For personal use only

Size: px
Start display at page:

Download "For personal use only"

Transcription

1 17 February MILLION TONNES MAIDEN JORC INFERRED COAL RESOURCE AT FERNDALE Resource underscores Coalworks confidence in Ferndale as a high quality, strategic project 443 Million tonnes Inferred JORC (2004) Resource identified within the Newcastle Coal Measures at depths amenable to open cut mining 300 Million tonnes Inferred JORC (2004) Resource identified within the Wittingham Coal Measures with Underground Mining potential. Based on completion and interpretation of 40 exploration drill holes during Stages 1-3 of drilling Announcement continues strong progress made by Coalworks in its strategy to build an independent Australian coal producer Coalworks Limited (ASX: CWK) today announced that its Inferred Resources (classified in accordance with the JORC Code) within the Ferndale Exploration Licence (EL7430) total 743 million tonnes of bituminous coal. The resources are based on the completion and geological interpretation of 40 exploration drill holes completed during the Stages 1, 2, and 3 of the current drilling program at Ferndale. The program which started in mid 2010 has concentrated on confirming continuity of seams both within the Shallow Newcastle Coal Measures and the deeper Upper and Middle Wittingham Measures. The Resources estimated by Ravensgate Minerals Industry Consultants, are classified in accordance with the 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Coalworks Chairman Wayne Mitchell said: This announcement is a significant milestone for both the Ferndale project and for Coalworks. We believe that the JORC endowment identified reaffirms the high quality, strategic nature of Ferndale, and justifies our confidence in the project, which is one of the core projects in Coalworks strategy to build a new independent Australian coal producer. The Stage 3 Drilling program is continuing with the aim of potentially upgrading Resources to Indicated and Measured Status. ACN Level 5, 44 Miller Street, North Sydney NSW 2060 AUSTRALIA Ph: Fax: info@coalworks.com.au

2 Tenement (Figures 1 and 3) The Ferndale deposit is contained within EL 7430, held by Loyal Coal Pty Ltd. Yarrawa Coal Pty Ltd, a 100% subsidiary of Coalworks Limited, owns 92.5% of Loyal Coal. EL 7430 was granted 18 December 2009 and expires 18 December Coal resources estimated and reported are wholly contained within EL Drillholes The resource estimate is based on results from 40 exploration drill holes (FD001-FD039 and FD042) drilled recently. Figure 2 shows the location of drill holes within EL7430 Of the 40 bore holes used to calculate the Maiden Inferred Resource, 37 were either partially or fully HQ Cored, with the seams sampled and submitted for coal quality analysis. Quality analysis results from 15 boreholes have been included in the Resource estimate. The remaining bore cores are awaiting completion of analysis. Drill hole spacing ranges from ~ 500m to ~2km. All drill holes completed to date have intersected coal. All of the completed drill holes were geophysically logged and corrected for depth. Coal core samples from Stage 1 drilling were submitted to Actest Laboratories in Newcastle for ply quality analysis. Subsequent coal core samples from Stages 2 and 3 drilling have been submitted to Bureau Veritas Laboratories in Newcastle for ply quality analysis. Quality data displayed in Table 2 and 3 is based on coal bore cores analysed for all seams. The current JORC Resource estimated is based on Coal Quality analysis completed on 15 completed boreholes to date. Stage 3 drilling is continuing with three drill rigs on site. Bore core samples are being continuously submitted for analysis upon completion of each hole, with currently a further 32 completed bore cores are awaiting analysis at Bureau Veritas in Newcastle. Raw Coal Analysis include was available from the following Boreholes: FD001 FD003 FD004 FD007 FD008 FD009 FD010 FD011 FD012 FD013 FD014 FD015 FD016/16R 1 FD017 FD038 2

3 1 Holes FD016 required abandoning and redrilling several metres from the original collar, hence the FD16R suffix. 2 Drill hole FD038 was abandoned at ~54m with sampling continuing in a re-drill several metres away at hole FD038R. The hole is labelled as FD038R on the Figure 2 Drill hole location plan. Figure 1 EL 7430 Tenement Location

4 Figure 2 Location of Coalworks boreholes within EL7430 (FD016 and FD038 were abandoned mid hole with drilling continuing several metres away on holes labelled FD016R and FD038R on the above plan)

