Seismic Analysis of Siri Dam Using Pseudo-Static Approach

Similar documents
Safety analyses of Srinagarind dam induced by earthquakes using dynamic response analysis method.

(Refer Slide Time: 01:15)

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Seismic Stability of Tailings Dams, an Overview

Seismic Evaluation of Tailing Storage Facility

J. Paul Guyer, P.E., R.A.

SAFETY CHECK OF SONDUR DAM FOR CHANGED SEISMIC CONDITION Aryak shori 1, R.K.Tripthi 2 and M. K. Verma 3

CONSIDERATION OF SOIL PROPERTIES FOR STABILITY ANALYSES OFPADMA AND JAMUNA RIVERBANK

Slope Stability. loader

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

International Journal of Modern Trends in Engineering and Research

Review of static and seismic stability of a cross-valley sand tailings embankment in a high rainfall, high seismicity setting

Instructor : Dr. Jehad Hamad. Chapter (7)

Reinforced Soil Structures Reinforced Soil Walls. Prof K. Rajagopal Department of Civil Engineering IIT Madras, Chennai

CPT Applications - Liquefaction 2

Phase II Report: Project Definition Options. Dam Safety

Liquefaction and Foundations

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Seismic Slope Stability

Behaviour of Earth Dam under Seismic Load Considering Nonlinearity of the Soil

Investigation of Liquefaction Behaviour for Cohesive Soils

STABILITY ANALYSIS OF EARTH DAM SLOPES SUBJECTED TO EARTHQUAKE USING ERT RESULTS INTERPRETATION

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

Module 8 SEISMIC SLOPE STABILITY (Lectures 37 to 40)

Evaluation of Geotechnical Hazards

Address for Correspondence

Evaluation of soil liquefaction using the CPT Part 2

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012

CHARACTERISTICS OF LIQUEFIED SILTY SANDS FROM MEIZOSEISMAL REGION OF SHILLONG PLATEAU, ASSAM AND BHUJ IN INDIA

Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR. Thanachot Harnpa* Dr.Schradh Saenton**

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading

Gravity dam and earthquake

Module 8 SEISMIC SLOPE STABILITY (Lectures 37 to 40)

PRINCIPLES OF GEOTECHNICAL ENGINEERING

IGC. 50 th INDIAN GEOTECHNICAL CONFERENCE PSEUDOSTATIC SEISMIC ASSESMENT OF SLOPES AND ITS REMEDIATION

Back Analysis of the Lower San Fernando Dam Slide Using a Multi-block Model

Dynamic Analysis Contents - 1

APPLICATION OF COMPOSITE CLAY AS CORE MATERIAL IN EARTHFILL EMBANKMENT DAMS

Module 2 Lecture 9 Permeability and Seepage -5 Topics

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Hazard assessment in dynamic slope stability analysis

OIKOS > landslide > mechanism >predisposing causes

On seismic landslide hazard assessment: Reply. Citation Geotechnique, 2008, v. 58 n. 10, p

STRUCTURAL STABILITY ASSESSMENT

Research Article Soil Saturated Simulation in Embankment during Strong Earthquake by Effect of Elasticity Modulus

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Ground Motions and Liquefaction Potential

Stability Analysis of Landslide Dam under Rainfall

Research on the Concrete Dam Damage and Failure Rule under the Action of Fluid-Solid Coupling

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials

Liquefaction. Ajanta Sachan. Assistant Professor Civil Engineering IIT Gandhinagar. Why does the Liquefaction occur?

Soil Behaviour in Earthquake Geotechnics

Geotechnical Earthquake Engineering

Endochronic model applied to earthfill dams with impervious core: design recommendation at seismic sites

Investigation of Liquefaction Failure in Earthen Dams during Bhuj Earthquake

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

International Journal of Scientific & Engineering Research, Volume 8, Issue 2, February ISSN

Mitigation of Earthquake-Induced Catastrophic Landslide Hazard on Gentle Slopes by Surface Loading

Important Concepts. Earthquake hazards can be categorized as:

Instability Investigate of Sarney dam abutments, under seismic loading

Determination of Excess Pore Pressure in Earth Dam after Earthquake

Case Study - Undisturbed Sampling, Cyclic Testing and Numerical Modelling of a Low Plasticity Silt

Slope Stability Theory

Seismic Analysis of Soil-pile Interaction under Various Soil Conditions

SEISMIC RISK EVALUATION OF IRRIGATION TANKS: A CASE STUDY IN IBIGAWA-CHO, GIFU PREFECTURE, JAPAN

Dynamic Analysis of Stability and Liquefaction in Dams in Unsaturated Soil Mode

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36.

