St. Louis District PRESENTATION TO: SOCIETY OF AMERICAN MILITARY ENGINEERS. Mike Feldmann Chief Programs and Project Management 27 April 2017

Similar documents
To: Olivia Dorothy March 9, 2018 Associate Director Upper Mississippi River Basin American Rivers

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101

Lake Winnebago Regulation Meeting

US Army Corps of Engineers BUILDING STRONG

DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND (SDDC) 1 SOLDIER WAY SCOTT AFB, IL 62225

2012 USACE Drought Actions

U.S. ARMY CORPS OF ENGINEERS

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update


Illinois State Water Survey Division

Hurricane KATRINA Lessons Learned for Managing Risk

Red River Levee Panel

Assessment of the Hood River Delta Hood River, Oregon

BANK EROSION AND HISTORICAL MORPHOLOGY STUDY OF THE MIDDLE KASKASKIA RIVER. Building Strong

GAMINGRE 8/1/ of 7

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

Presented By Quarterly Public Meeting February 22, 2012

Integrating Weather Forecasts into Folsom Reservoir Operations

EAGLES NEST AND PIASA ISLANDS

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

2014 San Gabriel Valley Water Forum. October 2, 2014

DRAFT PROGRAM Registration of participants, welcome coffee, exhibition tour

Island Design. UMRS EMP Regional Workshop. Presentation for the

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

Regional Sediment Management

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Locational business intelligence in the U.S. Forest Service: Geospatial Accomplishment Reporting ESRI USER CONFERENCE 2015 JULY 21, 2015

Average 175, , , , , , ,046 YTD Total 1,098,649 1,509,593 1,868,795 1,418, ,169 1,977,225 2,065,321

Average 175, , , , , , ,940 YTD Total 944,460 1,284,944 1,635,177 1,183, ,954 1,744,134 1,565,640

Hurricane Katrina August 29 th, 2005 Costliest Disaster/One of the 5 deadliest Hurricanes in US History. Total Cost: Approx. $100 Billion in damages O

Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting

Manatee School of Arts and Sciences, Inc. Budget vs. Actuals: Budget FY - FY16 P&L July June 2017

Folsom Dam Water Control Manual Update

Bank Erosion and Morphology of the Kaskaskia River

Friday, September 1st, 2017 American Currents

FIAR & Enterprise Risk Management (ERM)

United States Multi-Hazard Early Warning System

ATLANTIC INTRACOASTAL WATERWAY NORFOLK DISTRICT. Joel F. Scussel, Operations Support Section Dismal Swamp Canal July 27, 2017

Kansas Next Generation 911 Data Remediation Program. Esri Imagery Forum June 26, 2016

Grant All-Detail Report 2012 Cost Share Base Grant

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Department: Emergency Management FY 2018/19 Proposed Budget

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy

State Water Survey Division SURFACE WATER SECTION

The World Bank Cities and Climate Change (P123201)

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

REPORT ON LABOUR FORECASTING FOR CONSTRUCTION

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005

State GIS Officer/GIS Data

Implementation Status & Results Belize Municipal Development (P111928)

Role of Hydro-Met Services in Disaster Risk Management

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Strategic Mapping Program (StratMap)

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

Native Buffer Cost Share - Ramsey (SWCD)

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Sacramento River Bank Protection Project

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Sample Header for slide

Template for Sediment and Erosion Control Plan General Instructions

the IRIS Consortium Collaborative, Multi-user Facilities for Research and Education Briefing NSF Business Systems Review September 9, 2008

ITEM R0705 PROPOSAL 1 CREATION OF A NEW CENTER AT THE UNIVERSITY OF MONTANA-MISSOULA WITH AN ASSOCIATED FIELD STATION

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

WOLF CREEK GARRARD DITCH DIVESION GRINNELL DITCH DIVERSION ON WOLF CREEK

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Sediment Traps. CAG Meeting May 21, 2012

Midwest and Great Plains Climate and Drought Update

Wednesday, August 23rd, 2017 American Currents

Implementation Status & Results Jamaica Rural Economic Development Initiative (P105122)

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

Kenneth Shelton, Assistant Superintendent, Business Services Los Angeles County Office of Education 9300 Imperial Highway Downey, CA 90242

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

POTAMOLOGY INVESTIGATIONS REPORTS. Issued Prior To and Including This Report

Cities and Climate Change (P123201)

UPPER COSUMNES RIVER FLOOD MAPPING

SUSTAINABLE SEDIMENT MANAGEMENT

Flooding Performance Indicator Summary. Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St.

