Sample Procurement Plan

Similar documents
NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan for ETLP (P156590)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

GEF Procurement Plan (WARFP LIBERIA)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan for Eth Expressway Project ( P148850)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Procurement Plan for Project of Integrated Urban and Tourism Development

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. I. General

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Sample Procurement Plan

Prior Review Thresholds

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

PROCUREMENT PLAN (Textual Part)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Sample Procurement Plan

Sample Procurement Plan

Prior Review Thresholds

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement. International Competitive Bidding;

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

PPA PROCUREMENT PLAN (Textual Part)

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

PPA PROCUREMENT PLAN (Textual Part)

procurement Plan I. General

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan National Community Driven Development Project Department of Rural Development

Consultants: firms Consultants: individuals

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Sample Procurement Plan

Textual Procurement Plan

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Procurement Plan. Procurement Method Prior Review Threshold Comments

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan Poverty Alleviation Fund II- AFII

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

PROCUREMENT PLAN (Textual Part)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Sample Procurement Plan

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

PROCUREMENT PLAN (Textual Part)

The World Bank Zambia Water Resources Development Project (P114949)

Procurement Plan. I. General

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

Sample Procurement Plan

Implementation Status & Results Jamaica Rural Economic Development Initiative (P105122)

Implementation Status & Results China CN Integrated Economic Development of Small Towns (P118597)

Public Disclosure Copy

The World Bank Second Irrigation and Drainage Improvement Project (P086592)

The World Bank CG Rep. LISUNGI Safety Nets System Project (P145263)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Punjab Cities Program (P156972)

Procurement Plan. I. General

Procurement Plan. I. General

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Public Disclosure Copy

Actual Amount (US$) Process Status. Pending Interventions.

Public Disclosure Copy. Implementation Status & Results Report Ghana FIP - Enhancing Natural Forest and Agroforest Landscapes Project (P148183)

Sample Procurement Plan

Implementation Status & Results Congo, Democratic Republic of Democratic Republic of Congo Emergency Social Action Project (P086874)

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project information: Project ID: P075941 Sample Plan Borrower: The Republic of Burundi, the Republic of Rwanda, and the United Republic of Tanzania. Project Name: Regional Rusumo Falls Hydroelectric Project Credit Nos : 5295 RW, 5296 TA, Grant Nos : H872-BI, 873-RW. Project Implementing Agency (PIA): NELSAP s Rusumo Falls Project Unit (RPIU) on behalf Regional Rusumo Power Company. 2. Bank s approval Date of the procurement Plan: [Original: June 25, 2013; Revision 1: 20 th October 2014, Revised 2: 23 rd March 2015, Revised 3: 30th May 2015, Revised 4: 15th September 2015, Revised 5: 27 th October 2015. 2. Date of General Notice: July 11 th, 2013 3. Period covered by this procurement plan: June 2015 December 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for : Expenditure category Threshold Contacts subject to prior review 1. Works 1 ICB USD 10 million 15 million 2 NCB <USD 10 million None 3 Shopping <USD 100,000.00 None 4 LIB All values 15 million 5 Direct contracting All values 0,1 million 2. Goods 1 ICB USD 3 million 3 million 2 NCB <USD 3 million None 3 Shopping <USD 100,000.00 None 4 LIB All values 3 million 5 Direct contracting All values 0,1 million 3.Non-consultancy 1 NCB <USD 0.5 million 3 million services 4 LIB All values 3 million 3 Shopping <USD 100,000.00 None 4 Direct contracting All values 0,1 million July 9, 2010