THE LIQUEFACTION POTENTIAL OF LOESS IN CHINA AND ITS PREVENTION

Evaluating the Seismic Coefficient for Slope Stability Analyses

Impact : Changes to Existing Topography (Less than Significant)

Fujinuma Dam Performance during 2011 Tohoku Earthquake, Japan and Failure Mechanism by FEM

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Evaluation of soil liquefaction using the CPT Part 1

Seismic stability safety evaluation of gravity dam with shear strength reduction method

River Bank Erosion of the Surma River Due to Slope Failure

Nipigon River Landslide, Ontario, Canada

Theory of Shear Strength

Mass Wasting. Revisit: Erosion, Transportation, and Deposition

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

Civil Engineering Department College of Engineering

Geotechnical damage in rural areas caused by the 2015 Gorkha Nepal Earthquake

Ch 4a Stress, Strain and Shearing

Recent Research on EPS Geofoam Seismic Buffers. Richard J. Bathurst and Saman Zarnani GeoEngineering Centre at Queen s-rmc Canada

Effective stress analysis of pile foundations in liquefiable soil

Evaluation of Pore Water Pressure Characteristics in Embankment Model.

Liquefaction Potential Variations Influenced by Building Constructions

Deformation And Stability Analysis Of A Cut Slope

3.18 GEOLOGY AND SOILS

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Chapter (11) Pile Foundations

Triaxial Shear Test. o The most reliable method now available for determination of shear strength parameters.

DYNAMIC RESPONSE APPROACH AND METHODOLOGY

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY.

Geotechnical Properties of Soil

Transcription:

Seismic Analysis of Siri Dam Using Pseudo-Static Approach Shabbir Ahmed Osmani 1, Md. Jahir Bin Alam 2 1 Department of Civil Engineering, Leading University, Bangladesh 2 Department of Civil and Environmental Engineering, Shahjalal University of Science and Technology, Bangladesh Abstract: In this study, the seismic risk analysis of Siri embankment dam, situated on Meghna river has been performed using pseudostatic method. The dam was selected for four reasons: Firstly, the dam is situated in Zone II, which is becoming very vulnerable to Earthquake. Secondly, there is a lack of case history performance, which made it more unpredictable. Thirdly, the embankment dam is situated on Meghna, which is one of the most important river of Bangladesh. And lastly but not least, no earthquake occurred in these faults for many years, which means huge strength has gathered around the fault that could cause serious earthquakes in Bangladesh and its neighboring areas at any time. This paper represents a seismic risk assessment on a small scale, which is only for the dam area. The Factor of safety obtained for slope stability analysis and the liquefaction indicates the safety of the structures. But as Earthquake is one of the catastrophic and unpredictable disaster, safety measures like constructing houses and other infrastructures near the dam should be avoided. The dam was analyzed at U/S & D/S considering seismic coefficient in the range of 0.05 ~ 0.15. It is found that at k = 0.2, the dam is vulnerable in earthquake. Keywords: Embankment dam, Pseudo-static, factor of safety, seismic coefficient, Upstream, Downstream 1. Introduction Dam should be safe to resist overturning moment, seepage, earthquake etc. Its stability depends on shape of the dam, its profile, filter and seepage profile & quality of earth dam etc. Because of the lack of case history performance, the prediction of Embankment behavior under Earthquake loading generally has significant uncertainty[1]. So seismic risk analysis is needed for the safety of the dam. It is needed for preventing the settlement and cracking of embankment, particularly near crest of dam. Seismic analysis is needed for reducing the instability of upstream and downstream slopes of dam. It is essential for the reduction of freeboard due to settlement or instability which may result in overtopping of dam. Another purpose of seismic design & analysis is to prevent damages to outlet works through embankments, leading to leakage & potential internal erosion of Embankment dam. Embankment dams resting on unconsolidated landfill can turn into a great threat to human civilization during earthquake. Sociologic factors like the population nearby the dam, the importance of the area, time of the earthquake occurrence, community preparedness for the possibility of such an event is also very important[2]. The study of probability analysis of Naulong dam [3] was carried out on Mula river at Sunth, about 30 Km from Gandava town in Tehsil and District Jhal Magsi of Balochistan Province. From the analysis, it was concluded that the pseudo-static case is critical for this dam. Another study on the liquefaction analysis of Tendaho Earth-fill dam which is a part of Tendaho Dam and Irrigation Project was done[4]. The dynamic analysis results revealed that the loosely deposited alluvium foundation would completely liquefy under earthquake loading, endangering the stability of the dam. Hence, following the recommendations made in this study, the 6 to 10 m thick alluvium foundation under the dam seat has been completely removed prior to placement of the dam. Construction of the dam has been completed recently. 2. Dam Details 2.1 Location and Structure The dam is around 36.5 meter in length. This is adjacent with a closure dam of length 3.85 kilometer. The maximum height of the crest is 12.02 m from datum. The length of the reservoir is 75meter. The volume of the reservoir is 24637 m³, with a length of 75 m and hydraulic head of 9 m. Paper ID: NOV151249 953

