MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN

Similar documents
MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN. M/s Uttam Brick Field

To, The Director, Directorate of Geology & Mining Uttar Pradesh, Lucknow

Encl:- Two copies of Mining Plan with Progressive Mine Closer Plan.

Prakash Ent Udyog of Shri Jai Prakash Maurya S/o Shri Balram Maurya R/o :Village- Dighauta, Tehsil Handiya, District - Allahabad, Uttar Pradesh.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

AUTHORISATION LETTER BY THE LESSEE

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

MCDR INSPECTION REPORT

JAI MAA SHARDA STONE CRUSHING

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

SITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist Belt Area, Anantapur District, Andhra Pradesh

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

Analysis of Rainfall and Other Weather Parameters under Climatic Variability of Parbhani ( )

Woodford County Erosion Prevention Plan and Permit. Application #

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

3. HYDROMETEROLOGY. 3.1 Introduction. 3.2 Hydro-meteorological Aspect. 3.3 Rain Gauge Stations

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

MCDR INSPECTION REPORT

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

FOREST RESEARCH INSTITUTE, DEHRADUN

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

Advanced Hydrology. (Web course)

A Review of Concept of Peri-urban Area & Its Identification

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

Geography Class XI Fundamentals of Physical Geography Section A Total Periods : 140 Total Marks : 70. Periods Topic Subject Matter Geographical Skills

Paper presented in the Annual Meeting of Association of American Geographers, Las Vegas, USA, March 2009 ABSTRACT

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

STUDY AREA AND METHODOLOGY

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

Summary and Conclusions

ICSE Board Class X Geography Board Paper- 2014

A Study on Storm Water Drainage System of Annanagara and Ashokanagara of Shimoga City Karnataka India

Figure 2.1: Constituent Area

Limestone Deposit of Nimbahera area of Chittorgarh District (Raj.)

The Impact of Geography in South and East Asia

Flood hazard mapping in Urban Council limit, Vavuniya District, Sri Lanka- A GIS approach

Request for Empanelment

Geographical location and climatic condition of the

The Impact of Geography in South and East Asia

Natural Vegetation and Wildlife

The Impact of Geography in South and East Asia

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

Materials. Use materials meeting the following.

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

ABSTRACT. 2. Location : 31 o 04'16'' to 32 o 31'27'' North Latitudes and 74 o 30'38'' to 76 o 08'45'' East Longitudes

Assessment of Meteorological Drought- A Case Study of Solapur District, Maharashtra, India

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

1.0 Introduction 1.1 Geographic Location 1.2 Topography 1.3 Climate and Rainfall 1.4 Geology and Hydrogeology 1.5 Water Availability 1.

Submitted to Central Coalfields Limited BHURKUNDA OCP, CCL

Effect of rainfall and temperature on rice yield in Puri district of Odisha in India

Our Environment Class 7 Questions on Give Reasons for quick revision for Competitive Exams

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

NATIONAL SENIOR CERTIFICATE GRADE 12

Chapter- Three GEOMORPHOLOGY AND RAINFALL PATTERN

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

GOVERNMENT OF NEPAL MINISTRY OF IRRIGATION GROUND WATER RESOURCES DEVELOPMENT BOARD BABARMAHAL, KATHMANDU, NEPAL

Coalfields Limited. Based on Satellite Data for the Year Central Coalfields Limited Ranchi, Jharkhand. Submitted to:

Distribution of Temperature over the National Capital Territory of Delhi - A Preliminary Report

South, Southeast, and East Asia. Physical Geography

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Which graph best shows the relationship between intensity of insolation and position on the Earth's surface? A) B) C) D)

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years

NATIONAL SENIOR CERTIFICATE GRADE 12

Spatial and Temporal Analysis of Rainfall Variation in Yadalavagu Hydrogeological unit using GIS, Prakasam District, Andhra Pradesh, India


In the space provided, write the letter of the description that best matches the term or phrase. a. any form of water that falls to Earth s

Frequency analysis of rainfall deviation in Dharmapuri district in Tamil Nadu

Integration of Thematic Maps Through GIS for Identification of Groundwater Potential zones. Amaresh Kr. Singh & S. Ravi Prakash

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION

Abstract. TECHNOFAME- A Journal of Multidisciplinary Advance Research. Vol.2 No. 2, (2013) Received: Feb.2013; Accepted Oct.