5 Figure 3 EL7430 Ferndale Location Plan Geology Regional Geology EL 7430 is situated in the Upper Hunter region of the Permian-Triassic Sydney Basin. The Permian coal measures in the area are divided into three sequences: the Early-Mid Permian Greta Coal Measures, the Late Permian Wittingham Coal Measures, and the overlying Late Permian Newcastle Coal Measures, the latter two being of focus in EL The presence of the Greta Coal Measures in the tenement is unknown, but if present, it is considered to exist at depths excessive for mining. Local Geology The Triassic sediments in the tenement which overlie Permian coal bearing sediments generally form prominent escarpments and hilltops. Also present in the tenement are minor Quaternary alluvial sediments in some creeks which flow into the Goulburn River. Coal seams targeted are in the Newcastle Coal Measures (NCM) and upper and Middle

6 Wittingham Coal Measures (WCM) of the Singleton Supergroup. A general stratigraphic column is presented in Table 1. In the tenement, the seams of the NCM and WCM dip gently (around 1-3 ) to the general north-northwest, although dip direction varies throughout the majority of the tenement. In the tenement s north western portion, the dip direction is variable although it is generally to the north-northeast. Towards the tenement s north eastern portion, the strike swings around to produce north westerly dips. Minor faulting may also possibly be associated with this flexure. Igneous intrusions and heat affected strata occasionally exist in the WCM seams and to a lesser extent the NCM seams, and the interburden throughout the tenement. Newcastle Coal Measures (NCM) Intersected coal thicknesses for the NCM range from 0.07m in the Montrose 2 seam (FD001) to 2.64m in the Great Northern seam (FD014). The maximum depth to roof of Coal was a depth of 206.5m down hole for the Borehole Seam in bore hole FD014. Of the 15 Seams identified within the NCM (Table 1) containing up to 27 individual coal plys, only 8 seams and 13 individual plys have met resource assessment criteria and have been included in the Inferred Resource (Table 2). Wittingham Coal Measures (WCM) Coal Seams thickness intersected within the WCM ranged from 0.13m for the Redbank Creek 1 seam (FD006), to a maximum thickness of 8.82m in the Bayswater seam recorded in bore hole FD013.The Bayswater Seam is typically the thickest seam in the resource area. Geological interpretation has identified 15 seams within the WCM as displayed in Table 1, 8 of these seams have met resource assessment criteria and have been included in the Inferred Resource (Table 3). The depth to base of weathering intersected in boreholes ranges from ~10m to ~38m.

7 Figure 4 General East- West Cross-Section view of Ferndale Wittingham and Newcastle Resource Modelling Seams and selected sectional Drill-holes View (Azim=180, Dip-0 degrees). Coal Seams shown are JORC classified seams only - Newcastle Seams (Pink) and Wittingham Seams (Blue).Topography is green and Base of weathering orange. BLOCK MODEL CONSTRUCTION AND RESOURCE ESTIMATION Ravensgate has completed a Resource Model update in line with the JORC Code guidelines for the Ferndale Coal Project EL 7430 (Ferndale). The resource modelling has been carried out using industry best practice standards and are valid with respect to the JORC code (Dec 2004). It must be stated that the resource summaries shown here are to be classified as Inferred Resources only at this early stage of project development and will be subjected to some future up-dates as and when further data becomes available. Ravensgate primarily relied on the main logged stratigraphic logging codes and the available coal quality analyses to define the 3-D coal seam wire-frames which were used for block model coding and preliminary resource estimation. Block Modelling and Resource estimation was completed using Minesight software. Grade estimation was carried out using a standard averaging interpolation approach which is often used for resource block modelling when low volume variance affected variables are considered. Search ellipses used were orientated to reflect the orientation of the majority of coal seams. Each seam was coded with the coal quality and associated data on a seam by seam basis.

8 A pair of equivalent seam surfaces were developed by way of triangulation of roof and floor points in conjunction with an extruded boundary out to ~1500m from the nearest drill-hole logging interval. The deeper seams by default were generated on relatively fewer intervals on account of not all drill-holes intersected the deeper seams. The preliminary validated seam wire-frames were then clipped and contained within the current EL-7430 Lease Boundary. The seam surfaces were combined to produce 3-D seam solid wire-frames which were used to code the drill-hole Composite files and the Block Model file. Individual models were produced for the Newcastle and Wittingham Coal Measures. A standard block model was developed to help estimate the seam volumes and associated weight averaged coal quality for the Wittingham seams. For the Newcastle seams, the final clipped or rationalized seam wire-frames were directly interrogated to estimate total seam volumes. The surface topography for resource estimation was based on a Surface Digital Terrain Model. The Base of weathering was modelled as a separate surface from down hole lithological interpretation. Resources Models were clipped by Topography and surface weathering. Figure 5 General Oblique view of Ferndale Wittingham Resource Model Seams and Drilling View (Azim=150, Dip-25 degrees). Interpolation of Coal Quality Data Into Parts of Seams Is Shown Graphically As The Orange (1000m) and Purple (1500m) Areas.

