GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

Similar documents
SITE INVESTIGATION 1

Chapter 12 Subsurface Exploration

THE INSTITUTE OF COST ACCOUNTANTS OF INDIA (ICAI)

GEOTECHNICAL INVESTIGATION REPORT

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

Gotechnical Investigations and Sampling

Appendix J. Geological Investigation

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

Pierce County Department of Planning and Land Services Development Engineering Section

Week 3 : (3HL) Coverage : Typical geotechnical problems and usual application of SI methods

Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC

The attitude he maintains in his relation to the engineer is very well stated in his own words:


B-1 SURFACE ELEVATION

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

REPORT OF GEOTECHNICAL INVESTIGATION FOR CONSTRUCTION OF AIIMS AT GUNTUR, ANDHRA PRADESH

KDOT Geotechnical Manual Edition. Table of Contents

10. GEOTECHNICAL EXPLORATION PROGRAM

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

SI Planning & Laboratory Testing for Hill-Site Development

NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY

Geotechnical Data Report

An Introduction to Field Explorations for Foundations

PHYSICO-MECHANICAL PROPERTIES OF ROCKS LECTURE 2. Contents

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

Geotechnical Engineering Report

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

Module 1 : Site Exploration and Geotechnical Investigation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

APPENDIX E SOILS TEST REPORTS

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta


APPENDIX C. Borehole Data

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Engineering Report

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

3.0 SUMMARY OF FINDINGS

Geotechnical Engineering Report

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming


GEOTECHNICAL POLICIES AND PROCEDURES MANUAL CHAPTER 5 GEOTECHNICAL INVESTIGATION PLANNING GUIDELINES

EN Eurocode 7. Section 3 Geotechnical Data Section 6 Spread Foundations. Trevor L.L. Orr Trinity College Dublin Ireland.

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

LECTURE 10. Module 3 : Field Tests in Rock 3.6 GEOPHYSICAL INVESTIGATION

PREDICTION OF BEARING CAPACITY OF HIGHLY WEATHERED KHONDALYTIC ROCK FORMATIONS

Soils. Technical English - I 10 th week

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

SHEAR STRENGTH OF SOIL

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

REPORT OF SUBSURFACE EXPLORATION

Conventional Field Testing & Issues (SPT, CPT, DCPT, Geophysical methods)

PRINCIPLES OF GEOTECHNICAL ENGINEERING

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

APPENDIX C HYDROGEOLOGIC INVESTIGATION

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF



Geotechnical Geotechnical Assessment

Core Barrels. Core Barrels

GEOTECHNICAL SUBSOIL PROPERTIES FOR WASIT GOVERNORATE

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants


Underground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE

7. Foundation and Slope Stability

8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses.

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Use of RMR to Improve Determination of the Bearing Resistance of Rock

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Geotechnical Investigation

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure)

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

APPENDIX H SOIL SURVEY

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

(C) Global Journal of Engineering Science and Research Management

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

iii CONTENTS vii ACKNOWLEDGMENTS EXECUTIVE SUMMARY INTRODUCTION Study Area Data Sources Preparation of Geologic Maps

GEOTECHNICAL PHASE 1

Northern Colorado Geotech

J. Paul Guyer, P.E., R.A.

*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١

Two Case Studies on Soil Nailed Slope Failures

Transcription:

GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune - 411021,Maharashtra,India Structure : Proposed Industrial Shed Architect. Structural Consultant : Page 2

CONTENTS Page No. 1.0 Introduction 03 2.0 Scope for Geotechnical Assessment 05 3.0 Investigation Procedure and Standard code Provisions 07 4.0 Result of Investigation and Laboratory Testing 12 4.1 Engineering Analysis 16 5.0 Geotechnical Evaluation and Opinion 17 5.1 Safe Bearing Capacity 19 6.0 Location Plan 22 7.0 Bore-Logs 23 8.0 Lab test results 29 Page 3

