For personal use only

Size: px
Start display at page:

Download "For personal use only"

Transcription

1 18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity and grades of the intermediate depth mineralised targets LME TIN PRICE (16/04/13) US$21,270 / T (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE COMPANY IS ADVANCING THE ACHMMACH TIN PROJECT IN THE KINGDOM OF MOROCCO TOWARDS PRODUCTION. Best drilling results from 3130mE include: 0.69% Sn from 209.6m (including 1.59% Sn from 224m) Best drilling results from 3170mE include: 1.93% Sn from 261m (including 2.80% Sn from 261m) 1.00% Sn from 280m (including 2.47% Sn from 284m) (AD204) (AD203) (AD208) PROJECTS ACHMMACH TIN PROJECT BOU EL JAJ TIN PROJECT Best drilling results from 3290mE include: 1.30% Sn from 287m (including 2.22% Sn from 292m) (AD219) CAPITAL STRUCTURE SHARES ON ISSUE: 396M UNLISTED OPTIONS: 23.4M 31/12/12: $19.1M MAJOR SHAREHOLDERS WORLD BANK (IFC) 15.8% AFRICAN LION GROUP 15.1% TRANSAMINE 3.3% TRAXYS 3.3% MGMT & DIRECTORS 3.1% THAISARCO 2.0% CONTACT US : : info@kasbahresources.com : The current drilling at Achmmach will be complete in Quarter 2 and is aimed at: increasing the Measured component of the resource and the total resource tonnage; further defining the high-grade core of the deposit; and defining the extent of the Eastern Zone Shallow (EZS) target. Next Achmmach resource update expected in Quarter Definitive Feasibility Study (DFS) is on schedule for completion in Quarter

2 OVERVIEW Kasbah Resources Limited ( Kasbah, ASX:KAS) is pleased to report the continuation of high grade tin mineralisation from its 40m spaced in-fill drilling program at the Achmmach Tin Project in Morocco. Sections 3130mE, 3170mE and 3290mE have continued to demonstrate the general continuity and predicted grades of the mineralised targets within the March 2013 Resource model (refer Figure 1). DRILLING OBJECTIVE The Meknes Trend within the Achmmach hill has an interpreted strike length of approximately 2km and has been the prime focus of Kasbah s drilling to date. Approximately 1.6km of the Meknes Trend was modelled in the March 2013 Mineral Resource Estimate (refer Table 1) and this estimate utilised predominantly 40m spaced drill sections and three 20m spaced sections. Table 1 Achmmach Tin Project - March 2013 Mineral Resource Estimate (undiluted 0.5% Sn cut off grade) Category M Tonnes Sn % Contained Tin (k tonnes) Measured Indicated Inferred Total The objectives of the resource development drilling program currently underway is to: increase the Measured component of the resource and the total resource tonnage 1 ; further define the high-grade core of the deposit; and define the extent of the EZS target. This drilling program will be complete in Quarter 2, 2013 and a new resource update is expected in Quarter 3, The Quarter 3 resource update will incorporate all the drilling completed across the shallow and deeper targets within the Meknes Trend at Achmmach and underpin the definitive feasibility study ( DFS ) that is currently underway. This DFS will be the basis for a project financing decision for the Achmmach Tin Project and the DFS is scheduled for completion in Quarter 4, Kasbah notes that until the results of the drilling program are returned, the Mineral Resource classification upgrade cannot be guaranteed. 2

