Initial Report. North Central Texas Initial Attack. Hildreth Road Dozer Accident. February 9, 2006

Similar documents
Report of the Texas Forest Service Accident Investigation Team Hildreth Pool Road Bull Dozer Accident. Montague County February 9, 2006.

GREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)

GREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)

GREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)

Preliminary Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Near Serious Accident 12/9/2017

Informational Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Firefighter Injuries.

Informational Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Firefighter Injuries and Fatality

Panther Fire Dozer Accident and Motor Grader Rollover

Event Type: Date: Location: Chainsaw Operations Resulting in Broken Leg Background When is a quick informal briefing appropriate?

GREEN SHEET. California Department of Forestry and Fire Protection

Informational Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Bulldozer Rollover Fatality

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES CAL OES CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION CAL FIRE

Colorado Front Range Wildfires Situation Report #7 Monday, July 02, :15 AM (MDT)

The mowed firebreaks are at least 10 wide and are usually 20. A rotary hay rake is used to clear larger firebreaks.

Wyoming State Operations Center

City of Lee s Summit Public Works Operations

EMERGENCY PROCEDURES FLIPCHART READ AND UNDERSTAND ALL INSTRUCTIONS THOROUGHLY. THE LIFE YOU SAVE MAY BE YOUR OWN!

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

Flood Scenario Worksheet

I. What was planned, or what was our intent?

STORM COWBOY. FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION

DDAS Accident Report

AN ACCIDENT OF THE UNION PACIFIC RAILROAD AT WAMSUTTER, WYO., ON NOVEMBER 26, 1934.

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

Town of Oconomowoc Snow & Ice Control Policy

WATERFALL FIRE IN CARSON CITY, NEVADA JUNE 2004

Risk Assessment and Management System (RAMS)

ACCIDENT ON THE UNION PACIFIC RAILROAD DECKER; COLO. NOVEMBER 7, INVESTIGATION NO. 2119

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

Preliminary Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Fatality Firefighter Entrapment

APPENDIX F PRE-COURSE WORK

Comprehensive Emergency Management Plan

Smoke Fog Superfog - Smoke and Fog mixture Heavy rain and wind

May 31, Flood Response Overview

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

Natural Disaster Emergencies

MULTI-AGENCY COORDINATION SYSTEM PUBLICATION CALIFORNIA FIRE WEATHER PROGRAM RISK PREPAREDNESS GUIDE MACS 410-3

FOREST FIRE. News August 14, :00am. Parry Sound 33 Fire Update

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

Checklist: Deposing the Driver in an Auto Accident

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

2003 FIRE SIEGE CAUSES, RESPONSE AND RECOVERY

Dunn County Snow Removal Policy

FIREHOUSE MAGAZINE EMERGENCY VEHICLE OPERATIONS PERSONALLY OPERATED VEHICLES P.O.V. S KILL

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

Page 1 of 6 SWCC MORNING INTELLIGENCE BRIEFING. June 1, Daily Summary

TEXAS FIREFIGHTER POCKET CARDS

Emergency Action Guidelines for NH 4-H Animal Events

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Winter Ready DC District of Columbia Public Service Commission

FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION TO LOCATE POSSIBLE THREATS TO LIFE AND PROPERTY. And

University of Oklahoma Emergency Response Plan for INSERT EVENT NAME HERE.

Winter Storm Response - January 2016 Due to the uncertainty of the event, we must be prepared

Parish of Ascension. ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours

The hydrologic service area (HSA) for this office covers Central Kentucky and South Central Indiana.

