Cryostat Assembly. 17 September Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg

Similar documents
Cryo Mezzanine Design and Requirements. David Montanari, Aurélien Diaz, Kevin Haaf LBNF Cryostat, final design review SURF, August 2017

Charge readout and double phase

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

Grounding and Shielding

Microscopy Cryostat System

N. 1 ELECTRIC ARC FURNACE SECOND HAND 50 TONS. TAPPING CAPACITY

Hard and Soft X-ray Mirror System Design Status

CHAPTER 3 HELIPORT AND HELICOPTER STAGEFIELD LIGHTING SYSTEMS

CUORE Detector Calibration System

PS2 Status Report. Nick Kaiser Pan-STARRS, Institute for Astronomy, U. Hawaii. Durham Workshop 2013/01/08. Monday, January 7, 13

Critical Current Properties of HTS Twisted Stacked-Tape Cable in Subcooled- and Pressurized-Liquid Nitrogen

Measurements of temperature on LHC thermal models

ORTEC. SLP Series Silicon Lithium-Drifted Planar Low-Energy X Ray Detector Product Configuration Guide

Repair Parts List DUEL FUEL RANGE MODEL NUMBER SVD48600BC. When requesting service or ordering parts, always provide the following information:

Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation

KECK REALTIME SEISMIC/GEODETIC BOREHOLE STATION. WHOI Ocean Bottom Seismograph Laboratory

ACCEPTANCE PROCEDURE FOR ROMET ROTARY METER BODIES AND/OR MECHANICAL NON-CONVERTING AND CONVERTING MODULES

James Webb Space Telescope (JWST) Program Status. Mark Clampin JWST Observatory Project Scientist NASA/Goddard Space Flight Center

HiPace 300 with TC 400, DN 100 CF-F

GLP Series Planar HPGe Low-Energy Detector Product Configuration Guide

2.1. DOMINO Series DIMENSIONS QUALITY MARKS TECHNICAL CHARACTERISTICS VERSIONS BEHAVIOUR WITH CHEMICAL AND ATMOSPHERIC AGENTS. Acids.

LHC HTS CURRENT LEADS

GLAST Large Area Telescope

ENSC387: Introduction to Electromechanical Sensors and Actuators LAB 3: USING STRAIN GAUGES TO FIND POISSON S RATIO AND YOUNG S MODULUS

Physics 476LW Advanced Physics Laboratory Michelson Interferometer

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B )

REPAIR PARTS. GPH13 "H" Model Package Heat Pumps GPH1324H41AB GPH1330H41AB GPH1336H41AB GPH1342H41AB GPH1348H41BB GPH1360H41BB

Vacuum Pumps. Two general classes exist: Gas transfer physical removal of matter. Mechanical, diffusion, turbomolecular

Palm Beach County Fleet Management Asset Maintenance History

SECTION 1 - WHAT IS A BTU METER? BTU's = Flow x ΔT Any ISTEC BTU Meter System consists of the following main components:

HiPace 1200, with TC 1200, DN 200 CF-F

He II Heat transfer through a Corrugated Tube - Test Report

THM80X Series Feature Application. Temperature & Humidity / Flow Measuring Specialist

HiPace 300 with TC 110, DN 100 CF-F

Rotary modules.

HAWK TECHNOLOGY LTD.

Technical description of photoelectron spectrometer Escalab 250Xi

Parts List with Exploded Views

ORTEC. GLP Series Planar HPGe Low-Energy Detector Product Configuration Guide. Configuration Guidelines

Pre-owned - 8 colour press FA-Line: FA-4* NEXT CLEANINKING #F4733 MODULAR 16" MULTI-SUBSTRATE FLEXO PRESS

Integrating Quench Modeling into the ICME Workflow

CATALOG OF MOUNTS G3 AND G3 VISION VIDEO MOUNTS KP/N REVISION 1 SEPTEMBER 10, 2012

REPAIR PARTS. GPH13 "M" Series Horizontal Package Heat Pumps GPH1324M41AA GPH1330M41AA GPH1336M41AA GPH1342M41AA GPH1348M41AA GPH1360M41AA

VX25 Enclosure System. Technical documentation PE conductor connection, current carrying capacity

