Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Similar documents
Sample Procurement Plan

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan

Procurement Plan for Eth Expressway Project ( P148850)

Sample Procurement Plan

Procurement Plan for ETLP (P156590)

procurement Plan I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

PROCUREMENT PLAN (Textual Part)

Procurement Plan. Nepal Livestock Sector Innovation Project

Prior Review Thresholds

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan. Procurement Method Prior Review Threshold Comments

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan for Project of Integrated Urban and Tourism Development

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan

PROCUREMENT PLAN (Textual Part)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Procurement Plan. I. General

GEF Procurement Plan (WARFP LIBERIA)

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. Procurement Method Prior Review Threshold Comments

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Prior Review Thresholds

Sample Procurement Plan

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

P Safety Nets Project Procurement Plan June 1 st 2017

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan National Community Driven Development Project Department of Rural Development

PROCUREMENT PLAN (Textual Part)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. I. General

Procurement Plan. I. General

Consultants: firms Consultants: individuals

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Sample Procurement Plan

Sample Procurement Plan

PE Cusco Transport Improvement Project (P132505) Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Sample Procurement Plan

Procurement. International Competitive Bidding;

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Textual Procurement Plan

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

The World Bank Identity and Targeting for Social Protection Project (P155198)

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Sample Procurement Plan

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

PE Cusco Regional Development (P117318) Procurement Plan

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Actual Amount (US$) Process Status. Pending Interventions.

Sample Procurement Plan

Selection Method. Financing Share. Bid document submis-sion. Bank Review

PROCUREMENT PLAN (Textual Part)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Procurement Plan Poverty Alleviation Fund II- AFII

PROCUREMENT PLAN (Textual Part)

Transcription:

I. General Plan 1. Bank s approval Date of the procurement Plan. Original: 23 November 2016; Revision 2 of Updated Plan, 18 April 2017 2. Date of General Notice:. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018 II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : [ Method 1. ICB (Goods and Non-Consultant 2. NCB (Goods and Non-Consultant Review Threshold US$ Above or equivalent to US$ 5,000,000 Below 5,000,000 and Above US$ 300,000 and All review for contracts above or equivalent to US$ 2,000,000 3. ICB (Works) N/A All 4. NCB (Works) N/A All 5. Shopping (Goods and Non-Consultant Below or equivalent to US$ 300,000 review 6. Direct contracting (Goods and Non- Above or equivalent to Consultant US$ 800,000 All 2.. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: N/A 4. Reference to (if any) Project Operational/ Manual: Project Manual for World Bank Loan Project Identity and targeting for social protection project../../2017 issued by Ministry of Interior/Secretary General

5. Any Other Special Arrangements: N/A 6. Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. No. Description ICB (Works) ICB (Goods) NCB (Works) NCB (Goods) ) Cost US$ million Packages Domestic Preference (yes/no) Review by Bank ( / ) N/A N/A N/A N/A - - - - N/A N/A N/A N/A 1 st contract for Review 5.10 03 No and 1 contract (0.15 mil $US) under post review III. of Consultants 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of Consultants: Method Review Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 All 2. Single Source (Firms) Above US$ 500,000All All 3. Individual Above US$ 300,000 All Single Source (Individuals) Above US$ 150,000 All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Arrangements: N/A

4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Cost under QCBS under QCBS under other methods under Individual selection under Individual selection Packages Review by Bank ( / ) US$ million 5.0 02 0.41 03 0.08 02 CQS 1.93 05 0.55 04