NWS Fire Weather Forecast, Wildland Fire Assessment Systems and OKMesonet Products Applications as Short Term Mitigation Tools for Emergency Response

TEXAS WILDLAND FIRE POTENTIAL WINTER/SPRING 2018/2019

MODELING LIGHTNING AS AN IGNITION SOURCE OF RANGELAND WILDFIRE IN SOUTHEASTERN IDAHO

HURRICANES AND TORNADOES

Elements of the National Weather Service Fire Weather Forecast By Casey Sullivan, National Weather Service, Chicago

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

2010 Winter Weather Advisory

Innovative Decision Support Services for the 27 February 2011 Wildfire Outbreak Across the Texas Panhandle. Michael Scotten NOAA/NWS Amarillo, Texas

SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES. Plan/Event Information for:

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION

John A. Carlson Snow and Ice Removal

TABLE OF CONTENTS LIST OF TABLES. Page

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

Approaching Thunderstorm/Lightening. Severe Storm, Windstorm or Tornado

REVIEW. May 12, Shoshone National Forest. Washakie Ranger District. Lander, Wyoming

NOTE: Report Filter Groups are applied to the report SQL as "AND" conditions (i.e. Group 1 AND Group2 and Group 3 etc...)

Wildfire Preparedness

Texas Wildland Fire Season Outlook. for. Winter 2009

COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES

Pole Creek Bucket Extraction Sept 28, 2012 FACILITATED LEARNING ANALYSIS

Tornadoes pose a high risk because the low atmospheric pressure, combined with high wind velocity, can:

Your Task: Read each slide then use the underlined red or underlined information to fill in your organizer.

Transparency: Redoubt ash cloud

Snow Response in an Urban Setting

Southeast and Northeast Region After Action Report April 22, 2010 Severe Weather Events

Hot Calls. Odessa FD: MVA. Burdett FD: MVAs


Lesson 2C - Weather. Lesson Objectives. Fire Weather

FOREST FIRE. News August 4, :30

UDOT Weather Program Traffic Operations Center

Tornado Safety: 2013 Practical Steps for Weather-Related Emergencies

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Butte County Fire Department

#FireWeather. Historical Weather Data Clustering for Scenario-based Fire Simulation

Informational Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Burn Injuries

Quick Pick Directory. Emergency Reference Procedures Guide. FOR ALL EMERGENCIES: CALL 911 and Emergency Numbers. Bomb Threats.

Snow Plow Safety Quick Reference Guide

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

Blacks Creek Smokejumper Accident BLM. Accident Investigation Report Bureau of Land Management Great Basin Smokejumpers April 15, 2015

City of Brainerd, Minnesota Snowplowing Policy

National Park Service U.S. Department of the Interior Division of Fire and Aviation

Fire Weather Recording Form

THE STUDY ON 4S TECHNOLOGY IN THE COMMAND OF EARTHQUAKE DISASTER EMERGENCY 1

Bomb Threat Risk Factors Prevention Strategies White level inspections

Angora Fire Entrapment & Fire Shelter Deployment Accident Prevention Analysis Report

Transcription:

6.152 February 17, 2006 Initial Report North Central Texas Initial Attack Hildreth Road Dozer Accident February 9, 2006 This report is intended to inform interested parties, for a safety and training tool, and as an aid to preventing future occurrences. Because it is published on a short time frame, the information contained herein is subject to revision as further investigation is conducted and additional information is developed.

