Fluvial Driven Alluvial Fans

Similar documents
Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Assessment. Assessment

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

Why Geomorphology for Fish Passage

Case Study 2: Twenty-mile Creek Rock Fords

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Restoring the Napa River:

Step 5: Channel Bed and Planform Changes

Four Mile Run Levee Corridor Stream Restoration

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Lower South Fork McKenzie River Floodplain Enhancement Project

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

Fish Passage at Road Crossings

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

SELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

Russian River Independent Science Review Panel

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Why Stabilizing the Stream As-Is is Not Enough

PolyMet NorthMet Project

Case Study 8. North Fork Nooksack River In-channel Project

Case Study 14. Rocky Creek Vented Box Culvert Ford

Forest Service AOP Meeting Objectives of Stream Simulation: Examples and Talking Points

3.3 CLIMATE, GEOLOGY, TOPOGRAPHY, AND SOILS CLIMATE GEOLOGY TOPOGRAPHY

Dolores River Watershed Study

Tom Ballestero University of New Hampshire. 1 May 2013

Upper Mississippi River Basin Environmental Management Program Workshop

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Streams. Stream Water Flow

Stream Classification

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Options looking forward for sediment management in the Alameda Creek Flood Control Channel

Rosgen Classification Unnamed Creek South of Dunka Road

Griswold Creek August 22, 2013

Flood and Stream Restoration

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Long Valley Meadow Restoration Project

CASE STUDIES. Introduction

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

6.11 Naas River Management Unit

MEMORANDUM. Lebanon Area Regional Stormwater Consortium Participants. From: Dan Cannistraci. Streambank Restoration Projects.

APPENDIX B: Description of Structural Flood Control Options (from Tetra-Tech 2003 Draft Dungeness River Flood Hazard Management Plan)

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

!"#$%&&'()*+#$%(,-./0*)%(!

NORTHUMBERLAND COUNTY, PA

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

Garner State Park Pavilion Preservation Study

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted

Session C1 - Applying the Stream Functions Pyramid to Geomorphic Assessments and Restoration Design

Appendix G. Riverbank Stabilization Techniques

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

UPPER KETTLE CREEK FISH HABITAT CONSERVATION PLAN TRIBUTARIES ADDENDUM

Restoration Goals TFG Meeting. Agenda

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Natural Shoreline Landscapes on Michigan Inland Lakes

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012

ODFW AQUATIC INVENTORY PROJECT RESTORATION MONITORING STREAM HABITAT REPORT. Peggy Kavanagh, Trevan Cornwell TOLEDO SOUTH Coast Range Lora Tennant

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Erosion Surface Water. moving, transporting, and depositing sediment.

Elwha River response to dam removals through four years and a big flood:

GEOL 652. Poudre River Fieldtrip

Overview of fluvial and geotechnical processes for TMDL assessment

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

1 INTRODUCTION AND MAJOR FINDINGS... 1

4.1 Review the Road Context. 4.2 Review Resource Values. 4.3 Evaluate Watershed Risk Factors. 4.4 Conduct the Initial Site Reconnaissance

Sprague River Basin Restoration Post Project Evaluations: Lessons Learned and Future Applications

Degradation Concerns related to Bridge Structures in Alberta

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Site and Reach Assessment, Glacier Creek side SR542. Site and Reach Assessment Side Channel, Glacier Creek at SR542

Rapid Geomorphic Assessments: RGA s

3. MARINE HABITAT RESTORATION

Columbia Estuary Province

DESCHUTES RIVER BANK STABILIZATION PROJECTS ASSESSMENT

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Appendix 5 Fluvial Geomorphological Detailed Information

3.12 Geology and Topography Affected Environment

Working with Natural Stream Systems

ODFW AQUATIC INVENTORY PROJECT STREAM REPORT

Instream Erosion Control General

Technical Supplement 3E. Rosgen Stream Classification Technique Supplemental Materials. (210 VI NEH, August 2007)

