City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

Similar documents
Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart)

September 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department

Page G Crow Wing County Multi-Hazard Mitigation Plan, 2017

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

Timeframe. Crow Wing County, Baxter, Brainerd, Breezy Point, Crosby, Crosslake, Cuyuna, Deerwood, Emily, Fifty

SNOW CONTROL OPERATIONS

OC Public Works El Niño Storm Preparation 2015

Dunn County Snow Removal Policy

City of Brainerd, Minnesota Snowplowing Policy

Climate Adaptation Challenges for Boston s Water and Sewer Systems

Severe Storm Response Version # 1-0-1

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

WINTER STORM Annex II

Changing Climate. An Engineering challenge for today and the future. Milwaukee School of Engineering December 2, 2015

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

Town of Windsor. Department of Public Works

West Carroll Parish Hazard Mitigation Plan Update Public Meeting. August 25, 2015 Oak Grove, LA

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

2014 Annual Mitigation Plan Review Meeting

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

2012 FLOODS AND DEBRIS REMOVAL

Assumption Parish Hazard Mitigation Plan Update Public Meeting. September 1, 2015 Napoleonville, LA

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

Interpretive Map Series 24

CLIMATE CHANGE ADAPTATION BY MEANS OF PUBLIC PRIVATE PARTNERSHIP TO ESTABLISH EARLY WARNING SYSTEM

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

Village of Glenview: Community-wide Flood Risk Reduction Program (FRRP)

WHAT HAPPENS WHEN A TORNADO STRIKES THE COMMUNITY? Carroll County Sheriff s Office Emergency Management

GIS Monroe Geographic Information System March 14, 2018

Lessons Learned and Shared

USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

United States Multi-Hazard Early Warning System

Flood Scenario Worksheet

SITUATION REPORT: February 2018 Ohio River Flooding

City of Rhinelander Snow and Ice Policy

WELCOME Lake Wabukayne OPEN HOUSE

TFMA Spring Conference Houston, Texas March 10, 2016 PROJECT TEAM:

Snow Removal Winchester Department of Public Works

Minto, Mapleton, Huron communities contend with dangerous flood levels Friday

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

Suwannee Satilla Basins Flood Control Issues, Opportunities and Assistance

CITY OF LONSDALE SNOW PLOWING POLICY

IH 35 at Blanco River May 2015

ICE STORM! a mini tabletop exercise for home care agencies

Local Flood Hazards. Click here for Real-time River Information

NC Emergency Management A View from the Counties

Technical Memorandum #2 Future Conditions

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company

Oregon APA Legal Issues Workshop December 7, Tricia Sears, DLCD With information from Bill Burns, DOGAMI

AUTHORITY: Town Council POLICY NUMBER:

Emergency Preparedness Questions

Why Hydrological Services are Important to Business

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

SUBJECT: WINTER STORM PREPAREDNESS DATE: October 5, 2015

RESOLUTION NO INTRODUCTION

Review of August 7, 2018 Storm Event

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

Appendix C Fluvial Flood Hazards

Community Discovery Data Questionnaire

CLIMATE READY BOSTON. Climate Projections Consensus ADAPTED FROM THE BOSTON RESEARCH ADVISORY GROUP REPORT MAY 2016

Miami-Dade County Overview

West Baton Rouge Parish Hazard Mitigation Plan Update Public Meeting. September 9, 2015 Port Allen, LA

National Weather Service 1

Working with Natural Stream Systems

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Notes: We all know that Toulmins Spring Branch is a sub-watershed of Three Mile Creek watershed. Some part of it is in Mobile area and rest of it is

City of Punta Gorda Community Emergency Management Plan 2013

Complete Weather Intelligence for Public Safety from DTN

Roles of NGII in successful disaster management

City of Camrose Winter Road Maintenance Policy

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

Daily Operations Briefing. Friday, May 5, :30 a.m. EDT

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER

KENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT

Table 31. Steele County Master Mitigation Action Chart ( )

Response Case Study: April 2014 Historic Flood Event. Severe Weather April 29 30, 2014

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Appendix F Public Outreach & Engagement Documentation

CITY OF MINOT SNOW REMOVAL PLAN November 2017

Oklahoma City-County Health Department Response to the May 20, 2013 Tornado. occhd.org

Bossier Parish Hazard Mitigation Plan Update Public Meeting. August 10, 2016 Bossier City, LA

