John A. Carlson Snow and Ice Removal
|
|
- Henry Bradley
- 5 years ago
- Views:
Transcription
1 John A. Carlson Snow and Ice Removal A. Introduction 1. The purpose of the Snow and Ice Removal Operation Plan is to provide all personnel who are involved in snow and ice removal a single source document, which clearly defines the Carlson Center s, polices and procedures in all snow and ice operations. 2. The snow and ice season in Fairbanks, Alaska can begin as early as September and terminate as late as mid-may. The rate of accumulation of snowfall or icing is affected by atmosphere temperature, pavement temperature, moisture content, wind direction and velocity, to include intervals between snowfalls. Each snowfall is unique. Therefore, while this plan tries to cover the major operations during a snow or ice storm it must be recognized that there must be sufficient flexibility within the plan to provide for differences or contingencies as they occur. B. Snow and Ice Control Policy ( ) 1. The policy of the Carlson Center is to clear snow and ice in the following priority. a. All pedestrian sidewalks, steps and service ramps immediately adjacent to public entrances/exits. b. All parking lots located on C.A.C property. i. South Parking Lot ii. North Parking Lot c. Wilbur street extension from the 2 nd street and Wilbur intersection to the C.A.C North Parking lot. Emergency Vehicle exit route located on the Westside of the C.A.C. d. All overflow parking lots located on FNSB property e. C.A.C roof when advised by F.N.S.B public works/maintenance that snow load has required removal. 2. Removal and de-icing will be conducted as expeditiously as possible during and after the snowfall/storm and will be achieved through a combination as necessary, of mechanical (plowing), snow blowers, manual snow shoveling and t. The Center does not have a bare pavement policy because of climatic conditions. 3. Snow and ice control operations of all Carlson Center grounds will be prioritized based on what is of immediate need for public safety given the
2 climatic conditions. Priorities and standards of service for snow and ice removal operations are as follows: a. (Priority 1) All designated public entrances/emergency exits, steps, ramps; sidewalks adjacent to the venue will be given first priority. i. Depending on the rate of snowfall walkways should be kept to a minimum of ½ inch snowfall and ½ inch snow hard pack at anytime. 1. Snow will be piled in a manner, which minimizes patron foot traffic obstructions. Snow will be piled on areas adjacent to designated (i.e. concrete pathways), typically stacking piles on lawn areas. 2. The administrative office walkways and surrounding parking area should be removed prior to 8am Monday to Friday. The front main entrance should be removed prior to 4pm Monday to Friday and prior to 8am Saturday/Sunday. 3. Under extreme weather conditions building management may close CAC level 2 public entrances and exits in the interest of public safety. The public will be directed to exit the building via the interior steps. 4. Under normal weather conditions traction sand and/or E-chip will be spread on public entrances/emergency exits, steps and ramps after snowfall has been removed. a. During weather conditions that create severe ice conditions or areas with icy spots a liquid ice melt, granular ice melt, and/or E-chip, traction sand can be utilized. b. (Priority 2) All designated public parking areas located on C.A.C property. i. Depending on the rate of snowfall parking areas should be kept to a minimum of 2 snowfall and 2 snow hard pack at anytime. ii. The South Parking lot should be plowed by pick-up or by a snow removal contractor during periods of heavy snowfall. 1. A snow removal contractor will be utilized when inhouse staff requests support in order to maintain the lots during heavy snowfall. 2. Snow will be stacked in the drainage ditch along 2 nd avenue on C.A.C grounds. Snow may also be stacked on the West edge of the parking lot. 3. A traction sand and/or E-chip will be spread via a snow/sanding contractor. Mixture should be spread on all vehicle access lanes.
