procurement Plan I. General

Similar documents
Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Sample Procurement Plan

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Procurement Plan for ETLP (P156590)

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan. Procurement Method Prior Review Threshold Comments

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

PROCUREMENT PLAN (Textual Part)

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Sample Procurement Plan

Sample Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Prior Review Thresholds

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Sample Procurement Plan

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan. Procurement Method Prior Review Threshold Comments

Sample Procurement Plan

Procurement Plan. I. General

Procurement Plan for Project of Integrated Urban and Tourism Development

Sample Procurement Plan

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PROCUREMENT PLAN (Textual Part)

Urban Productive Safety Net Project (UPSNP) Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PROCUREMENT PLAN (Textual Part)

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

PROCUREMENT PLAN (Textual Part)

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

GEF Procurement Plan (WARFP LIBERIA)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

P Safety Nets Project Procurement Plan June 1 st 2017

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Prior Review Thresholds

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

PPA PROCUREMENT PLAN (Textual Part)

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Sample Procurement Plan

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Sample Procurement Plan

Consultants: firms Consultants: individuals

PE Cusco Transport Improvement Project (P132505) Procurement Plan

Sample Procurement Plan

Procurement Plan National Community Driven Development Project Department of Rural Development

Procurement Plan. I. General

Procurement Plan. I. General

Sample Procurement Plan

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Procurement. International Competitive Bidding;

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Textual Procurement Plan

Procurement Plan. NCB < 1 RfQ<0.1

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

Selection Method. Financing Share. Bid document submis-sion. Bank Review

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Implementation Status & Results Chad Urban Development Project (P072030)

Actual Amount (US$) Process Status. Pending Interventions.

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667)

Transcription:

I. General Sample Plan Pays Niger Emprunter Republique du Niger Denomination du projet Projet de Développement des Compétences pour la Croissance Références du don H840-NE Date of General Notice Dec 24, 2006 Dec 24, 2006 Agence exécution Ministère de la Formation Professionnelle et de l'emploi Bank s approval Date of the 18 mars 2013 procurement Plan Period covered by this procurement plan 01 juillet 31 décembre 2014 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for : Prior Review Threshold Comments Method US$ 1. ICB and LIB (Goods) Above US$ 500,000 2. NCB (Goods) Above US$ 100,000 3. ICB (Works) Above US$ 15 million 4. NCB (Works) Above US$ 5 million 5. (Non- Services) Below US$ 100,000 First contract First contract 2.. Bidders for _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/ Manual: Project Manual for World Bank Loan Project H840 01/09/2013 issued by <mention name of PIU> 5. Any Other Special Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing

6. Summary of the Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank s prior review first and then the other packages ] 1 2 3 4 5 6 7 Ref. No. Description Cost US$ 1 Equipements for CMCAN of Niamey) and cars ICB Godds 2 Equipements divers Eof the ICB (Goods) 3 Work contruction and réhabilation of the NCB (Works) 4 Others Goods (Suppliers consultations)) Packages Domestic Preference (yes/no) Review by Bank (Prior / ) Comments 1,940,000 2 No Prior 1st contract for Prior Review 1,312,120 7 No 1st contract for Review 4,800,000 3 No 1st contract for Prior Review 604,970 26 No 1st contract for Prior Review III. of s 1. Prior Review Threshold: decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 200,000 2. Single Source (Firms) 3. Individual Above US$ 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. NA 3. Any Other Special Arrangements: NA including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Methods and Time Schedule Consultancy Assignments with Methods and Time Schedule Consultancy Assignments with Methods and Time Schedule

1 2 3 4 5 6 Ref. Description of Packages Review Comments No. Assignment Cost by Bank Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods US$ million (Prior / ) 7,624,000 20 Prior SFQC 1,813,000 32 Prior and post QCS, CI, SMC, ED

