Flood Inundation Analysis by Using RRI Model For Chindwin River Basin, Myanmar

Similar documents
ANALYSIS OF FLOODS AND DROUGHTS IN THE BAGO RIVER BASIN, MYANMAR, UNDER CLIMATE CHANGE

TRANSBOUNDARY FLOOD FORECASTING THROUGH DOWNSCALING OF GLOBAL WEATHER FORECASTING AND RRI MODEL SIMULATION

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

INCORPORATION OF SNOW AND GLACIER MELT PROCESSES IN RRI MODEL FOR ESTIMATING PEAK RIVER DISCHARGES AND INUNDATION ANALYSIS IN NEELUM RIVER BASIN

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

Vulnerability of Flood Hazard in Selected Ayeyarwady Delta Region, Myanmar

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan

Method for predicting sediment runoff processes and channel changes in West Rapti River, Nepal

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

Use of Geospatial data for disaster managements

DROUGHT ASSESSMENT USING SATELLITE DERIVED METEOROLOGICAL PARAMETERS AND NDVI IN POTOHAR REGION

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Flash Flood Guidance System On-going Enhancements

4 th Joint Project Team Meeting for Sentinel Asia 2011

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

Fenhe (Fen He) Map of River. Table of Basic Data. China 10

ESTIMATING SNOWMELT CONTRIBUTION FROM THE GANGOTRI GLACIER CATCHMENT INTO THE BHAGIRATHI RIVER, INDIA ABSTRACT INTRODUCTION

Impact assessment on disasters

SOCIO-ECONOMIC IMPACTS OF FLOODING IN DIRE DAWA, ETHIOPIA

2015 Fall Conditions Report

Grant 0299-NEP: Water Resources Project Preparatory Facility

Evaluation of Flash flood Events Using NWP Model and Remotely Sensed Rainfall Estimates

ABSTRACT. Keywords: Flood hazard mapping, hydro-geomorphic method, hydrologic modelling method, return period, rainfall runoff inundation.

MAPPING THE FLASH FLOOD PRONE AREA IN THE TAITA WATERSHED (ROMANIA) USING TOPOGRAPHIC INDEXES AND HYDRAULIC MODEL

Impacts of climate change on flooding in the river Meuse

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14

How to integrate wetland processes in river basin modeling? A West African case study

Dr. S.SURIYA. Assistant professor. Department of Civil Engineering. B. S. Abdur Rahman University. Chennai

FLOODPLAIN MAPPING OF RIVER KRISHNANA USING HEC-RAS MODEL AT TWO STREACHES NAMELY KUDACHI AND UGAR VILLAGES OF BELAGAVI DISTRICT, KARNATAKA

The Huong River the nature, climate, hydro-meteorological issues and the AWCI demonstration project

Water Stress, Droughts under Changing Climate

Modelling snow accumulation and snow melt in a continuous hydrological model for real-time flood forecasting

ISSN Vol.03,Issue.10 May-2014, Pages:

COUNTRY PRESENTATION ON MR JAYNAL ABEDIN JOINT SECRETARY ( WORKS & DEVELOPMENT ) MINISTRY OF DEFENCE

EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

Flood Frequency Mapping using Multirun results from Infoworks RS applied to the river basin of the Yser, Belgium

Climate Change Impact Assessment on Indian Water Resources. Ashvin Gosain, Sandhya Rao, Debajit Basu Ray

HYDRAULIC MODELLING OF NENJIANG RIVER FLOODPLAIN IN NORTHEAST CHINA

Uncertainty in the SWAT Model Simulations due to Different Spatial Resolution of Gridded Precipitation Data

AMMA-ALMIP-MEM project soil moisture & μwaves Tb

Application of Satellite Data for Flood Forecasting and Early Warning in the Mekong River Basin in South-east Asia

Huong River. Serial No. : Viet Nam-8 Location: Thua Thien Hue Province, Viet Nam N 16 00' '

AN ASSESSMENT OF THE RELATIONSHIP BETWEEN RAINFALL AND LAKE VICTORIA LEVELS IN UGANDA

Progress Report. Flood Hazard Mapping in Thailand

Regional Flash Flood Guidance and Early Warning System

Terrestrial Flood Risk and Climate Change in the Yallahs River, Jamaica. An assessment of future flood risk. projections of future climate

The 2 nd Annual Gobeshona Conference Future Changes of Flash Flood in the North East Region of Bangladesh using HEC-HMS Modeling

UK Flooding Feb 2003

Analyzing spatial and temporal variation of water balance components in La Vi catchment, Binh Dinh province, Vietnam

VOLUME IV. Feasibility Study for the Madian Hydropower Project HYDRO - METEOROLOGICAL DATA BASE. Headrace Tunnel. Bahrain. Part 1 of 3.

