Decision rules applied to conformity assessment

Similar documents
APPENDIX G EVALUATION OF MEASUREMENT UNCERTAINTY

OA03 UNCERTAINTY OF MEASUREMENT IN CHEMICAL TESTING IN ACCORDANCE WITH THE STANDARD SIST EN ISO/IEC Table of contents

APPENDIX G ESTIMATION OF UNCERTAINTY OF MEASUREMENT

Calibration and verification: Two procedures having comparable objectives and results

Guide to the Expression of Uncertainty in Measurement (GUM) and its supplemental guides

SAMM POLICY 5 (SP5) POLICY ON MEASUREMENT UNCERTAINTY REQUIREMENTS FOR SAMM TESTING LABORATORIES Issue 2, 28 February 2007 (Amd. 1, 11 August 2014)

Uncertainty of Measurement A Concept

Measurement uncertainty and legal limits in analytical measurements

ERROR LIMITS AND MEASUREMENT UNCERTAINTY IN LEGAL METROLOGY

TITLE OF THE CD (English): New OIML Document

DECISION LIMITS FOR THE CONFIRMATORY QUANTIFICATION OF THRESHOLD SUBSTANCES

A Unified Approach to Uncertainty for Quality Improvement

Recent Developments in Standards for Measurement Uncertainty and Traceability (An Overview of ISO and US Uncertainty Activities) CMM Seminar

Revision of the Guide to the expression of uncertainty in measurement impact on national metrology institutes and industry

Measurement Uncertainty Knowing the Unknown

Document No: TR 12 Issue No: 1

Letter to the Editor. On the calculation of decision limits in doping control

Reproducibility within the Laboratory R w Control Sample Covering the Whole Analytical Process

DEPARTMENT OF INFORMATION AND COMMUNICATION TECHNOLOGY

Outline of the current status of measurement science: from the point of view of the International Vocabulary of Metrology (VIM)

Unit 4. Statistics, Detection Limits and Uncertainty. Experts Teaching from Practical Experience

Internal CQ. Performance criteria for internal QC how to define a significant deviation from the expected results

Certificate of Accreditation to ISO/IEC 17025:2005

A guide to expression of uncertainty of measurements QA4EO-QAEO-GEN-DQK-006

Uncertainty due to Finite Resolution Measurements

A61-02 CALA Guidance on Traceability Revision 1.2 October 15, 2012

STATISTICAL PROCESS CONTROL - THE IMPORTANCE OF USING CALIBRATED MEASUREMENT EQUIPMENT. CASE STUDY

THE CONSIDERATION OF MEASUREMENT UNCERTAINTY IN FORECAST AND MAINTENANCE RELATED DECISIONS

Measurement & Uncertainty - Concept and its application

Practical and Valid Guidelines for Realistic Estimation of Measurement Uncertainty in Pesticide Multi-Residue Analysis*

Traceability, validation and measurement uncertainty 3 pillars for quality of measurement results. David MILDE

Precision estimated by series of analysis ISO and Approach Duplicate Approach

Method Validation Characteristics through Statistical Analysis Approaches. Jane Weitzel

UNDERESTIMATING UNCERTAINTY

2.1. Accuracy, n- how close the indication of the thermometer is to the true value.

Joint Committee for Traceability in Laboratory Medicine Terminology. R. Wielgosz and S. Maniguet

Part IVB Quality Assurance/Validation of Analytical Methods

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

Essentials of expressing measurement uncertainty

DECISION LIMITS FOR THE CONFIRMATORY QUANTIFICATION OF THRESHOLD SUBSTANCES

OIML G GUIDE. Edition 2009 (E) ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

Uncertainty of Measurement

Conformity assessment of a high-performance liquid chromatography calibration.

Can there be a metrology for psychometricians?

Measurement & Uncertainty - Basic concept and its application

WADA Technical Document TD2018DL DECISION LIMITS FOR THE CONFIRMATORY QUANTIFICATION OF THRESHOLD SUBSTANCES

MEASUREMENT UNCERTAINTY AND SUMMARISING MONTE CARLO SAMPLES

On the declaration of the measurement uncertainty of airborne sound insulation of noise barriers

METHODS FOR CERTIFYING MEASUREMENT EQUIPMENT. Scott Crone

Workshops. Thursday, November 21, 9:00 AM to 11:00 AM: Models of measurement: measuring systems and metrological infrastructure

