

September 18, 2017 Project No.: 5077

September 18, 2017 Project No.: 5077 #109 3011 Underhill Avenue Burnaby, BC V5A 3C2 Phone: (604) 421-3288 Email: info@terrangeo.com September 18, 2017 Project No.: 5077 Kevin Brooks City of Campbell River 301 St. Ann s Road Campbell River,

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM Purpose: The Public Transportation Department (PTD) and AnchorRIDES paratransit contractor will provide transportation in as safe a manner as effectively possible. Paratransit vehicles primarily operate

More information

PTA-427 BAROMETRIC PRESSURE TRANSDUCER OPERATOR S MANUAL

PTA-427 BAROMETRIC PRESSURE TRANSDUCER OPERATOR S MANUAL PTA-427 BAROMETRIC PRESSURE TRANSDUCER OPERATOR S MANUAL REVISION: 4/95 COPYRIGHT 1991, 1995 CAMPBELL SCIENTIFIC, INC. WARRANTY AND ASSISTANCE The PTA-427 Barometric Pressure Transducer is warranted by

More information

Multi-Jurisdictional Hazard Mitigation Plan. Table C.10 The Richter Scale. Descriptor Richter Magnitude Earthquake Effects

Multi-Jurisdictional Hazard Mitigation Plan. Table C.10 The Richter Scale. Descriptor Richter Magnitude Earthquake Effects Geologic Hazards Earthquake Earthquakes are very rare in Pennsylvania and have caused little damage, with no reported injuries or causalities. Earthquakes that do occur in Pennsylvania happen deep within

More information

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction CHAPTER 9 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Case History: La Conchita Landslide La Conchita: small coastal community 80 km (50 mi) northwest of Los Angeles Landslide occurred on January 10, 2005

More information

Lightning Safety in a Flash / VAISALA AIRPORT LIGHTNING INFORMATION SYSTEM (ALIS)

Lightning Safety in a Flash / VAISALA AIRPORT LIGHTNING INFORMATION SYSTEM (ALIS) Lightning Safety in a Flash / VAISALA AIRPORT LIGHTNING INFORMATION SYSTEM (ALIS) Global Threat to Airports Proven. Global. The Vaisala Airport Lightning Information System (ALIS) opens a new era of universal

More information

Information (17:30), January 11, 2019

Information (17:30), January 11, 2019 Information (17:30), January 11, 2019 To All Missions (Embassies, Consular posts and International Organizations in Japan) Report on the discharge record and the seawater monitoring results at Fukushima

More information

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY MONTHLY REPORT October 15, 2007 Black & Veatch Project: 144374 Prepared by: Black & Veatch Corporation 6300 S. Syracuse Way

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation

More information

Early warning of geotechnical limit states: Slope ALARMS (a slope displacement rate sensor)

Early warning of geotechnical limit states: Slope ALARMS (a slope displacement rate sensor) Early warning of geotechnical limit states: Slope ALARMS (a slope displacement rate sensor) Professor Neil Dixon School of Civil and Building Engineering Loughborough University Outline of presentation

More information

Lightning Safety. MANSCEN Safety Office (573)

Lightning Safety. MANSCEN Safety Office (573) Lightning Safety MANSCEN Safety Office (573) 596-0116 Lightning Facts 2 nd Leading Cause of Weather Deaths in the United States Kills ~ 100 / Year Kills ~ 10% of those Struck Lightning Facts Survivors

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available Using Operating Experience to Prevent or Mitigate Nuclear Events What Is, Was and Will Be Available Introduction Remember, it is by understanding the lessons learned from past events that we can adequately

More information

Well Drilling in Benin, West Africa 30 March 2008 Executive Summary

Well Drilling in Benin, West Africa 30 March 2008 Executive Summary Report on Expenditure of Funding Ann Campana Judge Foundation National Ground Water Research and Educational Foundation Well Drilling in Benin, West Africa 30 March 2008 Executive Summary The University

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

Looking after Lyme Regis

Looking after Lyme Regis Looking after Lyme Regis Lyme Regis sits on one of the most unstable stretches of coastline in the country. The highly active and unstable nature of the land which Lyme Regis is built upon can easily be

More information

The Impact of 2007 Atlantic Hurricane Season on Dominica

The Impact of 2007 Atlantic Hurricane Season on Dominica The Impact of 2007 Atlantic Hurricane Season on Dominica DOMINICA November 2007 Main Activities Freak Twister on June 21st 2007. Hurricane Dean on August 16th to 17th 2007 Active Tropical Wave on September

More information

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time Broad-Scale Models Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda GOAL Predict Channel Characteristics in Space and Time Assess Potential for Fish Use and Productivity Assess

More information

Wednesday, November 7, :30 a.m. EST

Wednesday, November 7, :30 a.m. EST Wednesday, November 7, 2018 8:30 a.m. EST Significant Activity Nov 6-7 Significant Events: Tropical Cyclone Yutu Recovery Tropical Activity: Atlantic No new tropical cyclones are expected during the next

More information

Septem ber 28, 2016 EL PASO, Texas

Septem ber 28, 2016 EL PASO, Texas September 28, 2016 EL PASO, Texas Crews from Paso del Norte Trackworks will finalize underground utility work and begin laying rail on a portion of Kansas Street thru Downtown El Paso in the coming weeks,

More information

Check-Q-meter. Table of contents. Features. Functions. RE 27551/ /10 Replaces: Type FD

Check-Q-meter. Table of contents. Features. Functions. RE 27551/ /10 Replaces: Type FD Check-Q-meter RE /0.0 /0 Replaces: 09.9 Type FD Nominal size... Series ax. Operating pressure 0 bar ax. Flow 0 l/min K9/ Table of contents Contents Page Features Functions Ordering details Symbols Functional

More information

NATURAL FORCE THREATS, MONITORING AND RESEARCH NEEDS

NATURAL FORCE THREATS, MONITORING AND RESEARCH NEEDS NATURAL FORCE THREATS, MONITORING AND RESEARCH NEEDS 1 Southern California Thomas Fire and Montecito Debris Flows 2 Timeline/Description of Conditions Between December 4, 2017 and January 12, 2018, over

More information

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

GUIDELINES FOR FILMING IN TOMBALL, TEXAS GUIDELINES FOR FILMING IN TOMBALL, TEXAS I. PURPOSE The following guidelines are intended to protect the personal and property rights of our Tomball, Texas residents and businesses. The City Manager reserves

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Deadly Earthquake Strikes Peru

Deadly Earthquake Strikes Peru Deadly Earthquake Strikes Peru KEY POINTS On 14 January 2018, a magnitude-7.1 earthquake struck off the coast of Peru. At least two people have been reported dead, with dozens more left injured or homeless.

More information

4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND

4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND 98 COMITÉ DES TRANSPORTS 4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND COMMITTEE RECOMMENDATION That Council approve that the chain

More information

Geoscientific Instrumentation in River Valley Projects

Geoscientific Instrumentation in River Valley Projects J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon

More information

Significant Flooding Expected

Significant Flooding Expected Significant Flooding Expected Decision Support Briefing #5 As of: 9:00 AM September 14, 2018 What Has Changed? Flash Flood Watch now in effect for part of area, will be expanded later today 9/14/2018 9:23

More information