Wastelands Analysis and Mapping of Bhiwani District, Haryana

Description DESCRIPTION

Study on Bromide in Groundwater in Parts of Nalgonda District, Andhra Pradesh

Development of wind rose diagrams for Kadapa region of Rayalaseema

Roadmap to Stability

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

about GCC

SAMPLE QUESTION PAPER SET-II CLASS XII SUBJECT- GEOGRAPHY (029)

Urban Hydrology - A Case Study On Water Supply And Sewage Network For Madurai Region, Using Remote Sensing & GIS Techniques

Transcription:

MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN For M/s R & S Associates Village Palpur, Post Dandupur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh Brick Earth Mining from Khasra/Gata Nos. 317, 320, 324, 326, 466, 327, 328, 350, 352, at Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh Area 3.6860 ha (9.1083 Acres) AGREEMENT PERIOD 5.0 YEARS PLAN PERIOD 5.0 YEARS APPLICANT/LESSEE: Sri Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh PREPARED BY R B Chaudhary: RQP/JABAL/169/2015/A E-mail: chaurb@gmail.com

AUTHORISATION LETTER BY THE PROPONENT I Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh hereby authorized Sri R. B. Chaudhary, RQP/JABAL/169/2015/Ato prepare the Mining Plan with Mine Closer Plan under rule 34(2) of amended rules of U.P. Minor Mineral Concession Rule 1963 and 1M, PFR & CSR Plan and presentation before DEAC in respect of proposed earth extraction which to be used in Brick Kiln of M/s R & S Associates from Khasra/Gata Nos. 317, 320, 324, 326, 466, 327, 328, 350, 352, Area 3.6860 ha (9.1083 Acres) at Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. I hereby solemnly affirm that all the information & documents given by me are true to the best of my knowledge and belief. I, request, the Director, Directorate of Geology & Mining, Lucknow to make further correspondence regarding modification and to collect the approved copies of the aforesaid Scheme of Mining, the said recognized person on his following address. Sri R. B. Chaudhary 58 Mini MIG Govindpur Allahabad - 211004 Phone- 07706077778 RQP/JABAL/169/2015/A Place-Lucknow Date:.. Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh

Mine Plan INTRODUCTION Bricks are produced in India in small or cottage scale brick kilns and Clamps, operates seasonally. The raw materials in the brick kilns include topsoil, coal, paddy husk, fly ash, wood & locally available agro wastes to some extent. There are large variations in quality of soils available in different parts of the country and also in brick manufacturing process. Brick are good building material for construction activities. It is one of the primary building materials known to mankind. Over time, bricks have appeared, gained prominence, lost importance and then come to the forefront again with various styles of architecture. Burnt bricks were used in ancient Indian, Babylon, Egypt and Roman civilizations. With the increase of urbanization the demand for Bricks is growing in infrastructure sector in our country. Individual and private companies are increasingly demanding Brick for construction purposes and this has immense pressure on brick clay resources. This increasing demand and extraction makes this an environmental issue. As per Environment (Protection) Rules, 1986, vide S.O. 141(E), dated 15th Jan, 2016,) the applicant is seeking prior environmental clearance, Therefore applicant has submitted for mine plan for proposed earth extraction which to be used in Brick Kiln of M/s R & S Associates from Khasra/Gata Nos. 317, 320, 324, 326, 466, 327, 328, 350, 352, Area 3.6860 ha (9.1083 Acres) at Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. The applicant grants conditional agreement from different farmers which is enclosed as Annexure1. Hence, This Mining Plan including Progressive Mine Closer Plan is being submitted under rule 34 (2) of U.P. Minor Mineral (concession) Rules 1963. The authorization to prepare Mining Plan including progressive mine closer plan by applicant is enclosed. 1.0 GENERAL: A) Sri Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. B) Status of Applicant: Private /Partnership C) Mineral, occurring in the area & which Applicant Intends To Mine: Soil mining (extraction) which used in Brick Kiln D) Period of mining lease: As per agreement from farmer and self affidavit enclosed as Annexure 1 E) Name of R.Q.P. preparing the mining plans: Name Sri R. B. Chaudhary Page 1 of 10

