Installation Manual. Installation manual for PerfectEnergy Solar Modules. Content

Similar documents
THE POWER OF ASTRONERGY

KD-Series: KD260AH-4PG KT-Series: KT260-6GC-A

Installation guide 862 MIT / MIR

PUSH TUBE STANDARD DUTY

Self-Testing Prevectron 2 Millenium Lightning Conductor Set-up and Installation Manual

DRIFTER PLOW-IN-A-BOX

Table of Contents. 1 Introduction. 2 Table of Contents Introduction en. 1 Introduction 2. 2 Safety guidelines 3. 3 Positioning guidelines 4

Lamp and Control Panel (Lamp Panel)

iweathar EDGE V Installation Guide Copyright 2012 iweathar. All rights reserved.

INSTALLATION INSTRUCTIONS FRONT PLOW MOUNT KIT Part Number: Application: Polaris Sportsman 400, 500, 800

FOREMAN ASSEMBLY / OWNER S MANUAL

ATV WP2 FRONT MOUNT PUSH TUBE

Installation and Operation Guide Crystalline Solar Modules. deutsch

WARNING. INJURY HAZARD Failure to observe these instructions could lead to severe injury or death.

PLOW MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

SHARK Snow Plow. 52 (132 cm) / 60 (152 cm) Complete system blade INSTRUCTIONS / ESTABLISHMENT

product manual H-4204 Proving Ring Penetrometer

AIR CONDITIONER (SPLIT TYPE) SERVICE MANUAL

DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL

ASSEMBLY / OWNER S MANUAL

FOR CAN-AM ATV s P/N ASSEMBLY / OWNERS MANUAL

BETA Protecting. Low-Voltage Fuse Systems. LV HRC fuse links. 3/36 Siemens ET B1 2008

FLT5A FLT5A. abc. abc. Thermometer User Guide. Thermometer User Guide. Internet:

For Customer Service, Rev A - 6/ OF 6

Assembly Instructions for the 1-Wire Weather Station V2.0/V3.0

PLOW MOUNT KIT FOR YAMAHA VIKING P/N ASSEMBLY / OWNERS MANUAL. Application PLOW PUSH FRAME NO or

INSTALLATION INSTRUCTIONS ATV Plow Blade Part Number: (50 ), (54 ), or (60 ) Application: All Terrain Vehicles

FOR POLARIS ATV s P/N ASSEMBLY / OWNERS MANUAL

VX25 Enclosure System. Technical documentation PE conductor connection, current carrying capacity

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

Must Read Before Installation TadPoleTM Safety and Warnings

Latest generation testo air velocity & IAQ probes with cable handle. Instruction manual

STATIC GAS MONITOR Type SGM/DEW Revision A of 20 aprile 2016

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual

Conductor sizing is a critical step

Operating Instructions for Digital Manometer. Model: MAN-SD

2.8-1 SCIENCE EXPERIMENTS ON FILE Revised Edition. Dew Formation

Meteorological Station P03/3-RS485-WAGO

SK Series BOX PLOW INSTALLATION & OWNER S MANUAL TABLE OF CONTENTS

Amphenol C 091 A/B/D. Circular Connectors. Amphenol-Tuchel Electronics GmbH

Richter Optica. Instructions for Model: S850 Stereo Zoom Microscope

Snow Blade Operator s/assembly Instructions

SOLARWATT INSTALLATION INSTRUCTIONS

Amphenol. Amphenol-Tuchel Electronics GmbH. Circular Connectors C 091 A/B/D Series

Microcare LCD Solar MPPT User Documentation

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018

Requirements to perform accurate dielectric material analysis

INSTALLATION INSTRUCTIONS ProVantage Plow Pulley Part Number: 84526

WS-7047TWC Wireless 433 MHz Weather Station With Rainfall and Temperature. Instruction Manual

INSTALLATION INSTRUCTIONS PLOW MOUNT KIT Part Number: Application: Honda Foreman 500

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.

Power System Engineering Prof. Debrapriya Das Department of Electrical Engineering Indian Institute of Technology, Kharagpur

VK2 volume flow controller Overview

N) manual. Biomaster Operating manual

Weather Station P03/3-RS485-GPS with RS485 Interface

An Introduction to Insulation Resistance Testing

Instruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution

Instruction Manual SEFRAM Thermal Camera

Weather Station P03/3-RS485 with RS485 Interface

METALLIZED POLYPROPYLENE AC FILTERING CAPACITORS

INSTALLATION INSTRUCTIONS ATV PLOW ACCESSORY Plow Mounting Kit:Warn PN Application:2002 and newer+ Suzuki Eiger 400

LP PYRA Installation and Mounting of the Pyranometer for the Measurement of Global Radiation:

Installation instructions, accessories. Snow chains

Page 2 of 14 Report Ref. No

PHOENIX CONTACT - 04/2016. Features

8.2 AG Die Sachverständigen für

Collector test according to EN ,2:2002

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals.