9 Coal Resources The Inferred Resource (calculated in accordance with the JORC Code) in EL7430 total 743 Million tonnes of bituminous coal. Inferred Resource containing 443 Million tonnes have been estimated within the Newcastle Coal Measures. The thin, multi seam coal measures are at depths amenable to Open Cut Coal mining within the majority of the tenement. Where areas of steep relief including areas of potential cultural or environmental heritage exist high wall auger mining may be a potential option. Coal Resources within the Shallow Newcastle Coal measures were estimated assuming a maximum 50% average raw ash, a minimum average seam thickness of 0.3m, a maximum seam depth of 250m, maximum included parting 0.2m, and a maximum insitu waste : insitu coal ratio of 15:1m 3 /t. Insitu waste volumes were estimated from the surface topography to the roof of Coal. Estimated insitu waste bcm to insitu coal ratios are displayed in Table 4. Indicative ratios to the Wave Hill 4 seam are ~9.2:1, whilst indicative ratios to the Borehole Seam are ~12.7:1 It is worth noting that 7 additional seams modelled within the Newcastle Coal Measures including 14 additional coal plys were not included within the Resource estimate due to an average raw ash >50%. As additional bore core analysis results are completed on outstanding bore cores, the average raw ash of some of these seams may fall below 50% Ash potentially adding additional tonnes to the current resource estimate. Seams included within the Newcastle Coal Measures Resource Estimate Include: Great Northern 1 (GN1)1 Fassifern (FAS) Upper Pilot 1 (UP1)1 Hartley Hill 1 (HTH 1)1 Hartley Hill 2 (HTH 2)1 Montrose 1 (MON1)1 Montrose 2 (MON2)1 Wave Hill 1 (WVH1)1 Wave Hill 2 (WVH2)1 Wave Hill 3 (WVH3)1 Wave Hill 4 (WVH4)1 Nobby (NOB) Borehole (BRH) 1 Suffix 1 4 indicates sub seam set of general stratigraphy identified in Table 1.

10 Inferred Resource of 300 Million tonnes have been estimated for the Wittingham Coal Measures. Resources were estimated using a minimum seam thickness of 1m, no depth restriction, an average interburden distance between seams of 20m, maximum raw ash of 45%, a maximum stone parting of 0.5m, and a minimum seam resource of 20Mt. Seam depths ranged from ~166m (WYB1) to 658m (BAY1). The Inferred Resource estimated within the Wittingham Coal Measures have future underground mining potential. Seams included within the Newcastle Coal Measures Resource Estimate Include: Wybrow 1 (WYB1) 1 Redbank Creek 1 and 2 (RBC1 and 2) 1 Whynot (WNT) 1 Blakefield 1 and 2 (BLK 1 and 2) 1 Bowfield (BOW) 1 Warkworth (WKW) 1 Broonie 2 (BRO2) 1 Bayswater 1 (Bay1) 1 1 Suffix 1 4 indicates sub seam set of general stratigraphy identified in Table 1. Figure 6 Ferndale Resource Modelling Wittinham Coal Seams and Drilling Plan View showing Coal Mineralization (East toward top of page)

11 Coal Quality From the raw coal ply analysis results to date from 15 drill holes, the Ferndale Resource is defined as a high ash, high volatile, low sulphur coal deposit as displayed in Tables 2 and 3. Due to the high ash nature of the deposit it is envisaged that coal washing will be required. Limited Coal washability simulation test work has been completed on bore cores to date, with results to be announced upon final completion including clean coal composite analysis. Average raw ply CSN properties have been produced from limited bore cores. Although the average raw ply CSN value per seam to date is lower than a general Semi Soft Coking specification (typically >3.5 CSN), variability from a limited data set is quite high. Due to the high raw ash values of the Wittingham Coal Measures, it is envisaged that coal washing will be required. The Wittingham Coal Measures in Table 3 display maximum individual raw ply CSN values within a potential Semi Soft Coking Coal Range. Upon completion of further bore core analysis, including further washability test work and clean coal composite analysis, some sections of the Wittingham Measures may have the potential to produce a washed SSCC product. The average raw sulphur per seam is considered low, suggesting that the Ferndale coal may have additional low sulphur blending potential.