2. Prequalification. Bidders for Civil Works and Electro-Mechanical and 220 KV Substation at Rusumo side including T-Line shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Reference to (if any) Project Operational/ Manual: World Bank s Guidelines for of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits and Grants, dated January 2011; World Bank s Guidelines for and Employment of Consultants under IBRD Loans and IDA Credits and Grants by World Bank Borrowers, dated January 2011, Project Agreement between International Association and Rusumo Power Company, NBI & Disposal Manual and Rusumo Project Manual. 4. Reference to (if any) Project Operational/ Manual: -- 5. Any Other Special Arrangements: -- 6. Summary of the Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 6.1. Works 1 2 3 4 5 6 7 8 9 Ref. No. Contract (Description) 1 CP 1 - Civil Works 2 CP 2- Electro -Mechanical Works and 220 KV Substation at Rusumo side including T- Line Office renovation Cost $ Procure ment Prequali fication Domestic Preferen ce Review by Bank (Prior / ) Expected Bid-Opening Date 163,500,000.00 ICB Yes No Prior 01/04/2016 113,000,000.00 ICB Yes No Prior 26/04/2016 35,000.00 Shopp ing No Yes 06/10/2015 Comments July 9, 2010

6.2. Goods 1 2 3 4 5 6 7 8 9 Ref. No. Contract (Description) 1 Software (Accounting Sun System License 2 users) 2 Computers and Office Equipment 3 Safeguards Equipment and Personal protective equipment 4 Office Furniture 5 Developme nt Communica tion to support RAP / LADP implementat ion 6 Software (Electronic Archive) Cost $ Prequalif ication Domestic Preference 8,000.00 DC No No Prior Review by Bank (Prior / ) Expected Bid-Opening Date 12/11/2015 95,500.00 Shopping No No 04/09/2005 16,000.00 Shopping No No 09/11/2015 26,050.00 Shopping No No 04/09/2005 12,000.00 Shopping No No 15,600.00 Shopping No No 22/11/2015 22/11/2015 Comments 6.3. Non-Consulting Services 1 2 3 4 5 6 7 8 9 Ref. No. Contract (Description) 1 Awareness campaign program (Drama) Cost in $ 15,000.00 Procure ment Shop ping Prequalificat ion Domestic Preference Review by Bank (Prior / ) Expected Bid-Opening Date No Yes 07/08/2015 Comme nts July 9, 2010

III. of Consultants 1. Prior Review Threshold: decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines and Employment of Consultants: Expenditure category Prior Review Threshold Contacts subject to prior review 1. Firms 1 QCBS, QBS, FBS, USD 200,000.00 LCS 1 million 2 QCBS, CQS, LCS, QBS, FBS <USD 200,000.00 3 SSS All values 0,1 million 2. Individuals 1 Three CVs USD 100,000.00 0,2 million 2 SSS All values 0,1 million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $100,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Arrangements: 4. Consultancy Assignments with s and Time Schedule 1 2 3 4 5 6 7 Ref. No. Description of Assignment Cost Review by Bank (Prior / ) Expected Proposals Submission Date 1 External Audit 30,000.00 LCS 27/10/2015 2 Legal firm for Advise on legal matters 30,000.00 LCS 27/10/2015 3 Monitoring of water Quality measurements 80,000.00 QBS 13/11/2014 4 Two NGO,s for Implementing Livelihood 343,306.00 QCBS Prior 06/01/2015 Restoration Program 5 Consultant for preparation of EIA 30,000.00 IC 19/11/2015 6 Outcome Evaluation Specialist 40,000.00 IC 23/11/2015 STAFF 7 Mechanical Engineer 245,857.50 IC Prior 12/02/2016 8 9 Civil Engineer 245,857.50 IC Prior Electrical Engineer 245,857.50 IC Prior 12/02/2016 12/02/2016 Com ments July 9, 2010

