Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Similar documents
Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan for ETLP (P156590)

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Sample Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Sample Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Sample Procurement Plan

Prior Review Thresholds

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Procurement Plan. I. General

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan. Nepal Livestock Sector Innovation Project

Sample Procurement Plan

Sample Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

UNITED REPUBLIC OF TANZANIA. Procurement Plan

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan for Project of Integrated Urban and Tourism Development

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

procurement Plan I. General

PPA PROCUREMENT PLAN (Textual Part)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PROCUREMENT PLAN (Textual Part)

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Consultants: firms Consultants: individuals

Prior Review Thresholds

GEF Procurement Plan (WARFP LIBERIA)

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan National Community Driven Development Project Department of Rural Development

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sample Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

PROCUREMENT PLAN (Textual Part)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

PROCUREMENT PLAN (Textual Part)

Actual Amount (US$) Process Status. Pending Interventions.

Sample Procurement Plan

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan. Procurement Method Prior Review Threshold Comments

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

Procurement Plan. I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement. International Competitive Bidding;

Procurement Plan. I. General

PROCUREMENT PLAN (Textual Part)

Textual Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

Sample Procurement Plan

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Mozambique Mozambique Mining and Gas Technical Assistance Project (P129847)

PE Cusco Transport Improvement Project (P132505) Procurement Plan

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

Sample Procurement Plan

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Implementation Status & Results Chad Urban Development Project (P072030)

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Public Disclosure Copy

Public Disclosure Copy

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Procurement Plan. I. General

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies

Transcription:

I. General Plan Mozambique: P125120 - Greater Maputo Water Supply Expansion Project 1. Bank s approval Date of the procurement Plan 2. Date of General Notice: 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to June 2018 II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Method Review Threshold Comments 1. ICB and LIB (Goods) Above 1,500,000 All 2. NCB (Goods) Above 1,500,000 All 3. ICB (Works) Above 10 million All 4. NCB (Works) Above 10 million All 2.. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/ Manual: Available 5. Any Other Special Arrangements: Not Applicable 6. Summary of the Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Cost million Packages Domest ic Prefere nce (yes/no) Review by Bank ( / ) Comments

Summary of the NCB (Goods) 0.50 4 No III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Review Threshold Comments 1. Competitive Methods (Firms) Above 500,000 All 2. Single Source (Firms) Above 500,000 All 3. Individual Above 200,000 All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: None 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Cost million Packages Review by Bank ( / ) 0.60 2 Comments 1.40 9 CQS/IC

