Mitigation of Gypsum Mine Voids Under SR-2 in Ottawa County, Ohio

Similar documents
Engineering Geophysical Application to Mine Subsidence Risk Assessment

LOCATING AND CHARACTERIZING ABANDONED MINES USING MICROGRAVITY by Richard C. Benson 1, Ronald D. Kaufmann 1, Lynn Yuhr 1, Richard Hopkins 2 ABSTRACT

Geophysical Exploration in Water Resources Assessment. John Mundell, P.E., L.P.G., P.G. Ryan Brumbaugh, L.P.G. Mundell & Associates, Inc.

Development of geophysical investigation for verifying treatment efficiency of underground cavities

Applied Geophysics for Environmental Site Characterization and Remediation

KARST MAPPING WITH GEOPHYSICS AT MYSTERY CAVE STATE PARK, MINNESOTA

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

3.12 Geology and Topography Affected Environment

PART I A BRIEF SUMMARY OF SIX ROADWAY INVESTIGATIONS IN KARST

GM 1.4. SEG/Houston 2005 Annual Meeting 639

Geologging Imagery, Applications and Geological Interpretation. Shea Altadonna 1, Jim Fulton 2, E.I.T.

3/15/17. #22 - Subsidence - Rapid Sinkhole at Winter Park, FL in Rapid Subsidence Defined and Illustrated

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Association of Environmental & Engineering Geologists (AEG) To join AEG: Student membership is Free! Ask about our scholarships.

GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS. Abstract

10. GEOTECHNICAL EXPLORATION PROGRAM

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

An Introduction to Field Explorations for Foundations

Geology, Soils, and Seismicity

GEOLOGY, SOILS, AND SEISMICITY

ambiguity in earth sciences IESO Geophysics Section Eddy hartantyo, Lab Geofisika FMIPA UGM

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

US82 ROCKFALL MITIGATION PROJECT May, BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT

THE QUATERNARY GEOLOGY OF NEWARK BAY AND KILL VAN KULL CHANNEL, NEW YORK AND NEW JERSEY. and

SEISMIC REFRACTION SURVEY RIPPABILITY STUDY

Geophysical Site Investigation (Seismic methods) Amit Prashant Indian Institute of Technology Gandhinagar

High Resolution Geophysics: A Better View of the Subsurface. By John Jansen, P.G., Ph.D., Aquifer Science and Technology

Measurement of effective stress shear strength of rock

ELECTRICAL RESISTIVITY SURVEYS AT THE ANDERSON RESIDENCE SITE, PORT CLYDE, ME. For: St.Germain-Collins

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Highland Lake Bathymetric Survey

25th International Conference on Ground Control in Mining

High Resolution Seismic Reflection Investigation of Salt Dissolution Features in Kansas

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

A test boring program was utilized in this study in order to verify. existing information, and to obtain otherwise unavailable data that was

LECTURE 10. Module 3 : Field Tests in Rock 3.6 GEOPHYSICAL INVESTIGATION

FINAL REPORT GEOPHYSICAL INVESTIGATION WATER TOWER NO. 6 SITE PLANT CITY, FL

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports

Earthquakes and Earth s Interior

FINAL REPORT GEOPHYSICAL INVESTIGATION VILLAGE ALHAMBRA RETENTION POND SITE THE VILLAGES, FLORIDA

Geophysics for Environmental and Geotechnical Applications

Land Subsidence. Land subsidence is defined as the lowering of the land surface.

Subsurface laser scanning and multibeam sonar void surveys What really does lie beneath and where exactly? Mitigating your Risk

Hydraulic Impacts of Limestone Quarries and Gravel Pits. Jeff Green Minnesota DNR-Division of Ecological & Water Resources

Seismic tests at Southern Ute Nation coal fire site

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Rogun Hydropower Project

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk

Marine Geophysical Methods: What Can and Cannot Be Done to Iden8fy Hazards to Dredging & Marine Construc8on

Department of National Defence B-Jetty Reconstruction

BOS 100 Overburden and Bedrock Groundwater Remediation Former Dry Cleaning Facility

III. FORECASTED GROWTH

DEEP KARST CONDUITS, FLOODING, AND SINKHOLES: LESSONS FOR THE AGGREGATES INDUSTRY

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

GPR AS A COST EFFECTIVE BEDROCK MAPPING TOOL FOR LARGE AREAS. Abstract

Prepared for: Cargill, Inc. 191 PortLand Point Road Lansing, New York 14882

UTC R161. Geotechnical Site Characterization of Transportation Construction Sites and Structures. Neil L. Anderson. Derek B. Apel.