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Missouri River Basin Water Management Monthly Update

The World Bank Caribbean Regional Communications Infrastructure Program (P114963)

What s next for the Port Waterfront?

AFRCC AIR FORCE RESCUE COORDINATION CENTER

Missouri River Basin Water Management Monthly Update

3.11 Floodplains Existing Conditions

OC Public Works El Niño Storm Preparation 2015

Verona Area School District. C o m m u n i t y P r e s e n t a t i o n J u l y 1 8,

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Missouri River Basin Water Management Monthly Update

The World Bank Third National Urban Water Sector Reform Project (P123513)

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Daily Operations Briefing. Friday, May 5, :30 a.m. EDT

MAPPS/USGS Liaison Meeting U.S. Department of the Interior U.S. Geological Survey

Transcription:

PRESENTATION TO: SOCIETY OF AMERICAN MILITARY ENGINEERS 237 237 237 217 217 217 200 200 200 St. Louis District 255 0 163 131 255 0 163 132 Program 255 0 Overview 163 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102 130 102 56 48 130 120 111 Mike Feldmann Chief Programs and Project Management 27 April 2017

AGENDA St. Louis District Overview 2018 Priorities District Budget Contracting Opportunities Current and Future A/E Contracts Construction Contracts by Mission

ST. LOUIS DISTRICT VALUE TO THE NATION 10 rivers 5 lock & dam sites 5 Corps lakes 750 miles of levees 92 flood control systems 416 miles of navigable channel 70 pumping plants 162 recreation areas 1 hydropower plant MN MINNEAPOLIS IA MO LITTLE ROCK MI WI ST. PAUL ST. LOUIS LA ROCK ISLAND IL CAIRO MEMPHIS VICKSBURG NEW ORLEANS

ST. LOUIS DISTRICT VALUE TO THE NATION Provide engineering and water resource solutions that improve safety, energize the economy, sustain the environment and enhance the quality of life for those we serve through expertise, innovation, and partnerships. Protect People from Water Protect Water from People Make Water Useful

FY17 PROGRAM OVERVIEW Appropriations St. Louis District FY16 President s Budget St. Louis District FY17 President s Budget Investigations $1,200,000 $150,000 St. Louis District FY17 Anticipated Allocation Construction $6,925,000 $3,955,000 Operations & $86,652,000 $86,044,000 Maintenance MR&T $4,512,000 $4,912,000 FUSRAP $28,000,000 $24,550,000 FCCE Total $125,289,000 $119,611,000 Note: Supplemental Funds in the amount of $23M for O&M and $28M for FCCE will be obligated in FY17 & FY18.

CONTRACTING OPPORTUNITIES Solicitations o Vendors Federal Business Opportunities St. Louis o https://www.fbo.gov/?s=home&tab=list&mode=list Solicitations/RFQs for supply and services o ASFI The Army Single Face to Industry o https://acquisition.army.mil/asfi/solicitation_search_form.cfmarmy mil/asfi/solicitation search form cfm o Search solicitation number/select contract office

SELECTING CONTRACTORS Bid results: http://www.mvs.usace.army.mil/businesswithus/contracting/ BidResults.aspx Contract award results: Contract award results: http://www.mvs.usace.army.mil/businesswithus/contracting/ AwardResults.aspx

8 CURRENT ARCHITECT/ENGINEER & OTHER PROFESSIONAL SERVICES CONTRACTS

CURRENT REGIONAL A/E CONTRACTS 9 Contract Contractor Expires Civil Works and Support for Other Agencies Civil Works and Support for Other Agencies Gestra-Stanley JV Dec 2018 CDG Engineers May 2019 CURRENT ST. LOUIS A/E CONTRACTS Contract Contractor Expires Field & Hydrographic Surveys Thouvenot, Wade, & Nov 2020 Moerchen Field & Hydrographic Surveys Hanson Apr 2021 Field & Hydrographic Surveys Bowen Engineering & Surveying Apr 2021

CURRENT ST. LOUIS A/E CONTRACTS 10 Contracts Contractor Expires Photogrammetric Mapping The Atlantic Group Aug 2020 Photogrammetric Mapping Optimal GEO Sep 2020 Photogrammetric Mapping Towill Mar 2021 Photogrammetric Mapping GRW Mar 2021 Photogrammetric Mapping Dewberry Mar 2021 Photogrammetric Mapping Surdex Corp Jun 2021 Photogrammetric Mapping Continental Mapping Consultants Aug 2021 Photogrammetric Mapping Quantum Spatial Aug 2021 Photogrammetric Mapping Merrick & Co Nov 2021 Photogrammetric Mapping Fugro Geo Spatial Jun 2021

