Urban Productive Safety Net Project (UPSNP) Procurement Plan

Similar documents
Urban Productive Safety Net Project (UPSNP) Procurement Plan

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan for ETLP (P156590)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Sample Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Sample Procurement Plan

Sample Procurement Plan

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. I. General

Prior Review Thresholds

GEF Procurement Plan (WARFP LIBERIA)

Sample Procurement Plan

UNITED REPUBLIC OF TANZANIA. Procurement Plan

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Procurement Plan for Project of Integrated Urban and Tourism Development

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Prior Review Thresholds

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

PROCUREMENT PLAN (Textual Part)

procurement Plan I. General

Sample Procurement Plan

Procurement Plan National Community Driven Development Project Department of Rural Development

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

PPA PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan

Consultants: firms Consultants: individuals

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Procurement. International Competitive Bidding;

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. Procurement Method Prior Review Threshold Comments

PROCUREMENT PLAN (Textual Part)

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

Procurement Plan. I. General

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

Actual Amount (US$) Process Status. Pending Interventions.

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sample Procurement Plan

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Procurement Plan. I. General

Sample Procurement Plan

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Implementation Status & Results Chad Urban Development Project (P072030)

Sample Procurement Plan

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Textual Procurement Plan

The World Bank Decentralized Community Driven Services Project (P117764)

Implementation Status & Results Belize Municipal Development (P111928)

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667)

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Implementation Status & Results Chad Urban Development Project (P072030)

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Sample Procurement Plan

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Procurement Plan. I. General

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Transcription:

I. General Urban Productive Safety Net Project (UPSNP) Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Notice: August 20, 2016 4. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2017 II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for # Method Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,000,000 All 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. (Non- Services) Below US$ 1,000,000 All 2.. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/ Manual: Urban Productive Safety Net Project Manual (PIM) issued in June 2016 and UPSNP procurement manual issued May 2017. 5. Any Other Special Arrangements: Not Applicable 6. Summary of the Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Packages Domestic Description Cost Preference Comments US$ million (yes/no) Ref. No. Summary of the ICB (Works) - - - - Review by Bank ( / ) April 27, 2017

Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (Non- Services) 1.2 1 Yes - - - - - 0.2 4 No - - - - - III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Review Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$100,000 3. Individual Above US$ 200,000 Comment 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_or engineering services estimated to cost US$ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: Not Applicable 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Cost US$ million Package s Review by Bank ( / ) Comments Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods 0.350 2 0.870 19 post IC April 27, 2017

Page 1 PROCUREMENT PLAN Ethiopia : Urban Productive Safety Net Project (UPSNP) General Information Country: Ethiopia Banks Approval Date of the Original Plan: 2017-05-15 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-20 Project ID: P151712 GPN Date: Project Name: Urban Productive Safety Net Project (UPSNP) Loan / Credit No: Executing Agency(ies): Ministry of Urban Development and Housing WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / DD/UJCFSA/UPSNP/W- SH/003/2017 / Construction of Warehouse Store for public work hand tools and materials 49,883.00 0.00 2018-01-05 2018-02-12 2018-04-13 GOODS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / SH/008/17 / of Office Furniture (Swivel Chair for managerial & Experts, Table for experts, Guest Chair, File Cabinet, L-Shaped Table & White board) 58,374.00 0.00 Under 2017-05-30 2017-06-30 2017-07-17 SH/009/17 / of Vacuum Cleaner and Water cooler 2,967.00 0.00 2017-06-06 2017-07-11 2017-07-21 SH/010/17 / of Cash safe Box-100kg 660.00 0.00 2017-06-06 2017-07-05 2017-07-12 MUDH/UFSJCA/UPSNPPA/G- SH/011/17 / of Leather Bag for Laptop & documents 1,319.00 0.00 2017-06-12 2017-07-11 2017-07-26 NCB/004/17 / of Computers with all accessories (Lot 1), Office equipment (Lot 2) and Audiovisual equipment (Lot 3) Bids 319,570.00 0.00 2017-05-02 2017-05-09 2017-06-08 2017-06-19 2017-07-03 2017-08-17 NCB/001/17 / of public works hand tools (Lot 1), Bids waste collection & transporting wheel carts (Lot 2) and Gab ion in (lot 3) 995,088.00 0.00 2017-08-31 2017-09-06 2017-10-06 2017-10-26 2017-11-13 2017-12-13 SH/005/17 / of first Aid Kit for public work beneficiary or 93,000.00 0.00 2017-09-23 2017-10-27 2017-12-01 SH/004/17 / of different Seedlings 4,006.00 0.00 2017-09-19 2017-10-23 2017-11-07 SH/003/17 / of local made stand brooms for Public work activity 93,102.00 0.00 2017-09-16 2017-10-20 2017-11-17 SH/002/17 / of Client Cards for UPSNP beneficiaries 42,319.00 0.00 2017-09-11 2017-10-18 2017-11-07 SH/001/17 / of hand Gloves made of Leather for public work or beneficiaries. 98,392.00 0.00 2017-09-16 2017-10-19 2017-11-18 NCB/005/2017 / of Computers and accessories Lot - 1 (Desktop & Laptop Computers, UPS, Heavy duty printers, External hard disk,...) AND Office electronics machine under Lot - 2 (Photocopiers, Scanners, LCD Projectors...) Bids 250,805.00 0.00 2017-10-20 2017-10-25 2017-11-24 2017-12-25 2018-01-18 2018-03-19 SH/012/2017 / of Office Furniture (High Back Swivel Chair, Office Table for experts, Box file Cabinet-Metal for record keeping,...) 27,183.00 0.00 2017-10-23 2017-12-08 2017-12-28 SH/013/2017 / of Digital Photo Camera 471.00 0.00 2017-10-23 2017-12-01 2017-12-15