Delineation of Zones at Risk from Groundwater Inflows at an Underground Platinum Mine in South Africa

a z41. COMMONWEALTH OF AUSTRALIA DEPARTMENT OF NATIONAL DEVELOPMENT BUREAU OF MINERAL RESOURCES, GEOLOGY AND GEOPHYSICS RECORD 1961 No.

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

General Geologic Setting and Seismicity of the FHWA Project Site in the New Madrid Seismic Zone

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

Geophysical Case studies From Texas

Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

Geotechnical Aspects of the Ohio River Bridges Project

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

THE OHIO JOURNAL OF SCIENCE


Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

BUFFALO RIVER COALITION PO Box 101, Jasper, AR (870)

Seismic Reflection Imaging across the Johnson Ranch, Valley County, Idaho

5 Further Case Histories

Geologic Hazards. Montour County Multi-jurisdictional. General. Earthquake

Central Florida Sinkhole Evaluation

Multi-Jurisdictional Hazard Mitigation Plan. Table C.10 The Richter Scale. Descriptor Richter Magnitude Earthquake Effects

FRACTURE TRACES AND PRODUCTIVITY OF MUNICIPAL WELLS IN THE MADISON LIMESTONE, RAPID CITY, SOUTH DAKOTA

TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL. Feasibility Report July 2014

Major Points in Introduction

The Following was Noted: US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG

GEOL4714 Final Exam Fall 2005, C. H. Jones instructor

REPORT OF GEOPHYSICAL SURVEY

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Subsurface Geology of the Kennebec River

Which landscape best represents the shape of the valleys occupied by glaciers? A) B) C) D)

Geophysical Methods to Map Subsurface Evaporite Features to Aid Roadway Geometric Design

LIGO Experience in Site Selection, Evaluation and Characterization

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Remedial Program. GE Hudson Falls Plant Site. GE Hudson Falls Plant Site. TDCS Status

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For

Identified a possible new offset location where the customer is currently exploring drill options.

Terrain Units PALEOGEOGRAPHY: LANDFORM CREATION. Present Geology of NYS. Detailed Geologic Map of NYS

Transcription:

Subsurface Investigation and Conceptual Alternatives Mitigation of Gypsum Mine Voids Under SR-2 in Ottawa County, Ohio Presented By: Ohio Department of Transportation CH2M HILL CTL Engineering Technos, Inc. Workhorse Technologies

History Gypsum mined from 1902 to 1977 Section under SR-2 mined 1950 s 1960 s SR-2 constructed in 1965 Mines flooded in 1979 Active sinkholes since Dec. 2004

Location Lake Erie Sandusky Bay Mine Area

Difficult Mine Conditions Lower mine seam covers 500 acres Gypsum mine seam 16 feet Mine voids average 10 feet, but locally may be up to 15 feet in height Deepest section (Ahrens) 85 feet Room and pillar, with 15 x15 pillars and rooms span 20 feet Overlain by 10-15 feet of dolomite, shale, and gypsum

Purpose & Need Goals Minimize Community Impacts Airport, residential properties, large-scale camping facilities, cemeteries and municipal properties in project area Minimize environmental impacts Project be consistent with existing local plans

Purpose & Need Goals Minimize Peak Season Traffic Disruptions SR-2 carries 18,000 vpd SR-2 is vital to tourist industry along Lake Erie Primary access to Marblehead peninsula and Ferry access to Middle & South Bass Secondary access to Cedar Point Minimize construction duration

Purpose & Need Goals Retain Limited Access Functionality SR-2 is important east-west corridor Limited access facility throughout Ottawa County Maintain Norfolk & Southern Rail

Detour Cost

Project Goals Understand the existing geologic conditions Verify and define the approximate limits of the mine Understand the risks involved with mitigating the existing conditions

Project Goals Develop and evaluate conceptual alternatives based on the Purpose & Need Remediate existing mines (SR-2 maintains current alignment) Land bridge (SR-2 maintains current alignment) Relocate/Shift SR-2

Geotechnical Investigation Surface geophysical Confirmation borings (21 Total) Laboratory testing Sonar modeling

Surface Geophysics to Help Identify Mine Boundaries Approach included two surface geophysical methods: Microgravity primarily to map mine boundaries Resistivity Imaging primarily to identify other geologic variability and to aid in interpreting the gravity data

Microgravity Gravity measurements detect changes in the earth s gravitational field caused by local changes in the density of the soil and rock or engineered structures.

