The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

Similar documents
Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

PAMSIMAS Support Trust Fund (P116236)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Public Disclosure Copy

Name Previous Rating Current Rating

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Guilin Integrated Environment Management (P133017)

The World Bank Telangana Rural Inclusive Growth Project (P143608)

The World Bank BiH Floods Emergency Recovery Project (P151157)

NI - INTEGRATED PUBLIC PROVISION OF HEALTH CARE SERVICES (P164452)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Public Disclosure Copy

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

The World Bank Biodiversity Conservation and Rural Livelihoods Improvement (P088520)

Public Disclosure Copy. Implementation Status & Results Report India: ICDS Systems Strengthening & Nutrition Improvement Program (ISSNIP) (P121731)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Key Dates. Project Development Objectives. Components. Overall Ratings

Second Tamil Nadu Road Sector Project (P143751)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Cusco Regional Development (P117318)

Public Disclosure Copy

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Health System Strengthening and Support Project (P152799)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Uganda Energy for Rural Transformation III (P133312)

Public Disclosure Copy. Implementation Status & Results Report DJ-Rural Community Development and Water Mobilization Project (PRODERMO) (P117355)

Public Disclosure Copy

Urban Water Supply Project (P156739)

Public Disclosure Copy. Implementation Status & Results Report Pacific Islands Regional Oceanscape Program - Solomon Islands (P151777)

The World Bank Zambia Water Resources Development Project (P114949)

SUSTAINABLE CITIES (P128605)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

The World Bank India: Andhra Pradesh Rural Inclusive Growth Project (P152210)

The World Bank Can Tho Urban Development and Resilience (P152851)

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Second Rural Transport Improvement Project (P123828)

The World Bank Indonesia National Slum Upgrading Project (P154782)

Public Disclosure Copy

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Public Disclosure Copy

The World Bank Haiti Business Development and Investment Project (P123974)

Public Disclosure Copy

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable

The World Bank Health System Performance Reinforcement Project (P156679)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Cities and Climate Change (P123201)

Public Disclosure Copy

Public Disclosure Copy

Punjab Cities Program (P156972)

Public Disclosure Copy

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Public Disclosure Copy

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

Transcription:

Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 5 ARCHIVED on 23-Jun-2016 ISR24264 Implementing Agencies: Public Disclosure Authorized Program Development Objectives Program Development Objective (from Program-for-Results Appraisal Document) To improve the performance of Maharashtra's sector institutions in planning, implementation and monitoring of its Rural Water Supply and Sanitation program and to improve access to quality and sustainable services in peri-urban villages, and in water-stressed and water-quality affected areas. Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating -- Moderate Implementation Status and Key Decisions The Program has completed two years of implementation. Results achievement for second year are being verified by an Independent Verification Agent. Status of Results indicators will be updated after the mission at the end of June 2016. Public Disclosure Authorized Public Disclosure Authorized Page 1 of 8

PHDLIPDOTBL Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P126325 IDA-53750 Effective XDR 107.20 107.20 0.00 4.55 102.65 4% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P126325 IDA-53750 Effective 12-Mar-2014 30-May-2014 25-Aug-2014 31-Mar-2020 -- Disbursement Linked Indicators (DLI) DLI#1: Strengthened M&E system for the sector (Text) Page 2 of 8

PHDLIPDOTBL PHDLIPDOTBL Value Existing M&E system is limited in scope and is not fully used consistently across the state An attempt was made by the government to hire a consultant as System Integrator, for delivering outputs related to second year result -- developing the M&E system and pilot testing it. But the attempt could not attract good competition. Hence a second call was given with improvements in proposals, made in discussion with Bank team. Consultant is now expected to be on board by mid January 2016 Consultant is now on board. The result delivery will be delayed by six months - up to Sept 2016 The result delivery will be delayed by six months - up to Sept 2016 DLI#2:Strengthened capacity of key sector institutions (percentage of sanctioned staff maintained, trained and equipped every year in key sector institutions as per the Annual Capacity Dev Plan) (Percentage) Value 0.00 82.00 80.00 Comments Capacity building modules, plans and Policy prepared. DLI#3: No. of house connections to a commissioned water supply system (Number) Value 0.00 -- -- Comments Investment plans prepared in about 16 Detailed Project Reports, and are awaiting approval. Page 3 of 8

PHDLIPDOTBL PHDLIPDOTBL DLI#4: No. of house connections to a sustainable water supply system receiving a regular water service (Number) Value 0.00 -- -- Comments This DLI follows DLI-3. Target is not due currently. DLI#5: No. of Community Safe and Secure Water Supply Systems (CSSWS) (Number) Value 0.00 -- -- Comments Investment plans in about 16 DPRs have been approved, and 160 DPRs are awaiting approval. Results Results Area Intermediate Results Area 1.Strengthened Sector Planning and Monitoring 2. Improved Capacity for Program Implementation 3. Improved access to quality and sustainable access to Water and Sanitation services in peri-urban villages 4. Improved access to safe drinking water in water-stressed and water quality affected areas Project Development Objective Indicators PHINDPDOTBL PDO Indicator 1:Number of districts using improved planning processes and strengthened M&E systems (Number, Custom) Value 0.00 0.00 0.00 33.00 Page 4 of 8

