Regional Structure - Global Centers

Similar documents
East Land Quality Forum Drilling Techniques; Old and New

Sonic Drilling Offers Quality Control and Non-destructive Advantages to Geotechnical and Construction Drilling on Sensitive Infrastructure Sites

Geotechnical Geotechnical Assessment

Gotechnical Investigations and Sampling

Chapter 12 Subsurface Exploration

How to Interpret Mining Company Drill Reports & Announcements

Rotary Drilling Rotary Drilling Bits

Instructional Objectives

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

SITE CHARACTERIZATION

Instructional Objectives

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

10. GEOTECHNICAL EXPLORATION PROGRAM

APPENDIX C HYDROGEOLOGIC INVESTIGATION

SITE INVESTIGATION 1

Module 1 : Site Exploration and Geotechnical Investigation

MINING WEEKLY. INSIGHT R300m investment on way to resuscitate liquidated Orkney gold mine 6

DRILLING THROUGH EMBANKMENTS: THE STATE OF PRACTICE ABSTRACT

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

MUDLOGGING, CORING, AND CASED HOLE LOGGING BASICS COPYRIGHT. Coring Operations Basics. By the end of this lesson, you will be able to:

3.0 SUMMARY OF FINDINGS

The attitude he maintains in his relation to the engineer is very well stated in his own words:

Geophysical Site Investigation (Seismic methods) Amit Prashant Indian Institute of Technology Gandhinagar

BELFAST SEWERS PROJECT

Geologging Imagery, Applications and Geological Interpretation. Shea Altadonna 1, Jim Fulton 2, E.I.T.

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

Pressure Grouting of Fractured Bedrock to Control Acid Mine Drainage

Underground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

REPORT OF SUBSURFACE EXPLORATION

Site investigation in rock

Early Exploration Permit Activity Information

Remediation of Soft Clay Utilizing the Dry Mix Method. of Batavia, New York to its discharge into the Niagara River at Tonawanda, New York.

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

HOW. HOW vehicle mounted units portable units also available. HOW, WHEN & WHY to Geophysically Log in S.I.?

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

Applied Geophysics for Environmental Site Characterization and Remediation

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

KDOT Geotechnical Manual Edition. Table of Contents

Geotechnical Engineering Report

7 Years of Cutting Edge Technology for the Mining Industry in Canada

Early Exploration Plan Activity Information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

FACTSHEET. Types of drilling in mining

Alamitos Barrier Improvement Project - UPDATE

Geophysics for Environmental and Geotechnical Applications

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Exploration Drilling Techniques

MICRO TO MACRO ARE UK LINEAR INFRASTRUCTURE GI S SUITABLE FOR INVESTIGATING MASS SOIL PROPERTY CHARACTERISTICS?

7th ESA Workshop on Advanced Space Technologies for Robotics and Automation 'ASTRA 2002' ESTEC, Noordwijk, The Netherlands, November 19-21, 2002

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

b Blackwell Science Environmental Geology PRINCIPLES AND PRACTICE

APPENDIX C. Borehole Data

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS

Use of Non-Invasive Near-Surface Geophysics for Managing Brine Releases

EXTREMELY FAST IP USED TO DELINEATE BURIED LANDFILLS. Norman R. Carlson, Cris Mauldin Mayerle, and Kenneth L. Zonge

Quarter Summary Slide Pack

Department of National Defence B-Jetty Reconstruction

Variability of samples from various drilling and sampling methods

Drilling. What is the Activity?

DET CRC January 2013 Slide Pack Contents

BOS 100 Overburden and Bedrock Groundwater Remediation Former Dry Cleaning Facility

Table of Contents 8.1 GENERAL Overview Subsurface Exploration Methods Responsibilities... 8.

Mitigation of Gypsum Mine Voids Under SR-2 in Ottawa County, Ohio

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E. and Mr. Ian Kinnear, P.E. PSI

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

Exploration, Drilling & Production

Geological Models for Infrastructure Design:

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Geotechnical Testing Methods I

Optical and Acoustic Televiewer Borehole Logging Improved Oriented Core Logging Techniques

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Geophysical Site Surveys

Geotechnical Data Report

USE OF GEOPHYSICAL SURVEYS FOR FILL CHARACTERIZATION AND QUANTITY ESTIMATION AT BROWNFIELD SITES A CASE HISTORY. Abstract

Common Exploration Methods.