Chapter 1 INTRODUCTION TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD. is planning to execute proposed construction of Industrial Structure with ancillary structures at Mahad and entrusted geotechnical investigation work at the project location to, Pune by work order No.TSFIPL2016121401 Dated.15 th Dec 2016. Geotechnical investigation work was envisaged to assess the subsoil strata from safe bearing capacity point of view and to establish subsoil profile at the project location. Site investigation in one form or the other is required for every engineering project. Information about the surface and subsurface features is essential for the design of structures and for planning construction techniques. As a statutory requirement, client decided to carry out geotechnical investigation. Geotechnical investigation work consists of drilling and sampling in nine boreholes at the project location. TM Engineering Services, Chinchwad, Pune carried out fieldwork during December 2016. Selected soil and rock samples were tested in laboratory of TM Engineering Services, Chinchwad, Pune. Laboratory test results were obtained on Jan 01, 2016. This report has been prepared by TM Engineering Services, Chinchwad, Pune. This geotechnical investigation report is based on the data collected from three boreholes and from laboratory results and judgment of undersigned based on his experience. Scope of this investigation report is limited Page 4

to assess subsoil strata from safe bearing capacity point of view. It does not include site visits by the undersigned to confirm any aspects during construction phase. Professional judgments and recommendations are presented in this report. They are based partly on evaluation of the technical information gathered, partly on historical reports and partly on our general experience with sub-surface condition in the area. We do not guarantee the performance of the project in any respect other than that our engineering work and the judgments rendered meet the standard and care of our profession. It should be noted that the boring/trial pits may not represent potentially unfavorable subsurface conditions between boring. If during construction soil conditions are encountered that very from those discussed in this report or historical reports of if design loads and/or configuration change, we should be notified immediately in order that we may evaluate effects, if any, on foundation performance. The recommendations presented in this report are applicable only to this specific site. These data should not be used for other purposes. Page 5

Chapter 2 SCOPE FOR GEOTECHNICAL ASSESSMENT The purpose of this evaluation was to assess subsurface conditions at the site and to provide geotechnical recommendations for project. Objective of the site investigation was to obtain the information that may be useful for one or more of the following purposes: 1. To select the type and depth of foundation for a given structure. 2. To determine the bearing capacity of soil/rock layer. 3. To establish the ground water level. 4. To select the suitable construction technique. 5. To predict potential foundation problems. 6. To ascertain the suitability of the soil as a construction material. 7. To collect and transport the selected samples of soil and rock in testing laboratory and conduct relevant tests to determine properties. 8. Recommendations for soil-related construction conditions such as site preparation, earthwork construction, excavation slopes, and difficult excavation. Geotechnical investigation for proposed project was carried out by drilling three boreholes to examine subsurface profile. Depth of borehole to be drilled was determined using IS: 1892 1979 section 2.3.2.The lateral extent of exploration and the spacing of borehole depends mainly on the variation of the strata in horizontal direction. Representative of client decided the number and indicated location of bore hole in the field. Page 6

The scope of services included a site reconnaissance, site soil test, borings and soil sampling, laboratory soil testing, engineering evaluation of the field test data, and preparation of this report. Specifically, the scope of our engineering work for this site was to provide the following: 1. Soil nature and origin, including changes resulting from man s activities. 2. Depths, thickness and composition of soil strata that will be appreciably stressed by the intended construction. 3. Depths to encountered groundwater, dense soil strata, and rock that could affect the proposed construction. Collect undisturbed soil samples from cohesive soil stratum. 4. Conduct standard penetration tests at an interval of 1.0 to 1.5 metres and collect disturbed soil samples. 5. To prepare a geotechnical investigation report by compiling data collected from field, boreholes and results of laboratory tests. The scope of this investigation report did not include an environmental assessment or investigation for the presence or absence of hazardous or toxic material in the soil or groundwater or surface water within or beyond the site. Any statements in this report or on the soil test, boring logs regarding odors, staining of soils, or other unusual conditions observed are strictly for the information of our client. Page 7