Masterpact. Installation recommendations

Weather Station P03/3-Modbus-GPS for Modbus

CRAIG MANUFACTURING LTD. 96 McLean Ave. Hartland, New Brunswick CANADA E7P 2K5

REPAIR PARTS. DX17VS Outdoor Inverter. This manual is to be used by qualified technicians only.

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

SPECIFICATION SS 51/9 400KV COUPLING CAPACITORS FOR POWER LINE CARRIER SYSTEM

LP NET. 1 About LP NET. 2 Working Principle. TEL r.a. FAX

Accumulators Virginia KMP Suction Line Accumulators

Fischer Instruments Stainless Steel Barometer User Manual

Type B xxx/60. Snowplough // USER MANUAL Version 1.0 EN. Art.Nr.:

BASE. Rotary limit switch. OptiOnS. FEAtuRES. CERtiFiCAtiOnS

Ref: HLSR 16-PW; HLSR 32-PW; HLSR 40-PW-000; HLSR 50-PW-000,

Proximity Sensor Ideal for High Temperatures and Cleaning Processes. Applicable to 120 C

Operating instructions Magnetic-inductive flow meter SM6x04 SM7x04 SM8x04

Model 3024 Albedometer. User s Manual 1165 NATIONAL DRIVE SACRAMENTO, CALIFORNIA WWW. ALLWEATHERINC. COM

ZFK 4 X 25. Description and Utilization Instructions

Ambient Weather WS-152B 6" Contemporary Barometer User Manual

Presco AG. Standard Air Capacitor 10 nf / 2 kv. Type CL-0N10-K201. User's manual

Turbine Meter TRZ 03 PRODUCT INFORMATION. Reliable Measurement of Gas

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

Cold Weather Preparation

VELA Tango 100. VELA Tango 100A. VELA Tango 200 GAS

NOVALYNX CORPORATION MODEL 110-WS-16BP BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL

Operating instructions Magnetic-inductive flow sensor SM6004 SM7004 SM / / 2014

Safety Precautions WARNING If critical situations that could lead to user s death or serious injury is assumed by mishandling of the product.

Thermal Cube. Custom-built Heat Flux Sensor

EOSMS Guidelines Date: 01/16/2014 Page 1 of 5

Compact Orifice FlowMeter

u s e r m a n u a l w w w. v e l a. E U

3M Pak 10 Plug, PK10 series PK10-XXXPX-X-DA. 3M Pak 10 Socket, PK10 series PK10-XXXSX-X-DA

General. High Winds. High winds are a common hazard in the UAE.

Transcription:

Installation manual for PerfectEnergy Solar Modules Content 1. Preface 2. Technical data/general 3. Safety instructions 4. Mechanical Installation 5. Electrical installation 6. Grounding 7. Maintenance 1. Preface The solar modules use the photovoltaic principle to turn light into electricity. PerfectEnergy solar modules are primarily designed for connection to an inverter to feed the energy into the public power grid. When connecting to an inverter, please observe the instructions of the inverter-manufacturer. When connecting to a charge controller, please observe the instructions of the manufacturer of the charge controller and accumulator. These instructions contain information about safe handling and about the installation of framed solar modules by Perfectenergy in outdoor open spaces (fields) or on flat or tilted roofs. They are only for specialists, who are familiar with the installation due to their vocational qualification, and they contain safety-relevant instructions for the assembly, connection and maintenance of the solar modules. Important Notice: The installation of the solar modules and especially the electrical installation may only be carried out by personnel with electro-technical qualifications. Appropriately qualified technicians must always be deployed to service the units or remedy faults during operation. The installation techniques, handling and use of this product are beyond company control. For this reason, Perfectenergy accepts no liability for damage arising through improper use or incorrect installation, operation, use and maintenance. Please read these instructions carefully before handling the solar modules and familiarize yourself with the safety information. After the modules have been installed, hand over these instructions to the operator of the PV-system for safe-keeping. Last revised: January 2011 The technical specifications are subject to change without notice page 1

