County of San Diego, Planning & Development Services

Similar documents
APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

Exhibit IV-1: Initiation of Zoning Map Amendments Case Report HEARING DATE: MAY 3, 2012

9. GEOLOGY, SOILS, AND MINERALS

ON SITE SYSTEMS Chemical Safety Assistant

Honorable Mayor and Members of the City Council

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Exhibit A Description of Services Section 37 Floodplain Storage Design

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

3. Chemical Hygiene Plan: Laboratory Standard Operating Procedures. A. Laboratory Specific Information and Signatures

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

E-Community Check Request Checklist

Additional Testing for Padre Dam Eastern Service Area Secondary Connection- Alternative Site Location, San Diego County, California

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT

Trip and Parking Generation Study of Orem Fitness Center-Abstract

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

Materials. Use materials meeting the following.

Attachment E: CADP Design Shadow Analysis

COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)

PRELIMINARY WORKING DRAFT Work in Progress

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA

PLANNING COMMISSION AGENDA

APPENDIX A NOTICE OF PREPARATION AND INITIAL STUDY

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2.

BACKGROUND AND PROJECT DESCRIPTION

Regulations concerning protection of Bjørnøya Nature Reserve in Svalbard

4.12 Mineral Resources

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

3301 East 120 th Avenue Assited Living & Memory Care

Chapter 7 Mudflow Analysis

APPENDIX B. CalEEMod Output Files

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Appendix A Zoning Ordinance

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

DRAFT Initial Study and Mitigated Negative Declaration Kolev Residence Project City of Pacifica, San Mateo County, California

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

Eastlake Assited Living & Memory Care

Name of Applicant Mailing Address address Telephone Number

BENTON CLEAN AIR AGENCY 526 S. Clodfelter Road Kennewick, WA 99336

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

2267 N o r t h 1500 W C l i n t o n U T 84015

SUBJECT: CONGESTION MANAGEMENT PROGRAM 2013 LOCAL DEVELOPMENT REPORT, RESOLUTION NO

Specifications Whitcomb Elementary School Demolition January 15, 2016

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

University of Tennessee Safety Procedure

GUIDELINES OF PROCUREMENT - CHEMICALS FOR RESEARCH CHEMICAL MANAGEMENT CENTRE

DECREE No. 44. of the Ministry of Economy of the Slovak Republic. dated 19 February 1999,

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

Villages at Riverdale Thornton, CO

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

APPLICATION FOR CHANGE OF WATER RIGHT

ZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

TSCA SECTION 13 IMPORTER CERTIFICATION PROCEDURE

Fixture Seal of Approval Program

Chemical Hygiene Plan for Laboratories

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

Section 4: Model Development and Application

King City URA 6D Concept Plan

4.3 CULTURAL RESOURCES

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SYRACUSE UNIVERSITY RADIATION PROTECTION PROGRAM APPLICATION FOR USE OF RADIOACTIVE MATERIALS

MEMORANDUM. Trip Generation Analysis

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Chapter 7 Mudflow Analysis

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Chemical Donation Policy. Santa Clara University (SCU) 500 El Camino Real Santa Clara, CA 95053

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

G.1. Motion to approve Project Calendar regarding Planning and Development Department Payments as follows:

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

Professional Agreement Invoice and Progress Report

EXHIBIT H LOT 317 GRADING AND SITE PLAN

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

AM 500A 500 WATT AM 1A 1 KILOWATT AM BROADCAST TRANSMITTERS. October, 1999 IM No

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

REQUEST FOR PROPOSALS CLOSING DATE:

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

PLAZA MEXICO RESIDENCES

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority:

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

Transcription:

County of San Diego, Planning & Development Services E N V I R O N M E N T A L R E V I E W U P D A T E A P P L I C A T I O N F O R A P P L I C A T I O N S C O V E R E D B Y A P R E V I O U S L Y C O M P L E T E D C E Q A D O C U M E N T ZONING DIVISION SUBMIT FOUR (4) COMPLETED COPIES AND A COPY OF THE ORIGINAL APPLICATION FOR AN ENVIRONMENTAL INITIAL STUDY (AEIS) TO PDS ZONING Permit/Entitlement applications that are implementing all or portions of a project that was considered in a previous CEQA document (Negative Declaration or EIR) only require an update. The update consists of: 1) Ensuring that the application complies with all applicable environmentally related County Ordinances including, but not limited to, the Biological Mitigation Ordinance, Resource Protection Ordinance, Habitat Loss Permit Ordinance, and 2) A limited review of the previous CEQA document to determine if any changes to the project, changes in circumstances, or new information result in new or substantially more severe environmental effects that require additional CEQA analysis or documentation. Project Number(s): ^ Y)' t^"" oqu ih THIS FORM IS BEING COMPLETED BY: Nick Siracusa Name (Please print) Omega Engineering Consultants, Inc. Staff Engineer Agency (If applicable) Title Date 4340 Viewridge Ave. Suite B Address San Diego, CA 92123 (858)634-8620 (858) 634-8627 City state Zip Ptione Number Fax Number Quail Canyon Dr. El Cajon, CA APN No. 393-022-11 Project Location (including APN) / hereby certify that the statements furnished below and in the attached exhibits present the data and information required for adequate evaluation of this project to the best of my ability that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. I further understand that additional information may be required to be submitted before an adequate evaluation can bejnade by thej^unty of San Diego. Signature: Date: D^/l3>/H^ COUNTY USE ONL Y SDC PDS RCVD 06-24-16 TM5202TE 5510 OVERLAND AVE, SUITE 110, SAN DiEGO, CA 92123 (858) 565-5981 (888) 267-8770 http://www.sd cou PDS-366 (Rev. 09/21/2012) 1 I PAGE 1 of 7

PREVIOUS ENVIRONMENTAL REVIEW DETAIL 1. Indicate all open and previously approved discretionary permit applications filed with the County of San Diego related to the existing application. Indicate the respective case numbers: Contact Zoning for assistance at 1-(888)-267-8770. TR No. 5202 RPL 7 PDS2016-LDGRMN-20079 2. 13 n CU A stormwater management plan has been submitted with a prior related discretionary application. If yes, indicate application number(s): Unknown (old). 3 K Q n Multiple Species Conservation Program (MSCP) Findings/Biological Mitigation Ordinance (BMO) Conformance have been made with a prior related discretionary application. If yes, indicate application number(s): Unknown (old) 4 California Department of Fish and Wildlife Fees: If your project has an effect on native biological resources, State law requires the payment of a fee to the California Department of Fish and Wildlife (CDFW) for their review of the document (Fish and Wildlife Code 711.4). Generally, only one filing fee is required for each project. Please indicate the (CDFW) Fee Status of your project: D D K ] The project has previously paid for (CDFW) Fees. If Yes. and a receipt of the payment is available, please attach. CD EH Kl The project has previously been found to have a "de minimis impact" on fish and wildlife resources. PROJECT DETAIL FEATURES OF THE APPLICATION WHICH DEVIATE FROM, OR WERE NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT Describe all deviations of the current application from the project analyzed in the previous CEQA document. In cases where the project description in the previous CEQA document only generally recognizes the portion of the project covered by the current application, please provide additional detail. The narrative must be supplemented by a project plan or map of approphate scale and legibility with all deviations "Redlined". Also, include details such as any boundary adjustments, rezones, or general plan amendments which have involved the project site since the previous CEQA document was adopted/certified. If there are no deviations from the project analyzed in the previous CEQA document and the project description clearly details the specifics of the present application, please write "None." Lack of sufficient detail may result In project delay and the requirement to resubmit detailed project information. Use additional sheets if necessary. 5510 OVERLAND AVE, SUITE 110, SAN DiEGO, CA 92123 (858) 565-5981 (888) 267-87TO http://www.sdcountv.ca.qov/pds PDS-366 (Rev. 09/21/2012) PAGE 2 of 7