Draft EURACHEM/CITAC Guide Quantifying Uncertainty in Analytical Measurement. Second Edition. Draft: June 1999

Introduction to the evaluation of uncertainty

Novel mathematical and statistical approaches to uncertainty evaluation

COMMON MISTAKES IN DIMENSIONAL CALIBRATION METHODS

R SANAS Page 1 of 7

HOW TO ASSESS THE MEASUREMENT UNCERTAINTY

Revision of CMM performance specifications

ROLE AND SIGNIFICANCE OF UNCERTAINTY IN HV MEASUREMENT OF PORCELAIN INSULATORS A CASE STUDY

A combinatorial technique for weighbridge verification

CERTIFICATE OF CALIBRATION

OIML D 28 DOCUMENT. Edition 2004 (E) ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION. Conventional value of the result of weighing in air

ISO INTERNATIONAL STANDARD

The Monte Carlo method what and how?

Measurement Uncertainty in Mechanical Testing

However, reliability analysis is not limited to calculation of the probability of failure.

Verso il VIM4? La situazione delle attività del JCGM / WG2 (VIM) Luca Mari.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

Measurement Uncertainty, March 2009, F. Cordeiro 1

OIML R87 Quantity of prepackages: Statistics. Hans-Peter Vaterlaus, formerly METAS, Switzerland

SWGDRUG GLOSSARY. Independent science-based organization that has the authority to grant

ESTIMATION OF UNCERTAINTY IN HARDNESS MEASUREMENT OF RUBBER AND OTHER ELASTOPLASTIC MATERIALS

This document is a preview generated by EVS

ISO/TS TECHNICAL SPECIFICATION. Water quality Guidance on analytical quality control for chemical and physicochemical water analysis

Measurement Uncertainty of Dew-Point Temperature in a Two-Pressure Humidity Generator

WADA Technical Document TD2019DL DECISION LIMITS FOR THE CONFIRMATORY QUANTIFICATION OF THRESHOLD SUBSTANCES

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

OIML R 141 RECOMMENDATION. Edition 2008 (E) ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

INTERNATIONAL JOURNAL OF ADVANCED RESEARCH IN ENGINEERING AND TECHNOLOGY (IJARET)

Practical Interpretation of Metrological Traceability on Gauge Block as to VIM 3

Why is knowledge on measurement uncertainty so important in setting policies on energy efficiency? Rainer Stamminger & Christoforos Spiliotopoulos

Practical Statistics for the Analytical Scientist Table of Contents

DEPARTMENT OF INFORMATION AND COMMUNICATION TECHNOLOGY

A basic introduction to reference materials. POPs Strategy

Lecture 3. STAT161/261 Introduction to Pattern Recognition and Machine Learning Spring 2018 Prof. Allie Fletcher

Process Accuracy Ratio vs Process Uncertainty Ratio (Risk Mitigation: Calibration and the Customer s Process)

Quantifying Uncertainty in Analytical Measurement

University of Huddersfield Repository

Urban Legends in Gasmetering

Uncertainty Propagation for Force Calibration Systems

Analysis of interlaboratory comparison when the measurements are not normally distributed

Quantities and Measurement Units

This term refers to the physical quantity that is the result of the measurement activity.

Multiple Regression Analysis: Inference ECONOMETRICS (ECON 360) BEN VAN KAMMEN, PHD

Vocabulary of Metrology

PHYSICAL METHODS, INSTRUMENTS AND MEASUREMENTS - Measurement Science And Its Evolution - Luca Mari MEASUREMENT SCIENCE AND ITS EVOLUTION

HOW TO EXPRESS THE RELIABILITY OF MEASUREMENT RESULTS. The role of metrological traceability and measurement uncertainty-

ESTIMATION OF UNCERTAINTY IN THE DETERMINATION OF NITROGEN OXIDES EMISSIONS

Accuracy Calibration Certificate

WGFF Guidelines for CMC Uncertainty and Calibration Report Uncertainty

Technical Note A Quantification and NIST Traceability of Micromatter Thin Film Standards for XRF Analysis. Version March 16, 2017

Transcription:

Technical Report No. 01/ 2017 January 2017 Decision rules applied to conformity assessment Technical Report 1

Impressum EUROLAB Technical Report 1/2017 Decision rules applied to conformity assessment Authors: Álvaro Silva Ribeiro, Manfred Gölze, EUROLAB TCQA Members November 2017 EUROLAB General Secretariat Rue du Commerce 20-22 1000 Brussels BELGIUM Phone: +32 2 511 50 65 e-mail: info@eurolab.org URL: www.eurolab.org 2