Page 1 PROCUREMENT PLAN Mozambique : Greater Maputo Water Supply Expansion Project General Information Country: Mozambique Banks Approval Date of the Original Plan: 2017-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-11-23 Project ID: P125120 GPN Date: Project Name: Greater Maputo Water Supply Expansion Project Loan / Credit No: Executing Agency(ies): Water Regulatory Council, Water Supply Asset Holding and Investment Fund WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / FIPAG/GMWSP/W-04/16 / Design and Construction of 150km Network in Maputo - Lot 2 9,000,000.00 0.00 2017-07-05 2017-07-10 2017-08-21 2017-09-20 2017-10-25 2020-01-13 FIPAG/GMWSP/W-02/17 / Construction of Water Treatment Plant and Pumping Stations Component A: Investment in Water Supply Network Request for Bids Open - International 58,400,000.00 0.00 Under Review 2017-05-19 2017-07-07 2017-05-24 2017-07-24 2017-07-23 2017-08-22 2017-09-26 2020-12-19 FIPAG/GMWSP/W-05/17 / Installation of Pumps Component A: Investment in Water Supply Network Request for Quotations Open - National 900,000.00 0.00 2017-11-20 2018-01-20 2018-07-19 GOODS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CRA/GMWSP/G-03/15 / Video Conference Equipment for CRA's Head Office and Regional Offices Request for Quotations Open - National 70,000.00 53,899.21 Signed 2017-04-03 2017-05-29 2017-08-07 2017-11-25 FIPAG/ GMWSP /G-08/16 / Supply of pipes and fittings for networks Maputo - Lot 2 300,000.00 0.00 2017-05-31 2017-06-05 2017-07-17 2017-08-16 2017-09-20 2018-03-19 FIPAG/ GMWSP /G-11/13 / Supply of Transformers and electrical equipment to the Distribution Centers - Lot 1 600,000.00 0.00 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04 FIPAG/ GMWSP /G-13/13 / Supply of Valves & fittings for the Distribution Network in Maputo - Lot 1 170,000.00 0.00 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03 FIPAG/ GMWSP /G-06/16 / Supply of Water Meters for Maputo 60,000 connections - Lot 3 800,000.00 0.00 2017-05-31 2017-06-05 2017-07-20 2017-08-19 2017-09-23 2018-03-22 FIPAG/ GMWSP /G-03/16 / Supply of pipes and fittings for 60,000 connections, Maputo Lot 3 Request for Bids Open - National 1,600,000.00 0.00 2017-08-01 2017-08-08 2017-09-19 2017-10-19 2017-11-23 2018-05-22 CRA/GMWSP/G-02/16 / Supply of ICT Equipment for RECO Service Provider ( "Respond the Consumer Expectations" (RECO) in Urban and Small/Medium Towns) Request for Bids Open - National 150,000.00 0.00 Canceled 2017-07-03 2017-07-08 2017-08-19 2017-09-18 2017-10-23 2018-04-21 CRA/GMWSP/G-01/17 / Supply of ICT Equipment for the Reporting & Monitoring Platform (RECO & IBNET) Request for Bids Open - National 150,000.00 0.00 2018-02-20 2018-02-25 2018-04-08 2018-05-08 2018-06-12 2018-08-11 CRA/GMWSP/G-01/16 / Supply of IT Equipment for IBNET Monitoring Request for Bids Open - International Single Stage - Two 200,000.00 0.00 Canceled 2017-07-31 2017-08-05 2017-09-16 2017-11-29 2018-01-03 2018-07-02 NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / FIPAG/ GMWSP /CON 21/17 / Water analysis services for quality assurance Direct Direct 8,300.00 0.00 2017-11-16 2017-11-21 2017-12-26 2018-12-26 CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract CRA/GMWSP/CONS18/FCS/17 / Development and of a Strategic Evaluation (scored approach) for Human Resources Performance Under Open - National 90,000.00 0.00 2017-03-30 2017-04-20 2017-04-20 2017-06-03 2017-07-03 2017-08-07 2018-02-03