SUMMARY On Thursday, February 9, 2006, at approximately 1943 hours, firefighter Steve Burns, age 43, was run over by a Tractor Plow while directing the dozer through a wooded area with dense brush. The dozer operator called for help using his handheld radio. Upon arrival at the scene one crewmember called 9-1-1 using a cellular telephone. The crewmembers initiated first-aid and kept the injured firefighter comfortable until the ambulance crew arrived. Upon initial assessment, the EMS crew determined that the injuries warranted immediate medical evacuation by helicopter. The firefighter was transported by ambulance to a landing zone approximately 300 yards from the accident site. At approximately 2040 hours he was flown to the hospital where he is currently receiving treatment for his injuries. This accident happened during the North Central Texas Initial Attack of the Hildreth Road Fire in the vicinity of Decatur, Texas. Mr. Burns is an employee of United States Forest Service (USFS) from the Deschutes National Forest. He was in Texas assisting with the fire season of 2006 as a Field Observer (FOBS). SEQUENCE OF EVENTS On the afternoon of February 9, at 1530 hours, Mr. Burns was dispatched and arrived on location at 1615. He tied in with the local Incident Commander (IC) on the fire at 1630, and completed traversing (GPS) at 1800, determining the fire was 50.7 acres. Official sunset for that day was 1810 hours. Two dozer units were assigned to put in a fire break starting along the east flank working toward the north in tandem. Dozer unit E-287 was the lead dozer with dozer E- 346 improving line behind him. Swamper E-346 was leading dozer E-287 along the north flank and Swamper E-287 was trailing dozer E-346. A decision was made by the Taskforce Leader to have dozer E-346 back track the east flank mopping up. When the task was completed; dozer E-346 was directed by the Division Supervisor to return to the staging area and remain there. Swamper E-287 remained behind to help engine E- 345 mop up hot spots on the east flank. The Division Supervisor, Safety Officer, Taskforce Leader, dozer E-346, and the Field Observer (Steve Burns) were all present at the staging area. At approximately 1830, the Division Supervisor and Taskforce Leader directed dozer E-346 to improve a line that a local dozer had put in on the west flank. According to witness statements, Mr. Burns stated since he had been around the fire twice, he knew where the existing dozer line and fence were located, and would show dozer E-346 where to start. Mr. Burns was directing the dozer and had stopped E-346 near a dry creek to find a crossing. Mr. Burns then radioed E-346 to come toward the light (on his helmet) and wait for him on the dozer line. According to witness statements, after crossing the creek bed, Mr. Burns directed dozer E-346 to create a new line instead of improving the old line. Dozer E- 346 decided to knock down brush to the fence line and then improve the line back to the

north. Mr. Burns was directing from the front of the dozer through thick brush consisting of post oak, cedar, elm and green briar. At approximately 1930 hours, dozer E-346 received a radio transmission from Mr. Burns to again, come toward the light. E-346 dozer started in first gear toward the light of the helmet. The operator of Dozer E-346 indicated that the light appeared intermittent either from the thickness of the brush or from Mr. Burns turning his head. The dozer operator lost sight of Mr. Burns light and thought that he had cleared the area. The operator of dozer E-346 continued forward approximately 25 feet then stopped and called for Mr. Burns, since he had lost visual contact. Dozer E-346 operator then turned and saw a light on the ground behind the dozer, and got off the dozer to look for Mr. Burns. The dozer operator found the helmet belonging to Mr. Burns and noticed him lying on his back approximately ten feet behind the dozer. At approximately 1943 dozer E-346 operator used his radio to ask for emergency assistance. The Safety Officer and Taskforce Leader arrived at the scene at 1945 hours. The Taskforce Leader then called 9-1-1 for emergency medical assistance. A first responder from E-345 (Engine) arrived at the accident scene and monitored vital signs until EMS arrived at approximately 2010. After an assessment by EMS, Life Flight was requested for immediate evacuation. EMS crew secured Mr. Burns to a backboard and transported him by ambulance to a suitable landing zone. Soon after Life Flight arrived Mr. Burns was transported by helicopter to the hospital, departing at approximately 2040 hours. According to witness statements and evidence at the scene, the investigation team concluded that the injured party passed underneath the dozer between the tracks. FUEL Fuels for this fire were dense pockets of Cedar, Post Oak, Elm, and Green Briar (vines with thorns) with scattered openings of short grass. Local resources were in place by the time fire crews arrived on scene and the fire was at approximately 80 percent containment. Witnesses stated fire behavior included intermediate torching, with heavy fuels burning in the interior. Weather predictions indicated a cold front to enter the area with high winds expected. If the fire were to reignite, in these conditions, fire could move at 240 feet/minute with 6 to 7 foot flame lengths in the grass fuel types and 120 feet/minute with 20 foot flame lengths. Probability of ignition in both fuel types was 40-50%.

TOPOGRAPHY The accident area is a generally flat area with some low ground toward water sources. Vegetation in the area consists of dense to sparse wooded areas and intermittent open fields. WEATHER The temperature: 61 F Relative Humidity: 30% Winds: 11 MPH gusting to 18 MPH Photograph showing thickness of the understory vegetation

Photograph showing clearance under dozer