Chapter 3 INVESTIGATION PROCEDURE AND STANDARD CODE PROVISIONS PLANNING A subsurface exploration program depends upon the type of structure to be built and also upon variability of the strata at proposed site. Sub-surface explorations are generally carried out in three stages. A) Reconnaissance: Prior to our field exploration, TM engineer visually evaluated the site and surrounding areas. His observations were used in planning exploration, in determining area of special interest, and in relating site conditions to know geologic conditions in the proposed project area. Subsurface exploration programme includes visit to a site and study the map and other relevant records. The information about the following features is obtained: i) General topography of the site. ii) Existence of underground water mains, power conduits, etc. at the site. iii) Existence of settlement cracks in structure already builds near site. iv) The evidence of landslides, creep of slope and shrinkage cracks. v) The satisfaction of soil observed from deep cuts near the site. vi) Depth of ground water table as observed in wells and drainage pattern. vii) Type of vegetation existing at the site. B) Preliminary Exploration: The aim of a preliminary exploration is to determine the depth, thickness, extent and composition of each soil stratum at the site. The depth of bedrock and the ground water table is also determined. The preliminary explorations are generally in the form of trial pits. Trial pits were not considered for these sub-surface investigations. Page 8

TRIAL PIT Trial pits are excavated at the site to inspect the strata. The size of the pit should be sufficient to provide necessary working space. IS: 4453 1967 recommends a clear working space of 1.2m X 1.2m at the bottom of the pit. The depth of the pit depends upon the requirement of the investigation. Shallow pits up to a depth of 3m can be made without providing any lateral support. For deeper pits especially below the ground water table the lateral support in the form of sheeting and bracing system is required. Tests pits can be excavated manually in vertical bands or by other appropriate methods so as to expose a clean face of rock or soil. Measurements should be taken and recorded documenting the orientation, plan dimension, depth of the pit, and thickness of each stratum exposed in the pit. Adequate precaution should be taken against possible accidents due to caving of the ground. C) Detail Exploration: The purpose of detail exploration is to determine engineering properties of soil in different strata. It includes an extensive boring program, sampling and testing. Field test such as vane shear test, SPT, PLT, Permeability test are conducted to determine properties of soil in natural state. The tests for the determination of dynamic properties are also carried out, if required. DRILLING Location of the borehole is indicated on the attached Borehole Location Plan in the Annexure 6.1. On site location of borehole was specified by client. The boring was performed to maximum depth of 10m below the existing ground surface elevations. For drilling rotary type drilling rig was used. Rig was coupled with diesel engine, tripod and all drilling accessories. Drilling rig have tripod with suitable arrangement for driving as well as extracting casing. It was also used for conducting Standard Penetration Test (SPT), collection of Undisturbed Soil Samples (UDS) and Disturbed or wash Soil Sample (DS). Page 9

Initially casing of adequate diameter to suit boring of 100 mm boreholes was lowered and boring was commenced, when rock was encountered, diameter of boreholes was changed to N x (76mm) diameter. A core barrel and N x sized bits are used for drilling and recovering rock cores. Recovered rock cores were numbered serially and preserved in good quality sturdy wooden core boxes. Rock core recovery (CR) and Ro ck Quality Designation (RQD) were computed for every run of length drilled. Rock samples have been selected for laboratory test based on the probable founding elevation of the proposed structure. Standard Penetration test and Soil Sampling All soil sampling and Standard Penetration Testing (SPT) was performed in general accordance with IS:2131 1963 and ASTM Standard D 1586 and D 6151. The soil borings were advanced by rotary drilling methods. At regular intervals (1 to 1.5m), soil samples were obtained w ith a standard split-spoon. Sampler was first seated 15cm and then driven an additional 30cm with blows of a 63.5 kg hammer falling a distance of 75cm. The number of blows required to drive the sampler the final 30cm was recorded and is designated the standard penetration resistance or N value. Because the sampler may be damaged by driving it 12 to 18 inches into very dense soils, it is driven a few inches into such materials and the penetration, e.g. 100/3, 50/1, etc. Penetration resistance, when properly evaluated, is an index of the soil s shear strength, density, and foundation support capability. SPT N values are correlated with the relative density of non-cohesive soils and consistency of saturated cohesive soils, as shown in Annexure 6.5. Ground Water Ground water table was observed after dewatering the boreholes by suitable method and waiting for time period of 24 hours to allow for recuperation of ground water. Ground water samples were collected for chemical analysis [IS: 3025 (Part 24 and 32)] to determine their ph, Sulphate and Chloride content. Page 10