Contents 1 Introduction... 4 2 Risk assessment and errors type I and type II... 4 3 A general approach to conformity assessment procedure... 6 4 Decision rule applied to conformity assessment with a single tolerance without guard band... 7 5 Decision rule applied to conformity assessment with single tolerance and guard band... 10 6 Decision rule applied to conformity assessment with a tolerance interval without guard band... 11 7 Decision rule applied to conformity assessment with a tolerance interval and guard band... 12 8 References and further readings... 13 3

1 Introduction Conformity assessment is a common activity performed in testing, inspection and calibration, required to assure the compliance of products, materials, services and systems to requirements defined by standards, regulations and legal frameworks, being defined to establish confidence for consumers and for the safety and quality of life. It has today a major impact in the Global Economy because it implies accepting and rejecting items with direct impact in risk analysis, business decisions and reputational and financial costs. To establish procedures in order to perform conformity assessment in practical situations (e.g. conformity with metric tolerances) objective criteria are needed in what is called decision rules, which are intended to define the limits of conformity assessment conformance zone and, considering a probabilistic approach, the acceptance zone (measurement results including uncertainty that are considered acceptable). The conventional approach of decision rules was based on the comparison of single or intervals of limits of conformity with single measurement results, being the typical decision rule directly obtained from inequalities of these comparisons. The recent development of a probabilistic approach in measurement, introducing measurement uncertainty as a parameter to express the variability of measurement, had a significant impact in decision process, as it implies the need to consider the comparison through a probabilistic view. The following figure shows three possible situations of measurement results and their uncertainties within a conformity interval to which a decision rule should be applied. In Figure 1, we can state that the case A is clearly as in conformity, the case C is out of conformity, but in case B we have an undefined situation that needs a formal criteria based on the confidence interval expected, to be used to decide about it s conformity. Figure 1 Representation of three different measurement results and a tolerance interval Regarding the approach in this document it should be mentioned that it is based in the assumption that the uncertainty of measurement is represented by a Gaussian Probability Distribution Function (PDF), which is consistent with the typical measurement results (being assumed the applicability of the Central Limit Theorem). 2 Risk assessment and errors type I and type II When performing conformity assessment, there are probabilities related to two types of incorrect decisions, one for the supplier (α) and one for the consumer (β), defined as percentage risk, being the calculation procedure addressed in the [JCGM 106: 2012]. In this framework, the decision matrix can be expressed by: (1 αα) PP = αα ββ (1 ββ) 4

where the probabilities of making the correct decisions are found in the diagonal elements (1 α) and (1 β) and the risks of incorrect decisions in the off-diagonal elements α and β. These errors are also known as Type I (α) and type II (β) errors, respectively meaning that conforming products are incorrectly rejected or non-conforming products are incorrectly accepted. Table 1 shows another common representation of these errors, their probabilities and relation to decision. Decision Accept H 0 Reject H 0 H 0 (True) Correct decision Type I error (α error) H 0 (False) Type II error (β error) Correct decision Table 1 Conformity assessment probabilities related to correct or incorrect decision Both incorrect decisions expressed by α and β imply costs and economic risk, as presented in [Pendrill, 2007] and displayed in Figure 2 (adapted from the reference mentioned). This Figure intends to show the perspective of supplier regarding income and costs due to conformity assessment (in green the profits and in red the loss). Figure 2 Supplier income and costs due to conformity (adapted from [Pendrill, 2007] 5

3 A general approach to conformity assessment procedure Decisive for the proper definition of a decision rule is the question what should be proved by the conformity assessment: compliance or non-compliance with a specification or a limit value. Based on the answer either the supplier s risk (α) or the consumer s risk (β) has to be specified. The definition of a procedure intended to perform conformity assessment can be based on the following steps: a. The specification of a measurand (Y) and the measurement item to be tested. b. The experimental / analytical results (estimates y of the measurand Y). c. The measurement standard uncertainty, u(y), and for a certain confidence level, the expanded uncertainty (being known the confidence level required a k factor should be considered, e. g., for a Gaussian sample, is commonly used k = 2,00 for a confidence interval of 95%). d. The specification of a single tolerance limit (upper or lower) or tolerance interval limits. e. The definition of the acceptance zone, rejection zone and guard band assuming a probability of type I error (supplier s risk α) or type II error (consumer s risk β). f. A decision rule The terminology in this guide and presented below is adopted according the definitions presented in [EURACHEM Guide:2007] and based on [ASME B89.7.3.1:2001]. Decision rule: a documented rule that describes how measurement uncertainty will be allocated with regard to accepting or rejecting a product according to its specification and the result of a measurement. Acceptance zone: the set of values of a characteristic, for a specified measurement process and decision rule, that results in product acceptance when a measurement result is within this zone. Rejection zone: the set of values of a characteristic, for a specified measurement process and decision rule, that will give noncompliance when a measurement result is within this zone. Guard band: the magnitude of the offset from the specification limit to the acceptance or rejection zone boundary Type I error (α) = probability that tested sample is compliant, even though a noncompliant measurement is obtained (FN) Type II error (β) = probability that the tested sample is non-compliant, even though a compliant measurement is obtained (FP) 6