2. Technical Data Type designation PEM-230/X-60P Electrical data (rated at Standard Test Conditions: Irradiance 1000 W/m²; Air mass 1.5; Temperature 25 C) Nominal Power (P) 210 W 220 W 230 W Mpp-Voltage (Vmpp) 28,4 V 28,8 V 29,1 V Open Circuit Voltage (Voc) 36,0 V 36,5 V 36,7 V Mpp-Current (Impp) 7,40 A 7,65 A 7,90 A Short-circuit-current (Isc) 8,10 A 8,21 A 8,35 A Maximum over-current 13 A Temperature coefficients [%/ C] Power (αp) -0,48-0,48-0,48 Open Circuit Voltage (αvoc) -0,33-0,33-0,33 Short-circuit-current (αisc) +0,02 +0,02 +0,02 Mechanical Data Measurements 1650 x 991 x 50 mm Weight 22 Kg Maximum load 2400 Pa The power output is subject to a manufacturing tolerance of ± 3%. The dimensions are subject to a manufacturing tolerance of ± 2 mm. The technical specifications are subject to change without notice. General: Solar modules generate electricity as soon as they are exposed to light. The voltage of a single module is less than 50VDC. If several modules are connected in series, the voltages of the individual modules accumulate and can pose a hazard. The modules are qualified for application class A: Hazardous voltage (IEC 61730: > 50V; EN61730: >120V), hazardous power applications (>240W), where general contact access is anticipated. Modules qualified for safety through EN 61730-1 and -2 within this application class are considered to meet the requirements of Safety Class II. The maximum system voltage of solar modules connected to each other may not exceed 1000 VDC. Under normal conditions, a photovoltaic module is likely to experience conditions that produce more current and/or voltage than reported at standard test conditions. Sunny, cool weather and reflection from snow or water can increase current and power output. Accordingly, the values of Isc and Voc marked on this module should be multiplied by a factor of 1.25 when determining component voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV-output. Our products are not intended for use where artificially concentrated sunlight is applied to the module. Last revised: January 2011 The technical specifications are subject to change without notice page 2

3. Safety instructions The assembly and commissioning of the solar modules may only be carried out by those, who are qualified to correctly and safely install the system. Pay attention to the local ordinances, building standards and accident-prevention regulations. The safety information for other system components must also be followed. Do not install or handle the modules when they are wet or during periods of high wind. Use suitable fall-protection equipment. Secure work materials to prevent articles from falling. Secure the working area to avoid accidents with other people. Never install damaged solar modules! Before installing, check the junction-box, cables and socket connectors for damages. Never use the junction-box or the solar cable to carry the unit. Do not apply paint or any adhesives to the rear side of the solar module. Do not allow any objects to fall upon the solar module. Avoid scratches to the front glass. Do not walk across or step on the solar module! If the front glass is broken, or the backsheet is torn, contact with any module surface or module frame can cause electric shock. Cover all modules in the PV array with an opaque cloth or material before making or breaking electrical connections. Electrical commissioning of the solar modules may only be carried out by a professional installer! Do not connect or disconnect modules when current from the modules or an external source is present. Remove all metallic jewelry prior to installing this product to reduce the chance of accidental exposure to live circuits. Only use dry, insulated tools for the electrical assembly work. Ensure that the cable connections are in perfect condition (no cracking, soiling or other contamination). Pay attention to the inverter manufacturer s installation instructions! Before starting work on a PV-system, switch it off with a disconnection switch. Working with conductors, which conduct direct current can cause electric arcs! When installed on a roof, the module shall be mounted over a fire-resistant roof covering rated for the application. Solar modules are considered as non-explosion-protected-equipment. Hence, they must neither be installed near highly flammable gases and vapors (e.g. filling stations, gas containers, paint spraying equipment), nor near open flames or flammable materials. Last revised: January 2011 The technical specifications are subject to change without notice page 3

4. Mechanical installation 4.1 Location The solar modules can be installed on roofs or open spaces on support structures. Please pay attention to the local ordinances, building-standards and accident-prevention regulations during installation. The attachment must be sufficiently dimensioned to cope with the location s load requirements. To obtain maximum yield from the system, all modules should have the same direction and tilt-angle, and the solar irradiation should strike the modules perpendicular to their surface. In the northern hemisphere, the surface of the solar modules must face south. In Europe, the ideal module slope is approx. 30-40. The solar modules should not be exposed to shadows cast by trees or buildings as this would lead to energy losses! Even partial shading will cause a yield reduction! A module is shade free, when the entire surface is shade free all year round and, even on the most unfavorable days of the year, receives unobstructed sunlight. The solar modules must not stand in water. There is a risk of corrosion with exposure to salt (it is recommended that modules are installed at least 500m from the sea) and sulfur (sulfur sources, volcanoes). The modules may not be exposed to extremely corrosive chemicals (e.g. emissions from manufacturing plants). When installed on a roof, the module shall be mounted over a fire-resistant roof covering rated for the application. 4.2 Instructions for mounting Assembly work may only be performed by trained and qualified personnel. Fasten modules firmly to a support structure designed to withstand the local wind and snow loads. When selecting the material for the support structure, pay attention to the electrochemical series in order to avoid galvanic corrosion between different kinds of metal. A clearance of at least 20mm needs to be kept between the module frame and the attachment surface. This allows the cool ambient air to circulate below the solar module. Ventilation of the module backside is necessary to avoid the build-up of heat that can reduce performance. There should be a clearance of at least 5mm between the individual module frames to allow heat-related expansion. Do not remove or alter the module frame. Please use the existing mounting holes and do not drill any new holes into the frame! (doing so would void the warranty) The module clamps, which are used must not touch or shade the front glass and must not deform the frame. The solar modules may be mounted at any angle from horizontal to vertical. Each module must be securely fastened at a minimum of 4 points. Last revised: January 2011 The technical specifications are subject to change without notice page 4