Appendix F Channel Grade Control Structures

FLUVIAL LANDFORMS. Floodplains

Restoring Entrenched Rivers: lessons learned from the

Fluvial Geomorphology Assessment of Northern Connecticut River Tributaries

Ways To Identify Background Verses Accelerated Erosion

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

ODFW AQUATIC INVENTORY PROJECT OREGON PLAN FOR SALMON & WATERSHEDS STREAM RESTORATION HABITAT REPORT

REACH 1 T37S-R14W-S07NW

APPENDIX E Geomorphic Channel Surveys. October 2004

Transcription:

Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley

1. Basic Fan Description 2. Fluvial Driven Fan Characteristics 3. Restoration Project Evaluations 4. Key Lessons Learned presentation outline

Alluvial fans are gently sloping, fan-shaped landforms created over time by deposition of eroded sediment fan description 1

Debris Flow alluvial fans alluvial fans 2

Death Valley Fan alluvial fans 3

Fluvial Driven alluvial fans alluvial fans 4

Erosion Sediment Transport Deposition 1.) Stream flow carriers sediment through canyon. 2.)Stream leaves canyon dispersing water and sediment. 3.) Area below canyon forms a cone of deposited material. fan formation 5

zone of deposition zone of transportation zone of erosion fan formation 6

Alluvial Fan Creeks & Channels 7

fan channel fan channels are different from river valley channels river valley channel fan characteristics 8

Alluvial Fan Typical River fan characteristics 9

distributary channels: disperse water away from main channel sheet flow: thin sheet of water flowing over surface of fan fan characteristics 10

rock transport - powerful streamflow flow waters move boulders, cobble and gravel along fan channel rock deposition rocks are deposited at various points on the fan fan characteristics 11

In high flows mainstem river would cut into fan deposits. Alluvial fan deposits are an important source of coarse sediment. fan characteristics 12

unconsolidated material - drains easily Loosing stream dry channel Bedrock gaining stream fan characteristics 13

alluvial fan channels have seasonal flows fan characteristics 14

Fan apex Channelized zone Braided zone Sheet flow zone fan characteristics 15

3.21.08 8.17.11 (Parson s Creek, Sonoma County) fan characteristics 16

1942 Braided Channel Wetland Oak Savanna Distributary Channels fan characteristics 17

Alluvial Fans are unique types of creeks 18

Selby Creek Watershed Parsons Creek Watershed Morrison Creek Watershed Ritchie Creek Watershed Sulfur Creek Watershed Redwood Creek (Upper) Watershed case study sites 19

In the Napa Valley alluvial fans line the valley floor. In some locations fans merged together at the toe creating a bajada. The largest fans are located on the western side. 0 1.25 2.5 5 7.5 10 Miles lidar analysis 20

Fans push river across valley lidar analysis 21

Relic channel at fan head Channels at fan toe 0 0.0325 0.065 0.13 0.195 0.26 Miles 0 0.1 0.2 0.4 0.6 0.8 Miles lidar analysis 22

relic channels current channel lidar analysis 23

current channel Fan Head relic channel Mid Fan Fan Toe lidar analysis 24

current channel distributary channels lidar analysis 25

scars from flooding scars from flooding distributary channel oblique aerial 26

Understanding Alluvial Fan Channel Restoration and Management 27

selby creek 28

1940 Distributary Channels No Continuous Riparian Corridor Remnants of Oak Savanna Distributary Channels (photograph from SFEI) historic aerial photograph 29