CODE COMPLIANCE/VIOLATION ISSUES Describe any known open or active code compliance/violation issues on the proposed project site. Indicate related Violation Numbers. If no open or active code compliance/violation issues are present or known, please state "NONE" or "UNKNOWN", as appropnate. (Use additional sheets if necessary): NONE OFF-SITE IMPROVEMENTS/UTILITY EXTENSIONS WHICH DEVIATE FROM, OR WERE NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT YES NO Are there any necessary off-site improvements/utility extensions either 1) not detailed in the earlier environmental review or 2) deviates from the off-site improvements/utility extensions shown in the previous environmental review? If "Yes", answer the foilowinq questions and make sure that any deviations are "Redlined" on an attached exhibit/plan. Use additional sheets if necessary. Is construction of new off-site streets or widening of existing off-site streets proposed which deviates from or was not detailed in the project analyzed in the previous CEQA document? If yes, describe: ^ Is the extension of sewer/water/electric/gas lines proposed which deviates from or was not detailed in the project analyzed in the previous CEQA document? If yes, describe (include distance to the nearest existing lines - in miles or feet, and the location of anticipated connection point): 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5981 (888) 267-87T0 http://www.sdcountv-ca.gov/pds PDS-366 (Rev. 09/21/2012) PAGE 3 of 7

Con//nued YES NO Are new off-site drainage/stormwater/flood control facilities or improvements to the existing off-site drainage/stormwater/flood control facilities proposed which deviates from or was not detailed in the project analyzed in the previous CEQA document? If yes, describe: ^ Are pedestrian and/or bicycle paths which deviate from or were not detailed in the project analyzed in the previous CEQA document proposed? IV. GRADING WHICH DEVIATES FROM, OR WAS NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT K Is any necessary grading either 1) not detailed in the earlier environmental review or 2) deviates from the grading shown in the previous environmental review? If "Yes", answer the foilowinq questions and make sure that all deviations are "Redlined" on an attached exhibit/plan. Use additional sheets if necessary. Will grading or filling, which deviates from or was not detailed in the project analyzed in the previous CEQA document, be required? If yes, discuss deviations from original plan: Vol. of cut: cubic yds. Max cut slope ratio: Max. height: ^ft. Vol. of cubic yds. Max fill slope ratio: Max. height: ft. Vol. of cut: cubic yds. Max cut slope ratio: Max. height: _ ft. Vol. of cubic yds. Max fill slope ratio: Max. height: ft. If soil is to be imported/exported please describe the source of import/export location, if known. (Use additional sheets if necessary): K Is grading or filling of soil anticipated off-site which deviates from or was not detailed in the project analyzed in the previous CEQA document? Explain (Use additional sheets if necessary): 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5981 (888) 267-8770 http://www.sdcountv.ca.gov/pds PDS-366 (Rev. 09/21/2012) PAGE 4 of 7

YES NO UNKNOWN Is blasting which deviates from or was not detailed in the project analyzed in the previous CEQA document anticipated? If so, please indicate possible location of blasting sites on the grading plan & detail the areas expected to be blasted: K Are retaining walls proposed which deviates from or was not detailed in the project analyzed in the previous CEQA document? If yes, discuss deviations from original plan: (Show all retaining walls on site/plot plan or map) Max. height ft. Proposed Length ft. Max. height ft. Proposed Length V. PROPOSED SITE UTILIZATION WHICH DEVIATES FROM, OR WAS NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT YES NO I I K Is the project either a multi-family residential, commercial or industrial project AND were building characteristics either 1) not detailed in the earlier environmental review, or 2) deviates from the building characteristics shown in the previous environmental review? If "Yes", fill in only those areas below which deviate from the oriqinal proiect and make sure that these deviations/specifications are shown/'redlined" on an attached exhibit/plan. Use additional sheets if necessary. 1. Total area sq. ft. Total net area (total minus area of public street and dedication) 2. Number of buildings Height acres or sq. ft. Stories 3. Number of attached residential units 4. Number of floor area: Commercial uses Industrial uses: 5. Number of off-street parking spaces 1. Total area sq. ft. Total net area (total minus area of public street and dedication) 2. Number of buildings Height 3. Number of attached residential units 4. Number of floor area of: Commercial uses acres or sq. ft. Stories Industrial uses: 5. Number of off-street parking spaces 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5981 (888) 267-8770 http://www.sdcountv.ca.gov/pds PDS-366 (Rev. 09/21/2012) PAGE 5 of 7