12 Table 1 Generalised stratigraphic column showing seam codes based on drilling results.

13 Seam Inferred 2 Resources (MT) Average Thickness (m) Depth (m) to Coal (min) Depth (m) to coal (max) Relative Density (RD) Inherent Moisture Ash Volatile Matter (% adb) Fixed Carbon Total Sulphur Calorific Value (Mj/Kg, adb) Calorific Value (Kcal/Kg, adb) CSN 3 CSN 1 (min) GTN FAS UPL HTH HTH MON MON WVH WVH WVH WVH NOB BRH Total 443 Table 2 Resource Summary Newcastle Coal Measures including Raw Coal results 1 Minimum & maximum ply CSN value from Raw ply data 2 Insitu tonnes estimated on modelled seam RD. 3 CSN values estimated by weighted average CSN 1 (max) ACN Level 5, 44 Miller Street, North Sydney NSW 2060 AUSTRALIA Ph: Fax: info@coalworks.com.au

14 Seam Inferred 3 Resources (MT) Average Thickness (m) Depth (m) to Coal (min) Depth (m) to coal (max) Relative Density (RD) Inherent Moisture Ash Volatile Matter (% adb) Fixed Carbon Total Sulphur Calorific Value (Mj/Kg, adb) Calorific Value (Kcal/Kg, adb) CSN 1 CSN 2 (min) WYB RBC1 and WNT BLK1 and BOW WKW BRO BAY Total CSN values estimated on length weighted average ply data, not geo-statistically modelled 2 Minimum & maximum ply CSN value from Raw ply data 3 Insitu tonnes estimated on modelled seam RD. Table 3 Resource Summary Wittingham Coal Measures including Raw Coal results CSN 2 (max)

15 Seam cumulative Waste (M bcm) Cumulative Insitu Coal (Mt) Insitu Coal(t):bcm Waste WVH BRH Table 4 Estimated Insitu waste bcm to insitu coal ratios Cautionary Note: This release may contain forward-looking statements that are based upon management s expectations and beliefs in regards to future events.. These statements are subjected to risk and uncertainties that might be out of control of Coalworks Limited and may cause actual results to differ from the release. Coalworks Limited takes no responsibility to make changes to these statements to reflect change of events or circumstances after the release. In certain circumstances management has relied upon data provided by third parties. Coalworks, its officers and its subsidiaries take no responsibility for any inaccuracies flowing from information provided by third parties. The following statements apply in respect of the information in this report that relates to Exploration Results and Mineral Resources: The information is based on, and accurately reflects information compiled by Mr Stephen Hyland, who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Hyland is a geologist employed as Principal Consultant by Ravensgate, mineral industry consultants. He has the relevant experience in relation to the coal deposits being reported on to qualify as a Competent Person as defined in the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Identified Mineral Resources and Ore Reserves. Mr Hyland has consented in writing to the inclusion in this report of the matters based on the information in the form and context in which it appears. For further information, please contact: Nathan Bartrop Company Secretary Tel: Fax: info@coalworks.com.au For media inquiries, please contact: Dudley White / Garry Nickson MAGNUS Investor Relations + Corporate Communication Tel: dwhite@magnus.net.au / gnickson@magnus.net.au Coalworks has a portfolio of projects in Australia including: 1. Vickery South, Gunnedah Basin (exploration target coking/thermal coal) # JORC Resources Increase by 15% to 58.5 Mt - see ASX Announcement # ITOCHU to proceed with BFS for Vickery South - see ASX Announcement # ITOCHU signs Farm In Agreement in $11m deal - see ASX announcement # Preliminary Feasibility Study positive with semi soft coking coal forming 83% of product - see ASX announcement Ferndale Coal Project # Coalworks includes its 92.5% owned subsidiary Loyal Coal Pty Ltd # JORC Inferred Resource 743 Mt. # Coalworks alone commissioned Ravensgate to produce the Ravensgate JORC resource. Consent has not been sought nor has Boardwalk Resources Ltd or the Ferndale Joint Venture authorised the Ravensgate JORC resource referred to herein. 3. Oaklands Coal Project (JORC measured, indicated and inferred 822Mt thermal coal) #see ASX announcement ; #Strategic Alliance with Synthesis Energy Systems Inc to develop Oaklands coal-to-petrol plant announced see ASX announcement ACN Level 5, 44 Miller Street, North Sydney NSW 2060 AUSTRALIA Ph: Fax: info@coalworks.com.au