SELBY CREEK CONCEPTUAL MODEL (As described in project documents) IDENTIFIED PROBLEM SITE CONSTRAINTS OVERALL PROJECT OBJECTIVES RESTORATION ACTIONS OBJECTIVES Culvert blocks fish passage through creek Channel lack riparian vegetation Poor instream habitat conditions Unstable banks Legacy trees undercut project limited to current width of channel Create series of pools for fish passage and habitat Increased riparian vegetation and associated reduction in sediment input. Decreased water temperatures. Increase bank stability. Create a low flow meandering channel. opposing deflectors log boulder wing deflectors cross channel v-weir boulder wing deflectors boulder stream bank protection armored banks hand rocked trees reconnected stream to floodplain removal of mid channel willows live willow mattresses live willow baffles enhance low flow channel to develop meanders increase resting areas, pools, and large woody debris stabilize eroding banks reduce sediment inputs to main stem river rehabilitation of instream habitat limit channel incision decrease water temperatures protect existing trees increase native vegetation live willow brushes riparian vegetation enhancement remove invasive vegetation increase riparian canopy selby creek conceptual model 30

UNDISTURBED ALLUVIAL FAN SYSTEM high erosion in mountainous areas PROJECT SPECIFIC OBJECTIVES NEW TYPE OF ALTERED SYSTEM stream flows at high velocities carrying sediment through canyon stream exits canyon change in slope causes stream to deposits sediment channel migrates back and forth over thousands of years forming a fan shape of deposited rocks channel form is braided with distributary channels or entrenched fan head channel enhance low flow channel to develop meanders increase resting areas, pools, and large woody debris stabilize eroding banks reduce sediment inputs to main stem river rehabilitation of instream habitat limit channel incision decrease water temperatures protect existing trees Single channel, with stabilized banks, pool habitat, and vegetated with willow trees fan vegetated with oak savanna andromous fish use channels to seasonally migrate to spawning habitat in headwaters increase native vegetation remove invasive vegetation increase riparian canopy conceptual model comparison 31

Quantity Techniques and Structures 18 Boulder streambank protection sites - totally 867 11 V-weirs 102 Boulder wing deflectors (including opposing boulder wing deflectors) 4 Log/boulder wing deflectors 145 Live woven willow wall 50 Live willow brush mattress 281 Live willow brush mattress 26 Live willow siltation baffles, totalling 348 15 Live willow brushes, totalling 180 3 Live willow cluster sites, totalling 552 sq ft. 3 Boulder armor sites, totalling 35 yards 96 Gabion basket repaired (NRCS site) 6 Boulder wing deflectors repaired (NRCS site) 2 Undercut pines, hand rocked 23,956 ft Grading Misc. Removal of mid-channel willows causing disturbance selby creek 32

Digger Log To create pool habitat 2007 2012 ground photograph comparisons 33

Opposing Boulder Wing Deflectors To create pool habitat & improve fish passage 2007 2012 ground photograph comparisons 34

Rip Rap To stabilize bank 2007 2013 ground photograph comparisons 35

Willow Baffles To increase native vegetation 2007 2013 ground photograph comparisons 36

Benefit/ Goals Improved in-stream habitat - including pools, resting areas, shelter and large wood. Increased riparian vegetation and associated reduction in sediment input. Decreased water temperatures. Increased bank stability Improved fish passage Success Evaluation Low success Low success, majority of willow plants died No data - undetermined Success varies No data, culvert still fish barrier selby creek 37

project 2 project 1 redwood creek 38

1942 Braided Channel Wetland Oak Savanna Distributary Channels historic aerial photograph 39

Braided Channel No Continuous Riparian Corridor 1942 Gravel Bar historic aerial photograph 40

REDWOOD CREEK PROJECT 1 CONCEPTUAL MODEL (As described in project documents) IDENTIFIED PROBLEM SITE CONSTRAINTS OVERALL PROJECT OBJECTIVE RESTORATION ACTIONS OBJECTIVES Need for project not stated in project documents. 0.4 miles of channel available for restoration project Enhance 1,500 feet section of Redwood Creek for salmonid species. Create habitat for rearing juveniles. Enhance stream for Coho migration boulder deflectors upstream facing boulder weirs mid-stream boulder cluster with large woody debris pool enhancement boulder deflectors with willows erosion control vegetative plantings sediment recruitment willow cluster plantings cover redwood creek 1 conceptual model 41