Figure 2.1: Study area at Siri Dam in Raipur Upazela, Mymansingh District, Bangladesh. Figure 2.2: Cross section of The selected embankment dam (water development board) 2.2 Section of Dam The dam is built for the protection against flood for Siri and the surrounding area. The embankment dam will be considered as a small dam. Table 2.3.2: Soil properties for design Shear Wave Velocity Mass Density Poisson s Angle of Internal Cohesion Material (m/s) (kg/m 3 ) Ratio Friction Kpa Core 180 1910 0.28 26.5 32.2 Shell 190 2050 0.36 38 0 (Source: Bangladesh Geological Board Of Survey) 3. Pseudo-static Method Figure 2.3: Cross section of the Embankment Dam 2.3 Soil Properties Table 2.3.1: Soil Texture Soil Type Amount (in %) Clay 30.8 Silt 21.5 Sand 48.3 Others 1.4 (Source: Bangladesh Geological Board Of Survey) Circular arc method [IS 7894-1975] is used to determine the slip circle. Three sample trial circles are shown in Figure 3.1 and Figure 3.2, for which analysis is done. Factor of safety is evaluated by the following equation for the three samples[5]. FS=C Lab+[{(W-F v ) cos β}-f h sin β]tan φ/[(w- Fv)sin β + F h cos β] Where, L=Length of the arc a-b, C=cohesion, β=angle between the vertical and the line passing through the C.G. of the slice φ =Angle of internal friction, F h =Horizontal seismic coefficient Fv =Vertical seismic co-efficient Paper ID: NOV151249 954

A team which consists of geologists, seismologists and geotechnical engineers, are concerned about foundation of dam, in-situ geotechnical properties of dam. Since earthquake loading is rapid, stability for an earth dam is generally considered under un-drained condition[1]. Seismic slope stability is influenced by cyclic stresses induced by earthquake shaking and the cyclic stress-strain behavior of the materials within the body of the dam and that of foundation soils. According to pseudo-dynamic method, a dynamic factor of safety of less than a unity for a short time during earthquake shaking does not indicate complete failure. It means there is a potential relative motion between the soil above the slip surface and the rest of the sliding block. 3.1. Analysis for U/S Slope From the past studies and IS 7894-1975, it can be inferred that U/S slope of the embankment dam become very vulnerable in the sudden drawdown and reservoir partial pool condition. While calculating various forces acting on the dam, whole section is divided into two parts: 1. Zones above phreatic line: All the zones above phreatic line have been considered as moist in the computation of driving as well as stabilizing forces 2. Zones in drawdown range: Figure 3.2: Trial slip circles on Downstream Side The procedure for the drawing of circular arc and calculation is same as that of mentioned for U/S slope, only change is made in direction of earthquake excitation, which is now considered in the downward direction. Three different circles are shown in the figure. Table 4.1: Required Factor of Safety Case Slope Required Steady state seepage-normal pool DS 1.5 Steady state seepage-surcharge pool DS 1.4 Steady state seepage-partial pool US 1.5 RDD-Normal pool US 1.3 Pseudo-static Earthquake US >1 Pseudo-static Earthquake DS >1 Pseudo-dynamic Earthquake US & DS >1 Liquefaction >1 4. Factor of Safety in Pseudo-static Method The minimum required factor of safety for different cases are given in the table 4.1[3]: 4.1 Factor of Safety for Upstream Slope Figure 3.1: Trial slip circles on Upstream Side For the calculation of driving forces, core materials is considered as saturated and shell material is considered as moist while for the resisting forces both core and shell are considered as submerged. 3.2. Analysis for D/S slopes: The method is repeated for downstream slope. In the analysis for the D/S slope, steady seepage condition is considered. The condition is developed when water table is maintained at a constant level for sufficiency for longer time and due to that phreatic line is developed in the dam body. In this method, empirical values(k h, k v ) are typically adopted for the seismic co-efficient. This lies in the range of 0.05-0.15.From the analysis of dam for Upstream slope(pseudostatic method) following chart has been obtained: Table 4.2: Factor of safety for U/S K h K v Up-stream Side Slice A1 Slice B1 Slice C1 0 1.56 2.12 2.39 0.1 0 1.24 1.61 1.77 0.1 0.05 1.20 1.59 1.75 0.15 0 1.11 1.43 1.56 0.15 0.075 1.08 1.39 1.51 0.2 0 1.00 1.28 1.39 0.2 0.1 0.96 1.22 1.32 Paper ID: NOV151249 955