This is useful to predict corrosive effect of ground water on structures. Classification of water samples is based on the following table. In this case sample of ground water was not encountered and hence not tested. Laboratory Tests Lab tests are conducted (as per relevant IS code) on soil and rock samples to determine their properties, which may be used for design and geotechnical evaluation. Sr. Test Description Relevant IS/ASTM code No. A Soil Test 1 LL and PL IS: 2720 (Part 5) 1985; ASTM D4318 2 ph of soil IS: 2720 (Part 26) 1987; ASTM D4972 3 Soluble Sulphate in soil IS: 2720 (Part 27) 1977; ASTM D4230 4 Specific Gravity test IS: 2720 (Part 3) 1980; ASTM D854 5 Grain size analysis IS: 2720 (Part 4) 1985; ASTM D422 6 Relative density of sand IS: 2720 (Part 14) 1983 7 Permeability test IS: 2720 (Part 17) 1986; ASTM D2434 8 Proctor density test IS: 2720 (Part 7) 1980; ASTM D698 9 Direct shear test IS: 2720 (Part 13) 1986; ASTM D3080 10 Triaxial text IS: 2720 (Part 10, 11, 12) 1973; ASTM D2850 11 Consolidation test IS: 2720 (Part 15) 1986; ASTM D2435 B Rock Tests 1 Water absorption ASTM D 2 Porosity ASTM D 3 Dry density ASTM D 4 Crushing strength (UCS) ASTM D2938 5 Point load test ASTM D 6 Triaxial test ASTM D2664 Elastic Modulus of Rock ASTM D3148 Point load strength index is often used to predict uniaxial compressive strength. On average, uniaxial compressive strength is 20 to 25 times point load strength. However, the ratio can very between 15 and 50, especially for anisotropic rocks. Logging Procedures: In logging the exploration pit / boreholes, a vertical profile should be made parallel with one pit wall or boreholes. The contact between Page 11

geological units should be identified and drawn on the profile, and the units samples as recommended disturbed samples and IS: 8763 1978 (sand), IS: 10108 1982 (fine grained soil) for undisturbed samples. Characteristic and type of soil or lithologic contacts should be noted. Variation within the geologic unit must be described and identified, and indicated on the pit / borehole log wherever the variation occurs. The sample locations should be shown in the respective log and their location written on a sample tag showing the station location and elevation. Ground water should also be noted on the exploration pit / borehole log. Page 12

Chapter 4 RESULTS OF INVESTIGATION AND LABORATORY TESTING A preliminary site model was developed using the information obtained from existing data and the site visit. The model should be divided into zones of interest (i.e., geotechnical units) based on the necessary design parameters and objectives. This model will obviously change as results of the detailed investigation are collected. Following information was collected during the site reconnaissance stage. Sr. Checklist Item Sub-Item Description No. 1 Accessibility Easy 2 Visit to site Date and time December 16 Visitors Weather condition Temperature Sunny 3 Ground cover Silty sandy gravel 4 Existing Terrain Plain 5 Site hydrology Surface water None conditions Subsurface water Water loss 6 Site drainage.. 7 Soil and rock Surface soil Silty sandy gravel conditions Subsurface soil Weathered rock Rock features Weathering 8 Investigative Operation Drilling in nine borehole 9 Prior information Interviews with Client 10 Geological information NA Boreholes observations and laboratory testing results for proposed structure are presented in this section. Boreholes were drilled up to maximum 10m depth from the existing ground level. Fieldwork is summarized in the following table. Page 13

Table 4.1 Summary of Boreholes Bore Hole No. Occurrence of Rock Strata Final Depth of Borehole Ground Water Table (m) BH 01 1.5m 10.0m Water loss BH 02 0.5m 10.0m Water loss BH 03 0.5m 10.0m Water loss BH 04 0.5m 10.0m Water loss BH 05 0.5m 10.0m Water loss BH 06 0.5m 10.0m Water loss BH07 0.5m 10.0m Water loss BH 08 0.5m 10.0m Water loss BH 09 1.5 m 10.0m Water loss Representative of client decided number of borehole and indicated location of bore hole in field. Borehole log for the site is given in Chapter 7. SUB SOIL PROFILE: Sub-soil conditions described below are based on drilling and sampling in a total of three boreholes at the proposed site. A generalized sub-soil profile at the project location is described in various layers as follows. In the table thickness of various layers encountered (in mts) along with SPT N or RQD range as the case may be is tabulated. Subsoil at the project site may not be in the same order as tabulated. Layer I: Silty sandy gravel Layer II: Completely weathered rock (Hard murum) Layer III: Highly weathered fractured amyloidal basalt Layer IV:Slightly weathered & slightly fractured basalt Page 14