3 iii. The North Parking lot should be plowed by pick-up or by a snow removal contractor during periods of heavy snowfall. 1. A snow removal contractor will be utilized when in house staff requests support in order to maintain the lots during heavy snowfall. 2. Snow will be stacked in the drainage pond along the North edge of the lot. Snow may also be stacked on the West edge of the parking lot. 3. Traction sand and/or E-chip will be spread via a snow/sanding contractor. Material should be spread on all vehicle access lanes. iv. Wilbur street extension from the 2 nd street and Wilbur intersection to the C.A.C North Parking lot. Emergency Vehicle exit route located on the Westside of the C.A.C. 1. A snow removal contractor will be utilized when in house staff needs to be supported in order to maintain the lots during heavy snowfall. 2. Snow will be stacked in the drainage pond along the North edge of the North parking lot. 3. Traction sand and/or E-chip will be spread via a snow/sanding contractor. Material should be spread on vehicle lanes North and south bound. v. All overflow parking lots located on FNSB property 1. A snow removal contractor will be utilized when in house staff needs to be supported in order to maintain the lots during heavy snowfall. 2. Snow will be stacked along North and South edges of all FNSB lots. C. Storm Classifications: 1. Each snow or ice storm will be unique and vary in intensity, duration and total precipitation. This section will attempt to apply a basic classification system to assist in the establishment of priorities of equipment, material and manpower for a generic management system for implementation in all snow and ice removal operations. The storm classification system will utilize the estimated total expected snowfall for snow and total ice glazing for ice storms. 2. Classes of storms: a. Snowstorms i. Class A is defined as a storm of extremely heavy snowfall of 10 + inches or more occurring in a period of 24 hours of less. This type of storm will cause life-threatening conditions to occur. When weather forecasts indicate that a Class A storm is imminent, the Operations Manager will notify the General Manager that severe snowfall may impact daily facility operations. The General Manager will notify the appropriate parties of the adverse weather conditions.
4 ii. Class B is defined as a storm of moderated to heavy snowfall within the estimated range of 5 10 inches. This type of storm can pose the same threats to public safety and economic impact (Class A), but its intensity will allow the Operations department to keep the C.A.C open during the snowfall. A Class B storm will normally not require a declaration by the General Manager of the adverse weather conditions; however, as the storm progresses it could be upgraded to a Class A, which could necessitate the declaration of adverse weather conditions by the General Manager. iii. Class C, is defined as a storm with an accumulation of 1 to 4 inches. The Operations department will maintain all normal snow and ice removal procedures. b. Ice storms i. All ice storms will be rated as a Class A type storm. Ice storms will cause immediate threats to public safety and economic impact. If an ice storm is imminent, or occurs the Operations Manager will notify the General Manager that severe ice conditions may impact daily facility operations. The General Manager will notify the appropriate parties of the adverse weather conditions. 3. Under extreme weather conditions building management may close CAC level 2 public entrances and exits in the interest of public safety. The public will be directed to exit the building via the interior steps. D. Implementation Procedures: 1. Weather/Storm decision a. During normal business hours and non-business hours the key personnel (Operations Manager, Conversion Supervisor, Maintenance Supervisor, Event Supervisor, Janitorial Supervisor and General Manager) involved in snow and ice control will monitor forecasted storms using the FNSB website and link to the National Weather Service. If a Class A or B storm is predicted the Operations Manager will put snow removal crews (inhouse and subcontractors) on notice that they must be available on-call. E. Snow/Ice Removal Policies and Procedures: 1. Abrasive and de-icer guidelines a. The primary abrasive to be utilized by CAC personnel and subcontractors will be traction sand and/or E-chip. Abrasive application is usually applied to vehicle access lanes in the parking areas, sidewalks, steps, and emergency exits. b. The primary chemical de-icers when utilized by CAC personnel will be an inorganic salt mixture (Magnesium Chloride, Calcium Chloride, Sodium Chloride). The purpose of these chemicals is to function as de-icers for
5 sidewalks and steps adjacent to the venue. De-icer will only be used when temperatures remain above 25 degrees F. However when the temperatures fall between degrees F traction sand and/or E-chip will be spread as a primary abrasive. c. The Carlson Center does not have a bare pavement policy because of climatic conditions. Therefore application of de-icers, traction sand and/or E-chip is intended to make sidewalks adjacent to the venue reasonably safe but because of climatic conditions cannot be expected to be slip resistant at all times after initial application. F. Manpower and Equipment Assignments: 1. During a class A or B storm the Carlson Center Operations Department will immediately schedule snow removal shifts, each shift (8) hours in duration. 2. Shift times will vary dependent on time of storm prediction. Every attempt will be made to balance shift over time hours equally among employees. 3. The Carlson Center SMG staff will be the primary manpower and equipment resource for all snow removal operations. However, during sustained snow/ice removal operations subcontractors will be utilized to support/provide additional manpower and equipment. H. Safety: 1. All Carlson Center staff will operate snow/ice control equipment in a safe manner. Speeds will be kept to a safe minimum sufficient to plow and windrow snow to the shoulder. Operators will not plow at excessive speed causing snow to fly at a high speed and distance. 2. Plow truck operators will observe all posted CAC traffic signs. 3. Operators will plow form the street centerline to the right shoulder (Wilbur street extension). 4. Operators will ensure the plow truck is fully operational. 5. If the intensity of the storm is of such an intensity to cause danger to snow/ice control operators. Operations will be terminated pending weather improvements. 6. Operators and snow personnel will wear appropriate winter clothing to ensure cold weather injuries are not received. G. Pre-Winter Season Preparation: 1. New operators will be assigned to an experienced operator (mentor) to receive training on all phases of snow and ice control. New operators will receive this training in pre-season and during the actual snow and ice control season. The mentor of the new operator will at the time of new operator proficiency, certify to the Operations Manager that the new operator is cleared for individual (solo) operation and has a valid Alaska Drivers License. 2. Commencing in September the Carlson Center Maintenance Supervisor will prepare and ensure all snow and ice removal equipment is prepared and operational.