Mine Plan F) Name of prospecting agency: The lease area is prospected by lessee under the guidance of Sri R. B. Chaudhary (RQP). Address - 58 Mini MIG Govindpur Allahabad - 211004 Phone- 07706077778 Registration No: RQP/JABAL/169/2015/A G) Reference no & date of consent letter from the State Govt. 2.0 LOCATION AND ACCESSIBILITY A) Details of area (with location map) Proposed earth extraction which to be used in Brick Kiln of M/s R & S Associates from Khasra/Gata Nos. 317, 320, 324, 326, 466, 327, 328, 350, 352, Area 3.6860 ha (9.1083 Acres) at Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. B) Whether the area is recorded to be in forest (please specify whether protected, reserved etc.): The Agreement area is free from forest land. C) Ownership/Occupancy: Total lease area is completely outside of any restricted or protected area declared by any state or central government. D) Existence of public road /railway line, if any nearby and approximate distance: Soil miming area is located at Vi Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh, Which is connected to NH-27 about 0.9 Km (E), NH-76 about 6.0 Km (E), Karma Road 6.34 Km (S), Jamoli Road 4.80 Km (E) from excavation site and nearest Airport is Allahabad Airport 14.0 km (NW) away from the area. Location Map on Plate No 1. E) Toposheet No. with latitude and longitude: Toposheet /Google Map the boundary points have been demarcated with the help of GPS as per revenue/ khasra map & coordinates of all the gata. Table No 1 Co-ordinates of excavation Gata Khasra/ Gata Nos Latitude Longitude 317 25 21'2.17"N 81 49'24.06"E 320 25 21'1.47"N 81 49'23.08"E 324 25 21'0.88"N 81 49'23.64"E 326 25 21'1.24"N 81 49'21.85"E 466 25 21'0.26"N 81 49'22.39"E 327 25 21'0.42"N 81 49'21.43"E 328 25 21'0.70"N 81 49'20.04"E 350 25 21'0.04"N 81 49'20.67"E 352 25 20'59.67"N 81 49'21.89"E Page 2 of 10

Mine Plan 3.0 GEOLOGY AND EXPLORATION: a) Briefly describe the topography & general geology & local mine geology of the mineral deposit including draining pattern. 3.1 TOPOGRAPHY & PHYSIOGRAPHY Agricultural plain Allahabad city, also known as Prayag, is an ancient holy city of India. The city of Allahabad is situated at the confluence of two sacred rivers, the Yamuna and the Ganges. The confluence is known as Sangam and is visited by thousands of Hindu pilgrims every year. Allahabad is among the largest cities of Uttar Pradesh in terms of population and area. The geographical area of Allahabad is about 62 sq km (under Municipal Corporation). Its spatial extension falls at 25 28 N latitude and 81 54 E longitude. The district of Allahabad is surrounded by the Pratapgarh districts in the North, district Jaunpur in the Northeast, Sant Ravidas Nagar and Mirjapur in the east, Kaushambi and Chitrakoot in the west and the state of Madhya Pradesh in the South. Allahabad has its own domestic airport, Bambruali, which is located 14 km from the city. Apart from Indian Airlines, few private airlines also provide flight services to and from Allahabad. However, nearby cities, i.e. Varanasi (147 km) and Lucknow (210 km) also have airports. Allahabad is well connected by a network of trains to almost all major destinations throughout the country i.e. Kolkata, Delhi, Patna, Guwahati, Chennai, Mumbai, Gwalior, Meerut, Lucknow, Kanpur and Varanasi. Allahabad is located on National Highways 2 and 27. The government and private bus services are available to and from Allahabad to all nearby major destinations. 3.2 GEOLOGY Regional Geology: The Ganga basin has been dominated by transvers river system since Pliocene due to erosion during uplift that is symmetric subsidence of foreland. Large plio-pleistocene sediment combines with less asymmetric subsidence and uplift of the proximal fore land let to the pro gradation of the drainage system that displaced the Yamuna River and after Allahabad Ganga River to edge of the foreland basin. The Present river system consistent with erosion driven uplift adjacent Himalayan. The regional geological setup is very well depicted in the map below; Page 3 of 10