3 MARCH 2013 RESOURCE MODEL The 2013 Achmmach Resource model (refer Figure 1) interprets the Meknes Trend of the Achmmach deposit as being defined by several broadly NNE-WSW striking sub-vertical mineralised structures. These sub-vertical structures ( the feeders ) are the presumed conduits for the granite emanated fluids which carry tin mineralisation. As these fluids have come towards the surface they have produced a tourmaline alteration halo within the deposit and have deposited tin mineralisation in favourable trap sites that pervade up and down dip from the feeders ( the branches ). Figure 1: 3D view of Achmmach 2013 Resource model (vertical feeder structures in purple and permeating tourmaline-tin branches in orange) Eight feeders have been modelled in the Achmmach 2013 Resource with more than 50 branching tourmaline-tin envelopes being identified (the naming convention uses the code TZ (tourmaline zone) followed by two figures defining the coordinates of the centroid of the envelope in local grid Easting and RL.) KEY POINTS 3130mE, 3170mE & 3290mE Sections 3130mE, 3170mE and 3290mE are the ninth; tenth and thirteenth 40m spaced drill sections in the Eastern Zone area of the Meknes Trend (refer Figures 2 and 3). Diamond drilling on those sections tested Inferred Resources where the grade, widths and spatial location of interpreted structures were approximate and of lower confidence compared to other resource categories. 3

4 For personal use only Meknes Trend Figure 2: Achmmach Drill Plan within the Meknes Trend Figure 3: Perspective WSW looking view of the 2013 Geological Model (purple shapes represent feeder corridors; orange shapes are branching tourmaline envelopes associated with tin grade) Sections 3130mE, 3170mE and 3290mE shown in green, coordinates in local grid. 4

5 Section 3130mE was tested with AD197; AD204 and AD205 for a total of 1,222.7m (refer Figure 4). Section 3170mE includes AD190; AD203 and AD208 for a total of 1,284.5m (refer Figure 5) while section 3290mE was assessed with AD211; AD215 and AD219 for a total of 1,624.5m (refer Figure 6). Sections 3130mE and 3170mE are within the Eastern Zone of the Meknes Trend with Section 3290mE being the easternmost 40m infill completed section included in the March 2013 Resource model. On these sections the 2013 Resource block model predicted moderate tin grades in 3 branches (TZ_3090_980 at the 970RL; TZ_3150_880 at the 880RL and TZ_3010_820 at the 840RL) and low to moderated grade tin values in three other stacked tourmaline envelopes below the 800RL. On 3290mE the 2013 Resource Model predicted 7 narrow tourmaline envelopes branching southwards up dip from Feeder_8 with moderate grades concentrated in TZ_3010_820 and TZ_3250_800 around the RL. Broad low grade mineralisation was modelled across the wide mafic intrusive in the deeper parts of the section below the 770RL. Drilling on 3130mE and 3170mE has confirmed the general continuity of the mineralised envelopes between sections 3090mE and 3210mE. Grades above the cut-off applied in the PFS were encountered in two tourmaline zones around the 900RL and the 830RL. Section 3290mE (which in-fills the area within 100m of the limit of the 2013 Resource model) returned moderate, above cut off grades from two tourmaline zones at the 790RL to 850RL. On section 3130mE some moderate grade mineralisation was encountered at approximately 120m vertical depth from surface. This zone is possibly a satellite of the Eastern Shallow mineralisation ( ESZ ) whose continuity on section is currently being tested with a separate shallow drill program. At intermediate vertical depths ( m) the 2013 Resource model has moderate grades interpolated in two zones of tourmaline alteration (TZ_3150_880 and TZ_3010_820) carried by relatively continuous North dipping structures carrying quartz-cassiterite veins. On section 3170mE similar grades and thicknesses were encountered in the TZ_3090_980 envelope. TZ_3150_880 also sustained grades and augmented thickness around 900RL while TZ_3010_820 contained high grade mineralisation in the up dip portions that correlates well with previous drilling to the East 1.66% Sn from 257m in AD014 on section 3210mE). The deeper tourmaline envelopes below 800RL were also consistently mineralised at grades around the 0.5% Sn cut off. Section 3290mE delivered moderate grade intervals from two tourmaline zones TZ_3010_820 and TZ_3250_800. Broad moderate to low grade intervals also occur in the extensive mafic intrusive in the deepest parts of this section. 5