6 I. Post Operation Procedures: 1. During storm; at end of each shift the outgoing operator will perform the required maintenance and services of his assigned equipment prior to relief from shift. These services include the following. a. Fuel top-off b. Fluid checks c. Windshield washer fluid replacement d. Tire pressure e. Check snow plow edges and hydraulic fluid f. Check emergency lighting. 2. After storm; all equipment will receive a thorough inspection to include all operator-required services. All known maintenance deficiencies will be reported to the Operations Manager and/or Maintenance Supervisor for immediate correction.
CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008
CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008 A. INTRODUCTION B. GENERAL POLICY STATEMENTS C. STORM CLASSIFICATIONS D. IMPLEMENTATION PROCEDURES 1. WEATHER/STORM DECISIONS 2. PERSONNEL
More information1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots
City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationCITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY
CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,
More informationSNOW CONTROL OPERATIONS
SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow
More informationCity of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016
Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist
More informationTown of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan
Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county
More informationTOWN OF GRAND FALLS WINDSOR
TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned
More informationCOUNCIL POLICY BACKGROUND
COUNCIL POLICY Policy Title: Snow and Ice Control Policy Policy Number: TP004 Report Number: TTP2003-39, C2007-44, LPT2011-57 Approved by: City Council Effective Date: Interim policy approved 2009 December
More informationCITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION
CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions
More informationTown of Oconomowoc Snow & Ice Control Policy
Town of Oconomowoc Snow & Ice Control Policy Introduction The purpose of this policy is to provide a detailed overview of the Town s snow & ice control operations including its goals and objectives. All
More informationTown of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY
Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish
More informationDunn County Snow Removal Policy
Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern
More informationOperational Snow and Ice Control Plan
CITY AND COUNTY OF BROOMFIELD Operational Snow and Ice Control Plan For Streets, Parks, and Facilities DEPARTMENT OF PUBLIC WORKS 11/1/2014 Snow and Ice Control Plan for 2014-2015 Winter Season TABLE OF
More informationCity of Laramie, Wyoming SNOW AND ICE POLICY
City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and
More informationCITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3
Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION
More informationCITY OF MINOT SNOW REMOVAL PLAN November 2017
CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationH IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016
! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient
More informationSNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION
SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION 1 SNOW CONTROL OPERATIONS The following are the standard operating procedures f snow removal operations. 1. Plowing operations
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationSNOW CREW CALL IN SHEET
Western State Colorado University Snow Removal The purpose of the Campus Snow Removal Information is to educate the campus, community as to the standard operating procedures used in the control of winter
More informationSnow and Ice Removal
Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,
More informationCITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015
CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationWinter Roads Maintenance
Winter Roads Maintenance Reducing the Use of Chlorides for Snow and Ice Control (Utilizing Smart Salting Methods and Technologies) Richard M. Balgowan, PE, PP, CPWM Township of Hamilton, Mercer County,
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationFacilities Operations Procedure for the Management of Snow and Ice
Facilities Operations Procedure for the Management of Snow and Ice EFSOPS-005 Issued 4/25/02 Revised 9/1/02; 11/5/03; 4/29/05; 11/12/08; 11/18/14 Please direct any questions or comments about the applicability
More informationCITY OF MINOT SNOW REMOVAL PLAN October 2018
CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationTown of Windsor. Department of Public Works
Town of Windsor Department of Public Works 860.285.1855 TOWN OF WINDSOR PUBLIC WORKS SNOW REMOVAL PLAN In Windsor, as throughout the New England states, winter can bring a variety of weather conditions
More informationPOLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.