Fall 2014 Mott Target Replacement and Ladder Position Re- Calibration JLAB- TN Joe Grames. September 17, 2014

Success of long term preventive maintenance on telescope subsystems using the example of the VLT Adapter-Rotators at the ESO Paranal Observatory

LIGO On-line Documents July 1997

LUCKY STAR ST HELENA BAY EMERGENCY INTERVENTION PLAN

THERMAL-VACUUM TESTS OF THE AMAZONIA-1 SATELLITE TM PERFORMED AT INPE WITH SUCCESS

Thermal Vacuum Test: Plans and Procedures

China high-intensity accelerator technology developments for Neutron Sources & ADS

The ISIS Penning H - SPS and Diagnostic Developments at RAL

Capacitive Sensors. Contents

REPAIR PARTS. GPH14 "M" Series Residential Package Heat Pump. This manual is to be used by qualified technicians only.

Miniball Flexible Frame

Assembly Manual for the Brevard Astronomical Society 16 inch F4.5 Dobsonian Telescope Brevard Astronomical Society P.O. Box 1084 Cocoa, FL 32922

CapaciTorr HV 200 HIGHLIGHTS

Adaptive optics for the 6.5 m MMT

CapaciTorr HV Pumps. making innovation happen,together

SpRIT TPC: Device to constrain the symmetry energy at supra-saturation densities

The Dark Energy Spectroscopic Instrument

GLAST Large Area Telescope. LAT Systems Engineering. LAT Systems Engineering LAT Test Plan Update. Tom Leisgang. Gamma-ray Large Area Space Telescope

260A Tractor, Loader & Backhoe S/n & up

16 Input AC Block I/O Module

the foundation of any business starts here

REPAIR PARTS. GPH16 Horizontal Package Heat Pumps. This manual is to be used by qualified technicians only.

52095 dx sx. S.p.A VERSIONE - EDITING. Via Circonvallazione Nord, Guastalla (RE)

HiPace 300 with TC 110 and power supply pack OPS 100, DN 100 CF-F

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

2. OPERATIONAL CONDITIONS

Vacuum Solutions for Ion Thruster Testing

Loads on RPV Internals in a PWR due to Loss-of-Coolant Accident considering Fluid-Structure Interaction

REPAIR PARTS. GPC13 "M" Series 3-5 Ton Package Coolers

Status / Progress of the erosita X ray Observatory:

Switch or amplifies f. Capacitor i. Capacitance is measured in micro/pico farads ii. Filters frequencies iii. Stores electrical energy

SFP A 01 del

Vacuum Chambers. Type DK /DK /DK

CALEFFI. Modulating digital controller for heating and cooling. 161 series 01122/08 GB. replaces dp 01122/05

STS41-D Solar Array Flight Experiment

X-Ray Diagnostics Commissioning at the LCLS

The IPIE Adaptive Optical System Application For LEO Observations

Integrated radiation monitoring and interlock system for the LHD deuterium experiments

BINOCULAR STEREOSCOPIC MICROSCOPE MBS-10. User Manual

IDENTIFICATION STS400

CRYOGENIC SYSTEMS FOR INERTIAL FUSION ENERGY. CEA-Grenoble France DSM/DRFMC/SBT

INDEX OF ILLUSTRATIONS

SRP RESIDENTIAL GARAGE HEATERS

PARTS LIST GAS BOILERS MODELS:

Physics 1C OPTICAL SPECTROSCOPY Rev. 2-AH. Introduction

MAINTENANCE EVALUATION CHECKLIST HYDRAULIC ELEVATORS

Vibration-Free Pulse Tube Cryocooler System for Gravitational Wave Detectors I

Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators. IESO Training

CHARACTERIZATION OF PIEZOELECTRIC ACTUATORS USED FOR SRF CAVITIES ACTIVE TUNING AT LOW TEMPERATURE

ISOCON-6. 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER

Convertible source system of thermal neutron and X-ray at Hokkaido University electron linac facility

Consolidation of the Proton Synchrotron Vacuum Control System. Francois Bellorini TE-VSC-ICM

OWL: Further steps in designing the telescope mechanical structure and in assessing its performance

PFIS Camera and Collimator CDR Conceptual Design Report. March 5, 2003 J. Alan Schier