Figure 3a) Example of areas defined for a tolerance interval in order to minimise the consumer s risk Legend: TU Tolerance upper limit ; GU Acceptance zone upper limit ; TL Tolerance lower limit ; GL Acceptance zone lower limit; U(y) expanded uncertainty of the measurement. Figure 3b) Example of areas for the tolerance interval in order to minimise the supplier s risk Figure 3a) is an example for an acceptance zone defined in order to minimise the consumer s risk (β). In other cases it is important to minimise the supplier s risk (α), e.g. concerning rejection in business-to-business sales [e.g. ISO 14253-1:1998] or in court cases because of violation of limit values. This approach is demonstrated in figure 3b). While in the first case the guard bands are within the tolerance zone, they are outside the tolerance zone in the second case. Thus in figure 3a) the focus is on high confidence of correct acceptance (guarded acceptance) while in figure 3b) it is on high confidence of correct rejection (guarded rejection). For the cases using guard bands, particularly suitable for measurement results with fixed uncertainty, a simple strategy to establish a decision rule is to compare the measurement results with the acceptance zone limits, being considered in compliance (accepted) if the measured value is inside this zone and non-compliant (rejected) otherwise. If measurement results could have variable values of uncertainty, a different approach without considering guard bands is recommended requiring an approach ideally based on the definition of a test of hypothesis as support for the decision rule. 4 Decision rule applied to conformity assessment with a single tolerance without guard band Given a single tolerance upper limit, T U, and a measurement estimate y with measurement standard uncertainty of u(y), a decision rule should define a probability of conformity (P c) assuming a probability of type I error (α). 7

Figure 4 Example with single upper tolerance Decision rule Acceptance if the hypothesis H 0: PP(YY T UU ) (1 αα) is true; Rejection if the hypothesis H 0 is false, PP(YY T UU ) < (1 αα). Expression to test: PP C = PP(η TT U ) = Φ T U yy uu(yy) Example: Consider a measurement estimate y = 2,7 mm with a standard uncertainty of u(y) = 0,2 mm, a single tolerance upper limit of T U = 3,0 mm, and a specification of conformity (1 -α ) of 0,95 (95 %) thus assuming a type I error α = 0,05 (5 %). With the experimental result and tolerance limit, assuming a Gaussian PDF, the decision rule will be: Acceptance if the hypothesis H 0: PP(YY 3,0 mm) 0,95 is true To estimate probabilities related with the example given, the conformance probability (P c) need to be calculated using the general expression for Gaussian PDFs: PP C = PP(η TT U ) = Φ T U yy uu(yy) PP C = Φ 3,0 2,7 = Φ(1,5) 0,933 (93,3 %) < 0,95 0,2 Then the hypothesis H 0 is false and the decision is of non-conformity. Note: The value of Φ(zz) can be obtained using tables of standard normal PDF or software having functions to perform this type of calculations, e.g.: MS Excel function NORMDIST( x, mean, standard deviation, cumulative ), for this case, NORMDIST(3,0;2,7;0,2;TRUE) would calculate the result ( 0,933 ). 8

