The Yellow River Initiative: The Birth of a System Approach to Challenges Facing the Everglades of the North

Similar documents
Fluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades?

Bank Erosion and Morphology of the Kaskaskia River

Use of Space-for-Time Substitution in River Restoration: examples from SE England

Overview of fluvial and geotechnical processes for TMDL assessment

Nutrient and Sediment Cycling and Retention in Urban Floodplain Wetlands

Squaw Creek. General Information

Kaskaskia Morphology Study Headwaters to Lake Shelbyville

May 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences

Illinois State Water Survey Division

Working with Natural Stream Systems

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

HEC-6 Modeling of the Main Stem of the Kankakee River in Illinois from the Stateline Bridge to the Kankakee Dam

Sediment and nutrient transport and storage along the urban stream corridor

Measuring Streambank Erosion Bank Profiles to more Robustly Estimate Recession Rates and Calibration of the AnnAGNPS-CEAP Model

Why Geomorphology for Fish Passage

!"#$%&&'()*+#$%(,-./0*)%(!

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

Big Wood River. General Information

low turbidity high turbidity

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

River Restoration and Rehabilitation. Pierre Y. Julien

Application of an Enhanced, Fine-Scale SWAT Model to Target Land Management Practices for Maximizing Pollutant Reduction and Conservation Benefits

Restoring the Napa River:

REDWOOD VALLEY SUBAREA

Watershed concepts for community environmental planning

SECTION G SEDIMENT BUDGET

Technical Memorandum No Sediment Model

Roger Andy Gaines, Research Civil Engineer, PhD, P.E.

Factors influencing nutrient and sediment retention by riverine wetlands in the Chesapeake watershed Greg Noe, Cliff Hupp, Ed Schenk, Nancy Rybicki

Tom Ballestero University of New Hampshire. 1 May 2013

Vermont Stream Geomorphic Assessment. Appendix E. River Corridor Delineation Process. VT Agency of Natural Resources. April, E0 - April, 2004

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

UPPER COSUMNES RIVER FLOOD MAPPING

Ways To Identify Background Verses Accelerated Erosion

Remaining Capacity in Great Lakes Reservoirs

Assessment. Assessment

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

New Approaches to Restoring NH s Rivers Natural Channel Design and Dam Removal

Birch Creek Geomorphic Assessment and Action Plan

Why Stabilizing the Stream As-Is is Not Enough

Mapping Watershed-scale Streambank Erosion Using EPA- BANCS for Determining TMDLs

Solutions to Flooding on Pescadero Creek Road

SEDIMENT BENEFICIAL USE SUPPORT ASSESSMENT FOR OTTER CREEK

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Great Lakes Tributary Modeling: Canaseraga Creek Watershed

NORTHUMBERLAND COUNTY, PA

Mississippi River West Bay Diversion Geomorphic Assessment and 1-D Modeling Plan

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis

Fluvial Driven Alluvial Fans

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

5/4/2017 Fountain Creek. Gage Analysis. Homework 6. Clifton, Cundiff, Pour, Queen, and Zey CIVE 717

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

Mississippi River and Tributaries Project Mississippi River Geomorphology and Potamology Program

Kootenai River Habitat Restoration Program Update

Introduction Fluvial Processes in Small Southeastern Watersheds

CASE STUDIES. Introduction

Chris Lenhart, John Nieber, Ann Lewandowski, Jason Ulrich TOOLS AND STRATEGIES FOR REDUCING CHANNEL EROSION IN MINNESOTA

STREAM SEDIMENT MONITORING PROGRAM FOR ILLINOIS. Nani G. Bhowmik and J. Rodger Adams

Sediment Transport Model of the San Benito River Between Hollister and the Pajaro River Confluence

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Restoring Entrenched Rivers: lessons learned from the

River Model (Delft3D)

River Morphology. EAD 511 River management

Griswold Creek August 22, 2013

Dolores River Watershed Study

Session C1 - Applying the Stream Functions Pyramid to Geomorphic Assessments and Restoration Design

Rosgen Classification Unnamed Creek South of Dunka Road

Impacts of Upstream Disturbances on Downstream Sediment Yield and Morphology in the Presence of Best Management Practices

Swift Creek Sediment Management Action Plan (SCSMAP)

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

Chapter 5 CALIBRATION AND VERIFICATION

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly.