POLICY MANUAL Legal References: Policy department: Public Works Department Cross References: N7 Adoption Date: January 19, 2005 Revision Date: June 20, 2005 Motion# 06/662/2005 October 20, 2014 Motion#
More informationSnow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy
Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible
More informationYORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal
YORK REGION DISTRICT SCHOOL BOARD Procedure #NP464.0, Snow/Ice Clearance and Removal Application The Snow/Ice Clearance and Removal procedure addresses the practices to be followed with regards to the
More informationWORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING
WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING 1. Snow Removal Procedures Steven Lang 2. 2020 Budget Streets & Highways Tom Dankert
More informationTOWN OF WINDSOR SNOW CONTROL PLAN
TOWN OF WINDSOR SNOW CONTROL PLAN 2013-2014 Revised 10/30/13 WCS Page 1 TOWN OF WINDSOR SNOW CONTROL PLAN GOAL One of the primary goals of the Public Works Department is to provide for the safe and orderly
More informationSNOW AND ICE REMOVAL PROCEDURES
SNOW AND ICE REMOVAL PROCEDURES Policy: Expeditious removal of ice and snow from vehicle and pedestrian access ways is essential for the safe operation of the University as referenced in the University
More informationRESOLUTION NO INTRODUCTION
RESOLUTION NO. 0824 A RESOLUTION TO ESTABLISH THIS CITY S SNOW AND ICE CONTROL POLICY DURING WINTER MONTHS, SPECIFICALLY DEFINED AS NOVEMBER THROUGH MARCH. BE IT RESOLVED BY THE CITY COUNCIL OF SOLON,
More informationCITY OF EAGLE LAKE SNOW PLOWING POLICY
CITY OF EAGLE LAKE SNOW PLOWING POLICY 1. INTRODUCTION The City of Eagle Lake believes that it is in the best interest of the residents for the City to assume basic responsibility for control of snow,
More informationSNOW AND ICE REMOVAL. Policy i
Table of Contents SNOW AND ICE REMOVAL Policy 828.1 PURPOSE... 1.2 APPLICABILITY... 1.4 GENERAL POLICIES... 1 4.1 WEATHER MONITORING... 1 4.2 EQUIPMENT PREPARATION... 2 4.3 EMPLOYEE NOTIFICATION AND SHIFTS...
More informationCity of Camrose Winter Road Maintenance Policy
City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.
More informationPolicy Title: Snow Removal & Ice Control Policy #: PW
Village of Fruitvale Corporate Policy Manual Policy Title: Snow Removal & Ice Control Policy #: PW-2012-01 Section: PUBLIC WORKS Initially Approved: 2012 06 04 Last Reviewed: 2013 05 06 Council Approval:
More informationBOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:
BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION: The Roads Department of Boone County is responsible for providing snow removal for approximately 1100 miles of county roads. The Roads
More informationTOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES
TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter
More informationFACILITIES PLANNING AND MANAGEMENT (FP&M) SNOW REMOVAL PLAN (Revision)
GENERAL FACILITIES PLANNING AND MANAGEMENT (FP&M) SNOW REMOVAL PLAN 2017-2018 (Revision) The intent of this snow plan is to standardize and document the routine actions normally taken by Facilities Planning
More informationWINTER MAINTENANCE OPERATIONS POLICY. City of River Falls, Wisconsin
WINTER MAINTENANCE OPERATIONS POLICY City of River Falls, Wisconsin INDEX Page# 1. GENERAL PURPOSE 4 2. MOBILIZATION 4 3. COMMUNICATIONS 5 4. CITIZEN INQUIRIES 5 5. SNOW EMERGENCY PROCEDURES 5 6. EQUIPMENT
More informationCITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised
CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY Revised 12-7-17 In order for a snow and ice removal program to be effective, a written policy must be established. This policy will guide personnel of the Street
More informationSNOWPLOWING/ICE CONTROL POLICY
SNOWPLOWING/ICE CONTROL POLICY BACKGROUND: The Town of White Bear, Minnesota, finds that in the best interest of the residents of the Town to assume basic responsibility for the control of snow and ice
More informationTHE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution Snow Removal Policy
THE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution 20141029 Snow Removal Policy THIS POLICY RESOLUTION 20141029, Snow Removal Policy is made, effective as of October 29, 2014 by THE
More informationCity of Rhinelander Snow and Ice Policy