Mine Plan Source: Singh I B 1996 Table: Geological Succession Land Form Period Age Rock Type (Geomorphology) Upper Pleistocene to New Alluvium Fine Sand And Clays Recent QUATERNARY Lower Pleistocene Sand of different grades and Older Alluvium to Upper Pleistocene clay mixed with kankar - - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Vindhyan Sandstone (Proterozoic) - - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Bundelkhand Granitr (Archean) Local Geology: Geology map of Allahabad city shows the existence of Terrace Alluvium and Varanasi Alluvium as geologic unit. The Varanasi Older Alluvium, a polycyclic sequence of yellowish brown clay- silt and fine sand with dissemination of kankar, is exposed in the north of Yamuna. The Newer Alluvium is characterized by unoxidised khaki and grey coloured sediments which consists predominantly of micaceous sand, silt and clay. It has been divided into Terrace and Channel Alluvium. The Terrace Alluvium of both Ganga and Yamuna are developed on a cut and eroded platform of Varanasi Older Alluvium. The Terrace Alluvium of Ganga consists of multiple fill sequence of grayish sand, silt and clay while that of Yamuna consists of medium to fine grained quartzo- feldspathic and grey micaceous sand. Geology of the area is characterized by a thick pile of quaternary Alluvium consisting of sand, grave land clay with occasional presence of thin to thick kankar intercalation. Page 4 of 10

Mine Plan 4.0 MINEABLE RESERVE: It shall be opencast semi mechanised mine involves scooping the mineral through use of hand implements like spade, pick axe, shovel and crowbar (JCB will be used if required) etc. In future top soil shall be scrapped by means manually and shall be used for the purpose of making bundwall and rehabilitation/reclamation. Method of estimation of reserves: Geological Reserve: Area (sqm) Depth (m) Mineable Reserve: Geological Reserve (Volume left in berm (cum) + Volume of top soil (cum)) Volume of top soil: Area (sqm) Area of berm left (sqm) Thickness of top soil (m3) Mining shall be carried out from top to downward through the formation of benches. The height & width of benches shall be kept 1.0 m & 1.0 m with face slope. District Allahabad Village Palpur Gata No Area (ha) 317 0.4690 320 0.4870 Table No 2 Land Details Name of Land owner Mohid Ali, Smt Mariyam Bibi, Nizamuddin, Mohd Hashim, Hazaratunnishan, Anil Kumar Singh Vijay Bahadur, Gulab, Sumesh Kumar, Udaybhan, Abish kumar, Sunil Kumar, Smt Pankali, Mahesh, Mangala, Sunil Patel, Akash Patel, Smt Sonkali, Suresh, Rajesh, Santosh, Smt Tani Devi Consent of the owner Sri Anil Kumar Singh Consent given for the Period (Year) Consent given for the depth of mining (m) 324 0.5370 Bhailal 326 0.7570 Ramtirath, Rammurat, 466 0.1820 Smt Bittan devi 327 0.2850 Ashok Kumar 328 0.2740 Smt Gyanwati, 350 0.2960 Rajendra Singh, Ajay 352 0.3990 Kumar Singh, Mohd Ahmad Total Area 3.6860 Page 5 of 10

Mine Plan Gata No Table No 3 Geological Reserves Gata No Area(ha) depth of Geological Reserve Area(m2) mining (cum) 317 0.469 4690 2.0 9380 320 0.487 4870 2.0 9740 324 0.537 5370 2.0 10740 326 0.757 7570 2.0 15140 466 0.182 1820 2.0 3640 327 0.285 2850 2.0 5700 328 0.274 2740 2.0 5480 350 0.296 2960 2.0 5920 352 0.399 3990 2.0 7980 Total 3.686 36860 73720 Geological Reserve Area of berm left (m2) Table No 4 Minable Reserves Volume left in berm (m3) Thickness of top soil (m3) Volume of top soil(total area-area in berm) * thickness of top soil (cum) Minable Reserves (m3) 317 9380 235 469 0.15 668 8243 320 9740 244 487 0.15 694 8559 324 10740 269 537 0.15 765 9438 326 15140 379 757 0.15 1079 13304 466 3640 91 182 0.15 259 3199 327 5700 143 285 0.15 406 5009 328 5480 137 274 0.15 390 4816 350 5920 148 296 0.15 422 5202 352 7980 200 399 0.15 569 7012 Total 73720 1843 3686 5253 64781 DETAILS OF EXPLOITATION: Year Wise Production Year Production Production (Cum) (Tonnes) First 9091 10909 Second 9091 10909 Third 9091 10909 Fourth 9091 10909 Fifth 9091 10909 Total 45455 54545 As per Brick Kiln capacity yearly production of bricks are 30.00 lacs bricks/ season for that the required volume of brick clay will be 9091 cum/annum @ 330 brick in one cubic meter. Page 6 of 10