6 Figure 4: Cross Section 3130mE Figure 5: Cross Section 3170mE 6

7 Figure 6: Cross Section 3290mE Best drilling results from recent drilling into the Eastern zone on section 3130mE include: AD197: 0.50% Sn from 152.0m; 2.22% Sn from 270.0m; and 0.71% Sn from 383.2m. AD204: 0.81% Sn from 111.0m; 0.69% Sn from 209.6m (including 1.59% Sn from 224.0m); and 0.92% Sn from 274.8m. AD205: 2.01% Sn from 312.0m; 0.77% Sn from 319.0m; 7

8 Best results from on section 3170mE include: AD190: 2.94% Sn from 259.0m AD203: 0.88% Sn from 236.0m; 1.93% Sn from 261.0m (including 2.80% Sn from 261.0m); 1.10% Sn from 353.0m; and 0.49% Sn from 391.0m. AD208: 1.37% Sn from 195.0m; 0.56% Sn from 227.0m; and 1.00% Sn from 280.0m (including 2.47% Sn from 284.0m). Best results from on section 3290mE include: AD211: 0.75% Sn from 291.0m; and 0.52% Sn from 444.0m (including 1.31% Sn from 456.0m). AD215: 0.77% Sn from 308.0m; and 0.69% Sn from 344.0m. AD219: 1.30% Sn from 287.0m (including 2.22% Sn from 292.0m); 0.56% Sn from 305.0m; 0.58% Sn from 328.0m; and 0.71% Sn from 470.0m. 8

9 LOOKING FORWARD The current drilling at Achmmach is aimed at: 1. Increasing the Measured component of the resource and the total resource tonnage; 2. further defining the high-grade core of the deposit; and 3. defining the extent of the EZS target. Five diamond rigs continue with the ongoing resource development program and are focused on: 20m spaced in-fill drill sections (between 2270mE and 2670mE); 40m spaced in-fill and extensional drilling across the Eastern Zone (on sections 3330mE to 3370mE); and close spaced drilling of the Eastern Zone Shallow ( EZS ) mineralisation centred on 3050mE. All in-fill and extensional drilling across Achmmach will be complete in Quarter 2, 2013 and a further resource update for Achmmach is expected to be reported in Quarter 3, The DFS remains on track for completion in Quarter 4, Wayne Bramwell Managing Director For further information please visit: Or info@kasbahresources.com ABOUT KASBAH Kasbah Resources Limited ( Kasbah, ASX: KAS) is rapidly advancing its 100% owned Achmmach Tin Project located in the Kingdom of Morocco. The definitive feasibility study ( DFS ) into the development of a 1Mtpa underground mine, concentrator and associated infrastructure is due for completion in Q4 2013, and Kasbah is targeting first tin production in Toyota Tsusho Corporation ( TTC ) of Japan is Kasbah s development partner in Achmmach. TTC has a right to acquire a 20% interest in the Achmmach Tin Project, having earned a nominal interest of 18.8% to date by paying $16 million in cash to Kasbah in TTC is required to make a final payment to Kasbah within 90 days of completion of the DFS to earn its 20% interest. 9

10 COMPETENT PERSONS STATEMENTS The information in this announcement is based on information compiled by Mr Jeffrey Lindhorst, a Member of the Australasian Institute of Geoscientists (AIG). Mr Lindhorst is a full-time employee of Kasbah Resources Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Lindhorst consents to the inclusion in this report of the matters based on this information in the form and context in which it appears. The information in this announcement that relates to Kasbah Resources Limited s March 2013 Mineral Resource estimate for the Achmmach Tin Project is based on information compiled by Michael Job, who is a full time employee of Quantitative Group Pty Ltd. and a Fellow of the Australasian Institute of Mining and Metallurgy. Michael Job has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a 'Competent Person' as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral resources and Ore Reserves (JORC Code). Michael Job verifies that this Report is based on and fairly and accurately reflects in the form and context in which it appears, the information in the supporting documentation relating to Mineral Resources. 10