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

Development of the Hydrologic Model

MODELLING FROST RISK IN APPLE TREE, IRAN. Mohammad Rahimi

Estimating Probable Maximum Precipitation for Linau River Basin in Sarawak

Extreme Phenomena in Dobrogea - Floods and Droughts

DEVELOPMENT OF FLOOD HAZARD VULNERABILITY MAP FOR ALAPPUZHA DISTRICT

Effect of land use/land cover changes on runoff in a river basin: a case study

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

Country Report: Floods and Flood Forecasting System in Myanmar. Ms. Tin Yi Director Department of Meteorology and Hydrology MYANMAR

Development of Pakistan s New Area Weighted Rainfall Using Thiessen Polygon Method

Mekong River Commission

D. MATHEMATICAL MODEL AND SIMULATION

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Promoting Rainwater Harvesting in Caribbean Small Island Developing States Water Availability Mapping for Grenada Preliminary findings

Hydro-meteorological Analysis of Langtang Khola Catchment, Nepal

Soil Erosion Calculation using Remote Sensing and GIS in Río Grande de Arecibo Watershed, Puerto Rico

Flood Inundation Mapping and Analysis Using SAR Data at Middle Reach of the Brahmaputra River

July, International SWAT Conference & Workshops

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

FLOOD RISK MAPPING AND ANALYSIS OF THE M ZAB VALLEY, ALGERIA

Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist Belt Area, Anantapur District, Andhra Pradesh

ENGINEERING HYDROLOGY

Assessing bias in satellite rainfall products and their impact in water balance closure at the Zambezi headwaters

Analysis of real-time prairie drought monitoring and forecasting system. Lei Wen and Charles A. Lin

Study 16.5 Probable Maximum Flood (PMF)

CE 394K.3 GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.

HYDROLOGICAL MODELING OF HIGHLY GLACIERIZED RIVER BASINS. Nina Omani, Raghavan Srinivasan, Patricia Smith, Raghupathy Karthikeyan, Gerald North

NUMERICAL SIMULATION OF TSUNAMI PROPAGATION AND INUNDATION ALONG THE RAKHINE COAST AREAS IN MYANMAR

Abebe Sine Gebregiorgis, PhD Postdoc researcher. University of Oklahoma School of Civil Engineering and Environmental Science

Mekong River Commission

Flood Forecasting in Bangladesh

HYDRO-METEOROLOGICAL INVESTIGATION OF 2015 FLASH FLOOD IN EASTERN HILL BASIN BANGLADESH

Impacts of precipitation interpolation on hydrologic modeling in data scarce regions

Behavior of radioactive cesium accumulation in water bodies in contaminated area by FDNPP accident

The Importance of Snowmelt Runoff Modeling for Sustainable Development and Disaster Prevention

Country Presentation-Nepal

Flood Forecasting Tools for Ungauged Streams in Alberta: Status and Lessons from the Flood of 2013

PRELIMINARY ASSESSMENT OF SURFACE WATER RESOURCES - A STUDY FROM DEDURU OYA BASIN OF SRI LANKA

Flash Flood Guidance: SARFFG modeling system

Mekong River Commission Regional Flood Management and Mitigation Centre

Chapter-3 GEOGRAPHICAL LOCATION, CLIMATE AND SOIL CHARACTERISTICS OF THE STUDY SITE

Analysis of Rainfall and Other Weather Parameters under Climatic Variability of Parbhani ( )

Mekong River Commission Regional Flood Management and Mitigation Centre

Chapter 2 Drought Hazard in Bihar

Simulation of sedimentation rates using the SWAT model A case study of the Tarbela Dam, Upper Indus Basin

Response of Flash Flood Early Warning Critical Rainfall to Storm Pattern in South Branch of Censhui Watershed

EXAMINING THE SENSITIVITY OF FLOOD MODELLING IN PERIURBAN AREAS IN RAINFALL INPUTS OF VARIABLE ACCURACY

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

Transcription:

Flood Inundation Analysis by Using RRI Model For Chindwin River Basin, Myanmar Aye Aye Naing Supervisor : Dr. Miho Ohara MEE14625 Dr. Duminda Perera Dr. Yoshihiro Shibuo ABSTRACT Floods occur during the south west monsoon between the months of June to October in Myanmar on an almost annual basis. In order to reduce flood damage, it is essential to identify flood prone area and prepare flood inundation scenarios by developing flood hazard maps. In Chindwin River Basin (CRB) in Myanmar, DMH (Department of Meteorology and Hydrology) has developed flood hazard maps by using HEC-RAS model. This study aimed to conduct flood inundation analysis by using Rainfall Runoff Inundation Model (RRI-Model) and develop flood hazard maps with different return periods. As a result of comparing flood hazard maps by RRI model and HEC-RAS model, it was found that both models identified similar high risk area. However, flood inundation depth by RRI model was slightly higher than that by HEC-RAS model. INTRODUCTION The Chindwin river basin (CRB) is the third largest river in the North Western part of Myanmar. The CRB has the catchment area of 11,35 km 2 and 91 km long from north to south. The source of Chindwin radiates from the Kachin plateau. The basin is important for agriculture production and food exportation for the country and farmers cultivate the paddy and crop plants in the flood prone area of the basin. CRB is selected as the pilot area because it represents typical basins and flood plains that are prone to annual monsoon floods in Myanmar. Location of Chindwin river catchment area was shown in Figure 1. Major Township in CRB is Homalin. Elevation in the study area ranges from 5 m to 1692 m above mean sea level. Most of the buildings in Homalin locate in flood zones of river. The population of Homalin Township is approximately 258,26 people and the western and north western part of the study area have the mountain area. In Homalin, 9916 households, 995 families and 59594 populations were affected by 1997 July flood. 3867 households, 3867 families and 28399 populations were affected by 1997 September flood. Department of Meteorology and Hydrology (DMH) conducted mini project for flood hazard mapping in Homalin Township in Chindwin River Basin in 212-213. *Senior Observer, Department of Meteorology and Hydrology, Myanmar **International Center for Water Hazard and Risk Management (ICHARM), PWRI

It simulated flood inundation for different return periods such as 1, 5, 1, 5 years by HEC-RAS model using the annual peak discharge from 1968 to 211 at Hkamti and Homalin stations which are upstream and downstream stations of DMH. The main objective of this study is to conduct flood inundation analysis by using RRI model for CRB. Inundated areas are estimated by RRI simulations using MODIS satellite images and flood hazard maps are developed in Homalin Township for different return periods. Finally, flood hazard maps by RRI model and HEC-RAS model are compared and discussed. Hkamti Homalin Mawlaik Kalewa Monywa Figure: 1 Location of Chindwin Catchment Area & Homalin Township DATA AND METHODOLOGY At first, RRI model is applied to CRB and the floods in 1997 and 24 were simulated. The topography data such as digital elevation model, flow direction and flow accumulation and observed rainfall data is used as input data for the model. The model can produce inundation map with depth and duration and calculated discharge. The model is calibrated with observed discharge. Then, inundation area by RRI model is validated based on inundation area at part of flood events. These maps are derived using Moderate Imaging Spectroradiometer (MODIS). Next, frequency analysis is conducted using observed rainfall data from 1992 to 213.The design rainfalls for 1, 25, 5, 1 years are estimated by using GEV and Gumbel distribution. Finally, inundation maps are developed by simulation model and compared with the maps by HEC- RAS model by DMH. Figure: 2 Schematic Diagram of Study approach 2

May-4 May-4 May-4 May-4 May-4 Jun-4 Jun-4 Jun-4 Jun-4 Aug-4 Aug-4 Aug-4 Aug-4 Sep-4 Sep-4 Sep-4 Sep-4 Oct-4 Oct-4 Oct-4 Oct-4 Oct-4 Discharge (m3/s) Rainfall (mm) Discharge (m3/s) Rainfall (mm) RESULTS AND DISCUSSION Flood Inundation Analysis by RRI model Flood inundation simulation was conducted by using RRI Model with six months rainfall data in 1997 and 24. At first, the data of five rain gauge stations were arranged in text file. Then Rain Thiessen program in the RRI Model was used to create a rainfall file to use in the model. At Homalin station, simulation result was higher than observed discharge and reached at peak level in July second week in 1997. On the other hand, observed discharge was higher than simulation result in July third week in 24. Hydrographs for 1997 and 24 flood event at Homalin station were shown in Figures 3. 27 24 21 18 15 12 9 6 3 Homalin Observed Q Simulation Q (a) Homalin Station (1997) 5 1 15 2 25 3 35 4 45 5 21 18 15 12 9 6 3 (b) Homalin Station (24) Homalin Observed Q Simulation Q 5 1 15 2 25 3 35 4 45 5 Months Months Figure: 3 Simulation & Observed Discharge at Homalin Station from May to Oct, (a) 1997 & (b) 24 (With Infiltration) Validation of Homalin area for RRI Model and MODIS Satellite Images Two MODIS images of 27.7.24 and 12.8.24 were used for testing the best suited index for Homalin area. Identification of water pixels was done using the following threshold values, NDVI>=.2, LSWI>=.2 and MLSWI>=.7. In this study, MLSWI threshold value was the most effective at.7 to identify water bodies such as muddy water and mixed water caused by flood. Figure 4 shows that the flood maps computed using for RRI model and MODIS (MLSWI) at Homalin station. The CSI value was obtained to be.27 for 27.7.24. The CSI value was obtained to be.16 for 12.8.24. In the case of 27.7.24, 27% of the inundation area by RRI model were also identified by MODIS derived flood maps. 27.7.24 12.8.24 Figure: 4 Flood Maps computed using for RRI Model & MODIS (MLSWI) at Homalin Station 3