KATINGAN RIA COAL RESOURCE UPGRADE

KATINGAN RIA COAL RESOURCE UPGRADE Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 14 February 2013 Dear Sir/Madam KATINGAN RIA COAL RESOURCE UPGRADE Fivefold increase in Measured and

More information

JV PROJECT UPDATE JORC COAL RESOURCE

JV PROJECT UPDATE JORC COAL RESOURCE 29 May 2012 ASX Announcement JV PROJECT UPDATE JORC COAL RESOURCE Dynasty Metals Australia (ASX:DMA) holds a minority interest of approximately 8.65 in a joint venture company with a subsidiary of Tiaro

More information

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT

More information

SESE MEASURED RESOURCE EXCEEDS 650MT COAL

SESE MEASURED RESOURCE EXCEEDS 650MT COAL For electronic distribution 15 th August 2012 SESE MEASURED RESOURCE EXCEEDS 650MT COAL Highlights: Initial Measured Resource at Sese calculated at 651Mt coal. Sese Coal & Power Project: Resource Summary

More information

For personal use only

For personal use only ASX Announcement 2 April 2012 Substantial Upgrade to Underground Coal Resource at Doyles Creek Highlights: Infill drilling has increased Measured Resources by 248% to 23.1Mt from 9.3Mt. Measured and Indicated

More information

For personal use only

For personal use only 1.74 Billion Tonne JORC Resource 17 th September 2012 East Energy Resources are pleased to announce updated JORC Resource of 1.74Bt East Energy Resources Limited (ASX:EER) is pleased to announce their

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 13 August 2012 INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 2.6 BILLION TONNES ADDITIONAL INFERRED RESOURCE DEFINED Key Points: 2.6 Billion Tonnes classified over the initial Phase

More information

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 15 October 2014 MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT

More information

For personal use only

For personal use only ASX Announcement Moorlands Project Concept Mining Study Update Concept Mining Study confirms the proposed South Pit as initial mining focus at the Moorlands Project with: Strip ratios of 2 to 4 bcm/tonne,

More information

Ovoot Coking Coal Project (100%)

Ovoot Coking Coal Project (100%) NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918

More information

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 11 July 2013 The Manager Company

More information

A summary of the review s findings for the six areas, listed in Table 1, is given below.

A summary of the review s findings for the six areas, listed in Table 1, is given below. 11 February 2010 Company Announcements Office Australian Stock Exchange 20 Bridge Street SYDNEY NSW 2000 RESULTS OF COAL PROJECT REVIEW Pacific Enviromin Limited (PEV) is pleased to release the main findings

More information

For personal use only

For personal use only MOZAMBI COAL LTD (ASX: MOZ, Company or Mozambi ) ASX RELEASE 7 SEPTEMBER 2011 EXPLORATION PROGRAMME UPDATE is pleased to announce an update on exploration activities in Mozambique including the results

More information

NCONDEZI COAL COMPANY LTD ("Ncondezi" or the "Company") Ncondezi Project South Block Resource Update

NCONDEZI COAL COMPANY LTD (Ncondezi or the Company) Ncondezi Project South Block Resource Update Ncondezi Coal Company Limited No 1 le Truchot St Peter Port Guernsey Channel Islands GY1 3JX Tel: +44 (0) 1481 810102, Fax: +44 (0) 1481 810120 December 21, 2011 NCONDEZI COAL COMPANY LTD ("Ncondezi" or

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

For personal use only

For personal use only ASX Code: HDG Fully paid s hares: 74,854,029 Announcement to the Australian Stock Exchange 7 th June 2011 Unlisted options: 7,000,000 Increased Exploration Target of 1.4 to 1.6 Billion Tonnes of Coal for

More information

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT ASX ANNOUNCEMENT November 10, 2010 Highlights: VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT Coal Resource on the flagship Vista Coal Project increases by 297.1Mt