Con//nued VI. COMMERCIAL/INDUSTRIAL SITE UTILIZATION Complete ONLY for proposed projects associated with Commercial or Industrial development (including Day Care Centers and Cottage Industries). Fill out to the extent known. PROJECT OPERATIONS WHICH DEVIATE FROM, OR WERE NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT 1. Number of average daily vehicle trips generated by the project 2. Facilities to be open on weekdays from a.m. to p.m. On weekends from a.m. to p.m. 3. Total number of employees Each Shift 4. Number of clients, customers, or users EACH weekday 5. Radius of the service area 6. Total floor area square feet Type of uses 7. Number of off-site parking spaces provided 8. North American Standard Industrial Classification Code(s) mo://vmv^.census.aov/eocd/www/naicstab.iitm): PROJECT OPERATIONS (cont.) Complete ONLY for proposed projects associated with Commercial or Industrial development (including Day Care Centers and Cottage Industries). Fill out to the extent known. 1. Number of average daily vehicle trips generated by the project 2. Facilities to be open on weekdays from a.m. to p.m. On weekends from a.m. to p.m. 3. Total number of employees Each Shift 4. Number of clients, customers, or users EACH weekday 5. Radius of the service area 6. Total floor area square feet Type of uses 7. Number of off-site parking spaces provided 8. North American Standard Industrial Classification Code(s) (iittd://www.census.aov/epcd/www/naicstab.iitm): A. INDUSTRIAL WASTE WHICH DEVIATES FROM, OR WAS NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT 1. Will industrial waste be discharged which deviates from or was not detailed in the project analyzed in the previous CEQA document? If yes, attach a discussion of the provisions for disposal. 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5981 (888) 267-8770 http://www.sdcountv-ca.gov/pds PDS-366 (Rev. 09/21/2012) PAGE 6 of 7

2 u ^ u Will the project result in the use or discharge of hazardous materials including hazardous air emissions (i.e., chemicals, dust, smoke, etc.) which deviate from or were not detailed in the project analyzed in the previous CEQA document? If yes, attach a discussion of the pollutants mandated for control and any special permits required. Also answer the following (Use additional sheets if necessary) : a. What type of material(s) b. How often? B. MISCELLANEOUS ITEMS WHICH DEVIATE FROM, OR WERE NOT DETAILED IN THE PROJECT ANALYZED IN THE PREVIOUS CEQA DOCUMENT 1- u ^ u Could the project result in the emission of any substances or energy such as odor, vibration, glare, or electrical disturbance (including blasting) which deviate from or were not detailed in the project analyzed in the previous CEQA document? 2 U M U Will the project contain any unique elements, such as industrial machinery, generators, exterior heavy work areas, outdoor speakers, heavy equipment operation that could generate substantial noise that could be heard outside the project which deviates from or was not detailed in the project analyzed in the previous CEQA document? (Do not include common noise sources associated with all projects such as construction and traffic.) 3- U M U Will the project involve the storage of dangerous materials (e.g., liquefied petroleum gas) which deviate from or were not detailed in the project analyzed in the previous CEQA document? If yes, what safety measures have been taken? Use additional sheets if necessary. 5510 OVERLAND AVE, SUITE 110, SAN DIEGO, CA 92123 (858) 565-5981 (888) 267-8770 http://www.sdcountv-ca.gov/pds PDS-366 (Rev. 09/21/2012) PAGE 7 of 7