11 APPENDIX A: Significant Intersections A Hole ID Section ID Collar UTM 30N WGS84 N Collar UTM 30N WGS84 E From (m) To (m) Down-hole interval (m) Tin Grade B Sn % AD mE AD mE incl AD mE AD mE AD mE incl AD mE incl AD mE incl AD mE AD mE incl A Significant intersections >100m below natural surface selection criteria: 0.5% Sn and 5m down-hole and 3m down-hole < 0.5% Sn included; or 0.5% Sn and 2.5 %Tin-metres metal accumulation down-hole and 3m down-hole consecutive < 0.5% Sn included. B grades adjusted for recovery. 11

12 APPENDIX B: Drill-Hole Collar Details Hole ID Collar UTM 30N WGS84 N Collar UTM 30N WGS84 E RL (m) Azimuth TRUE Dip Depth AD AD AD AD AD AD AD AD AD APPENDIX C: Assay Data Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD AD

13 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD

14 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD AD

15 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD

16 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% B grades adjusted for recovery 16

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

HIGH-GRADE TIN ZONES AT ACHMMACH CONFIRMED. 19 June 2013 ASX RELEASE ASX CODE: KAS HIGHLIGHTS OUR PRIME COMMODITY IS TIN

HIGH-GRADE TIN ZONES AT ACHMMACH CONFIRMED. 19 June 2013 ASX RELEASE ASX CODE: KAS HIGHLIGHTS OUR PRIME COMMODITY IS TIN HIGH-GRADE TIN ZONES 19 June 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (17/06/13) US$20,295 / T (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT 2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter

More information

New High Grade Lode Discovered at Wagtail South

New High Grade Lode Discovered at Wagtail South 23 April 2013 ASX Announcement New High Grade Lode Discovered at Wagtail South Bulletin Resources Limited (ASX: BNR) is pleased to announce the receipt of further assay results from the 5,000 metre reverse

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

Diamond Drilling Extends the Netiana Lodes at Depth

Diamond Drilling Extends the Netiana Lodes at Depth ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011 4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com

More information

For personal use only

For personal use only 22 May 2012 Thick, high-grade copper intersection from First Extension Hole Assays at A-Zone, reaffirming the growth potential of the Viscaria Project Highlights Drill hole VDD0125 intersects 18.6m @ 1%

More information

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE 29 August 2011 CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE Outstanding drill results extend scope of Mining Study for Jambreiro Iron Ore Project,

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited Snapshot: Current CSD Share Price: $0.060 Current LME Tin Price: $22,950 Key Points Detailed information at www.csdtin.com.au Additional Tin Resource Acquired at Jeannie River Additional 13,440 tonne tin

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

For personal use only

For personal use only ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces ASX / Media Release ASX Code AZM Friday 10 th September 2010 More growth at Wa Project as Julie-Collette resource increases to 410,700 ounces Further rise expected www.azumahresources.com.au Investment

More information

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate 29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia

More information

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) ASX/MEDIA RELEASE 27 November 2008 Highlights Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) Indicated and Inferred resources total 970,000 ounces at 1.9 using 1 cut-off (15.7 million

More information

Developing the +1.2Moz Pilbara Gold Project

Developing the +1.2Moz Pilbara Gold Project Developing the +1.2Moz Pilbara Gold Project ASX Announcement 20 November 2017 ASX Code DEG FRA Code WKN 633879 Resource infill and extension drilling has commenced at the Toweranna Prospect ABN 65 094

More information

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso ASX/Media Announcement 18 January 2013 Further Extensions to the Netiana Lodes at Balogo, Burkina Faso All assays from the recent diamond and reverse circulation drilling have been received. New intersections

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

Exploration targets identified to increase Browns Range Project s mine life

Exploration targets identified to increase Browns Range Project s mine life Exploration targets identified to increase Browns Range Project s mine life Highlights Exploration Target estimate demonstrates the potential for very significant increases in Total Mineral Resource at

More information

High-grade Copper and Gold Discovered at Productora

High-grade Copper and Gold Discovered at Productora ASX ANNOUNCEMENT Tuesday 25th September 2012 High-grade Copper and Gold Discovered at Productora Potential for High-grade Copper-Gold Shoots to Add New Dimension to Productora High-grade copper-gold discovered

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

Ovoot Coking Coal Project (100%)