4.2 Factor of Safety for Downstream Slope Table 4.3: Summary of F.S. evaluated for Downstream Slope Downstream Side K h K v Slice A2 Slice B2 Slice C2 0 1.69 1.85 2.13 0.1 0 1.33 1.44 1.61 0.05 1.31 1.42 1.59 0.15 0 1.19 1.28 1.43 0.075 1.16 1.25 1.39 0.2 0 1.07 1.15 1.28 0.1 1.03 1.10 1.22 From the table 4.2,it is observed that the minimum factor of safety for static case of upstream is 1.56.While for seismic case the minimum factor of safety is 0.96,which is obtained for K h =0.2.It has been also observed that the value of factor of safety is decreasing with the enhancement of K h. From the table 4.1, it has been observed that in seismic slope stability analysis, if factor of safety is more than or equal to Figure 4.2: Factor of Safety of Different slices in D/S 1, the slope is considered to be stable. But,if the factor of safety is less than one, the slope is considered to be unstable. So, from the chart of Factor of safety for upstream slope, slice A1 is taken as unstable(for k h =0.2,k v =0.1). The minimum desirable Factor of safety for downstream slope of embankment dam subjected to earthquake condition is 1. Paper ID: NOV151249 956

Figure 4.3: Comparison of Factor of Safety of Different slices in U/S and D/S From the table 4.3, it is shown that the minimum factor of safety for static case is 1.69. While for seismic case, the minimum factor of safety has been obtained for K h =0.2, 1.03.And it is also been observed that the values of factor safety is decreasing with the enhancement of value of K h. Earthquake is one of the catastrophic and unpredictable disaster, safety measures like constructing houses and other infrastructures near the dam should be avoided. References 5.5 Liquefaction Analysis F.S.=CRR/CSR=0.22881/0.18=1.27 Here, FS for liquefaction is greater than 1.So the soil will not be susceptible for liquefaction. Because a factor of safety less than 1.00 indicates failure is likely to be occurred[6]. Though sometimes for the inappropriate data and the inadequate knowledge of earthquake, soil with factor of safety greater than 1.00 can also be liquefied. 5. Conclusion Siri embankment dam is one of the most important infrastructures for local area. Its primary object is to protect the surrounding area from flood during the monsoons. The dams total height is 12.02 meter, whereas the width of the crest is 6 meter and the length of the base is 36.5 meter. The Factor of safety has been derived for the Embankment dam through the Pseudo-static method and Pseudo-dynamic method. Factor of safety for liquefaction has been also derived here. An empirical value has been taken for horizontal seismic co-efficient and vertical seismic coefficient during the calculation of factor of safety by Pseudostatic method. Due to the lacking of data regarding Earthquake, it is possible to derive factor of safety only for k h =0.15. The minimum factor of safety for upstream slope by Pseudo-static method is 0.96 and for Downstream is 1.03. From the results, it has been seen that, the dam is almost safe during the Earthquake, as the value of Factor of safety only once crosses the line below 1. The structure is also not susceptible to liquefaction, as the factor of safety for liquefaction is also greater than 1, which indicates the safety of structure. This paper represents a seismic risk assessment application on a small scale, which is only for the dam area. The Factor of safety obtained for slope stability analysis and the liquefaction indicates the safety of the structures. But as [1] Tripathy L.K. (2011) Seismic analysis of earth dams, Proceedings of Indian Geotechnical Conference(Paper No.F-205.) [2] Geological Survey Board of Bangladesh [3] Khan, & Malik, (2013), Probability and Sensitivity Analysis of the Slope Stability of Naulong Dam, Pak. J. Engg. & Appl. Sci. Vol. 13,(p. 54-64). [4] Hadush Seged and Messele Haile, (2012), Earthquake induced liquefaction analysis of Tendaho earth-fill dam. [5] Cristiano Melo and Sunil Sharma ( 2004), Seismic coefficients for pseudostatic slope analysis, 13th World Conference on Earthquake Engineering, Vancouver, B.C., Canada, Paper No. 369. [6] Ajanta Sachan, Liquefaction, [7] Jibson, R.W., (2011), Methods for assessing the stability of slopes during earthquakes A retrospective: Engineering Geology, v. 122, p. 43-50. [8] Maksat Omarov, B.S. (2010), Liquefaction potential and post-liquefaction settlement of saturated clean sands; and effect of Geo-fiber reinforcement. [9] Water development board of Bangladesh [10] Arora S.K.(1993) Soil Mechanics and Foundation Engineering Paper ID: NOV151249 957