Page 2 CRA/GMWSP/CONS13/FCS/15 / Study for Defining Appropriate Regulatory Framework Sanitation Services, including Drainage s and Fecal Sludge Management Open - International 190,000.00 0.00 2017-08-21 2017-09-11 2017-10-25 2017-11-24 2017-12-29 2018-06-27 16/FCS/16 / Technical Assistance for Review of CRA Internal Regulations Under Open - National 100,000.00 0.00 2017-04-24 2017-05-11 2017-05-15 2017-06-28 2017-07-28 2017-09-01 2018-02-28 CRA/GMWSP/CONS 21/FCS/17 / Improve Computer and Software use skills for CRA's Staff Open - National 70,000.00 0.00 Under 2017-04-24 2017-04-19 2017-05-15 2017-06-28 2017-07-28 2017-09-01 2018-02-28 CRA/GMWSP/CONS 09/FCS/17 / Model Study for Performance Improvement of Local Regulatory Agents (ALC & CORAL) Open - National 90,000.00 0.00 2017-07-10 2017-07-31 2017-09-13 2017-10-13 2017-11-17 2018-05-16 FIPAG/ GMWSP /CON 03/17 / Financial Audit 2017 2018 & 2019 Least Cost Open - National 300,000.00 0.00 2017-05-12 2017-06-02 2017-07-16 2017-08-13 2017-09-12 2017-10-17 2017-11-21 2020-11-05 FIPAG/ GMWSP /CON 07/13 / Study for supply to additional areas of demand Based Open - International 500,000.00 0.00 2017-10-03 2017-10-17 2017-11-27 2018-01-07 2018-02-02 2018-03-04 2018-04-01 2019-03-07 24/ICS/17 / Accountant Manager Open - National 30,000.00 0.00 Canceled 2017-06-19 2017-06-09 2017-07-10 2017-08-23 2017-09-22 2017-10-27 2018-10-26 CRA/GMWSP/CON-28/FCS/17 / Avaliaçao nda Eficacia do Contracto de Adesao (Serviço do Abastecimento de Agua) Open - National 150,000.00 0.00 2017-09-29 2017-10-20 2017-12-03 2018-01-02 2018-02-06 2018-05-07 11/FCS/17 / Designing Tools for Improving Regulatory Governance in Water and Sanitation Services Open - International 250,000.00 0.00 2017-10-10 2017-10-31 2017-12-14 2018-01-13 2018-02-17 2018-08-16 CRA/GMWSP/CON-29/FCS/17 / Institutional Regulatory Study Based Open - International 300,000.00 0.00 2017-09-29 2017-10-20 2017-12-03 2017-12-31 2018-01-30 2018-03-06 2018-04-10 2019-04-10 08/FCS/15 / Impact Evaluation - Completion of Baseline and End Project Survey of Water Service in the Greater Maputo Area Open - International 200,000.00 0.00 Canceled 2017-09-18 2017-10-09 2017-11-22 2017-12-22 2018-01-26 2018-07-25 02/FCS/17 / DESIGN AND IMPLEMENTATION OF SERVICE QUALITY REPORTING SYSTEM (RECO - Project) Open - National 140,000.00 0.00 Canceled 2017-04-17 2017-05-08 2017-06-21 2017-07-21 2017-08-25 2018-02-21 05/FCS/15 / Design and Scaling Up of RECO (Respond to Water and Sanitation Consummers Expectations) Open - National 110,000.00 0.00 Canceled 2017-11-27 2017-12-18 2018-01-31 2018-03-02 2018-04-06 2018-10-03 01/FCS/16 / Beneficiary Assessment - 3 Regions (South, Center and North) Based Open - International 300,000.00 0.00 2018-03-13 2018-04-03 2018-05-17 2018-06-14 2018-07-14 2018-08-18 2018-09-22 2019-09-22 02/FCS/15 / Design and Establishment of CRA Monitoring Information and IBNET Data Collection Platform and Operational Support to CRA Based Open - International 300,000.00 0.00 Canceled 2017-04-14 2017-05-05 2017-06-18 2017-07-16 2017-08-15 2017-09-19 2017-10-24 2018-10-24 FIPAG/ GMWSP /CON 09/13 / Design Check and Supervision of construction of Network - Lot 2 (150 Km) Based Open - International 900,000.00 0.00 2017-12-08 2017-12-29 2018-02-11 2018-03-11 2018-04-10 2018-05-15 2018-06-19 2020-12-05 INDIVIDUAL CONSULTANTS Contract Type Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRA/GMWSP/CONS 07/ICS/17 / IT Specialist Limited 50,000.00 0.00 2017-07-18 2017-07-23 2017-08-13 2017-09-17 2018-03-16 FIPAG/ GMWSP /CON 06/13 / Preparation of phase II of Greater Maputo Open 300,000.00 0.00 2017-10-16 2017-12-04 2017-12-25 2018-01-22 2018-08-20 FIPAG/ GMWSP /CON 11/13 / Technical Assistance for Environmental Management (inc. implementation) Open 400,000.00 0.00 2017-10-16 2017-12-04 2017-12-25 2018-01-29 2019-04-24 FIPAG/ GMWSP /CON 13/13 / Technical Assistance Short Term Specialist on Water Treatment es Open 150,000.00 0.00 Under 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2019-05-10