10 Accountant 70,000.00 IC 29/10/2015 11 Lead Safeguard Specialist 153,486.00 SSS1 Prior 29/10/2015 12 11/04/2016 Communications Officer 140,000.00 IC Prior 13 Social and Resettlement Officer 141,023.00 SSS Prior 29/10/2015 14 Administrative Assistant 53,781.00 SSS Prior 29/10/2015 15 Finance Officer 141,023.00 SSS2 Prior 01/06/2016 16 Officer 141,023.00 SSS Prior 01/06/2016 17 External Audit July 2015- June2016 8,000.00 SSS Prior 26/04/2016 18 Water Hyacinth 25,000.0 IC 11/07/2016 1 The assignments 12 to 14 are amendments2 on the contracts signed on 1 st October 2012 and amended 1 st October 2013, currently William Katete, Communication Officer, left the project and we request his replacement 2 The assignments 16 to 17 are amendment1 for contracts which began in July 2014. July 9, 2010

Page 1 PROCUREMENT PLAN Africa : AFCC2/RI-Regional Rusumo Falls Hydroelectric Project General Information Country: Africa Banks Approval Date of the Original Plan: 2017-02-16 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-05-12 Project ID: P075941 GPN Date: Project Name: AFCC2/RI-Regional Rusumo Falls Hydroelectric Project Loan / Credit No:,,, Executing Agency(ies): Nile Basin Initiative WORKS Activity Reference No. / Description Loan / Credit No. Component Review Type Market Approach Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-NELSAP -6422-CW-RFB / CP1 Civil Works and Design, Supply and Installation of Hydro- Mechanical Equipment A1. Civil works Prior Bids Open - International 159,893,467.00 74,516,905.15 Signed 2015-09-30 2015-12-23 2016-05-03 2016-08-16 2017-04-06 2016-11-09 2016-11-09 2020-01-31 RW-NELSAP -6419-CW-RFB / CP2 Design, Supply and Installation of Electro-Mechanical Equipment A2. Mechanical and Electrical Works Prior Bids Open - International 91,930,016.00 45,305,497.59 Signed 2015-09-30 2016-01-09 2016-05-03 2016-08-16 2017-03-29 2016-11-09 2016-11-09 2020-02-02 RW-NELSAP -6442-CW-RFQ / Install the river hydrology monitoring equipment 20,000.00 0.00 2016-11-18 2017-01-15 2017-03-15 RW-NELSAP -6451-CW-RFQ / Galery forest whithin the spray zone 15,000.00 0.00 2016-12-24 2017-03-13 2017-04-12 RW-NELSAP -8902-CW-CDD / Build and furnish a chicken pen - National 5,333.00 0.00 2017-03-01 2017-03-08 2017-03-15 