In a similar way, given a single tolerance lower limit, T L, and a measurement estimate y with measurement standard uncertainty of u(y), a decision rule should define a probability of conformity (P c) assuming a probability of type I error (α). Decision rule Figure 5 Example with single lower tolerance Acceptance if the hypothesis H 0: PP(YY T L ) (1 αα) is true; Rejection if the hypothesis H 0 is false, PP(YY T L ) < (1 αα). Expression to test: PP C = PP(η TT L ) = 1 PP(η TT L ) = 1 Φ T L yy uu(yy) = Φ yy T L uu(yy) Example: Consider a measurement estimate y = 0,012 g with a standard uncertainty of u(y) = 0,001 g, a single tolerance lower limit of T L = 0,010 g, and a specification of conformity (1 α) of 0,99 (99 %) thus assuming a type I error α = 0,01 (1 %). With the experimental result and tolerance limit, assuming a Gaussian PDF, the decision rule will be: Acceptance if the hypothesis H 0: PP(YY 0,010 g) 0,99 is true. To estimate probabilities related with the example given, the conformance probability (P c) need to be calculated using the general expression for Gaussian PDF: PP C = Φ yy T L uu(yy) PP C = Φ 0,012 0,010 = Φ(2,0) 0,977 (97,7 %) < 0,99 0,001 Then the hypothesis H 0 is false and the decision is of non-conformity. Note: The value of Φ(zz) can be obtained using tables of standard normal PDF or software having functions to perform this type of calculations, e.g.: MS Excel function NORMDIST( x, mean, standard deviation, cumulative ), for this case, NORMDIST(0,012;0,010;0,002;TRUE) would give the result ( 0,977 ). 9

5 Decision rule applied to conformity assessment with single tolerance and guard band In the case that measurement estimates, y, are obtained with a known standard uncertainty, u(y), a decision rule may be established considering a guard band, allowing to accept a measurement estimate by direct comparison with the acceptance interval. Figure 6 Guard band between acceptance and rejection zones for a single upper tolerance For the case of a single tolerance upper limit, T U, being known the standard uncertainty, u(y), and the probability of type I error (α), the guard band upper limit can be obtained by using the definition of the Gaussian PDF Φ TT U yy = 1 αα uu(yy) TT U yy uu(yy) = Φ 1 (1 αα) GG UU = yy = TT U uu(yy) Φ 1 (1 αα) Example: Consider a measurement estimate y = 18,9 ºC with a standard uncertainty of u(y) = 0,3 ºC, a single tolerance lower limit of T L = 20,0 ºC, and a specification of conformity (1 α) of 0,95 (95 %), thus assuming a type I error α = 0,05 (5 %). To calculate the guard band upper limit, equation XX can be used, GG UU = 20 0,3 Φ 1 (0,95) = 20 0,3 1,64 19,5 C. Then the hypothesis H 0 is false and the decision is of non-conformity. Note: The value of Φ -1 (1-αα) can be obtained using tables of critical values of the normal PDF or software having functions to perform this type of calculations, e.g.: MS Excel function NORMINV(probability; mean; standard deviation), for this case NORMINV(0,95;0;1)would give the result ( 1,64 ). A common practice is to evaluate the expanded uncertainty for the confidence interval intended to guard and use it directly to define the guard band upper limit, for the case of 95% confidence interval and using the previous example, UU 95 (yy) = kk 95 uu(yy) = 2,00 0,3 = 0,6 C GG UU = TT U UU 95 (yy) = 20,0 0,6 = 19,4 C 10

Figure 7a Guard band for upper tolerance and guarded acceptance defined with an expanded uncertainty of 95% Figure 7 b) Guard band for upper limit and guarded rejection In the case of guarded rejection G u is given by: GG UU = yy = TT U + uu(yy) Φ 1 (1 αα) Example [s. JCGM 106:2012]: For speed limit enforcement the speed of a car can be measured using a Doppler radar. This measurement can be performed with a relative standard uncertainty u(v)/v of 2 % in the interval 50 km/h to 150 km/h. The speed limit on a motor way might be set to 100 km/h. Because of the principle in dubio pro reo (Latin for when in doubt, for the accused ) a level of significance of (1 α)= 0,999 is used. GG UU = yy = 100 + 2 Φ 1 (0,999) = 100 + 2 3,09 107 km/h Thus the guard band is [100 km/h v 107 km/h]. If the measured value is 107 km/h or greater, the probability that the speed limit has been exceeded is at least 99.9 %. 6 Decision rule applied to conformity assessment with a tolerance interval without guard band Given a tolerance interval defined by a lower limit, T L, and an upper limit, T U, and a measurement estimate y with measurement standard uncertainty of u(y), a decision rule should define a probability of conformity (P c) assuming a probability of type I error (α). 11