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

PHASE 1 STREAM GEOMORPHIC ASSESSMENT. Castleton River, Rutland County Vermont. Final Report

Rapid Geomorphic Assessments: RGA s

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1. David A. Greenfield 2 Dennis M. Palladino 3

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Fluvial Geomorphology

Modeling Post-Development Runoff and Channel Impacts from Hydromodification: Practical Tools for Hydromodification Assessment

Opportunities to Improve Ecological Functions of Floodplains and Reduce Flood Risk along Major Rivers in the Puget Sound Basin

Stop 1: Marmot Dam Stop 1: Marmot Dam

Section 4: Model Development and Application

ILLINOIS RIVER BASIN RESTORATION COMPREHENSIVE PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT APPENDIX B

7.3 Sediment Delivery Analysis

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009

Laboratory Exercise #3 The Hydrologic Cycle and Running Water Processes

Columbia Estuary Province

SELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW

Transcription:

The Yellow River Initiative: The Birth of a System Approach to Challenges Facing the Everglades of the North Robert Barr and Siavash Beik 2016 INAFSM Annual Conference Belterra Conference Center, Indiana September 7, 2016 Many Agencies One Solution 1

9/26/2016 Kankakee River in St Joseph County. Walkerton Area Historical Society 2

Burrows Camp near Dunn's Bridge. Northwest Indiana Genealogical Society Collection Photo, Northwest Indiana Genealogical Society Collection 3

Traditional Restoration Example, Kankakee River, Indiana, June 2015 reach was restored in 2013 4

Traditional Maintenance Example, Bank maintenance on a tributary channel, Kankakee River, Indiana 2015 Wildland Hydrology, after Lane, 1955 5

Yellow River, East of Knox, IN Yellow River, West of Knox, IN 6

9/26/2016 Hickin, 2010 Wildland Hydrology 7

Mar 2016 Jul 2016 Change in pool cross section, Yellow River at Trigg Farms Channel Evolution Model Stages (Schumm, from Simon and Rinaldi (2006)) 8

Introduction Study initiated and funded by KRBC Problem Statement Too much, repeated maintenance expenditures needed to deal with significant bank failures, erosion, and sediment aggradation Too much sediment is going to Illinois Yellow River cited as a major sediment source Degraded habitat and quality in Yellow River and Kankakee Our Charge Pinpoint the root causes Recommend sustainable solutions (where to do what) 9

Selected Previous Studies CBBEL, 1992 Holmes (USGS), 1997 Bhowmik and Demissie, 2001 USACE, 2007 (Illinois Basin Comprehensive Plan) CBBEL, 2012 USACE, Kankakee River Basin Evaluation of Sediment Management Strategies, Little and Jonas, 2013 USACE, Kankakee River Mainstem Critical Restoration Project Summary Report, 2014 10

System Assessment: Channel Morphologic Zones Yellow River Headwaters at St. Joseph County Line 11

Yellow River near Armey Ditch, Marshall County Yellow River at Marshall Starke County Line 12

Yellow River, Starke County Yellow River, Starke County 13

Yellow River West of Knox Detail from Quaternary Geologic Map of Indiana (Gray, 1989) 14

Location of USGS Gages, Yellow River Watershed Data Analysis Drainage modification Soils & land management Sediment gage data Sediment source analysis Channel geometry Channel processes Bank Failures 15

Sediment Gage Data Variability from year to year Sharp increase in sediment between Oak Grove & Knox Knox sediment load Brems sediment load Location Contributing Drainage Area (sq. mi.) Adjusted Annual Suspended Sediment Load (tons) 2013 2014 2015 Average Annual Oak Grove 377 20,340 12,682 20,324 17,782 Knox 435 61,179 29,028 57,023 49,077 Brems 438 70,232 19,392 49,353 46,325 Sediment Gage Data Oak Grove Suspended Sediment Load Knox Suspended Sediment Load Brems Suspended Sediment Load Flow @ Knox Flow @ Oak Grove Rainfall 5/27/13 6/3/13 6/10/13 3000 0 Flow Rate (cfs) Suspended Sediment Load (tons/day) 2500 2000 1500 1000 500 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 Rainall (inches) 0 2 5/27/13 6/3/13 6/10/13 Date (mm/dd/yy) 16