GIS Data and Technology to Support Transportation & MPO Decision-Making & Planning. using an Eco-Logical* Approach within the Kansas City Region

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE

The Coastal Change Analysis Program and the Land Cover Atlas. Rebecca Love NOAA Office for Coastal Management

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

Snow and Ice Removal

2014 San Gabriel Valley Water Forum. October 2, 2014

MISSOURI LiDAR Stakeholders Meeting

Jefferson Parish GIS Hurricane Response Review. From the information given by A.J. Tapie, GIS Manager of Jefferson Parish, the use of

Transcription:

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How did Engineering Respond? Public and Private Sandbag and Protective Measures How Does Engineering Plan to Proceed? Moving Forward New Policy Short-Term Actions Mid-Term Actions What types of solutions will we look at??? Next Steps

2 events: Flash Flooding + Flooding from High Lake Levels 6.66 inches of rain in 24 hours has a 1% chance of occurring

2 events: Flash Flooding

Response to Rain Event Quick response to flash flooding EOC opened Damage surveyed Emergency repairs Lake levels rise slowly City was able to begin preparing the isthmus while triaging flash flooding on west side

Elevation (ft) 2 nd Event: High Lake Level Flooding 853 Lake Levels 8/19/18 to 8/22/18 852 851 850 849 848 847 846 845 844 8/19/2018 8/20/2018 8/21/2018 8/22/2018 Lake Mendota (Max Elevation=852.32' on 8/23) Lake Monona (Max Elevation=848.52' on 9/6) Lake Monona Target Summer Max=845.2' Lake Mendota Target Summer Max=850.1' Lake Monona 100 Year=847.7' Approximate Lake Mendota SIL Elevation=852.36'

ANIMATION SHOWING TYPICAL SLOW ONSET LAKE LEVEL RISE

ANIMATION SHOWING TYPICAL SLOW ONSET LAKE LEVEL RISE

ANIMATION SHOWING TYPICAL SLOW ONSET LAKE LEVEL RISE

ANIMATION SHOWING TYPICAL SLOW ONSET LAKE LEVEL RISE *animation flooding is significantly more extreme than what occurred after August 20 th storm

Isthmus Sewer Animation Example ISTHMUS YAHARA RIVER

Isthmus Sewer Animation Example ISTHMUS YAHARA RIVER

Isthmus Sewer Animation Example ISTHMUS Storm sewers are necessary to drain the Isthmus during rain events Large amounts of water released from Lake Mendota caused higher water levels along the Yahara River Sewers act in reverse allowing water to travel up them Water standing in isthmus is part of the lake YAHARA RIVER

Isthmus Sewer Animation Example-Flash Flooding ISTHMUS High lake level flooding increases risk of flash flooding, especially on the isthmus YAHARA RIVER

Isthmus Sewer Animation Example-Flash Flooding ISTHMUS Storm sewers are full and cannot effectively drain additional rain water YAHARA RIVER

Isthmus Sewer Animation Example-Flash Flooding ISTHMUS This leads to flash flooding in places that normally do not flood YAHARA RIVER

City Amid Preparations for High Lake Level Flooding (2017-present) Table Top (11/17) Utility Plan-identifying vulnerabilities and creating contingency plans Installed generators above max flood stage to pump stations Sanitary System Study-impact of extreme I&I Fire Dept AASPIRE Intern - developing public information Critical Elevations Survey 33 + locations (Water Utility, Monona Terrace, Metro Transit, MMSD Schools, Pump Stations) Debris Management Planning

Elevation (ft) 853 Lake Levels 8/19/18 to 10/2/18 852 851 850 849 848 847 846 845 Lake Mendota (Max Elevation=852.32' on 8/23) Lake Monona (Max Elevation=848.52' on 9/6) Lake Monona Target Summer Max=845.2' Lake Monona 100 Year=847.7' Lake Mendota Target Summer Max=850.1' Approximate Lake Mendota SIL Elevation=852.36'

Max Flood Levels Lake Mendota 852.32 8/22/2018 USGS Johnson St 849.43 8/24/2018 Survey Main St 849.19 8/24/2018 USGS Lake Monona 848.52 9/6/2018 USGS