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

Opto-Mechanical Design of Altair, the Gemini Adaptive Optics System

Transcription:

Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg

General Cryostat section views Contents Raft Tower load transfer process Integration fixturing Back end cable routing Front end vacuum barrier LSST Camera Systems Integration 2

Cryostat Section Views

Cryostat 2/3 Section Isometric View LSST Camera Systems Integration 4

Cryostat ¾ Section Isometric View LSST Camera Systems Integration 5

Cryostat XZ-Plane Section LSST Camera Systems Integration 6

Cryostat YZ-Plane Section LSST Camera Systems Integration 7

Cryostat and Valve Box YZ-Plane Section LSST Camera Systems Integration 8

Raft Tower Load Transfer

Raft Tower on Cryo Plate LSST Camera Systems Integration 10

Raft Tower Side Views LSST Camera Systems Integration 11

Raft Hold-Down Device Details: -X X Side LSST Camera Systems Integration 12

Raft Hold-Down Device Details: +X Side LSST Camera Systems Integration 13

Raft Tower Hold-Down in a Grid Bay LSST Camera Systems Integration 14

Cryostat Integration and Fixturing

Cryostat Assembly and Integration Flow Legend FEE Cage Guide sensors, electronics SLAC Harvard Sensor package Raft Plate Front End Electronics cards Sensor-FEE flex cables Thermal straps FEE-RCC flex cables Raft Control Crates Wavefront sensors, electronics Assemble Corner Raft Towers Corner Raft Acceptance Test L3 Lens Assembly LLNL BNL TBD Acceptance test (color denotes responsibility) Assemble, test Raft assemblies Assemble Raft Towers Raft Tower Acceptance Test Integrate Raft Towers into Cryostat Integrate Corner Rafts into Cryostat Close Cryostat front end Close Cryostat back end and Utility Trunk Cryostat Assy cold acceptance tests to Page 2 Science Bay Int. Corner Bay Int. Cryostat Close-out and Utilities Integration Front End Install. Back End Install. Cryostat Close-out Install Grid, Cryo Plate, into Cryostat Install Cold Plate, back end in Cryostat Close out Cryostat Assembly Cryostat pressure and leak tests Cryostat cold functional tests Assemble, test Instrument. Ring Utility Trunk structure and panels Power and conditioning module Cryostat Housing Cold Plate Support Ring Valve Box Ethernet switch Cryo Shroud Pumping chimneys, plenum X-Ray Calibration wiper arms Control/Valve Panel Timing and Control module Cryo Plate Feedthrough Flange Pattern generating gratings Flexures Grid Assembly Blank-Off Flange Vacuum pumps Cryostat Integration and Test Sequence From LSST-2119-D, Camera Integration and Test Flow Chart LSST Camera Systems Integration 16

Cryostat Integration Facility Plan View Metrology system Assembly stand Integration gantry Cart 19'-9" 4'-4" 19'-11" 4'-4" 7'-0" clr A Class 10K Clean Room Cryostat Integration 3'-0" wide walkway A Raft Test Station Single-Bay Cold Test Station Cryostat Electronics 44'-0" From LSST-6176-A, SLAC Bldg 33 Camera I&T Facility Layout LSST Camera Systems Integration 17

Cryostat Integration Facility Elevation View Metrology system Assembly stand Integration gantry Cart 44'-0" 1-Ton Crane min hook height 7'-10 1/2" clr Clean Room Elevation 4'-10 1/2" clr 9'-6" clr 11'-5 1/2" Room 103 Elevation A-A: Integrate Raft Towers into Cryostat Cryostat with valve box in cold-test configuration From LSST-6176-A, SLAC Bldg 33 Camera I&T Facility Layout LSST Camera Systems Integration 18

Cryostat Integration Fixture LSST Camera Systems Integration 19

Cryostat Cart 3-point mount Cryostat pivots around mounting points during rotation LSST Camera Systems Integration 20

Back End Cable Routing

Back End Cable Routing LSST Camera Systems Integration 22

Feedthrough Flange and Cable Routing from RCC LSST Camera Systems Integration 23

Back End Section Views LSST Camera Systems Integration 24

Front End Vacuum Barrier

Cryostat Vacuum LSST Camera Systems Integration 26