Mine Plan B) Attach supporting composite plan & section showing pit layout, dumps, stacks of sub grade mineral, if any etc: All quantities of brick-earth to be generated shall be used for the purpose of making brick except top soil. Therefore no proposal of separate stacking of brick-earth has been envisaged. All quantities of brick earth to be exploited shall be used for making brick. Top soil shall be kept on bundwall which will spread out after the completion of mining. C) Indicate proposed rate of production when the mine is fully developed & the expected life of mine & the year from which effected. As per Brick Kiln capacity yearly production of bricks are 30.00 lacs bricks/ season for that the required volume of brick clay will be 9091 cum/annum @ 330 brick in one cubic meter. D) Conceptual Plan: The lease area is small & during plan period 45455 cum shall be explored. Remaining reserve will be exploration in next mining plan and agreement period if any. The ultimate shape of pit by the end of conceptual period shall be same as the shape of area except bundwall. E) Waste Management Top soil exists within the area therefore its Preserved on bundwall and use in reclamation propose. F) Reclamation/Rehabilitation: The mined out area & reclamation / rehabilitation as on date, at the end of plan period & at the end of conceptual period Top soil shall be kept on bundwall which will spread out after the completion of mining. 5.0 BLASTING: As mentioned earlier there is simple Alluvium (soil) mining, mined mineral will be used f or brick making.therefore blasting not proposed/required. 6.0 MINE DRAINAGE: One dug well is situated near by area. The top level of the well is 98 mrl & water table encountered in the well is about 12-15 m. deep 7.0 DISPOSAL OF WASTE All quantities of brick earth to be generated shall be used for the purpose of making brick except top soil. Therefore no proposal of separate stacking of brick earth has been envisaged. All quantities of brick earth to be exploited shall be used for making brick. Page 7 of 10

Mine Plan 8.0 USE OF MINERAL: The brick earth below top soil in the agreement area is soft, medium to light in color alluvium typically found in the Indo-gangetic plane. After removal of top soil, the excavated brick earth will be used for making the brick (simple earth brick). 9.0 OTHER& SITE SERVICES The following site services will be provided at mine site 1. Office 2. Drinking water shed 3. Rest shelter 4. First Aid Centre 10.0 MINERAL PROCESSING The entire area consists of soil form & it is ready to making brick, no beneficiation of mineral processing will required. No Mineral beneficiation is involved within the lease area.. 11. ENVIRONMENTAL MANAGEMENT PLAN: Attach a note on the status of base line information with regard to the following: I) Land Use: The existing land use of the area is almost agricultural waste lands. II) Water Regime: There is no perennial water body in the area. Water table loses its significance in this region due to great depth. The depth of water table is about 15-20 m. below: general ground level. (III) Flora and Fauna: Vegetation and wild life are quite scanty. Trees of Neem, Jamun, Mango, Babul etc. are found only in and around the villages or in agriculture fields. Cows, donkeys, goats, sheep and buffalows are kept for house hold requirements. Wild life comprises of rabbits, Squirrels, foxes, snakes, and lizard. Fishes, turtle, and crabs form aquatic life which occurs within a radius of 5 km. No wild life is found within the lease area. (IV) Quality of ambient air noise level and water: The proposed site is located in the remote area having a clean atmosphere. Therefore the quality of ambient air will be as good. 12.0 Climatic data Page 8 of 10