More information

For personal use only

For personal use only ASX RELEASE 4 May 2012 Injune Thermal Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Injune Thermal Coal Project with the following JORC classification: A total Resource

More information

Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition)

Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition) DINGO (PEARL CREEK) PROJECT JORC RESOURCE Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition) The following table provides a summary of important assessment and reporting

More information

African Energy Resources Limited

African Energy Resources Limited 27 July 2010 Manager Announcements Company Announcements Office Australian Stock Exchange Limited 10th Floor, 20 Bond Street SYDNEY NSW 2000 Dear Sir/Madam, Via electronic lodgement FURTHER COAL INTERSECTIONS

More information

For personal use only

For personal use only ASX RELEASE 3 May 2012 For personal use only Wilpeena PCI Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Wilpeena PCI Coal Project with the following JORC classification:

More information

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA T +61 7 3312 6299 E info@cokal.com.au Level 10, 110 Mary Street, Brisbane QLD 4000 PO Box 7122, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT 30 September 2016 COKAL

More information

For personal use only

For personal use only ASX RELEASE 15 March 2013 CELSIUS ESTABLISHES MAIDEN 255 MILLION TONNES JORC RESOURCE AT UZGEN BASIN COKING COAL PROJECT HIGHLIGHTS Maiden total Inferred JORC Code Resource of 255 million tonnes of coal

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

For personal use only

For personal use only ASX announcement 1 July 2015 Stanmore acquires the Wotonga coking coal deposit in the Bowen Basin Highlights Stanmore has acquired the Wotonga coking coal deposit contained within Mineral Development Licence

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

For personal use only

For personal use only ASX Announcement Monday, 5 December 2011 ASX Code: MOU MODUN ANNOUNCES 489 MILLION TONNE MAIDEN JORC REPORTABLE COAL RESOURCE AT NUURST PROJECT IN MONGOLIA Highlights: Maiden JORC Reportable Coal Resource

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

JORC COAL RESOURCE MILESTONE

JORC COAL RESOURCE MILESTONE QUEENSLAND UPDATE GUILDFORD EXCEEDS 2PROJECTS BILLION TONNE JORC COAL RESOURCE MILESTONE 5th March 2012 ASX: GUF SHARE INFORMATION Issued Shares: 439.6m Listed Options: N/A Unlisted Options: N/A BOARD

More information

For personal use only

For personal use only ENERGY to GROW Second project expands South Pentland by more than 50% to 3.6 5.0 Bt thermal coal JORC Exploration Target October 8, 2012 ASX: BWD Level 8 102 Adelaide Street Brisbane, QLD, 4000 T: +61

More information

COKAL CONFIRMS PREMIUM QUALITY METALLURGICAL COAL AT BUMI BARITO MINERAL PROJECT (BBM)

COKAL CONFIRMS PREMIUM QUALITY METALLURGICAL COAL AT BUMI BARITO MINERAL PROJECT (BBM) T +61 7 3001 4100 E info@cokal.com.au Level 34, Riverside Centre, 123 Eagle Street, Brisbane QLD 4000 PO Box 7122, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) w w w.cokal.co m.au ASX ANNOUNCEMENT/MEDIA

More information

LOCHINVAR COKING COAL PROJECT. LOI-001 Raw Coal Analysis ASX RELEASE. 18 February 2013 ASX RELEASE. 11 April 2013

LOCHINVAR COKING COAL PROJECT. LOI-001 Raw Coal Analysis ASX RELEASE. 18 February 2013 ASX RELEASE. 11 April 2013 LOCHINVAR COKING COAL PROJECT Exploration Target - 330 Mt 410 Mt high volatile coking coal - 13 historic drill holes and 100km of seismic lines Drilling Program - Phase 1a drill program underway - 6 drill

More information

For personal use only

For personal use only COMPANY ANNOUNCEMENT Coal exploration permit granted and target of up to 155 million tonnes identified Highlights EPC 1992 ( the Etona Coal Project ) has now been granted Independent Geological sign-off

More information

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, 20 June 2008 Companies Announcement Office Via Electronic Lodgement GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, Fiji. (Geopacific

More information

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI January 12, 2005 IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland and President John

More information

For personal use only

For personal use only Southern Cross Goldfields Ltd is an Australian exploration company offering investors a compelling combination of near term cash flow and outstanding exploration potential. The Company has a dominant 4,000km