Page 3 FIPAG/ GMWSP /CON 14/13 / Technical Assistance Short Term Specialist (Electro Mechanical) Open 100,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2019-05-10 FIPAG/GMWSP/CON-19/17 / Consultancy Services for Revision of the Sábie Water Treatment Plant Bypass Design and Feasibility Study for Temporary WTP Direct Direct 100,000.00 112,144.61 Under 2017-05-15 2017-06-06 2017-05-25 2017-05-02 2017-06-17 2017-07-07 2017-11-14 25/ICS/17 / Translation Specialist for Documents Open 55,000.00 0.00 2017-07-10 2017-08-28 2017-09-18 2017-10-23 2018-04-21 CRA/GMWASP/CON-24/ICS/17 / Accountant Manager Direct 30,000.00 24,470.10 Signed 2017-07-07 2017-07-12 2017-07-17 2017-10-10 2017-08-07 2017-10-19 2017-09-11 2017-09-15 2019-09-11 22/ICS/17 / CRA South Regional CTR (Inhambane) Open 30,000.00 0.00 Canceled 2017-03-13 2017-05-03 2017-05-01 2017-05-22 2017-06-26 2018-06-26 CRA/GMWSP/CONS23/ICS/17 / CRA South Regional Assistant - Inhambane Limited 30,000.00 0.00 Under 2017-03-20 2017-05-04 2017-03-25 2017-07-11 2017-04-15 2017-07-17 2017-05-20 2018-05-21 CRA/GMWSP/CON-22/ICS/17 / TECHNICAL ASSISTANT OF CRA SOUTH REGION (Inhambane) Direct 30,000.00 0.00 2017-07-07 2017-07-17 2017-08-07 2017-09-11 2019-09-11 CRA/GMWSP/CONS 06/ICS/17 / Specialist Open 50,000.00 0.00 Canceled 2017-05-08 2017-06-05 2017-06-26 2017-07-17 2017-08-21 2018-02-17 CRA/GMWSP/CON-06/ICS/17 / PROCUREMENT SPECIALIST and Operational Support to CRA Direct 50,000.00 0.00 2017-09-29 2017-10-09 2017-10-30 2017-12-04 2018-12-04 CRA/GMWSP/CON-26/ICS/17 / Project Manager Direct 95,000.00 0.00 2017-09-26 2017-10-06 2017-10-27 2017-12-01 2018-12-01 15/ICS/16 / Establishment of a Center of Excellence for the Development of Water and Sanitation Services Regulation Limited 70,000.00 0.00 Canceled 2017-09-18 2017-09-23 2017-10-14 2017-11-18 2018-05-17 CRA/GMWSP/CON-22/17 / TECHNICAL REGIONAL COORDINATOR - CTR - CRA SOUTH REGION (Inhambane) Direct 30,000.00 0.00 Canceled 2017-07-07 2017-07-17 2017-08-07 2017-09-11 2019-09-11 CRA/GMWSP/CON -22/ICS/17 / Regional Technical Coordinator - CTR (South Region - Inhambane) Limited 30,000.00 0.00 2017-09-05 2017-09-10 2017-10-01 2017-11-05 2018-05-04 20/ICS/17 / Financial Analyst Limited 50,000.00 0.00 Canceled 2017-07-17 2017-07-22 2017-08-12 2017-09-16 2018-03-15 CRA/GMWSP/CONS19/ICS/17 / Development and of CRA's Communication Strategy to reach the Water Consumers Limited 30,000.00 0.00 Canceled 2017-04-24 2017-03-16 2017-04-29 2017-05-20 2017-06-24 2017-12-21 FIPAG/ GMWSP /CON 20/17 / Consultancy Services for Documents Translation Limited 110,000.00 0.00 2017-09-12 2017-09-17 2017-10-08 2017-11-12 2020-01-11