CURRENT SERVICES CONTRACTS 11 Contract Contractor Expires Environmental Lab Testing Services ARDL Sep 2019 Drilling & Testing Brotcke Jun 2021 Drilling & Testing Palmerton & Parish Jun 2021 HTRW Investigation & Remediation of Environmental Programs Leidos, Inc. Oct 2017 Laboratory Analysis HTRW Test America Lab Apr 2018 Curation Illinois State Museum Oct 2018 Curation Burke Museum Association Sept 2019 Curation ERG-NSA JV Sept 2017

12 PLANNED FUTURE ARCHITECT/ENGINEER & OTHER PROFESSIONAL SERVICES CONTRACTS

FUTURE ST. LOUIS A/E & SERVICE CONTRACTS 13 St. Louis District Amount Contract Advertise Anticipated Contracts Period Award Environmental Lab Testing Services (2 Awards) $1-5M $5-10M 1 (+4) (4Qtr) FY17 FY18 Laboratory Analysis HTRW $1-5M 1 (+4) FY18 FY18 1 (+4) Curation <$50M (3Qtr) FY17 FY17

14 POTENTIAL FY17 CONSTRUCTION CONTRACTS

FY 17 POTENTIAL CONTRACTS NAVIGATION AND FLOOD RISK PROJECTS Project: Description: Advertise Date: Cost Range: Upper & Lower River, MRM 300-195 MRM 195-0 (O&M) Dike & Revetment for the maintenance of existing river training structures and revetments 3 Qtr FY17 $5-10M Bois Brule Ditching & Culverts 3 Qtr FY17 $1-5M Bois Brule Relief Well Reach 3 Qtr FY17 $1-5M Cape Girardeau Rock Berm & Culvert Extension 3 Qtr FY17 $1-5M

FY17 POTENTIAL CONSTRUCTION CONTRACTS PL 84/99 FLOOD REPAIRS Project Description Advertise Date Cost Range Elm Point & Lakeside Slide & Erosion repairs 3Qtr FY17 $.5M-$1M Prairie Du Rocher & Kaskaskia Island Slide Repairs 3Qtr FY17 $1M-$5M $5M Ft Chartres & Ivy Landing Gravity Drain Repairs 3Qtr FY17 $1M-$5M Keach, Eldred, Spanky Erosion, Scour Repair 4Qtr FY17 $1M-$5M McGee Creek, Valley City, Meredosia Lake, Erosion Repair 4Qtr FY17 $1M-$5M $ Mud Creek Columbia D&LD Sluice Gate Rehab 4Qtr FY17 $.5M-1M

FY17 POTENTIAL CONSTRUCTION CONTRACTS MISCELLANEOUS Project EPA Region 7 Support Big River, Byrnes Mill Dam Stabilization VA - Jefferson Barracks Columbarium Dept. of Energy Weldon Springs Interpretive Center, Weldon Springs, MO Description Use 8A or Competitive Contract to construct temporary mill dam stabilization structure, sediment dewatering area, and access features for removal actions. Work includes site work, foundations, and pre-cast columbarium niches. The columbarium will contain 5,000 niches. Construction of a 15,000 sq. ft. interpretive center & administration building. Advertise Cost Date Range 4 Qtr FY17 $.5M-$1M FY18 $1M-$5M FY18 $5M-$10M

SMALL BUSINESS St. Louis District Small Business Program Office o Vital to success o Educate and provide guidance to Small Businesses and Corps personnel o Ensuring all business entities can compete for Corps of Engineer projects o Meet short and long term initiatives and goals Small Business Office Karen Fountain (314) 331-8517 Fax: (314) 331-8770

POINTS OF CONTACT C l Anthony A th Mit h ll District Di t i t C d Col. Mitchell, Commander John Peukert, Deputy for Planning, Programs, and Project Mgt. (314) 331-8012 Chris Pulliam, Executive Assistant (314) 331-8016 Dave Busse Busse, Chief, Chief Engineering-Construction Division (314) 331-8202 Lou Dell Orco, Chief, Operations Division (314) 331 331-8100 8100 Jeff Derrick, Acting Chief, Construction Branch (573) 204-7770 Patricia Voss, Chief, Contracting Division (314) 331-8500 Small Business (314) 331-8513