UNDISTURBED ALLUVIAL FAN SYSTEM high erosion in mountainous areas PROJECT SPECIFIC OBJECTIVES NEW TYPE OF ALTERED SYSTEM stream flows at high velocities carrying sediment through canyon stream exits canyon pool enhancement change in slope causes stream to deposits sediment channel migrates back and forth over thousands of years forming a fan shape of deposited rocks channel form is braided with distributary channels or entrenched fan head channel erosion control sediment recruitment cover Single channel, with stabilized banks, pool habitat, and vegetated with willow trees fan vegetated with oak savanna andromous fish use channels seasonally to migrate to spawning habitat in headwaters conceptual model comparison 42

3 7 9 A REDWOOD CREEK Knights Valley, Sonoma County, California field survey 08.25.2011 construction zone END OF SURVEY N 38.635707501 W 122.6874300242 wp 2 A 3 08.25.2011 Cabled boulders on RB, but instream boulders covered in cobble. 12.08.2005 Plan called for weir, j-hook installed. 3 CABLED J HOOK cabled CONSTRUCTED LEVEE 5 5a 5b 5c B 5 08.25.2011 Three pairs of boulder deflectors found. Pools formed along LB 5b and 5c. Three more boulder clusters found on RB, about 285 upstream. No cables, unclear if part of project. 12.08.2005 According to as-built map, three deflectors on RB and four on LB. 5 BOULDER DEFLECTORS ACCESS ROAD 5d N 38.635321240 W 122.6856061754 5e 5f F 5 wp 7a 12.08.2005 Six cabled clusters, mid-channel along 258 feet of channel. Pool excavated. 7 INSTREAM BOULDER STRUCTURES 7b 08.25.2011 No cabled boulders found mid-channel. Found three boulder clusters/deflectors on LB. Pools formed at two upstream clusters. 7c C 7 LEVEE 10a LEVEE 9 B 9a cabled 10b 9 C 10c 08.25.2011 Four stuctures found on RB. Unclear if these were deflectors or weirs. 12.08.2005 Five structures in plan, four installed along 113 feet of channel. Treatment placed on BFC (bankfull channel?). No photos. 10 BOULDER DEFLECTORS N 38.634827671 W 122.6819423810 D 10 9 D cabled 10d 11 ACCESS ROAD wp START OF SURVEY (fence) flow C 11 11c 2 CABLED J HOOK 08.25.2011 No vestige found. Location approximated. 12.08.2005 Plan called for weir, j-hook installed. 6 RIP RAP 08.25.2011 No vestige found. 12.08.2005 Installed 40 feet of riprap along left bank, parallel to stream. From 2005 report: Riprap not called for in plan. Appears that excess material used for riprap would have been more appropriately used to create another deflector. 9 WEIRS 08.25.2011 One weir (9A) remains intact. Unclear if other boulder structures along RB were part of Feature 9: instream Weirs or Feature 10: Boulder Deflectors. 12.08.2005 Series of four weirs along 414 feet of channel. From 2005 report: All weirs exceed 1 height called for in plan. 11 BOULDER DEFLECTORS 08.25.2011 Six structures found. 12.08.2005 Series of six boulder deflectors along 150 feet of LB. From 2005 report: No boulder deflectors called for at this site in the plan. Extra work poorly implemented, need to be restacked for correct functioning. N waypoints based on NAD27 surveyed project features 100 ft wp X estimated location of as-built feature Base aerial from Google Earth, image dated 10/24/2009 redwood creek 1 project map 43