2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS

Week 3 : (3HL) Coverage : Typical geotechnical problems and usual application of SI methods

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

December 20, 2017 (Revised from December 15, 2017) Project No

APPENDIX B GEOTECHNICAL REPORTS. B.1: Geotechnical Data Report. Part A: Report

Geotechnical Engineering Report

Title: Author: Background: Maximise core recovery: Identify and resolve orientation and data transfer issues at rig:

Geotechnical Engineering Report

ENGINEERING ASSOCIATES

Innovative Direct Push Technologies for Characterization of the 216-Z-9 Trench at DOE s Hanford Site

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Introduction to Soil Mechanics Geotechnical Engineering

March 13, 2015 Presented at the Western Dredging Association, Midwest Chapter Meeting March 11 13, 2015, Milwaukee, Wisconsin

CHARACTERIZATION OF SOFT CLAY- A CASE STUDY AT CRANEY ISLAND

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND

CHAPTER 3.0 DRILLING AND SAMPLING OF SOIL AND ROCK

Subsurface Geology of the Kennebec River

Role of the Geotechnical Consultant in Design Build Projects a General Contractors Geotechnical Engineer s Perspective

DRILL HOLE # BH-BGC13-FN-01

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

GEOTHERMAL SYSTEMS AND TECHNOLOGIES 3. GEOTHERMAL RESERVOIR ENGINEERING

Advanced Foundation Engineering

Transcription:

October 22, 2009

Regional Structure - Global Centers Boart Longyear Europe (BLE) Salt Lake City Burghaun Boart Longyear Americas (BLA) Peru Sandton Boart Longyear Far East (BLFE) Adelaide Boart Longyear South Africa (BLSA)

U.S. Locations - E & I Seattle Portland We service Canada & operate Internationally Little Falls/St. Cloud Yuba City Reno Salt Lake Flint Wausau Marietta Indianapolis Bost Windsor Santa Fe Springs Phoenix San Antonio Huntsville Memphis New Ellenton Atlanta Pensacola Ocala Ft. Lauderdale

Boart Longyear Company Diamond Coring & Percussive Surface Underground Rotary Air / Mud Reverse Circulation Drilling Products Environmental & Infrastructure

Environmental & Infrastructure Drilling Services Speciality Contractor & Innovative Drilling Solutions 115 Years Experience Serving Environmental and Infrastructure Drilling Markets Drilling is our Business!

Drilling Equipment DPT (Geoprobes truck/tracked) Hollow Stem Augers (truck/tracked) Air/Mud Rotary (including Dual Rotary) Cable Tool Coring Sonic (Truck/Tracked/Mini)

Sonic Drilling Technologies

SONIC DRILLING

Basic Principle of Sonic Drilling VIBRATORY FORCE Energy @ face of bit achieves localized displacementd to shear and penetrate ROTARY FORCE slow rotation to enhance vibratory effects & penetration of hard layers AXIAL FORCE OR FEED FORCE steady down pressure to aid advancement

Principles of Sonic Drilling High-speed eccentric counter-rotating rollers High-frequency low-amplitude mechanical vibration with rotation & down-pressure. Resonance occurs - vibrations coincide with the natural resonate frequency of the drill string - resonant energy is delivered to and focused at the bit face. Borehole advancement a result of shearing & displacement.

Basic Principle of Sonic Drilling

How Does Sonic Deliver Your Subsurface Information?

Core Barrel Advancement - Sonic

Sonic Core Barrel Advancement

Casing Over Drilling Process

Sonic Sample Extraction

Why Use Sonic? Speed 2-4 times faster than conventional drilling Superior Information (continuous core sample) Lithology/geochemistry/hydrogeology Waste Minimization ~ 70% less IDW than conventional drilling methods due to cased hole Ability to dry drill Better Well Construction Less development time/better yield Safer and Cleaner No flights just smooth drill tooling Elevated platform No refusal Drills through cobbles, boulders, & hard layers/lenses Great for heaving sands Reduced Risk for Mistakes Better info to make decisions Angle wells/multi-cased wells w/o leaving casing in ground

Sonic Benefit - Fast 2-4 times faster than HSAs when sampling Advances at rates up to 1 / second drilling friendly formations Automated rod make up and break out enhances speed & safety Reduces Site Time - lowers project cost for your client (compressed time line), lower management cost, lower per diem cost, reduced down time of an operational site

Sonic Benefit Sample Quality Clearly displays lithology in delicate, hard-to-recover material Sample quality is basis of your remedial strategies Samples virtually any overburden formation or obstruction

Sonic Benefit - Remarkable Sampling & Recovery Overburden Cement Rebar (reinforced) Rip-Rap Sands Gravels Cobbles Boulders Bricks Wood Tires Compacted Garbage Slag Piles Bedrock Steel - Train Rails Delicate Formations

