Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

Similar documents
Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

FAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany

Towards the High Intensity Limit in the FAIR Project - Present Status and Future Challenges. Peter Spiller HB

Approaches to High Intensities for FAIR

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

The FAIR/GSI Accelerator Facility

A high intensity p-linac and the FAIR Project

Status of the ESR And Future Options

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

The FAIR Accelerator Facility

Longitudinal stacking and electron cooling of ion beams in the ESR as a proof of principle for FAIR. C. Dimopoulou

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Advanced Design of the FAIR Storage Ring Complex

ACCELERATION, DECELERATION AND BUNCHING OF STORED AND COOLED ION BEAMS AT THE TSR, HEIDELBERG

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Development of the UNILAC towards a Megawatt Beam Injector

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Operational Experience with HERA

On-axis injection into small dynamic aperture

Heavy ion fusion energy program in Russia

The TESLA Dogbone Damping Ring

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

ELECTRON COOLING OF PB54+ IONS IN LEIR

A Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:

SIS18/SIS100 Status and Perspectives

Conceptual design of an accumulator ring for the Diamond II upgrade

Accelerator Physics. Tip World Scientific NEW JERSEY LONDON SINGAPORE BEIJING SHANGHAI HONG KONG TAIPEI BANGALORE. Second Edition. S. Y.

Review of ISOL-type Radioactive Beam Facilities

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

Multi-Purpose Accelerator-Accumulator ITEP-TWAC for Nuclear Physics and Practical Applications

Space Charge Studies on the ISIS Ring

Proposal to convert TLS Booster for hadron accelerator

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

Using an Electron Cooler for Space Charge Compensation in the GSI Synchrotron SIS18 William D. Stem Oliver Boine-Frankenheim

The CIS project and the design of other low energy proton synchrotrons

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

Beam diagnostics: Alignment of the beam to prevent for activation. Accelerator physics: using these sensitive particle detectors.

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

Raising intensity of the LHC beam in the SPS - longitudinal plane

Beam. RF antenna. RF cable

ELECTRON COOLING EXPERIMENTS IN CSR*

WG2 on ERL light sources CHESS & LEPP

Bunched Beams Longitudinal Beam Dynamics

Accelerator Physics. Accelerator Development

Status of linear collider designs:

LCLS Accelerator Parameters and Tolerances for Low Charge Operations

Design Status of the PEFP RCS

+ EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN PS DIVISION. The CERN Antiproton Decelerator (AD) Operation, Progress and Plans for the Future

High performance computing simulations. for multi-particle effects in the synchrotons

Accelerator Complex U70 of IHEP-Protvino: Status and Prospects for Upgrade

LHC upgrade based on a high intensity high energy injector chain

FACET-II Design Update

Diagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site

Diagnostics Needs for Energy Recovery Linacs

The optimization for the conceptual design of a 300 MeV proton synchrotron *

Introduction to particle accelerators

2.6 Electron transport lines

COMMISSIONING AND STATUS OF THE DIAMOND STORAGE RING

COMBINER RING LATTICE

Varying accelerating fields

RF BARRIER CAVITY OPTION FOR THE SNS RING BEAM POWER UPGRADE

THE GSI FUTURE PROJECT: AN INTERNATIONAL ACCELERATOR FACILITY FOR BEAMS OF IONS AND ANTIPROTONS

The GSI Anomaly. M. Lindner. Max-Planck-Institut für Kernphysik, Heidelberg. Sildes partially adopted from F. Bosch

Measurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron

HIGH-ENERGY HEAVY-ION ACCELERATORS

Optics considerations for

X-band Experience at FEL

Accelerator Design and Construction Progress of TPS Project

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

High Intensity Operation and Control of Beam Losses in a Cyclotron based Accelerator

Introductory slides: Ferrite. Ferrite

Beam Physics at SLAC. Yunhai Cai Beam Physics Department Head. July 8, 2008 SLAC Annual Program Review Page 1

Heavy ion linac as a high current proton beam injector

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Studies of trapped modes in the new extraction septum of the CERN Proton Synchrotron

Preliminary design study of JUICE. Joint Universities International Circular Electronsynchrotron

Acceleration to higher energies

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Simulations of the IR/THz Options at PITZ (High-gain FEL and CTR)

Low Energy RHIC electron Cooling (LEReC)

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi

Abstract. 1. Introduction

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

STATUS OF THE TARN II PROJECT. T. Tanabe Institute for Nuclear Study, University of Tokyo, Tanashi, Tokyo 188, Japan

Spin-Filtering Studies at COSY

Compressor Lattice Design for SPL Beam

Development and application of the RFQs for FAIR and GSI Projects

Time resolved transverse and longitudinal phase space measurements at the high brightness photo injector PITZ

Parameter selection and longitudinal phase space simulation for a single stage X-band FEL driver at 250 MeV

Review of proposals of ERL injector cryomodules. S. Belomestnykh

Lattices for Light Sources

Instabilities Part III: Transverse wake fields impact on beam dynamics

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

Summary Report: Working Group 2 Storage Ring Sources Future Light Source Workshop SLAC, March 1-5, S. Krinsky and R. Hettel

PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,

STATUS OF HIRFL-CSR PROJECT *

FIRST OPERATION OF THE SWISS LIGHT SOURCE

NOVEL METHOD FOR MULTI-TURN EXTRACTION: TRAPPING CHARGED PARTICLES IN ISLANDS OF PHASE SPACE

Transcription:

Statusreport Status of the GSI accelerators for FRS operation Jens Stadlmann (FAIR Synchrotrons)

Overview Intensities reached and "candidates" for experiments. Uranium? Upgrade program New developments: - Fast ramping - Hardt condition for lower extraction losses Conclusion and Outlook

Present intensities at SIS18 Lower Z: close to space charge limit. Higher Z: lacking intensity due to source and UNILAC problems and dynamic vacuum effects. More machine development time needed. (Status: early 2008)

SIS Intensity Accumulation Two ways to gain intensity 1. High primary intensity Stacking by multi turn injection High current injector : I = 0.25 A/q 2. Low primary intensity Stacking by multi-multi turn injection (e-cooling) The present currents reached from the high current injector and sources need no stacking by the electron-cooler.

New Uranium service area Due to a necessary upgrade of the service area for all types of uranium sources there is no Uranium beam available at present. The revision will be finished in Summer 2009. The first Uranium experiments are expected to be possible in July (KW 29). Another possible candidate for high current SIS operation with high Z is Ta. Machine experiments using Ta 3+ from the MEVVA source have reached several 10 9 particles per spill.

SIS18 upgrade program Supported by EU Construction contract: Task 1: RF System New h=2 acceleration cavity and bunch compression system for FAIR stage 0, 1 (2010) Task 2: UHV System New, NEG coated dipol- and quadrupole chambers (2006-2009) Task 3: Insertions Set-up of a low-desorption scraper system (2007-2009) Task 4: Injection / Extraction Systems New, large acceptance injection system plus HV power suppy (2007) Task 5: Beam Diagnostics Systems Fast residual gas profile monitor and high current transformer (2008) Task 6: Injector Set-up of a TK charge separator (2007)

SIS18 upgrade program Not supported by EU construction program: Pulse Power Connection Dedicated 110 kv power connection and transformer for fast ramping (2006 and 2010) Replacement of Main Dipole Power Supplies Operation with 10 T/s up to 18 Tm (2010) Longitudinal and Transverse Feed Back Systems Damping of coherent oscillations, coupled bunch modes and phase stabilization Beam Diagnostics upgrade New digital front end electronics for BPMs (2007) New high current transformer (2006) Machine Protection and Interlock Systems Halo collimators, local shielding, transmission interlock etc. Development of High Current Operation Compensation of resonances, impedance issues etc. (2008-2010)

Life Time and Beam Loss: XHV is the key to heavy ion acceleration Life time of U 28+ is significantly lower than of U 73+ Life time of U 28+ depends strongly on the residual gas pressure and composition Ion induced gas desorption (η 10 000) increases the local pressure Beam loss increases with intensity (dynamics vacuum, vacuum instability)

Beam Loss due to Charge Change U 28+ U 29+ U 73+ U 72+ Ionization dominated Capture dominated

SIS18 upgrade - Pressure Stabilization Short cycle times and short sequences SIS18: 10 T/s - four cycle sequence for injection (new power connection, power converters and Rf system) Enhance pumping power (UHV upgrade) (NEG-coating, cryo panels - local and distributed) (new magnet chambers, improved bake out system) cryo pump increased pressure Localizing beam loss and control/suppression of desorption gases (Scraper system) ion beam scraper system Materials with low desorption yields η-teststand, ERDA measurements,

Fast Ramping High average beam intensity requires fast short cycle times with fast ramping. Shortening of cycle time (low charge state operation) Higher repetition rate (booster operation 2.7 4 Hz ) Increased average intensity (x 2-9) A. SIS18 Modus B max = 1.8 T, db/dt = 4 T/s I max = 3500 A, V max = 5.5 kv Standard operation: db/dt = 1.3 T/s, 1/3 Hz 2 groups each 2 parallel power converters 2 groups each 12 dipoles P max = +19/-17 MW B. SIS12 Modus B max = 1.2 T, db/dt = 10 T/s, I max = 2300 A, V max = 11.2 kv 4 power converters in series supply 4 groups of each 6 dipoles P max = +26/-23 MW (U 73+ : E max = 512 MeV/u) Power converter upgrade for 10 T/s up to 18 Tm (project start 2008)

Beam loss due to momentum spread. (slow extraction) Hardt condition: D n cos (α - µ) + D n' sin (α - µ) = - 4 π (Q' / S) Angle X [arb. units] Effective septum thickness p/p=0.1% Septum blade p/p=0.1% Hardt condition (coaligned separatrices) Septum blade D n D n' α Dispersion at ES Derivative of dispers. Orientation separatrix at sextupole µ Phase advance sextupole - ES Q' Chromaticity S Sextupole strength Finite angular spread at septum No angular spread at septum Hardt condition realized (via chromaticity control) thus minimum beam loss Lateral position X [arb. Units] First experiment at SIS18 Extraction efficiency raise from 83 to 93%

Outlook The upgrade program aimed at the operation of SIS18 and UNILAC for FAIR delivers higher beam intensities already now. Only the combination of all planned improvements will lead to the desired "FAIR intensities". The upgrade program needs long shutdowns and extended time for machine development. New benefits are introduced into normal operation as fast as possible.