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

For personal use only

For personal use only 6 February 2012 Australian Securities Exchange Exchange Centre 20 Bridge Street Sydney NSW 2000 SIGNIFICANT MAIDEN JORC COMPLIANT RESOURCE FOR EUCLA WEST MINERAL SANDS PROJECT Forge Resources Ltd (ASX:FRG,

More information

For personal use only

For personal use only 30 July 2015 ASX ANNOUNCEMENT Grant of Mineral Development License (MDL) 3002 and positive Coal Quality Results for Springsure Project (EPC 1674) Guildford Coal Limited (Guildford or the Company) (ASX:

More information

KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE

KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE ABN 61 119 966 353 17 June 2008 ASX RELEASE KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE Northern Uranium Limited (ASX: NTU) will immediately commence an investigation of phosphate potential at its Kurundi

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

Annual Report Amended Additional Information

Annual Report Amended Additional Information ASX Announcement 13 October 2017 Annual Report Amended Additional Information ASX Code: VKA Viking Mines Ltd (Viking or the Company) hereby releases amended commentary to relevant sections of its annual

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS Perth Office 512 Hay Street Subiaco, WA, 6008 T: +61 8 9381 4534 F: +61 8 9380 6440 E: admin@ascotresources.com W: www.ascotresources.com ASX ANNOUNCEMENT 4 June 2013 The Manager Company Announcements

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights ASX Release EXPLORATION UPDATE Highlights Bonsiega Joint Venture tenements minimum expenditure commitment met by 30 November 2010 Commencement of power auger bedrock drilling program at Fouli Prospect

More information

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia ASX Announcement ASX Code: DYL 29 October 2010 Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia HIGHLIGHTS Deep Yellow received a Mineral Resource estimate for the INCA uranium

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

For personal use only

For personal use only 10 th September 2014 The Manager Companies ASX Limited 20 Bridge Street Sydney, NSW, 2000 Dear Madam JORC Upgrades at South Pentland Project to 445Mt Cockatoo Coal Limited ( Cockatoo ) is pleased to announce

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence

More information

For personal use only

For personal use only ASX Release 25 October 2012 SIGNIFICANT COAL INTERSECTED IN DRILLING AT GROUNDHOG HIGHLIGHTS DDH-GH-12-11 intersected 36.0m and DDH-GH-12-09 intersected 30.4m of cumulative coal in multiple seams between

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

Helix Resources Limited A.C.N Incorporated in Western Australia

Helix Resources Limited A.C.N Incorporated in Western Australia Helix Resources Limited A.C.N. 009 138 738 Incorporated in Western Australia 3 rd June 2008 Australian Stock Exchange Limited Via Electronic Lodgement Dear Sirs INITIAL INFERRED RESOURCE ESTIMATE OF 112

More information

For personal use only

For personal use only 18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity

More information

Wongai Project Presentation

Wongai Project Presentation Wongai Project Presentation 16 September, 2014 Geos Mining Limited Andrew Todd, Coal Resource Specialist (JORC competent) 7 years: 8 years: coal resource geologist - New Zealand and Indonesia; coal quality

More information

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MARKET UPDATE ON URANIUM AND GOLD PROJECTS ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence

More information

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT ASX ANNOUNCEMENT 1 April 2015 UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT Attached for shareholders information, is an announcement made to the market by Apollo Minerals Limited (ASX:

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT ASX/MEDIA RELEASE 25 November 2009 ASX Codes: EMG, EMGO EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT Beyondie now comprises; Inferred Mineral Resource

More information

Gold Exploration Update

Gold Exploration Update ASX Announcement 26 October 2009 Gold Exploration Update The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to provide the following update on the Rannes and Clermont gold exploration

More information

Increased equity in prospective metallurgical coal projects (BBM & BBP) to 60%

Increased equity in prospective metallurgical coal projects (BBM & BBP) to 60% T +61 7 3112 2662 E info@cokal.com.au Level 18, 123 Eagle Street, Riverside Centre, Brisbane QLD 4000 GPO Box 7122, Riverside Centre, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au 28

More information

Fox Resources Coking Coal Exploration Program commences at Bundaberg EPC 1523 early May 2013