Mine Plan The study area is Allahabad Plateau zone and is subjected to vagaries of weather. The climate of the project area is characterized by cool and dry climate. The year can be divided into three distinct seasons; winters last from October to March followed by summers from April to June. Temperature rom February there is rapid increase in temperature, May is the hottest month with the mean daily maximum temperature is 41.5 C and mean daily minimum temperature 26 C. After the onset of the monsoon there is appreciable drop in temperature, January is the coldest month with mean daily maximum temperature is 26.20 C and mean daily minimum temperature is 9.3 C. The mean monthly maximum temperature is 19.54 C and mean monthly minimum temperature is 6.23. Humidity The relative humidity is high during the southwest monsoon season, with mean monthly morning relative humidity at 63.92% and mean monthly evening relative humidity at 48%. Cloudiness In the winter season the sky is generally clear or lightly clouded except for brief spells of a day or two each time when in association with the passage of western disturbances particularly in the northern parts of the district sky become cloudy. Sky is clear or lightly clouded in the summer and post-monsoon seasons. Heavily clouded to overcast sky prevail in the monsoon seas. Winds Winds are generally high with some increase in force during summer and southwest monsoon season. The mean wind velocity is 5.16 Km/hr and the potential evapo-transpiration rate is 1456.7 mm. Rainfall The main rainy season is the southwest monsoon season, from about the last week of June to September-mid, some rainfall much less in amount occurs in the cold season from December to February in association with the passage of western disturbances, The average annual rainfall is 934 mm. Climate is sub humid and is characterized by hot summer and pleasant monsoon and cold season. About 90% of rainfall takes place from June to September. During monsoon surplus water is available for deep percolation to ground water. 13.0 HUMAN SETTLEMENT& EMPLOYMENTS POTENTIAL The details of population, number of households, land, literacy etc. within a radius of 5 km. Human settlements are distributed in fringes of buffer zone. The inhabitants belong to all the four castes. The Page 9 of 10

Mine Plan main occupation in 5 km. buffer zone is farming and mining. Poor literacy conditions prevail in the surrounding of lease area & condition of literacy is more pathetic in females. Older generation wear Dhoti Kurta while younger generation is adopting dresses like pant, shirts etc. 14.0 SOCIOECONOMIC BENEFICIATE OUT OF MINING: The scale of operation is limited with 90% local employment. Hence some benefit to the local community will occur on this aspect. Besides the direct employment, indirect employment will include tractor owners, truck drivers, shop keepers dhaba walas etc Year wise no of saplings to be planted is as below: Along the approach roads and in the nearby villages i.e. with consultation the Gram Panchayats The tree species recommended are Ficus religosa (peepal), Shorea robusta (Sal) may also be recommended. Mangifera indica (Aam), Emb lica officinalis (Anwala), Aegle marmerlos (Ibei), Planting should be done in large sized 90 cm x 90 cm. due in advance and filled about 50 days before planting. The plantation raised earlier should be carefully maintained. Mortalities should be replaced by fresh planting. Page 10 of 10

Progressive Mine Closure Plan PROGRESSIVE MINE CLOSURE PLAN Name of Brick Kiln: M/s R & S Associates A) Name & address of applicants Sri Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. B) Location: Soil miming area is located at Vi Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh, Which is connected to NH-27 about 0.9 Km (E), NH-76 about 6.0 Km (E), Karma Road 6.34 Km (S), Jamoli Road 4.80 Km (E) from excavation site and nearest Airport is Allahabad Airport 14.0 km (NW) away from the area. Location Map on Plate No 1. Proposed Method of Mining: The proposed project is to mine Brick Clay from plot (s) under agreement sustainably and scientifically. Mining will be opencast and manual using hand tools only in the allotted plots keeping the nearby plot (s) unaffected. Following geo-scientific methods are proposed to carry out the activity. Mining will be confined to extraction of Brick Clay in its existing form from the allotted plot(s) only. Mining of Brick Clay from the allotted plot(s) will be restricted to a maximum depth of 2.0 m from the surface in proper bench form as per MCR-1960 and MMR 1961. The width and height of bench will be 1.0 m x 1.0 m. Topsoil up to 6 depth will be preserved to spread it after mining activity is completed to restore the fertility of land. Reasons for Closure: At present there is no foreseeable reason regarding closure of mine. The progressive mine closure plan is being submitted, under amended rule under Rule 34 (6) & (7) of amended rules of U. P. Minor Mineral (Concession) Rules 1963 Closure plan preparation: A) Name and address of the Applicant Sri Anil Kumar Singh S/o Sri Rajendra Singh R/o Village Palpur, Tehsil Karchhana, District - Allahabad, Uttar Pradesh. B) Name, address & Registration No. of R. Q. P. The lease area is prospected by lessee under the guidance of. Sri R. B. Chaudhary (RQP). Address - 56 Mini MIG Govindpur Allahabad - 211004 Phone- 07706077778 Page 1 of 6