PHINDPDOTBL PDO Indicator2: Percentage of completed rural water supply schemes that follow GoM s demand responsive approach & exited implementation with a schedule performance index of between 0.75 & 1.25. (Percentage, Custom) Value 0.00 16.00 16.00 30.00 PHINDPDOTBL PDO Indicator 3:Number of people in peri-urban villages who are connected to a sustainable water supply system and receive a regular water service (Number, Custom) Value 0.00 0.00 0.00 340000.00 Date 31-Mar-2014 21-Dec-2015 21-Dec-2015 31-Mar-2020 PHINDPDOTBL PDO Indicator 4:Number of people in water-stressed and water quality-affected areas who have access to a safe drinking water source (Number, Custom) Value 0.00 0.00 0.00 471000.00 Date 31-Mar-2014 21-Dec-2015 21-Dec-2015 31-Mar-2020 Overall Comments Intermediate Results Indicators Intermediate Results Indicator 1: Strengthened M&E system for the sector (Text, Custom) Value Existing M&E system is limited in scope and is not fully used consistently across the state An attempt was made by the government to hire a consultant as System Integrator, for delivering outputs related to second year result -- developing the M&E system and pilot testing it. But the attempt could not attract good competition. Hence a An attempt was made by the government to hire a consultant as System Integrator, for delivering outputs related to second year result -- developing the M&E system and pilot testing it. But the attempt could not attract good competition. Hence a second call WSSD carries out a review of implementation of the strengthened M&E system and identifies required changes and future needs Page 5 of 8

second call was given with improvements in proposals, made in discussion with Bank team. Consultant is now expected to be on board by mid January 2016 The result delivery will be delayed by six months - up to Sept 2016 was given with improvements in proposals, made in discussion with Bank team. Consultant is now expected to be on board by mid January 2016 The result delivery will be delayed by six months - up to Sept 2016 Date 31-Mar-2014 21-Dec-2015 21-Dec-2015 31-Mar-2020 Intermediate Results Indicator 2: Improved sector planning process for the sector (Text, Custom) Value Existing planning processes lack strategic orientation. Strategic Plan, the first year s result, is yet to be prepared. WSSD requested Bank s assistance in learning from international experiences while preparing such a strategic plan. A team from MIT, Boston, has visited Maharashtra in October 2015 for field visits to understand the current practices of sector planning. The team is working on developing improved models for annual actions plans and is expected to share draft results by March 2016. Strategic Plan, the first year s result, is yet to be prepared. WSSD requested Bank s assistance in learning from international experiences while preparing such a strategic plan. A team from MIT, Boston, has visited Maharashtra in October 2015 for field visits to understand the current practices of sector planning. The team is working on developing improved models for annual actions plans and is expected to share draft results by March 2016. All 33 districts are using improved planning framework and are producing annual action plans that are consistent with sector strategic plan. Intermediate Results Indicator 3:Strengthened capacity of key sector institutions (Percentage, Custom) Value 0.00 82.00 82.00 75.00 Page 6 of 8

Intermediate Results Indicator 4:Percentage of rural water supply schemes that follow GoM s demand responsive approach (Percentage, Custom) Value 0.00 100.00 100.00 40.00 Intermediate Results Indicator 5:Percentage of GPs that are using sustainable O&M mechanisms (Percentage, Custom) Value 10.00 100.00 100.00 40.00 Intermediate Results Indicator 6: No. of Aquifer Water Management Initiatives successfully implemented (Number, Custom) Value 6.00 6.00 6.00 24.00 Intermediate Results Indicator 7: Percentage of Gram Panchayats that maintain Open Defecation Free status (Percentage, Custom) Value 10.00 10.00 10.00 40.00 Intermediate Results Indicator 8:No. of house connections to a commissioned water supply system (Number, Custom) Value 0.00 0.00 0.00 68095.00 Intermediate Results Indicator 9: No.of houses connections to a sustainable water supply system receiving a regular water service (Number, Custom) Page 7 of 8

Value 0.00 0.00 0.00 51071.00 Intermediate Results Indicator 10:No. of houses connections to sustainable sullage collection and safe disposal system (Number, Custom) Value 0.00 0.00 0.00 51071.00 Date -- 21-Dec-2015 21-Dec-2015 31-Mar-2020 Intermediate Results Indicator 11:No. of Community Safe and Secure Water Supply Schemes completed and operational (Number, Custom) Value 0.00 0.00 0.00 580.00 Overall Comments The results indicators will be updated after the mission in end June 2016. Page 8 of 8