2017-03-22 2017-03-24 2017-04-23 RW-NELSAP -8947-CW-CDD / cowshed construction - National 7,000.00 0.00 2017-03-01 2017-03-06 2017-03-20 2017-03-27 2017-04-05 2017-05-20 RW-NELSAP -8903-CW-CDD / Construct goat shed - National 1,460.00 0.00 2017-03-01 2017-03-08 2017-03-15 2017-03-22 2017-03-24 2017-05-08 RW-NELSAP -8916-CW-CDD / Construct a piggery - National 1,460.00 0.00 2017-03-01 2017-03-08 2017-03-15 2017-03-22 2017-03-24 2017-04-23 RW-NELSAP -8913-CW-CDD / Construct hydroponics structures - National 2,000.00 0.00 2017-03-01 2017-03-06 2017-03-20 2017-03-27 2017-04-05 2017-05-05 RW-NELSAP -8911-CW-CDD / Construct 1 green house construction Open - National 16,800.00 0.00 2017-03-01 2017-03-06 2017-04-05 2017-04-12 2017-04-21 2017-05-21 RW-NELSAP -9694-CW-CDD / Cowshed, cages sets constructed 0.00 Open - National 13,400.00 2017-01-22 2017-01-27 2017-02-24 2017-03-26 2017-04-04 2017-05-19 GOODS Activity Reference No. / Description Loan / Credit No. Component Review Type Market Approach Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-NELSAP -6484-GO-CDD / Purchase block fabricating machine, treadle sewing machines - singer, one hand sewing machine, decorating machine, Startup material - National 10,200.00 0.00 2017-03-05 2017-03-19 2017-04-18 2017-04-25 2017-05-09 2017-06-08 RW-NELSAP -6483-GO-CDD / Acquisition of 9000 avocado seedlings, vegetative gears, propagation tools, transportation, Nursery establishment support - National 5,700.00 0.00 2017-03-10 2017-03-24 2017-04-07 2017-04-14 2017-04-28 2017-05-28 RW-NELSAP -6481-GO-CDD / Procure Friesian and Jersey, Goats, 1000 chicken breed, two pregnant Large White, One Landrace sows and one nucleus Pietrain boar for piggery production - National 26,200.00 0.00 2017-02-03 2017-02-08 2017-02-28 2017-03-07 2017-03-21 2017-04-21 RW-NELSAP -6478-GO-CDD / Procure medicines, drugs, vaccines, medical kits 0.00 - National 4,200.00 2017-02-20 2017-03-06 2017-03-20 2017-03-27 2017-04-10 2017-04-24 RW-NELSAP -6475-GO-CDD / Rent premises - National 2,000.00 0.00 2017-04-14 2017-04-28 2017-05-12 2017-05-19 2017-06-02 2017-06-16 RW-NELSAP -6568-GO-CDD / Agricultural produces stock and sale 3,500.00 0.00 2017-04-14 2017-04-28 2017-05-12 2017-05-19 2017-06-02 2017-06-16