Sonic Samples

Samples Delicate Soils & Hard-rock Interfaces

Sonic Samples Till 6 Granite

Modeling Applications

Sonic Samples - Aggregates

Gas Station Sample - Drilled dry

Sonic Sample - Hard Clay

Penetrates Reinforced Concrete

Sonic Sample - Steel Train Rail

Sonically Cored Conglomerate

Hard Rock Sample Cored using Speed increaser on Sonic Drill Diamond

Acrylic Liners Carolina Coastal Studies

Split Barrel Sample -

Telescoping Capability Sample Sizes 3,4,5,6,7 and 8 inch Casing Sizes - 5,6,7,8,9,10, and 12 inch

Sonic Drilling Platforms

Sonic Truck Drills

Full-Size Sonic Drills

Off Road Full size All Terrain Vehicle (ATV)

Off Road ATV to access most sites

Pre-collaring Diamond Core Holes Drill Through Difficult Overburden Materials (glaciated tills, high permeability formations, flowing sands, etc) Low Water Use Required Angle Drilling Installations Extremely straight hole drilled due to guided system of Coring / Casing

Inside Building Small Footprint

Inside Building - Compact footprint & ability to sample soil and rock with same drill

Maneuverable in tight spots

Barge Work lagoons, lake, river & ocean bottoms

Sonic Benefit - Clean Site

Multiple Programs One Rig Demonstrating a wide variety of our capabilities with Sonic Shelby Tube Sampling Split Spoon Sampling Grout Borings Deeper, larger diameter, targeting ʻfeaturesʼ, sleeve ports, barrier bags

How Will Sonic Benefit Your Project?

Sonic Benefit Minimizes IDW Cuttings are expensive to dispose of and require time & dollars to characterize them Sonic drilling reduces the amount of Investigative Derived Waste (IDW) by 70 80% compared with Hollow Stem Auger or Rotary Drilling operations.

Sonic Minimizes Bridging

Water Sampling Vertical Profile Aquifer

Vertical Water Profiling

Sonic Applications Contaminated Soil and Groundwater Investigations Plume Delineation Vertical Aquifer Profiling Monitor Well/Recover Well Installation Air Sparge Installations Remedial Injections Deep Earth Dam and Levee Investigative Sampling Karst Formation Exploration Landfill Investigations/Expansion MGP site characterizations

Sonic Applications Mine Tailings Coal Bing Investigations Freeze Hole Boring Earth Stabilization Quantification of Aggregate Resources Micro-Pile Installation Earth Anchors Installation Grout Verification Sampling Sampling of Soil Mixing Applications Grouting -- Grout Curtain Installation

Additional - Sonic Benefits Angle Borings (Up to 22 Degrees from Horizontal) Standard penetration test (Automatic Hammer) Shelby Tubes Dennison Samples Piston Samplers Pressure Meter Testing Geophysical Logging CMT Wells FLUTe Liners Multiple Casing installations Excellent for Nested Well installations

Angle Boring

Multi-cased Wells - Sonic

Sonic Value Superior Information Complete accurate geological information Enables precise site investigations Visibility of delicate formations Recovers delicate sand seams and other easily altered geology Penetrates Faster Compresses time line reduces overhead and management cost Drills Deep To define lower contamination boundaries such as Chlorinated Solvents Drills & Samples toughest geology without refusal Drills Dry - Avoiding sample bias & cross contamination

Why Use Sonic? Speed 2-4 times faster than conventional drilling Superior Information (continuous core sample) Lithology/geochemistry/hydrogeology Waste Minimization ~ 70% less IDW than conventional drilling methods due to cased hole Ability to dry drill Better Well Construction Less development time/better yield Safer and Cleaner No flights just smooth drill tooling Elevated platform No refusal Drills through cobbles, boulders, & hard layers/lenses Great for heaving sands Reduced Risk for Mistakes Better info to make decisions Angle wells/multi-cased wells w/o leaving casing in ground

Safety and Training SAFETY AND TRAINING _ We are an ISO 14001 company which means we are trained to lower environmental risks on each project we undertake. Boart Longyear has attained ISO 14001 and ISO 18001 certification. Boart Longyear is committed to safety; it s our number one priority, as we have determined that efficiency and production go hand in hand. Comprehensive, ongoing training and surveillance program that is second to none. We employ safety officers focused on our Behavior Based Safety (BBS) system to ensure regular reviews of all crews with a continuous circle of modification and improvement.

October 22, 2009