4.3 Mounting requirements The PerfectEnergy-modules described in this manual are designed to meet a maximum positive (or upward, e.g. wind) and negative (or downward, e.g. snow) load of 2400 Pa (Pascals; 240 kg/m²) when mounted in one of the following mounting configurations. A design-strength of 2400 Pa corresponds approximately to a wind speed of 200 Km/h (125 mph). Notice: The frame of the big, poly-crystalline PerfectEnergy-modules has been stress tested for mounting at the long sides. The modules should not be secured by their short sides! Screw attachment Secure the module to the structure using the factory mounting holes. Four M8 stainless steel bolts, with nuts, washers, and lock washers are recommended per module. Refer to the drawing on the right for the module dimensions and mounting-hole locations. PEM-230/X-60P Clamps Mount the module with the clamps on the long side of the frame. Please pay attention to use appropriate, corrosion-proof fastening materials. The clamps should have a length of at least 40mm, and should overlap the frame by at least 7mm. Last revised: January 2011 The technical specifications are subject to change without notice page 5

5. Electrical connection Only specially trained and qualified personnel may make the electrical connection! The maximum system voltage of solar modules connected with each other may not exceed 1000VDC! When designing the system, please note that the module voltage increases when the temperatures are low. Only connect solar modules of the same type and power category with each other. For the electrical connection, the solar modules are equipped with a junction box and solar cables with plugs. The plugs are marked with the respective polarity. Ensure that the polarity is correct and that the connections are secure and tight. Never connect or disconnect electrical contacts when under load! Always use special solar cables with a diameter of at least 4 mm² for further wiring. We recommend securing the cables to the mounting system, using UV-resistant cable ties, to avoid the pin and socket connections being at a water-settlement level. The junction-boxes are equipped with 3 bypass-diodes. In the event of clouding, these minimize the losses and help to prevent damage to the solar modules. When connecting the solar modules to an inverter, please observe the information provided by the manufacturer of the inverter. 6. Grounding The company installing the solar module frame is also responsible for proper grounding. If the building is already equipped with an exterior lightning protection system, the PVinstallation must be integrated in the protection system against direct effects of lightning. Country specific standards must be adhered to. Attach a separate conductor as grounding wire to one of the 4mm diameter grounding holes on the module frame with a set of M4 bolt, cup washer, flat washer, tooth washer and M4 nut. This is to ensure positive electrical contact with the frame. For the position of the grounding holes, please refer to the technical drawing in paragraph 4.3. Ensure that the anodized layer of the frame is penetrated and a secure electrical contact is created with the frame. Drawing: Last revised: January 2011 The technical specifications are subject to change without notice page 6

7. Maintenance Perfectenergy solar modules are designed for long-term service and are almost maintenancefree. When the slope is adequate (>15 ), the solar modules do not need to be cleaned thanks to the self-cleaning effect of rain. In case of heavy soiling, we recommend cleaning the modules using plenty of water, without any cleaning agents and using a gentle cleaning implement (cloth or sponge). Do not use harsh cleaning materials such as scouring powder, steel wool, scrapers, blades, or other sharp instruments to clean the glass surface of the module. Use of such materials will invalidate the product warranty! The PV-system should be inspected once a year with regard to the following: Secure hold and no rust on any of the attachments. Secure connection, cleanliness and that all cable connections are free of corrosion. Soundness of cables and front glass. For further information, actual datasheets, terms of warranty, certificates, etc., please visit our website: www.perfectenergy-gmbh.de Contact: PerfectEnergy GmbH Tannenweg 8-10 53757 Sankt Augustin Tel: +49 (0)2241-23425-0 Fax: +49 (0)2241-23425-10 Email: info@perfectenergy-gmbh.de Web: www.perfectenergy-gmbh.de Last revised: January 2011 The technical specifications are subject to change without notice page 7