Progressive Mine Closure Plan Registration No: RQP/JABAL/169/2015/A Mine Description: Topography: Agricultural plain Allahabad city, also known as Prayag, is an ancient holy city of India. The city of Allahabad is situated at the confluence of two sacred rivers, the Yamuna and the Ganges. The confluence is known as Sangam and is visited by thousands of Hindu pilgrims every year. Allahabad is among the largest cities of Uttar Pradesh in terms of population and area. The geographical area of Allahabad is about 62 sq km (under Municipal Corporation). Its spatial extension falls at 25 28 N latitude and 81 54 E longitude. The district of Allahabad is surrounded by the Pratapgarh districts in the North, district Jaunpur in the Northeast, Sant Ravidas Nagar and Mirjapur in the east, Kaushambi and Chitrakoot in the west and the state of Madhya Pradesh in the South. Allahabad has its own domestic airport, Bambruali, which is located 14 km from the city. Apart from Indian Airlines, few private airlines also provide flight services to and from Allahabad. However, nearby cities, i.e. Varanasi (147 km) and Lucknow (210 km) also have airports. Allahabad is well connected by a network of trains to almost all major destinations throughout the country i.e. Kolkata, Delhi, Patna, Guwahati, Chennai, Mumbai, Gwalior, Meerut, Lucknow, Kanpur and Varanasi. Allahabad is located on National Highways 2 and 27. The government and private bus services are available to and from Allahabad to all nearby major destinations. Geology: Regional Geology: The Ganga basin has been dominated by transvers river system since Pliocene due to erosion during uplift that is symmetric subsidence of foreland. Large plio-pleistocene sediment combines with less asymmetric subsidence and uplift of the proximal fore land let to the pro gradation of the drainage system that displaced the Yamuna River and after Allahabad Ganga River to edge of the foreland basin. The Present river system consistent with erosion driven uplift adjacent Himalayan. The regional geological setup is very well depicted in the map below; Page 2 of 6

Progressive Mine Closure Plan Source: Singh I B 1996 Table: Geological Succession Land Form Period Age Rock Type (Geomorphology) Upper Pleistocene New Alluvium Fine Sand And Clays to Recent QUATERNARY Lower Pleistocene Sand of different grades and to Upper Older Alluvium clay mixed with kankar Pleistocene - - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Vindhyan Sandstone (Proterozoic) - - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Bundelkhand Granitr (Archean) Local Geology: Geology map of Allahabad city shows the existence of Terrace Alluvium and Varanasi Alluvium as geologic unit. The Varanasi Older Alluvium, a polycyclic sequence of yellowish brown clay- silt and fine sand with dissemination of kankar, is exposed in the north of Yamuna. The Newer Alluvium is characterized by unoxidised khaki and grey coloured sediments which consists predominantly of micaceous sand, silt and clay. It has been divided into Terrace and Channel Alluvium. The Terrace Alluvium of both Ganga and Yamuna are developed on a cut and eroded platform of Varanasi Older Alluvium. The Terrace Alluvium of Ganga consists of multiple fill sequence of grayish sand, silt and clay while that of Yamuna consists of medium to fine grained quartzo- feldspathic and grey micaceous sand. Geology of the area is characterized by a thick pile of quaternary Alluvium consisting of sand, gravel and clay with occasional presence of thin to thick kankar intercalation. Page 3 of 6