City of Rhinelander Snow and Ice Policy General: Policy: Procedure: The ability to react promptly and decisively to varying winter weather conditions with regard to snow removal and ice control on city
More informationCity Policy POLICY ON SNOW CLEARING AND ICE CONTROL
City Policy Title: POLICY ON SNOW CLEARING AND ICE CONTROL REFERENCE: ADOPTED BY: City Council 2007 06 20 City Council City Council 2003 10 22 2011 09 28 City Council 1998 04 20 City Council 1993 09 22
More informationNEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION
NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION Winter Maintenance Snow Removal And Ice Control Policy. Commissioner Revised, adopted (date) State of New Hampshire Department of Transportation SNOW REMOVAL
More informationMONTGOMERY COUNTY SNOW PLAN
2018 2019 MONTGOMERY COUNTY SNOW PLAN COMMUNICATION DURING SNOW/ICE SITUATIONS Communication will be established prior/during all winter storms between the Sheriff s Office, Public Works Department, and
More informationSample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)
Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,
More informationSNOWabout...
For more information ormation: www.cambridge.ca 519-623-1340 1340 (TTY) 519-623-6691 91 www.kitchener.ca ca 519-741-2345 45 (TTY) TY) 1-866-969-9 866-969-99946-969-999499994 www.waterloo.ca wate 519-886-2310
More informationSnow Plow Safety Quick Reference Guide
PUBLIC WORKS INITIATIVE Snow Plow Safety Quick Reference Guide INTRODUCTION This quick reference guide highlights snow removal/snow plow safety practices. Its purpose is to help prevent personal injury
More informationIOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY
IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY AN ORDINANCE REPEALING ESTABLISHING THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW AND ICE AND MAINTENANCE OF IOWA COUNTY S SECONDARY
More informationWinter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works
Winter Weather Safety Tips From your friends at South Brunswick Township Department of Public Works South Brunswick Township Department of Public Works is committed to providing timely, efficient, and
More informationAUTHORITY: Town Council POLICY NUMBER:
TOWN OF RAINBOW LAKE POLICY TITLE: Town Snow Clearing Policy AUTHORITY: Town Council POLICY NUMBER: 2009-04 APPROVAL DATE: EFFECTIVE DATE: Policy Statement: The purpose of this policy is to regulate a
More informationSNOW REMOVAL & ICE CONTROL POLICY
SNOW REMOVAL & ICE CONTROL POLICY 1. GENERAL POLICY: Winter weather in northern New England is difficult to predict. There are many variables affecting winter maintenance operations such as type of precipitation,
More informationMUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS
MUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS Policy In consideration of the extreme weather conditions that may be experienced during the winter season, the will strive to achieve the objectives
More informationCity of Pittsfield. Snow and Ice Control Plan
City of Pittsfield Snow and Ice Control Plan Overall Program The City of Pittsfield encompasses 42.5 square miles and has a population of approximately 45,000 people. The City is responsible for snow and
More informationCLEARING THE WAY CAUTION. brampton.ca/snow
CLEARING THE WAY CAUTION brampton.ca/snow Who clears the roads? Not all roads in Brampton are the responsibility of the City of Brampton. The Region of Peel does winter maintenance on the major roads highlighted
More informationSnow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014
Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)
More informationWINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)
WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) 1.0 PURPOSE: It is the goal and intent of the City of Rochester to provide timely, efficient
More informationWinter Weather Snow and Ice Hazard Mitigation Guidelines. November 30, 2018
Winter Weather Snow and Ice Hazard Mitigation Guidelines November 30, 2018 TABLE OF CONTENTS 1. DEFINING THE PLAN... 4 (A) Purpose... 4 (B) Objective... 4 (C) Expectations... 4 (D) Partners... 5 2. PLAN
More informationSNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)
Mayor Dwayne D. Warren, Esq. And The Orange Municipal Council MOVING ORANGE FORWARD City Of Orange Township SNOW REMOVAL GUIDE Public Works Snow Removal Hotline: (973) 266-4030 My Orange Hotline: (973)