Page 1 PROCUREMENT PLAN Morocco : Identity and Targeting for Social Protection Project General Information Country: Morocco Banks Approval Date of the Original Plan: 2017-02-15 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-07-26 Project ID: P155198 GPN Date: Project Name: Identity and Targeting for Social Protection Project Loan / Credit No: Executing Agency(ies): MINISTERE DE L INTERIEUR WORKS Amount Bid Report Documents Report / Justification Notice / Invitation GOODS Amount Bid Report Documents Report / Justification Notice / Invitation NON CONSULTING SERVICES Amount Bid Report Documents Report / Justification Notice / Invitation 24ICPS-2016 / Logistique pour organisation de Voyage d'études Building, and Monitoring and Request for Quotations Limited Single Stage - One Envelope 100,000.00 0.00 Pending 2017-02-08 2017-02-20 2017-03-22 CONSULTING FIRMS Contract Type Amount Combined Expression of Interest Short List and Draft Request for Proposals Opening of Technical of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract 8ICPS-2016 / Test du nouveau questionnaire/formule RSU sur un échantillon représentatif des bénéficiaires du RAMED (formation, collecte, saisie, transport et salaires) (2017). Based Open - National 90,000.00 0.00 Pending 2017-07-03 2017-07-24 2017-08-28 2017-09-18 2017-09-23 2017-10-02 2017-10-17 2018-01-15 3ICPS-2016 / Préparation des documents de cadrage du SI des spécifications fonctionnelles détaillées de description de l'architecture technique matérielle et logicielle, développement du système Based Pending Open - International 2,450,000.00 0.00 2017-04-28 2017-05-19 2017-06-22 2017-08-03 2017-08-10 2017-09-14 2017-09-21 2021-12-31 19ICPS-2016 / Conception du Système d'information pour le suivi/évaluation du projet + Formation UGP et partenaires du projet Building, and Monitoring and Based Open - International 400,000.00 0.00 Pending 2017-06-01 2017-06-22 2017-07-31 2017-09-01 2017-10-01 2017-10-15 2017-10-24 2017-12-23 11ICPS-2016 / Consultant pour a/n de la Zone 2 Based 0.00 Pending Open - National 310,000.00 13ICPS-2016 / Consultants pour a/n de la Zone 4 Based Open - National 320,000.00 0.00 Pending 10ICPS-2016 / Consultant pour a/n de la Zone 1 Based 0.00 Pending Open - National 310,000.00 12ICPS-2016 / Consultants pour a/n de la Zone 3 Based Open - National 310,000.00 0.00 Pending MA-MI-18091-CS-QCBS / Services de consultants en accompagnement à la mise en place du Registre National de la Population Based Under Open - International 1,120,000.00 0.00 2017-05-02 2017-05-04 2017-06-06 2017-06-27 2017-08-07 2017-08-14 2017-09-10 2017-09-19 2020-06-30 6ICPS-2016 / Services de consultants en accompagnement à la mise en place du Registre National de Population. Based Open - International 700,000.00 0.00 Canceled 2017-02-28 2017-05-02 2017-03-21 2017-04-24 2017-06-06 2017-06-05 2017-06-12 2017-07-17 2017-07-24 2021-12-28 INDIVIDUAL CONSULTANTS Contract Type Amount Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 9ICPS-2016 / Analyse des données du test (2017) Open 40,000.00 0.00 Pending 2017-09-01 2017-10-20 2017-11-10 2017-11-27 2018-01-06

Page 2 1ICPS-2016 / Développement de la nouvelle formule de notation & formulaire d'enregistrement Open 100,000.00 0.00 Pending 2017-02-28 2017-04-14 2017-04-21 2017-05-13 2017-08-21 4ICPS-2016 / Mise à jour des systèmes d'information existants qui alimenteront le RNP (préparation des cahiers des charges et développement) y compris fiabilisation des données MASSAR Open 360,000.00 0.00 Pending 2017-12-19 2018-02-18 2018-03-11 2018-03-30 2018-07-28 5ICPS-2016 / Développement et mise à jour des manuels d'opération/ documentations techniques du RSU (procédures enregistrement, mécanismes traitement des réclamations...) et évaluation des processus/mise à jour des MO du RAMED, TAYSIR et DAAM. Open 400,000.00 0.00 Pending 2018-01-15 2018-03-05 2018-03-26 2018-04-13 2018-10-30 7ICPS-2016 / Mise à jour des systèmes d'information existants qui utiliseront le RSU (préparation des cahiers des charges et développement) RAMED TAYSIR DAAM Open 180,000.00 0.00 Pending 2017-12-29 2018-02-28 2018-03-21 2018-04-09 2018-08-07 14ICPS-2016 / Sélection d'un consultant spécialiste en passation des marchés Building, and Monitoring and Open 200,000.00 0.00 Under 2017-03-30 2017-05-03 2017-05-24 2017-06-09 2021-12-31 18ICPS-2016 / Sélection d'un assistant administratif Building, and Monitoring and Open 70,000.00 0.00 Under 2017-03-30 2017-05-03 2017-05-24 2017-06-09 2021-12-31 16ICPS-2016 / Sélection d'un consultant spécialiste/juridique Building, and Monitoring and Open 300,000.00 0.00 Under 2017-01-16 2017-02-19 2017-03-12 2017-03-28 2021-12-01 15ICPS-2016 / Sélection d'un consultant spécialiste en gestion financière Building, and Monitoring and Open 300,000.00 0.00 Under 2017-01-16 2017-02-19 2017-03-12 2017-03-28 2021-12-01 20ICPS-2016 / Formation en management de projets pour équipe UGP et partenaires du projet Building, and Monitoring and Direct Direct 40,000.00 0.00 Pending 2017-06-01 2017-06-11 2017-08-15 2018-02-11 21ICPS-2016 / Formation en Gestion des risques pour équipe UGP et partenaires du projet Building, and Monitoring and Direct Direct 40,000.00 0.00 Pending 2017-06-01 2017-06-11 2017-07-03 2017-10-20 17ICPS-2016 / Sélection d'un consultant pour appui au suivi/évaluation Building, and Monitoring and Open 350,000.00 0.00 Pending 2017-08-01 2017-09-17 2017-10-08 2017-10-24 2022-06-29