Channel dimensions are what we expect in natural channel reach Difference from stable channel dimensions is greatest downstream of Knox Channel Geometry Location Approx. Bankfull Width (ft) Regional Equation Bankfull Width (ft) Description of Measurement Location 1 22 33 Man-made ditch 2 30 48 Man-made ditch 3 45 54 Man-made ditch 4 49 63 Man-made ditch 5 54 68 Man-made ditch 6 70 78 Natural channel 7 84 82 Natural channel 8 89 84 Natural channel 9 96 87 Natural channel 10 88 88 Natural channel 11 101 90 Channelized stream 12 102 92 Channelized stream 13 129 93 Man-made ditch Recommendations 17

Recommendations, Basin Wide In partnership with the County SWCDs, NRCS, and ISDA, promote soil health practices on all agricultural areas Reduce bank slopes as maintenance is done Utilize multi stage ditch where possible and beneficial Recommendations, Zones 1 and all headwater Laterals Zone 1 Establish/maintain riparian corridor Reduce bank slopes as maintenance is done Utilize multi stage ditch where possible and beneficial 18

Recommendations, Zone 2 Zone 2 Monitor Maintain riparian corridor Recommendations, Zone 3 19

Recommendations, Zone 3 Stabilize banks Use Toe wood technique for bank stabilization Develop typical cross sections for bank reconstruction Develop cost estimates for reach Initiate pilot projects to refine model Toe Wood Illustration Source: Wildland Hydrology 20

9/26/2016 Recommendations, Zone 3 Proposed pilot project location Recommendations, Zone 3 Proposed pilot project location, showing toewood 21

Recommendations, Zone 3 Recommendations, Zone 4 22

Recommendations, Zone 4 Narrow bankfull width and create floodplain shelves (within levees) Develop typical cross sections for floodplain reconstruction Work with contractor to develop cost estimates for reach Initiate pilot project Recommendations, Zone 4 Proposed reference reach, Yellow River near E. Division Road, Starke County, Indiana 23

9/26/2016 Recommendations, Zone 4 Proposed pilot project reach, Yellow River at SR 39, Starke County, IN 100 Year Floodplain Geomorphic Floodplain 24

Recommendations, Zone 4 Bottom Line Major sources of sediment production: Sand on headwater land surfaces Severe streambank erosion between Knox and Starke Marshall County line Major cause for severe aggradation in lower reaches: Too much incoming sand Lack of an efficient sediment transport mechanism Recommended measures: Agricultural conservation practices watershed wide Flatter side slopes and appropriate slope cover to minimize sand production Streambank stabilization through use of Toe Wood techniques u/s of Knox Creating a 2 stage low flow channel by narrowing the width at bankfull flow depth through addition of stable shelves in the lower reach 25

Call for Action Incentivize conservation practices on headwaters land surfaces Proceed with flattening side slopes/2 stage ditching of select headwaters tributaries (when maintaining ditches) Proceed with design and cost estimating of a suitable streambank stabilization measure for the problem area upstream of Knox Currently designing a pilot project Proceed with design and cost estimating of creating low flow inset channel in the lower reaches Start with a pilot project Continue supporting sediment gages to promote good designs and to make sure improvements are working & Add gages along Kankakee Consider expanding this type of assessment to the entire Kankakee (to determine where to do what) Include the Momence reach in Illinois Implementation Roadmap 26

Addressing Watershed wide Flow and Sediment Supply Addressing Reach Specific Sediment Supply and Transport 27

Implementation Prep for the Bigger Kankakee System Function based Hierarchy Function based approach for addressing a legacy ecosystem restoration need & achieving ecological lift Source: A Function Based Framework for Stream Assessment & Restoration Projects, U.S. EPA, May 2012 28

QUESTIONS? Robert Barr Research Scientist Center for Earth and Environmental Science Department of Earth Sciences IUPUI 317.278.6911 (office) 317.332.5463 (mobile) e mail: rcbarr@iupui.edu Siavash Beik, PE, CFM, D.WRE Vice President, Principal Engineer Christopher B. Burke Engineering, LLC 115 West Washington Street, Suite 1368 South Indianapolis, IN 46204 317.266.8000 (office) 317.509.1673 (mobile) Email: sbeik@cbbel in.com 29