Bore Layer I Layer II Layer 3 Layer 4 hole no Thick Thick Thick Thick BH1 1.5 7.5 1.0 BH2 0.5 7.5 1.0 BH3 0.5 1.0 6.5 1.0 BH 04 0.5 1.0 BH 05 0.5 1.0 BH 06 0.5 1.0 BH 07 0.5 1.0 6.5 1.0 BH 08 0.5 1.0 BH 09-1.5 6.5 1.0 GROUND WATER LEVEL: Water level was encountered in the borehole as tabulated. In case it is required to determine ground water level it is advised to install piezometers and monitor over long period of time. Ground water is considered at foundation depth for design calculations. Ground water shall be considered at ground surface for calculating uplift pressure on bottom of raft of basement. LABORATORY TESTING: Sub stratum is mainly consists of backfill and weathered basalt. On completion of drilling samples were sent to the laboratory for further testing. Samples were classified in the laboratory and representative samples were selected for testing. Following tests were performed. Unconfined Compression Test Dry Density Tests were performed as per relevant IS standards, latest revision. Page 15

ENGINEERING ANALYSIS: Engineering analysis of the subsoil was performed to determine net safe bearing capacity. Parameters obtained are based on various field and laboratory tests. Foundations shall be placed on weathered rock Allowable stress intensity is determined as per the procedure given in IS12070 Code of practice for Design and Construction of Shallow Foundations on Rock. The procedure is based on RMR (Rock Mass Rating) concept. RMR is calculated as per the method given in IS 13365 (Part 1) Quantit ative Classification System of Rock Mass. Determination of RMR takes into consideration following properties of rock stratum Strength of Intact rock material Rock Quality Designation Spacing of Discontinuities Condition of Discontinuities Ground water condition Orientation of Discontinuities Joint Orientation It is mentioned in IS 12070 that if net allowable bearing capacity is determined based on RMR settlement of raft foundation upto 6m thickness to be less than 12mm. It shall be noted that for foundations placed on rock IS code does not specify any limit on width of foundations, type of foundations. Also there is no specific reference to factor of safety against shear failure. Page 16

Chapter 5 GEOTECHNICAL EVALUATION AND OPINION Conclusions and Recommendations are based on following accepted norms. Foundations should not fail in shear. It is mentioned in IS 12070 that if net allowable bearing capacity is determined based on RMR settlement of raft foundation upto 6m thickness to be less than 12mm Net safe bearing capacity to be adopted for pad (spread foundations or raft) placed at different depths below the ground surface existing at the time of investigation is tabulated below. Exact foundation depth will depend on up lift forces on the foundations. Bore hole no Depth of foundation Net safe bearing capacity BH1 1.5m 30T/m 2 2.5m 35T/m 2 3.5m 40T/m 2 4.5m 45T/m 2 BH2 0.5m 25T/m 2 1.5m 30T/m2 2.5m 35T/m 2 3.5m 35T/m 2 4.5m 40T/m 2 BH3 1.5m 30T/m 2 2.5m 35T/m 2 3.5m 35T/m 2 4.5m 40T/m 2 BH 04 0.5m 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 BH 05 3.5 m 0.5m 35T/m 2 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 Page 17

BH 06 0.5m 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 BH 07 0.5m 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 BH 08 0.5m 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 BH 09 0.5m 25T/m2 1.5m 30T/m 2 2.5 m 35T/m 2 Whenever foundations are placed on rock, it is essential to ensure that there are no loose pockets on rock surface. In case of loose pockets or over excavation, it shall be filled by plain cement concrete. Constrologix takes this opportunity to thank staff of Taein Constructions Mahad for their cooperation and support during execution of this work. Shirish Joag M. Tech. (Geotech). FIIB, FIGS, FIIE Geotechnical Consultant Page 18