Page 2 RW-NELSAP -6444-GO-RFQ / Safeguards Equipment and Personal protective equipment 16,000.00 0.00 2016-10-25 2016-11-30 2016-12-14 RW-NELSAP -6449-GO-RFQ / Communication Materials developed, produced and distributed 5,000.00 0.00 2017-02-27 2017-04-04 2017-05-04 RW-NELSAP -6447-GO-RFQ / Computer Equipment and Softwares 25,810.00 0.00 2017-01-31 2017-03-01 2017-03-31 RW-NELSAP -6493-GO-CDD / Modern hives, beekeeper toolbox 1,800.00 0.00 2017-03-25 2017-04-08 2017-04-22 2017-04-29 2017-05-13 2017-05-27 RW-NELSAP -6500-GO-RFQ / Office Equipment 26,000.00 0.00 2017-02-15 2017-03-12 2017-04-11 RW-NELSAP -6578-GO-RFQ / Archive software server Archive software installing and training 15,000.00 0.00 2017-02-25 2017-04-08 2017-05-23 RW-NELSAP -6450-GO-DIR / Software (Accounting Sun System License 2 users) Direct Direct 8,000.00 0.00 2017-02-21 2017-02-26 2017-02-28 2017-03-14 RW-NELSAP -9491-GO-CDD / Procure exotic pregnant breed pigs (Large White, Landrace sows and nucleus Pietrain boar) 4,000.00 0.00 2017-03-20 2017-03-25 2017-04-08 2017-04-15 2017-04-18 2017-05-02 RW-NELSAP -9676-GO-CDD / Rent premises for saloon services for the first 6 months - National 300.00 0.00 2017-04-03 2017-04-08 2017-04-22 2017-04-24 2017-04-28 2017-10-25 RW-NELSAP -9679-GO-CDD / Rent premises for tailoring workshop for the first 6 months - National 300.00 0.00 2017-04-03 2017-04-08 2017-04-22 2017-04-24 2017-04-28 2017-10-25 RW-NELSAP -9681-GO-CDD / Rent premises for restaurant services - National 600.00 0.00 2017-04-03 2017-04-08 2017-04-22 2017-04-24 2017-04-28 2017-10-25 RW-NELSAP -9680-GO-CDD / Rent premises for Stock and sales of agricultural produces for the first 6 months - National 600.00 0.00 2017-04-03 2017-04-08 2017-04-22 2017-04-24 2017-04-28 2017-10-25 RW-NELSAP -9360-GO-CDD / Procure Coffee husks or wood dust for poultry for 1st six months - National 3,200.00 0.00 2017-02-16 2017-02-21 2017-03-07 2017-03-14 2017-03-22 2017-04-05 RW-NELSAP -9359-GO-CDD / Procure Napier grass (seeds) and prepare a garden for napier grass for cows - National 260.00 0.00 2017-02-16 2017-02-21 2017-02-28 2017-03-01 2017-03-03 2017-05-02 RW-NELSAP -9634-GO-CDD / Procuring 10 expecting heifers (Friesian and Jersey) - National 16,000.00 0.00 2017-03-10 2017-03-15 2017-03-29 2017-04-05 2017-04-14 2017-04-28 RW-NELSAP -9481-GO-CDD / Procure dairy cow management inputs and tools (water tank, wheel barrow, spade, spraying pump...) - National 2,000.00 0.00 2017-03-14 2017-03-19 2017-04-02 2017-04-09 2017-04-11 2017-04-25 RW-NELSAP -9358-GO-CDD / Procure Napier grass (seeds) and prepare a garden for napier grass for goats - National 200.00 0.00 2017-02-16 2017-02-21 2017-02-28 2017-03-01 2017-03-03 2017-05-02 RW-NELSAP -9475-GO-CDD / Procure goats management inputs and tools (water tank, wheel barrow, spade, spraying pump...) - National 700.00 0.00 2017-03-20 2017-03-25 2017-04-01 2017-04-08 2017-04-10 2017-04-24 RW-NELSAP -9626-GO-CDD / Procure pregnant goats of exotic breed and 1 Boer buck - National 1,200.00 0.00 2017-03-24 2017-03-29 2017-04-05 2017-04-06 2017-04-08 2017-04-22 RW-NELSAP -9368-GO-CDD / Procure two-months old chickens (1000 breed chickens) - National 5,000.00 0.00 2017-02-16 2017-02-21 2017-02-28 2017-03-01 2017-03-16 2017-03-30 RW-NELSAP -9465-GO-CDD / Procure poultry management tools and equipment (drinkers, feeders, egg trays, weighing machines, wheelbarrows, hoes, spades) - National 750.00 0.00 2017-03-06 2017-03-11 2017-03-18 2017-03-25 2017-03-27 2017-04-10 RW-NELSAP -9639-GO-CDD / Procure chicken feeds (1 chicken @6kg for the first 8 months) - National 3,200.00 0.00 2017-03-23 2017-03-28 2017-04-04 2017-04-05 2017-04-07 2017-04-21 RW-NELSAP -9480-GO-CDD / Procure and install a water tank for poultry activities - National 650.00 0.00 2017-03-20 2017-03-25 2017-04-01 2017-04-08 2017-04-10 2017-04-24