Progressive Mine Closure Plan MINEABLE RESERVE: It shall be opencast semi mechanised mine involves scooping the mineral through use of hand implements like spade, pick axe, shovel and crowbar (JCB will be used if required) etc. In future top soil shall be scrapped by means manually and shall be used for the purpose of making bundwall and rehabilitation/reclamation. Method of estimation of reserves: Geological Reserve: Area (sqm) Depth (m) Mineable Reserve: Geological Reserve (Volume left in berm (cum) + Volume of top soil (cum)) Volume of top soil: Area (sqm) Area of berm left (sqm) Thickness of top soil (m3) Mining shall be carried out from top to downward through the formation of benches. The height & width of benches shall be kept 1.0 m & 1.0 m with face slope. District Allahabad Village Palpur Gata No Area (ha) 317 0.4690 320 0.4870 Table No 2 Land Details Name of Land owner Mohid Ali, Smt Mariyam Bibi, Nizamuddin, Mohd Hashim, Hazaratunnishan, Anil Kumar Singh Vijay Bahadur, Gulab, Sumesh Kumar, Udaybhan, Abish kumar, Sunil Kumar, Smt Pankali, Mahesh, Mangala, Sunil Patel, Akash Patel, Smt Sonkali, Suresh, Rajesh, Santosh, Smt Tani Devi Consent of the owner Sri Anil Kumar Singh Consent given for the Period (Year) Consent given for the depth of mining (m) 324 0.5370 Bhailal 326 0.7570 Ramtirath, Rammurat, 466 0.1820 Smt Bittan devi 327 0.2850 Ashok Kumar 328 0.2740 Smt Gyanwati, 350 0.2960 Rajendra Singh, Ajay 352 0.3990 Kumar Singh, Mohd Ahmad Total Area 3.6860 Page 4 of 6

Progressive Mine Closure Plan Gata No Table No 3 Geological Reserves Gata No Area(ha) depth of Geological Reserve Area(m2) mining (cum) 317 0.469 4690 2.0 9380 320 0.487 4870 2.0 9740 324 0.537 5370 2.0 10740 326 0.757 7570 2.0 15140 466 0.182 1820 2.0 3640 327 0.285 2850 2.0 5700 328 0.274 2740 2.0 5480 350 0.296 2960 2.0 5920 352 0.399 3990 2.0 7980 Total 3.686 36860 73720 Geological Reserve Area of berm left (m2) Table No 4 Minable Reserves Volume left in berm (m3) Thickness of top soil (m3) Volume of top soil(total area-area in berm) * thickness of top soil (cum) Minable Reserves (m3) 317 9380 235 469 0.15 668 8243 320 9740 244 487 0.15 694 8559 324 10740 269 537 0.15 765 9438 326 15140 379 757 0.15 1079 13304 466 3640 91 182 0.15 259 3199 327 5700 143 285 0.15 406 5009 328 5480 137 274 0.15 390 4816 350 5920 148 296 0.15 422 5202 352 7980 200 399 0.15 569 7012 Total 73720 1843 3686 5253 64781 DETAILS OF EXPLOITATION: Year Wise Production Year Production Production (Cum) (Tonnes) First 9091 10909 Second 9091 10909 Third 9091 10909 Fourth 9091 10909 Fifth 9091 10909 Total 45455 54545 As per Brick Kiln capacity yearly production of bricks are 30.00 lacs bricks/ season for that the required volume of brick clay will be 9091 cum/annum @ 330 brick in one cubic meter. Page 5 of 6

Progressive Mine Closure Plan Closure Plan: Mined out land: The mining has been proposed in already degraded land. Mining faces will advance from middle of the area towards north-east & south- west directions. The height and width of benches will be kept 1.0 m to 1.0 m, slope of mining faces will be kept 70 deg. and the overall slope of the pit will be kept 45 deg. No waste shall be generated, as all the ROM will be used as for brick making. Hence the reclamation will be done only on mature benches by planting local species after the bench reaches to its maturity. Top Soil Management: Top soil exists within the area therefore its Preserved on bundwall and use in reclamation propose. Safety and Security: Each worker shall be provided with helmets & safety shoes. Safety belt shall be provided to workers on working the top benches. Hanging of loose boulders shall be removed from mine faces. The mining area shall be properly fenced to avoid any inadvertent entry in to mining pit. Working hours shall be displaced at conspicuous places. Disaster Management and risk assessment: The mining will go up to a depth of 2.0 meter max. from the surface in the respective year and thereafter excavated area shall be left open during monsoon to restore the topography of the area. The mining faces shall be dressed properly because loose material may create fatal accidents to the labourers while working in area. Any other information: Community Development: The expensed increased towards the socio-economic development is done by proponent time to time. Page 6 of 6

Location Map Plate No. 1

Google Map Fig: 500 m Radius Map

Google Map Fig: 5.0 Km Radius Map