Figure 8 Example of a tolerance interval Decision rule Acceptance if the hypothesis H 0: PP(T L YY T U ) (1 αα) is true; Rejection if the hypothesis H 0 is false, PP(T L YY T U ) < (1 αα). PP C = PP(TT L η TT U ) = Φ T U yy uu(yy) Φ T L yy uu(yy) Example: Consider a measurement estimate y = 23,5 kn with a standard uncertainty of u(y) = 0,5 kn, a tolerance interval of [20 kn, 25 kn], and a specification of conformity (1 α ) of 0,95 (95 %), thus assuming a type I error α = 0,05 (5 %). With the experimental result and tolerance interval, assuming a gaussian PDF, the decision rule will be: Acceptance if the hypothesis H 0: PP(22 YY 25) 0,95 is true To estimate probabilities related with the example given, the conformance probability (P c) need to be calculated using the general expression for Gaussian PDF: PP C = PP(TT L η TT U ) = Φ T U yy uu(yy) Φ T L yy uu(yy) PP C = Φ 25 23,5 Φ 22 23,5 = Φ(3,0) Φ( 3,0) = 0,9987 0,0013 0,997 (99,7 %) > ) 0,5 0,5 0,95 Then the hypothesis H 0 is true and the decision is of conformity. 7 Decision rule applied to conformity assessment with a tolerance interval and guard band The conformity assessment applied to a tolerance interval can also be developed using guard bands in the case where measurement estimates, y, are obtained with a known standard uncertainty, u(y). 12

In this case, guard band limits for a confidence level of (1 α) can be obtained, considering a symmetric error of α/2 at each tail of the PDF. A common approach adopted for guarded acceptance is to consider that: GG U = TT U UU(yy) GG L = TT L + UU(yy) with the expanded uncertainty U(y) obtained for a (1 α) confidence level Figure 9 Example of a guard band applied to a tolerance interval For guarded rejection the guard bands can be calculated according: GG U = TT U + UU(yy) GG L = TT L UU(yy) 8 References and further readings ASME B89.7.3.1-2001 Guidelines for Decision Rules: considering Measurement Uncertainty in Determining Conformance with Specifications. Carbone, P., Macii, D., Petri, D. Measurement uncertainty and metrological confirmation in quality-oriented organizations, Measurement 34 (2003) 263 271. EURACHEM/CITAC Guide: use of uncertainty information in compliance assessment, 2007. Forbes, A. B. Measurement uncertainty and optimized conformance assessment. Measurement 39 (2006) 808 14 ILAC-G8:03 Guidelines on the Reporting of Compliance with Specification, 2009. ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories. ISO/IEC 17000: Conformity assessment Vocabulary and general principles. ISO/IEC 17043:2010 Conformity assessment General requirements for proficiency testing. 13

ISO 14253-1:1998 Geometrical Product Specifications (GPS) - Inspection by measurement of workpieces and measuring equipment - Part 1: Decision rules for proving conformance or non-conformance with specifications, International Organization for Standardization (ISO). JCGM 106:2012 Evaluation of Measurement Data The role of measurement uncertainty in Conformity Assessment Joint Committee on Guides in Metrology (BIPM). JCGM 200:2012 International Vocabulary of Metrology Basic and General Concepts and Associated Terms (VIM) Joint Committee on Guides in Metrology (JCGM) Pendrill, L. R. Optimised measurement uncertainty and decision-making when sampling by variables or by attribute. Measurement 39 (2006), 829 840. Pendrill, L. R., and K allgren, H. Exhaust gas analysers and optimised sampling, uncertainties and costs. Accred. Qual. Assur. 11 (2006), 496 505. Pendrill, L. R. Optimised measurement uncertainty and decision-making in conformity assessment. NCSLI Measure 2, 2 (2007), 76 86. Pendrill, L. R. Using measurement uncertainty in decision-making and conformity assessment. Metrologia 51 (2014), S206 S218. Possolo, A., and Toman, B. Assessment of measurement uncertainty via observation equations. Metrologia 44 (2007), 464 475. Rossi, G. B., and Crenna, F. A probabilistic approach to measurement-based decisions. Measurement 39 (2006), 101 19. Sommer, K.-D., and Kochsiek, M. Role of measurement uncertainty in deciding conformance in legal metrology. OIML Bulletin XLIII, 2 (April 2002), 19 24. WADA Technical Document TD2010DL: decision limits for the confirmatory quantification of threshold substances, 2010. Weitzel, M. L. J.; Johnson, W. M. Using target measurement uncertainty to determine fitness for purpose, Accred.Qual.Assur. 17 (2012) 491 495. 14