Ovoot Coking Coal Project (100%) NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

For personal use only Heemskirk Tin Project - Tasmania

For personal use only Heemskirk Tin Project - Tasmania Heemskirk Tin Project - Tasmania CEO Peter Blight International Tin Conference 24-25 April 2012 Focused on Tin Rapidly advancing Heemskirk Tin near Zeehan, Tasmania single commodity - single project focus

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

For personal use only

For personal use only FeOre Limited 62/F, Thee Center 99 Queens Road Central Hong Kong Tel: +8522 3960 6518 www.feore.com ASX ANNOUNCEMENT 14 th February 2013 UPDATED MINERAL RESOURCE ESTIMATE FeOre Limited (ASX: FEO) is pleased

More information

New Zone of High Grade Gold Discovered at Balogo

New Zone of High Grade Gold Discovered at Balogo ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.

More information

For personal use only

For personal use only Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000 COMMENCEMENT OF DRILLING, PILOT MOUNTAIN - NEVADA The Board of Thor Mining Plc ( Thor or the Company ) (AIM,

More information

ASX and Media Release

ASX and Media Release ASX and Media Release Outstanding walk-up drill targets identified at Tarcoola Highlights High priority mineralised zones identified under existing high-grade Tarcoola open pit which are open along strike

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is

More information

For personal use only

For personal use only ASX Announcement Moorlands Project Concept Mining Study Update Concept Mining Study confirms the proposed South Pit as initial mining focus at the Moorlands Project with: Strip ratios of 2 to 4 bcm/tonne,

More information

For personal use only

For personal use only 12 November 2014 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (10/11/14) US$20,000/t (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia ASX Announcement ASX Code: DYL 29 October 2010 Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia HIGHLIGHTS Deep Yellow received a Mineral Resource estimate for the INCA uranium

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

SUMBA EXPLORATION UPDATE

SUMBA EXPLORATION UPDATE ASX RELEASE Tuesday, 23 November 2010 SUMBA EXPLORATION UPDATE Hillgrove Resources Limited (ASX:HGO) today announces a planned airborne geophysical survey, Pelitalira prospect progress and final results

More information

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6

More information

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes ASX ANNOUNCEMENT/MEDIA RELEASE 7 January 2019 Drill testing of gold zones at Albury Heath intersect impressive quartz lodes Focused drill testing of bonanza grade gold at Albury Heath completed Seven holes

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND MEDIA RELEASE 30 October 2018 OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND (MELBOURNE) OceanaGold Corporation (TSX: OGC) (ASX: OGC) (the Company ) is pleased to announce

More information

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam ASX / Media Release 12 June 2012 Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam HIGHLIGHTS A diamond drilling program will begin this week on the Me Xi Prospect, within the Quang Tri

More information

ASX/Media Announcement 14 July 2010

ASX/Media Announcement 14 July 2010 ASX/Media Announcement 14 July 2010 HIGH-GRADE DRILL RESULTS FROM ANDY WELL EXTEND WILBER LODE Diamond drilling at Andy Well intersects visible gold in quartz lodes below MNRC006, extending the depth of

More information

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling Resource Diamond Drilling Commences at Productora Strong results continue from Productora central area drilling Resource diamond drilling commences at Productora 5 drill rigs to be operating shortly Productora

More information

Additional significant gold and copper intercepts obtained in Sweden

Additional significant gold and copper intercepts obtained in Sweden 18 November 2009 Additional significant gold and copper intercepts obtained in Sweden Drake Resources (ASX: DRK, Drake ) is pleased to announce that additional significant assays for the drilling programme

More information

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE 27 th October 2008 EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE Atlas Iron Limited (ASX Code: AGO) is pleased to announce a number of high grade results from the first drilling programme completed at

More information

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION 27 October 2009 FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION Drake Resources (ASX: DRK, Drake ) is pleased to announce that the first assays for the drilling programme at Falun,