Page 3 RW-NELSAP -9492-GO-CDD / Procure piggery demonstration farm tools and equipment (weighing machines, spades, wheelbarrow, etc.,&) - National 1,460.00 0.00 2017-03-15 2017-03-20 2017-03-27 2017-03-29 2017-04-02 2017-04-16 RW-NELSAP -9708-GO-CDD / Procure pig feeds for the 1st six months - National 2,400.00 0.00 2017-03-22 2017-03-27 2017-04-10 2017-04-11 2017-04-14 2017-10-11 RW-NELSAP -9487-GO-CDD / Procure and install a water tank for pig farming - National 1,300.00 0.00 2017-03-20 2017-03-25 2017-04-01 2017-04-03 2017-04-07 2017-04-21 RW-NELSAP -9632-GO-CDD / Procure feeds for pigletts 0.00 - National 4,800.00 2017-03-27 2017-04-01 2017-04-08 2017-04-09 2017-04-11 2017-04-25 RW-NELSAP -9467-GO-CDD / Procure and set 20 modern Langstroth hives (including a brood-box, queen excluder and super chamber) and 40 new colony hives - National 1,000.00 0.00 2017-03-08 2017-03-13 2017-03-20 2017-03-27 2017-03-29 2017-04-12 RW-NELSAP -9376-GO-CDD / Procure beekeeping tools + trainer's beekeeping toolbox - National 800.00 0.00 2017-02-16 2017-02-21 2017-04-04 2017-04-11 2017-04-19 2017-05-19 RW-NELSAP -9479-GO-CDD / Procure seeds (wheat 2Kg) for hydroponics - National 1,536.00 0.00 2017-03-20 2017-03-25 2017-04-08 2017-04-15 2017-04-18 2017-05-18 RW-NELSAP -9619-GO-CDD / Procure agricultural inputs for (Seeds, sprinklers, spraying machines, rakes, wheelbarrows etc) - National 3,000.00 0.00 2017-03-06 2017-03-11 2017-03-25 2017-03-26 2017-03-28 2017-04-11 RW-NELSAP -9409-GO-CDD / Procure agricultural fertilizers - National 300.00 0.00 2017-02-16 2017-02-21 2017-02-28 2017-03-01 2017-03-03 2017-03-17 RW-NELSAP -9486-GO-CDD / Procure mushroom production materials (Paddy Straw, Plastic Sheet, Wooden mould, hand Chopper, drum for boiling straw, plastic ropes, Gunny bags, sprayers) - National 1,500.00 0.00 2017-03-20 2017-03-25 2017-04-08 2017-04-10 2017-04-14 2017-05-14 RW-NELSAP -9413-GO-CDD / procure equipment for the saloon - National 3,500.00 0.00 2017-03-02 2017-03-07 2017-03-21 2017-03-28 2017-04-05 2017-05-05 RW-NELSAP -9373-GO-CDD / Procure tailoring training materials including machines - National 6,500.00 0.00 2017-02-16 2017-02-21 2017-03-07 2017-03-14 2017-03-22 2017-05-21 RW-NELSAP -9600-GO-CDD / Procure equipment for the restaurant and set it up - National 5,000.00 0.00 2017-03-23 2017-03-28 2017-04-11 2017-04-18 2017-04-26 2017-05-26 RW-NELSAP -9483-GO-CDD / Procure initial agricultural produces stock for sale - National 3,500.00 0.00 2017-03-27 2017-04-01 2017-04-08 2017-05-08 2017-05-10 2017-05-24 RW-NELSAP -9674-GO-CDD / of Fresian cows, Fresian bulls Open - National 25,000.00 0.00 2017-01-22 2017-01-27 2017-02-26 2017-03-05 2017-03-13 2017-04-12 RW-NELSAP -9673-GO-CDD / of improved Rabbits - National 3,080.00 0.00 2017-03-22 2017-03-27 2017-04-10 2017-04-17 2017-04-20 2017-05-20 NON CONSULTING SERVICES Activity Reference No. / Description Loan / Credit No. Component Review Type Market Approach Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-NELSAP -6501-NC-RFQ / Ground Breaking Ceremony 20,000.00 0.00 Under 2016-12-06 2017-02-07 2017-03-31 RW-NELSAP -6677-NC-RFQ / Asset codification and inventory 8,000.00 0.00 2017-04-02 2017-05-28 2017-06-27 RW-NELSAP -9689-NC-RFQ / Communication to support RAP / LADP implementation 12,000.00 0.00 2017-03-25 2017-05-20 2017-06-19 CONSULTING FIRMS Activity Reference No. / Description Loan / Credit No. Component Review Type Market Approach Contract Type Amount (US$) Actual Amount (US$) Status Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-NELSAP -6672-CS-LCS / Audit FY 2016-2017 Least Cost Open - National 15,000.00 0.00 2017-05-16 2017-06-06 2017-07-04 2017-08-01 2017-08-31 2017-10-05 2017-11-16 2017-12-22