Return Period Frequency Analysis Results The frequency analysis was conducted by using the average maximum rainfall of 5 days, 7 days and 1 days. Both Gumbel and GEV was suitable but GEV was much better than Gumbel as shown in Figure 5. From the result of Chi Square Test between observed and expected value, GEV was selected as it has smaller value of 2.959. 1-days maximum rainfall value based on GEV was obtained to be 66.64 mm for 1 years return period. The ratio of 1-days maximum rainfall for 1 years return period to the rainfall of 24 flood event was calculated to be 1.163 times. Design rainfall for 1 Period was obtained by magnifying the peak rainfall values between 9.7.24 to 17.7.24 by using this ratio. GEV & Gumbel Probability Plot (1-days) 12 Gumbel 1 GEV Ten days data 8 6 4 2 1 2 3 4 5 6 7 Rainfall (mm) Figure: 5 Probability Plot of 1 days Maximum Rainfall Comparison of the Simulation Discharge for 1 year return period by RRI & HEC-RAS model One of the major purpose of this study is to develop the flood hazard map for flood management by RRI model simulation. Flood inundation maps of 1, 5 and 1 years return periods were shown in Figure 6. In order to check the meaning of 1 years return period, both simulation and discharge in this study and DMH study were compared. Simulation results by RRI model and HEC-RAS model by DMH identified similar discharge values for 1 years return period. Simulation discharge values by RRI model (21668 m 3 /s) was less than HEC-RAS model (21836 m 3 /s). Two maps by RRI and HEC-RAS Model for 1 years return period in Homalin Township were compared in Figure 6. Flood area for different return periods for RRI and HEC-RAS model was shown in Figure 7. The results showed the flood depth is to more than 5 m. The flood inundated area at Homalin Township by RRI model was obtained to be 45 km 2, 462 km 2 and 493 km 2 for 1, 5 and 1 years return periods. These values was more than the flood inundated area by HEC-RAS model (DMH) which was obtained to be 377 km 2, 411 km 2 and 424 km 2 for 1, 5 and 1 years return periods. Simulations by RRI model and HEC-RAS model by DMH identified similar inundation area, although inundation depth by RRI model was higher than HEC-RAS model. 4

(d) Figure: 6 Comparison of Flood Hazard Maps for Different Return Period: (a) 1-year return period by RRI; (b) 5-years return period by RRI, (c) 1-years return period by RRI, (d) 1-years return period by HEC-RAS Model (b) Flood area for different return period by HEC-RAS Figure: 7 Flood Area for Different Return Periods: (a) RRI model; (b) HEC-RAS (DMH) RECOMMENDATION This study aimed conducted flood inundation analysis by using Rainfall-Runoff-Inundation Model (RRI Model) in CRB. Floods hazard maps for different return periods such as 1, 5 and 1 years were developed based on frequency in Homalin Township. Finally, these maps were compared with the maps obtained by DMH by using HEC-RAS model. As a result of comparing flood hazard maps by two models, it was found that both models identified similar high risk area. However, flood inundation depth by RRI model was slightly higher than that by HEC-RAS model. 5

This study revealed that RRI model is also useful for flood inundation analysis in CRB. Especially, RRI model could be useful tool because this is two dimensional simulation model considering the effect of soil type and land use although HEC-RAS Model used by DMH study is one dimensional model which does not include these effect. As further study, discussion about flood events with local people and surveying in flood affected area are very important to enhance the accuracy of the simulation. These observations should be conducted for future research. In addition, to improve flood inundation analysis and flood inundation mapping, the observed rainfall data is not enough and more meteorological stations should be necessary for more accurate simulation for CRB. ACKNOWLEDEGMENT I would like to express my gratitude to my respected supervisor Dr. Miho Ohara and my sub-supervisors Dr. Duminda Perera and Dr. Yoshihiro Shibuo for their guidance, suggestions and valuable comments during the course of study. REFERENCES 1. Hazard Profiles of Myanmar, July 29, www.preventionweb.net/files/14567_14567 Hazard Report 25.8.91.pdf 2. Takahiro Sayama, Rainfall-Runoff-Inundation (RRI) Model User's Manual. Tsukuba: International Center for Water Hazard and Risk Management (ICHARM), 213. 3. Daw Htay Htay Than Department of Meteorology and Hydeology Flood Hazard Mapping in Homalin City in Chindwin River, Myanmar (Mini-project 212-213). 6