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,

More information

SESE MEASURED RESOURCE EXCEEDS 650MT COAL

SESE MEASURED RESOURCE EXCEEDS 650MT COAL For electronic distribution 15 th August 2012 SESE MEASURED RESOURCE EXCEEDS 650MT COAL Highlights: Initial Measured Resource at Sese calculated at 651Mt coal. Sese Coal & Power Project: Resource Summary

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

For personal use only

For personal use only (ASX:HLX) is a minerals exploration company focused on identification, acquisition and Canbelego Drilling Extends Mineralisation at Depth Assay results from the recent RC/Diamond drilling at the Canbelego

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

ASX Announcement. Bulletin grows resource base and tenement position

ASX Announcement. Bulletin grows resource base and tenement position Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m

More information

» Mineralisation up to 45m wide and open along strike and down dip. Infill and extensional drilling completed. Results awaited.

» Mineralisation up to 45m wide and open along strike and down dip. Infill and extensional drilling completed. Results awaited. 11th April 2011 March December 2011 Quarterly Quarterly Report Report 2008 Highlights Significant New Gold Discovery along Kandia Trend» RC drilling has confirmed persistent bedrock gold mineralisation

More information

For personal use only

For personal use only For personal use only AGM Presentation 2 November 2016 Greg Solomon Chairman 3 Investment in Eden Energy Ltd (ASX:EDE) Tasman holds 493 million shares (42%) in the issued capital of Eden and 101 million

More information

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

ROE HILLS COBALT AND GOLD DRILLING ADVANCES ASX ANNOUNCEMENT 22 June 2017 ROE HILLS COBALT AND GOLD DRILLING ADVANCES Aircore drilling completed to test ROE-1 cobalt prospect with assays awaited; RC drilling now underway targeting three high-priority

More information

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME ASX ANNOUNCEMENT 28 March 2013 FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME Focus Minerals Ltd. (ASX: FML) is pleased to announce the first round of results

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

******************* *******************

******************* ******************* This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN

More information

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR. DISCOVERY OF LARGE TONNAG E-POTENTIAL MAGNETITE MINERALISA TION FROM HAWSONS IRON PROJECT DRI LLING HIGHLIGHTS Excellent Davis Tube Recovery (DTR) concentrate chemistry reported in drill samples average

More information

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE ASX/Media Announcement 20 th September 2010 MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE MT DOROTHY: Phase 2 diamond drilling to commence. ELAINE DOROTHY New copper zone discovered and to be drilled.

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

For personal use only

For personal use only 22 April 2013 Drilling to commence at Majada, Copper-Gold Prospect, Chile. Red Gum Resources Limited (ASX: RGX, Red Gum or the Company ) is pleased to announce that drilling of its Majada Copper-Gold Prospect,

More information

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT ASX/MEDIA RELEASE 25 November 2009 ASX Codes: EMG, EMGO EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT Beyondie now comprises; Inferred Mineral Resource

More information

KAS KASBAH INTERSECTS HIGH GRADE TIN AT ACHMMACH. 18 August % Sn from 39.5m (WZGTD002) HIGHLIGHTS ASX RELEASE ASX CODE: KAS

KAS KASBAH INTERSECTS HIGH GRADE TIN AT ACHMMACH. 18 August % Sn from 39.5m (WZGTD002) HIGHLIGHTS ASX RELEASE ASX CODE: KAS 18 August 2014 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (15/08/14) US$22,375 / T (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE

More information

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT

More information

For personal use only

For personal use only NOWA NOWA RESOURCE UPGRADE ASX Code: EFE ASX Code: EFE Issued Capital: Issued Capital: 91,835,926 Share Price at Market Capitalisation at Directors Cash Glenn on Goodacre hand at Greg De Ross Directors

More information

For personal use only

For personal use only 21 December 2017 MASSIVE SULPHIDES INTERSECTED IN DRILLING 15 hole, 2270m diamond drill program completed at Midrim Thick zones of massive sulphides intersected Core being logged and sampled with assays

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide 9 th July 2008 Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide Castle Minerals Limited (ASX:CDT) is pleased to advise that further sampling at its Wa project has confirmed

More information