J-Hook To create pool habitat 2005 2011 ground photograph comparisons 44

J-Hook To create pool habitat 2005 2011 ground photograph comparisons 45

Rock Weir To create pool habitat 2005 2011 ground photograph comparisons 46

12.08.2005 08.25.2011 Of the 30 installed rock structures only 11 could be considered functioning. ground photograph comparisons 47

project 2 Instream ford removal project 1 redwood creek - project 2 48

REDWOOD CREEK PROJECT 2 CONCEPTUAL MODEL (As described in project documents) IDENTIFIED PROBLEM SITE CONSTRAINTS OVERALL PROJECT OBJECTIVE RESTORATION ACTIONS OBJECTIVES Ford (instream road crossing) blocks fish passage through creek 0.6 miles of channel available for restoration project Remove ford across Redwood Creek Rehabilitate channel to allow fish access upper watershed ford removed rock ramps separated by pools remove ford and rehabilitate the channel to allow fish access to upstream areas design for fish passage by swimming rather than leaping armored bank rock ribs prevent thalweg from moving from right to left bank rock barb live willow mattresses make fanhead trench self-maintaining so that sediment is carried through reach rather than deposited rock and willow lifts create riparian cover and protect against bank erosion oak trees planted revegetation of fan redwood creek 2 conceptual model 49

UNDISTURBED ALLUVIAL FAN SYSTEM high erosion in mountainous areas PROJECT SPECIFIC OBJECTIVES NEW TYPE OF ALTERED SYSTEM stream flows at high velocities carrying sediment through canyon stream exits canyon change in slope causes stream to deposits sediment channel migrates back and forth over thousands of years forming a fan shape of deposited rocks channel form is braided with distributary channels or entrenched fan head channel fan vegetated with oak savanna design for fish passage by swimming rather than leaping prevent thalweg from moving from right to left bank make fanhead trench self-maintaining so that sediment is carried through reach rather than deposited create riparian cover and protect against bank erosion revegetation of fan Single channel, with stabilized banks, pool habitat, and vegetated with willow trees andromous fish use channels seasonally to migrate to spawning habitat in headwaters remove ford and rehabilitate the channel to allow fish access to upstream areas conceptual model comparison 50

Irrigation pipe Step Pools J-hook Rip Rap Boulder Cluster ² 50 ft Rock and willow lifts Boulder Cluster Rip Rap redwood creek 2 project map 51

04.24.2012 02.16.13 rock structures breaking apart live willow mattress eroding & pools filling in redwood creek - project 2 52

XS- 1 428.00 XS- 5 426.00 426.00 424.00 424.00 422.00 422.00 420.00 420.00 Axis Title 418.00 416.00 Oct. 28, 2011 Apr. 20, 2012 Axis Title 418.00 Oct. 28, 2011 26- Jun- 12 Feb. 15, 2013 414.00 Feb. 15, 2013 416.00 414.00 412.00 412.00 410.00 410.00 408.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 408.00-20.0 0.0 20.0 40.0 60.0 80.0 100.0 120.0 Axis Title Axis Title Channel has aggraded 2-3 feet in 2 years. 426.00 XS- 4 Control cross section 424.00 XS- 10 438.00 422.00 436.00 420.00 434.00 Axis Title 418.00 416.00 Oct. 28, 2011 26- Jun- 12 Feb. 15, 2013 Axis Title 432.00 430.00 Oct. 28, 2011 Apr. 20, 2012 428.00 Feb. 16, 2013 414.00 426.00 412.00 424.00 410.00-20.0 0.0 20.0 40.0 60.0 80.0 100.0 120.0 Axis Title 422.00-50.0 0.0 50.0 100.0 150.0 200.0 250.0 Axis Title 1 4 10 5 redwood creek - project 2 53

pools filling in with rock redwood creek - project 2 54

02.16.13 live willow mattresses falling apart redwood creek - project 2 55

02.16.13 rip rap channel banks falling apart redwood creek - project 2 56

02.16.13 boulder cluster - instream structure destroyed redwood creek - project 2 57

The feasibility of small scale highly engineered habitat enhancement projects should be reconsidered given the dynamic nature of the system. Large scale management is needed. Site sediment deposition and transport capacity should be assessed to ensure appropriate models and methods are used in the site design. Stream flow and infiltration rates need to be studied to determine the duration of pools in channel. Fish surveys and studies need to be conducted to determine how fish use these channels for migration. key lessons learned 58