High Lake Levels: August 20 th -Present What can we control? City of Madison Protect critical infrastructure Sand bagging, rubber sealing manhole covers Effective public messaging + coordinating volunteer efforts Dane County Weed cutting to increase flow out of lower lakes What can t we control? Monona outlet or downstream lake levels Quantity of water coming into the system Either stored in Mendota, or passed onto downstream lakes Protection of Tenney Locks Lake Mendota operated in a manner to prevent dam failure Need enough storage for upcoming rain events Water was released in a controlled manner (1-3 /day allowed people to prepare) Traditional Lake Level rise for 1 rain 2.5 rise of Mendota 3 rise of Monona 3-3.5 rise of Waubesa

Damages How did Engineering respond? Engineering staff received over 250 calls and emails. Staff continues to get calls and emails Field reviews were completed of all greenways and shorelines immediately following the event. Crews were on 24/7 to respond to emergencies. Leveraged approximately 2,000 volunteer hours for sandbagging efforts. National Guard assisted with sandbagging efforts for 3 days.

Damages 336 Residential - $15.1M 11 Businesses - $2.4M Total reported private damages were $17.5M+ Public damages $3.94M There are many more that didn t report!

Damages - Roadways Deming Way, Regent Street, Baker Ave

Damages Drainage ways and Parks Public Easement in Wexford Village Glenwood Children s Park

Damages Odana and West Town Ponds

Damages Flooding and Clean Up Attic Angel Greenway at Junction Rd; John Nolen Drive Bike Path Flooding

Damages Private Damage Wexford Village & Commerce Dr near Menards West

Damages Private Damage

Damages Private Damage Gettle Ave near Bordner Park Elder Place near Bordner Park

Damages Private Damage GHC Sauk Trails Clinic

Damages Isthmus Flooding

SANDBAGS 225,000 Sandbags Provided City Staff worked 13 days, 24/7 on protective measures National Guard Deployed Estimated cost to date $907,000 + More City resources required for removal

SANDBAGS

SANDBAGS Removal Plan Streets, Engineering and Parks to lead sandbag removal efforts Mayor s office, PIO and IT will prepare message on removal plan and necessary outreach via social media, email lists and text messaging 3- week curbside collection window will be established for residents An email sign up and a phone line will be set up for reporting sandbags for collection

FEMA The City provided documentation on damages. City, County, WEM, DNR and FEMA staff visited public and private sites on Sept 25 th and 26 th including 20-30 damaged homes on west side. FEMA will make determination if there will be a disaster declaration towards early November. If disaster declared further documentation will be required to determine any funding. THERE IS STILL A LOT MORE TO DO

FEMA Funding Request Breakdown of Public Infrastructure Debris Removal - $164,900+ Protective Measures - $970,000+ Roadways - $231,200+ Water Control (Storm sewer and drainage systems) $647,800+ Buildings and Equipment $31,100+ Utilities $12,900+ Park and Rec $1,889,000 TOTAL: $3.94M+ Note: not all issues have been identified

How does Engineering plan to proceed?? To ensure we proceed uniformly and predictably we have DRAFTED/REVISED two policies for response to flooding concerns.

There are two (2) typical types of problems that Engineering responds to: Public problems where stormwater runoff from the street or greenway leaves public land and enters private property causing damage. Private problem stomwater runoff draining from one private property to another without ever entering public land causes damage to a downstream private property.

Public problems are the focus for this discussion. There are two main types to focus on: Flash flood problems Isthmus and surrounding area flooding from lake backwater.

Isthmus Drainage Problems

Flash flooding can be the result of varying public design standards over the years combined with limited private design standards.

MOVING FORWARD

What types of solutions will we look at???

NEXT STEPS: BPW approval of public and private drainage policies Meeting with Alders Creation of a Flood Control / Pond and Greenway group and review appropriate staffing levels for said group Watershed analysis in priority locations Public Informational meetings on specific projects once analysis completed Public engagement / website creation PIO position to be filled in early 2019

QUESTIONS?

Works Cited Flood mapping data from City 2016 LiDAR data Rain accumulation data from KMKX Radar that was bias corrected using rain gauges by UW Professor, Dan Wright The information on the maps was derived from digital databases and other City of Madison data. The City of Madison provides this site as a public service. The City of Madison makes no claims, representations or warranties, express or implied, concerning the validity, reliability or accuracy of the data and expressly disclaims liability for errors and omission in its contents. Each user of the data is responsible for determining the data s suitability for the user s intended purpose. Personal safety should be the user s primary concern.