More informationSnow Response in an Urban Setting
Snow Response in an Urban Setting Pat Kennedy, PE Denver Street Maintenance Road and Street Supervisors Conference October 15, 2013 Yakima, WA 2 Denver Agenda Population ~600,000 Metropolitan area 2.5
More informationSNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy
Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),
More informationEstablishing Winter Standard Operating Procedures
Establishing Winter Standard Operating Procedures Achieving Consistency (Or how to do your job without getting canned!) Presenter: Chip Porter, P.E. Highway Engineer St. Joseph County Dept. of Public Works
More information20 18CEHA Fall Chloride Workshop
20 18CEHA Fall Chloride Workshop Moving Forward Overview Design Practices Level of Service Comparison of ConnDOT vs. New England States Pre-Storm/Planning Application Rates Inventory Control Complaint
More informationSNOW AND ICE CONTROL GUIDELINES
SNOW AND ICE CONTROL GUIDELINES 2017-2018 I. PERSONNEL All Department of Public Works and Parks and Recreation personnel shall be available for snow and ice control operations. The City may also utilize
More informationMUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM
Purpose: The Public Transportation Department and contracted provider will provide safe transportation for AnchorRIDES customers and employees during severe weather or emergency conditions. AnchorRIDES
More informationSNOW & ICE CONTROL PLAN
SNOW & ICE CONTROL PLAN Revised September 2017 Page 1 SNOW & ICE CONTROL PLAN GOAL The primary goal of the Public Works Department is to provide the traveling public with the safest driving surface possible
More informationCustomer Track Maintenance Guide
Customer Track Maintenance Guide Winter Safety Safety is of the utmost importance at CN, not only for our employees but also for you, our customers. We ve developed this Customer Track Maintenance Guide
More informationDEPARTMENT OF PUBLIC WORKS
Village of Hartland DEPARTMENT OF PUBLIC WORKS SNOW AND ICE CONTROL/REMOVAL POLICY PPM-1 ADOPTED BY VILLAGE BOARD 12/28/87 Revised 7/22/13 VILLAGE OF HARTLAND SNOW AND ICE CONTROL/REMOVAL POLICY General
More informationSchedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots
SNOW AND ICE CONTROL SERVICES - (4) SEPARATE DEPARTMENTS SCHEDULE C REQUEST FOR PROPOSAL 2244 Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots 1.0 General
More informationCUSTER COUNTY SNOW REMOVAL PROCEDURES
CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial
More informationAPPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT
APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT (2) Tractors with Front End Loader and Box Blade (1) Unit used to load sand and salt mix (1) Unit used to remove plowed snow in parking
More informationSNOW AND ICE CONTROL POLICY
SNOW AND ICE CONTROL POLICY INTRODUCTION The following policies and procedures serve as a practical guide for the efficient and cost-effective removal of snow and ice in the City of Sioux City. The responsibility
More informationSnow & Ice Management Policy/Guide. Town of Medway Massachusetts
Snow & Ice Management Policy/Guide Town of Medway Massachusetts April, 2006; Rev. 4 January 8, 2018 General The purpose of this policy/guide is to provide a general overview of the Town of Medway, MA snow
More informationMotorists are urged to drive wisely and cautiously in all winter weather situations:
Snow and Ice Snow and ice control is a central winter activity of the Milford Township road crew, especially during a rough winter. Milford Township is responsible for keeping 76.45 miles of roads passable
More informationResolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution
Resolution Number: 112612(2) Resolution Title: Snow Policy Signed: 11/26/12 DAVIS COUNTY Snow Policy Resolution A RESOLUTION TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW
More informationChapter 3 Snow & Ice Training Program Annual Review Checklist Wing Plow Operational Guidelines
Chapter 3 Snow & Ice Training Program Annual Review Checklist Wing Plow Operational Guidelines Snow & Ice Training Program WSDOT employees are our most important resource and providing a safe environment
More informationA Guideline for Training Patrol Staff Ontario Good Roads Association