Page 1 PROCUREMENT PLAN Niger : NIGER Skills Development for Growth Project General Information Country: Niger Banks Approval Date of the Original Plan: 2017-08-26 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-09-18 Project ID: P126049 GPN Date: Project Name: NIGER Skills Development for Growth Project Loan / Credit No:, IDA / Q8510 Executing Agency(ies): Projet de Developpement des Competences pour la Croissance - PRODEC WORKS Amount NE-PRODEC-27234-CW-RFB / Construction d'un mur de clôture, un bloc de salle de professeurs et de surveillants et d'un portique au lycée technologique de Doutchi (avenant N 1 au contrat 002/2016/AON/W/IDA) Direct Direct 221,784.00 0.00 Pending 2017-09-19 2017-09-24 2017-10-29 2018-09-05 NE-PRODEC-27247-CW-RFB / Construction d'un mur de clôture et trois blocs de latrines au lycée professionnel d'agadez Request for Bids Open - National 199,740.00 0.00 Pending 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 GOODS Amount 31602 / Acquisition de serveurs pour opérationnaliser la base de données du MEP/T Strengthening Short Term Skills Development and Apprenticeships Programs Request for Quotations Limited 33,333.00 0.00 Pending 2017-08-06 2017-10-01 2018-03-30 NE-PRODEC-24107-GO-UN / Acquisition d'équipement des infirmiers des trois (3) établissements cibles Centre des Métiers de Cuire et d'art du Niger CMCAN de Niamey le lycée technologique de Doutchi le lycée Professionnel de l'hôtellerie et de Tourisme d'agadez 0.00 Pending Prior UN Agencies (Direct) Direct 25,000.00 NE-PRODEC-27299-GO-RFP / Acquisition de mobilier de bureau pour les trois centres cible du PRODEC Request for Bids Open - National 147,712.00 0.00 Pending 2017-09-10 2017-09-15 2017-10-27 2017-11-26 2017-12-31 2018-06-29 NE-PRODEC-24103-GO-UN / Acquisition d'équipements pédagogiques pour le lycée technologique de Doutchi Prior UN Agencies (Direct) Direct 618,572.00 0.00 Pending NE-PRODEC-24111-GO-UN / acquisition d'équipements pour la plateforme tannerie du CMCAN Prior UN Agencies (Direct) Direct 196,421.00 0.00 Pending NE-PRODEC-24118-GO-UN / Acquisition d'équipements le Lycée Professionnel de l'hôtellerie, du Tourisme et de la Restauration d'agadez Prior UN Agencies (Direct) Direct 196,422.00 0.00 Pending NON CONSULTING SERVICES Amount CONSULTING FIRMS Contract Type Amount Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract NE-PRODEC-23903-CS-CQS / Etude pour la conception et la mise en place d'un dispositif national de suivi-évaluation de l'enseignement et de la formation techniques et professionnels du Niger Open - National 25,000.00 0.00 Under 2017-08-11 2017-09-15 2017-09-01 2017-10-15 2017-11-14 2017-12-19 2018-06-17 NE-PRODEC-24121-CS-CQS / Elaboration d'une méthodologie et réalisation d'un enquête sur le devenir les bénéficiaires des formations à la demande du FAFPA Open - National 80,000.00 0.00 Pending 2017-08-14 2017-08-29 2017-09-05 2017-09-26 2017-10-31 2018-04-29 NE-PRODEC-24125-CS-CQS / Elaboration d'un stratégie et d'un plan de communication pour le MEP/T Open - National 25,000.00 0.00 Under 2017-08-14 2017-09-04 2017-09-04 2017-10-18 2017-11-17 2017-12-22 2018-06-20

Page 2 22104 / formation en installation de système photo voltaïque Open - National 50,000.00 0.00 Pending 2017-09-11 2017-10-02 2017-11-15 2017-12-15 2018-01-19 2018-07-18 31309 / Recrutement de l'auditeur externe des comptes du PRODEC Strengthening Short Term Skills Development and Prior Least Cost Open - International 58,333.00 0.00 Under Review 2017-08-14 2017-08-24 2017-09-28 2017-11-01 2017-11-07 2017-12-05 2017-12-14 2019-12-31 Apprenticeships Programs INDIVIDUAL CONSULTANTS Contract Type Amount Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 21104 / Formation en Mécatronique Prior Direct Direct 113,333.00 0.00 Under 2017-08-05 2017-08-15 2014-12-29 2017-10-19 2018-04-17 NE-PRODEC-27092-CS-INDV / Etude de la possibilité d'installation d'un connexion intranet au lycée technologique de Doutchi Individual Open 5,000.00 0.00 Under 2017-09-04 2017-09-15 2017-10-23 2017-11-13 2017-12-01 2018-01-31 NE-PRODEC-27100-CS-INDV / Appui au MEP/T dans le processus d'élaboration des textes d'application de la loi N 2015-22 du 22 avril 2015 Individual Open 5,000.00 0.00 Under 2017-09-11 2017-09-15 2017-10-30 2017-11-01 2017-11-14 2018-01-02 NE-PRODEC-28856-CS-INDV / Recrutement d'un consultant individuel pour l'élaboration des IDA / Q8510 CGES et des PGES prévus dans le cadre du financement additionnel du PRODEC Individual Open 25,000.00 0.00 Pending 2017-09-29 2017-10-31 2017-11-02 2017-11-08 2017-12-25