Page 2 NCB/002/17 / locally made working cloth (Tuta) in Lot - 1, of locally made working leather shoes in Bids Lot - 2 and of protection materials like "eye glass made of plastic materials, mouse & nose dust protection masks" in Lot - 3 1,392,307.00 0.00 2017-10-13 2017-10-27 2017-11-27 2017-12-18 2018-01-05 2018-02-05 SH/006/17 / of Local made sunhat for PW 69,230.00 0.00 2017-10-25 2017-12-01 2017-12-26 NCB/001/2017 / of Public Work Hand tools in Lot-1, of personal Safety materials for public work Bids activities in Lot-2, procurement of galvanized Gabion wire for soil & water conservation in Lot-3 1,370,356.00 0.00 2017-12-25 2018-01-01 2018-01-31 2018-02-14 2018-02-28 2018-03-30 SH/001/2017 / of Locally made hand push Carts 11,111.00 0.00 2018-01-02 2018-02-16 2018-03-16 SH/002/2017 / of locally made stand brooms, locally made Hut for public work 13,425.00 0.00 2017-12-29 2018-02-08 2018-03-15 SH/004/2017 / of First Aid kit for public work 3,700.00 0.00 2017-12-29 2018-02-01 2018-02-21 SH/005/2017 / of Different seeds and seedligs 69,630.00 0.00 2018-02-22 2018-03-29 2018-04-13 SH/006/2017 / of Client Identification cards 8,888.00 0.00 2017-12-28 2018-02-01 2018-02-21 NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / MUDH/UJCFSA/UPSNP/NCS- DC/024/17 / For renting additional office space for UPSNP coordination Unit in the same building rented before for 12 months Direct Direct 24,000.00 0.00 2017-08-31 2017-09-05 2017-10-10 2018-10-10 CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Proposals / Minutes Proposal Negotiated Contract MUDH/UFSJCA/UPSNP/C- 021/17 / scoping study/assessment on people with special needs (Urban destitute) and service providers in 11 Cities 98,000.00 0.00 2017-05-15 2017-06-05 2017-07-17 2017-07-24 2017-08-07 2017-10-06 MUDH/UFSJCA/UPSNP/C- 022/17 / Baseline study-conduct baseline community report card (CRC) or Score (CSC) among beneficiaries. 50,000.00 0.00 2017-06-15 2017-07-05 2017-08-16 2017-08-23 2017-09-06 2017-11-05 023/17 / Preparation of Livelihoods guidelines 2. Livelihood Services 150,000.00 0.00 2017-08-14 2017-08-29 2017-10-12 2017-11-11 2017-12-16 2018-01-30 025/2017 / Organizational Capacity Assessment 25,150.00 0.00 2017-12-15 2017-12-29 2018-02-13 2018-03-15 2018-04-13 2018-06-07 MOLSA/UPSNP/C-026/2017 / Conduct need assessment for direct support to link with service providers 39,726.00 0.00 2017-12-14 2017-12-29 2018-02-12 2018-03-14 2018-04-11 2018-06-10 24/2017 / Audit EFY 2009/10 in 11 UPSNP cities Least Cost 100,000.00 0.00 Under 2017-10-20 2017-11-21 2017-11-06 2017-12-20 2018-01-22 2018-02-06 2018-03-07 2018-04-05 2018-06-04 INDIVIDUAL CONSULTANTS Contract Type Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 3 A/A 01/17 / Recruitment of Specialist for Addis Ababa City UJCFSA for three year (Sept. 2017 - Sept. 2020) on contractual bases Individual Open 27,847.08 0.00 Under 2017-08-29 2017-09-02 2017-10-02 2017-10-17 2017-11-07 2018-11-07 HAWASA 02/17 / Recruitment of Expert for Hawasa City UPSNP for the period of three years contractual bases Individual 2017-08-29 2017-09-02 2017-09-25 2017-10-10 2017-10-24 2018-10-24 D/DAWA 03/2017 / Recruitment of Expert for Dire Dawa City Administration UPSNP for the period three years contractual bases. Individual ADAMA 042017 / Recruitment of Experts for Adama city UPSNP for the period three years contractual bases. Individual DESSIE 05/2017 / Recruitment of Expert for Dessie City UPSNP for the period of three years (Sept.2017 - Sept.2020) on contractual bases. Individual MEKELE 06/2017 / Recruitment of Expert for Mekele City UPSNP for the period of three years (Sept.2017 - Sept. 2020) on contractual bases. Individual