Page 4 RW-NELSAP -8873-CS-LCS / Training on saloon services and setting up of the saloon Least Cost Open - National 1,660.00 0.00 2017-01-22 2017-02-12 2017-02-18 2017-03-18 2017-03-21 2017-03-23 2017-03-26 2017-03-31 RW-NELSAP -8848-CS-LCS / Training on cattle keeping management Least Cost Open - National 1,650.00 0.00 2017-01-22 2017-01-29 2017-02-08 2017-03-08 2017-03-11 2017-03-15 2017-03-18 2017-03-23 RW-NELSAP -8872-CS-LCS / Training on Develop of the system of fodder conservation Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8856-CS-LCS / Training on goat management Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8869-CS-LCS / Training on poultry management Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8861-CS-LCS / Training on pig management Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8868-CS-LCS / training on bee management Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8870-CS-LCS / Training on hydroponics use Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8871-CS-LCS / Training on modern bean and soya bean Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8859-CS-LCS / Training on mushroom Least Cost Open - National 1,650.00 0.00 RW-NELSAP -8864-CS-LCS / Training on set up the restaurant Least Cost Open - National 1,025.00 0.00 RW-NELSAP -8865-CS-LCS / Training on set the food stocks Least Cost Open - National 1,025.00 0.00 INDIVIDUAL CONSULTANTS Activity Reference No. / Description Loan / Credit No. Component Review Type Market Approach Contract Type Amount (US$) Actual Amount (US$) Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-NELSAP -6418-CS-INDV / Rusumo Communication Officer Prior Open 129,340.00 0.00 Under 2016-03-04 2016-06-08 2016-06-29 2016-11-01 2018-11-01 RW-NELSAP -6661-CS-INDV / Recruitment of 2 Environment compliance Inpsectors Open 72,000.00 0.00 2017-02-14 2017-04-14 2017-05-05 2017-06-09 2019-05-30 RW-NELSAP -6602-CS-INDV / Carbon credit Open 30,000.00 0.00 2017-01-11 2017-03-06 2017-03-20 2017-04-29 2017-06-30 RW-NELSAP -6420-CS-CDS / Rusumo Project Manager Prior Direct Direct 271,917.00 0.00 Under 2016-08-29 2016-09-08 2016-10-01 2017-09-30 RW-NELSAP -6673-CS-CDS / Training on sunsystem Direct Direct 2,000.00 0.00 2017-02-10 2017-02-20 2017-03-09 2017-03-16 RW-NELSAP -6684-CS-INDV / Legal advisor services 30,000.00 0.00 2017-02-28 2017-03-05 2017-03-26 2017-04-30 2018-04-30 RW-NELSAP -6666-CS-CDS / RPCL MD Prior Direct Direct 189,460.00 0.00 2017-02-20 2017-03-20 2017-05-31 2019-05-31 RW-NELSAP -6669-CS-CDS / Environmental Officer Prior Direct Direct 135,807.00 0.00 Under 2017-02-13 2017-02-23 2017-04-27 2019-04-27 RW-NELSAP -6678-CS-CDS / Social Resettlement Officer Prior Direct Direct 121,800.00 0.00 Under 2017-02-15 2017-03-04 2017-04-27 2019-04-27 RW-NELSAP -6683-CS-CDS / Resettlement Assistant Direct Direct 60,000.00 0.00 2017-02-20 2017-03-06 2017-04-27 2019-04-27

Page 5 RW-NELSAP -10740-CS-INDV / Project Civil Engineer Prior Open 129,340.00 0.00 Under 2016-07-12 2017-03-29 2017-04-04 2017-04-14 2020-04-13 RW-NELSAP -10737-CS-INDV / Project Electrical/Mechanical Engineer Prior Open 133,800.00 0.00 Under 2016-07-12 2017-03-27 2017-04-03 2017-04-11 2020-04-10 RW-NELSAP -8853-CS-INDV / Training on tailoring Open 1,050.00 0.00 2017-01-22 2017-02-12 2017-02-14 2017-02-23 2017-02-28 RW-NELSAP -9675-CS-INDV / Assistant Open 60,000.00 0.00 2017-04-20 2017-06-08 2017-06-10 2017-06-12 2019-06-12