A Guideline for Training Patrol Staff Ontario Good Roads Association A Guideline for Training Patrol Staff Rationale A patroller is required to observe both weather and road conditions either in the field
More informationCity of Lee s Summit Public Works Operations
City of Lee s Summit Public Works Operations 2015 2016 Snow Operations August 3, 2015 GOAL The City of Lee s Summit s snow and ice goal is to provide a high level of customer service to our citizens within
More informationAuburn Lewiston Airport. Snow and Ice Removal Plan
Auburn Lewiston Airport Snow and Ice Removal Plan SNOW AND ICE REMOVAL PLAN The Auburn-Lewiston Airport has established this Snow and Ice Plan as the instruction and guideline for managing winter weather
More information10 th Annual Road Salt Symposium. Thursday, February 3, 2011
10 th Annual Road Salt Symposium Thursday, February 3, 2011 Where We Were Where We Are Where We re Going... David Redig, Maintenance Operations Superintendent - Mn/DOT District 6 Snow Plow Evolution 1973
More informationADMINISTRATIVE PROCEDURES
PROCEDURES NO: A-AD-109-14 ADMINISTRATIVE PROCEDURES SUBJECT: A. Communications For the purpose of communicating the policies, regulations, administrative procedures, and parental expectations of Transportation
More informationMUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM
Purpose: The Public Transportation Department (PTD) and AnchorRIDES paratransit contractor will provide transportation in as safe a manner as effectively possible. Paratransit vehicles primarily operate
More informationCity of Hailey Public Works - Street Division
City of Hailey Public Works - Street Division Snow Removal Policy 2015-2016 PRESEASON The Public Works Department s primary objective during the winter storm season is to provide safe transportation, emergency
More informationPublic Works Operations Procedure Report FY 2016 Snow Plan
Public Works Operations Procedure Report FY 2016 Snow Plan 3556 Dam Neck Road Virginia Beach, VA 23453 Snow Plan Procedure Report FY 2016 Table of Contents Section 1 Introduction 1 Section 2 Snow Alert
More informationUNIVERSITY OF VIRGINIA
FACILITIES MANAGEMENT UNIVERSITY OF VIRGINIA SNOW AND ICE CONTROL PLAN 2017-2018 Table of Contents Introduction... 2 Snow and Ice Control Objectives... 2 Organization... 2 Director of Operations:... 2
More informationDeicing Chemicals - State of Practice
Methods of Operation Deicing Chemicals - State of Practice Ron Wright Chemist Supervisor Idaho Transportation Department Traditional Methods Plow and antiskid Anti-icing Deicing Pre-wetting Anti-icing
More informationPolicy for Snow Removal and Ice Control Wahpeton, North Dakota
Policy for Snow Removal and Ice Control Wahpeton, North Dakota No: PW-100 Date: January, 2008 Policy: Snow Removal and Ice Control Approval Date: January 29, 2008 OBJECTIVE & GOALS: It is the City of Wahpeton
More informationSnow & Ice Removal Policy. October 27 th, The Village of New Lenox Public Works 2401 Ellis Rd
October 27 th, 2014 The Village of New Lenox Public Works 2401 Ellis Rd TABLE OF CONTENTS The Plan s Objective: 2 Notification and Response: 2 Snow Removal Operations: 2 Table 1: Snowfalls and Typical
More informationSOUTH HOLDERNESS TECHNOLOGY COLLEGE Snow and Ice Policy and Procedures
1. Purpose To provide staff students and visitors with a clear statement of the measures that will be taken by SHTC in the event of snow and ice conditions occurring on the college grounds. 2. Introduction
More informationCoconino County Common Snow Plow Questions/Concerns
Coconino County Common Snow Plow Questions/Concerns I didn t know it snows so much in northern Arizona. Is this normal? According to the National Climatic Data Center, Flagstaff is the eighth snowiest
More informationWINTER STORM Annex II
WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential
More informationWinter Maintenance on Ontario s Highways
Ministry of Transportation Winter Maintenance on Ontario s Highways MTO Eastern Region November 18, 2015, Northumberland County Council Outline 1. Winter Maintenance Areas - Eastern Region 2. Winter Maintenance
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All
More information1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment
1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure Engineering Vulnerability
More information