Fox Resources Coking Coal Exploration Program commences at Bundaberg EPC 1523 early May 2013 ABN 44 079 902 499 22 April 2013 ASX / Media Announcement FOX RESOURCES LTD ASX: FXR ABN: 49 079 902 499 Street Address: Level 1, 9 Bowman St South Perth 6151 Western Australia Postal Address: PO BOX 480,

More information

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON PRINCIPAL OFFICE Level 2, 25 Richardson Street, West Perth WA 6005 PO Box 92, West Perth WA 6872 T +61 8 9485 2600 F +61 8 9485 2500 www.mindax.com.au ABN 28 106 866 442 Statement to ASX Limited 31 March

More information

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

For personal use only

For personal use only About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold: Key Projects Gold Mt Clement (WA) Yandal (WA) Rare Metals Yangibana (WA) Buchanan's Creek (QLD)

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 26 April 2016 QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDING 31 March 2016 ASX: NXM Capital Structure Shares on Issue 70.4 million First Earn-in milestone completed in the Pinnacles JV

More information

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE ASX ANNOUNCEMENT 10 FEBRUARY 2015 APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE HIGHLIGHTS 2014 Exploration 2015 Plans Project 1: Eaglehawk IOCG & TiO 2-Phosphate o Confirmed IOCG age geology, alteration

More information

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent* Resource upgrade at Greater Whitewash Project to 242mt @ 604 Moly Equivalent* 240% increase in tonnage Date: Monday 30 May, 2011 ASX: AQR Share Price: $0.40 Shares on issue: 145,022,440 Market Capitalisation:

More information

For personal use only

For personal use only ASX Announcement 23 May 2014 DORAY FARMS IN TO EXCITING NEW GOLD PROJECT Doray to explore highly prospective Horse Well Gold Project in north-eastern Goldfields through Joint Venture with Alloy Resources

More information

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com

More information

For personal use only

For personal use only 29 March 2011 ASSAYS CONFIRM COKING COAL AT BERENICE The Board of Directors of Universal Coal plc ("Universal Coal" or Company ) is pleased to provide an update on its Coking Coal Projects: The first phase

More information

For personal use only

For personal use only ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

2018 Drilling Underway at Juruena Gold Project

2018 Drilling Underway at Juruena Gold Project 2018 Drilling Underway at Juruena Gold Project Crusader Resources (ASX:CAS) ( Crusader ) is pleased to announce the commencement of its initial 2018 exploration program over its highly prospective and

More information

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011 4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

For personal use only

For personal use only PACIFIC AMERICAN COAL LIMITED (Formerly Metals Finance Limited) MAIDEN 257.5 MILLION TONNES JORC RESOURCE CONFIRMS COKING COAL QUALITY AT ELKO, BRITISH COLUMBIA Initial exploration confirms 257.5 million

More information

For personal use only

For personal use only 29 July 2011 ASX RELEASE ACN 008 901 380 ABN 35 008 901 380 Level 1 460 Roberts Road Subiaco, Western Australia 6008 P.O. Box 66 Floreat Forum WA 6014 Email:wally@stratmin.com.au Website: www.stratmin.com.au

More information

DECEMBER QUARTERLY REPORT

DECEMBER QUARTERLY REPORT DECEMBER QUARTERLY REPORT Resource Mining Corporation Limited ( RMC ) For the period ended 31 st December 2011 HIGHLIGHTS: Resource Mining Corporation Limited ABN: 97 008 045 083 Updated Mineral Resource

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

For personal use only

For personal use only 30 May 2012 Potential 500 to 800 million tonne magnetite target zone( * see note below) identified from geophysical data modelling of HELITEM survey at Gabanintha. ASX [YRR]. Web page: www.yellowrock.com.au

More information

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes

More information

For personal use only

For personal use only CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265

Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265 Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265 Principal Author: Ian Blayden PhD, MBA, BSc, MAusIMM, MMICA, MAIG, MGSA Principal Reviewer: Christine Standing BSc Hons, MAusIMM,

More information

For personal use only

For personal use only About Convergent ASX Code: CVG CVG owns 100% of the Bounty Goldfield in Western Australia with 872,000 ounces of gold Our Aim CVG s key objective is to define high grade gold and to recommence gold production

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

For personal use only

For personal use only 22 May 2012 Thick, high-grade copper intersection from First Extension Hole Assays at A-Zone, reaffirming the growth potential of the Viscaria Project Highlights Drill hole VDD0125 intersects 18.6m @ 1%

More information