Mapping of Top of Rock

Mapping Old Paleo-Collapse Sinkholes 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 Easting (feet) 3200 3200 3000 3000 2800 2800 2600 2600 Northing (feet) 2400 2200 2000 1800 1600 1400 1200 1000 800 Gravity Contour Map Terrain and Fill Corrected 120 100 80 60 40 20 0-20 -40-60 -80-100 -120-140 -160-180 -200-220 -240-260 10-uGal Contour Interval 2400 2200 2000 1800 1600 1400 1200 1000 800 Northing (feet) Buried paleocollapse 600 600 400 400 200 200 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 Easting (feet)

Detection of Large Conduits

Map the Presence of Mines

Limitations Only detects features with a density contrast Supporting data must be used to constrain gravity models (non-unique modeling) Vibrations can produce noise in data (e.g. distant earthquakes, wind, waves, vehicles, construction, etc.) Nearby topography can introduce noise if not accounted for in the data processing

Soil Forward Model of Gravity Response Over Expected Mine Conditions Bedrock Mine 85 ft deep, 15 ft high

Planned Geophysical Lines Test Phase Data

- Fairly insensitive to depth due to large planar target - Very sensitive to thickness 11 ft assumes water-filled, could be up to 15 ft or as little as 7 ft, if air-filled Microgravity Test Data

Microgravity Data Line 1

Microgravity Results

Results from Microgravity Alone Response from mine, even at deepest provided a good target for microgravity Top of rock is deeper to east Mine is deeper to east Thickness of mine varies 2 to 12 ft, getting thinner to northwest

SUBSURFACE INVESTIGATION PLAN

Sonar Deployment Sonar deployed by hoist from tripod Sonar linked mechanically to the surface providing a physical orientation Horizontal sonar scans are collected at 1 ft or less incremental elevations Computer controls and logs data from sonar unit

Statistics 200,000 cu ft of void modeled 1800 linear ft of mine corridor modeled Mine conditions revealed in models

Sonar Modeling Process Collect horizontal sonar scans in small vertical increments in the field Combine scans to create a 3 dimensional model of the flooded void Translate and orient the model into site coordinates Produce plots, models, and analyze the model for volume View 2-D and 3-D data to access the remaining mine structures Align the features in the model with the mine map features

Sonar plot from field P-18 Sonar plot for 1 elevation as viewed in the field Red circles represent 36 ft per division in this scan Red cross hairs show the borehole location center of the scan Center to edge is approximately 200 ft Dark areas are reflections from surfaces in the mine. Crisp black lines are from vertical surfaces and fuzzy lines like shown to the left show slope of roof.

Composite plot of sonar scans P-17

P-17 sonar aligned on mine map

Sonar Results Confirmation and orientation of old mine maps through feature matching with sonar models Revealed areas of collapse and areas where pillars are still intact Larger models verified dip of the seam where both roof and floor were visible Sonar data was gathered 200 ft from some of the boreholes The water was filled with suspended particles and visibility was minimal. The camera was only useful to verify the water level and to confirm blockage or bottom.

Alternative Development Minie Stabilization (SR-2 maintains current alignment) Land bridge (SR-2 maintains current alignment) Relocate/Shift SR-2

SR 2 GENERAL SUBSURFACE PROFILE

BORING INJECTION PLAN

MINE STABILIZATION PLAN

Area A $ 3,654,330.00 107 vertical holes, 20 angled holes, 7100 yds³ Barrier Concrete Grout, 14,500 yds³ Production grout, Mob/Demob + Misc.

Area B - $ 3,204,626.00 78 vertical holes, 19 angled holes, 14,074 yds³ Barrier Concrete Grout, 10,100 yds³ Production grout, Mob/Demob + Misc.

Area C - $ 9,791,22500 399 vertical holes, 109 angled holes, 23,889 yds³ Barrier Concrete Grout, 51,834 yds³ Production grout, Mob/Demob + Misc.

Area D - $ 9,513,363.00 348 vertical holes, 82 angled holes, 18,333 yds³ Barrier Concrete Grout, 52,620 yds³ Production grout, Mob/Demob + Misc.

Area A $ 3,654,330.00 Grouting Costs 107 vertical holes, 20 angled holes, 7100 yds³ Barrier Concrete Grout, 14,500 yds³ Production grout, Mob/Demob + Misc. Area B - $ 3,204,626.00 78 vertical holes, 19 angled holes, 14,074 yds³ Barrier Concrete Grout, 10,100 yds³ Production grout, Mob/Demob + Misc. Area C - $ 9,791,22500 399 vertical holes, 109 angled holes, 23,889 yds³ Barrier Concrete Grout, 51,834 yds³ Production grout, Mob/Demob + Misc. Area D - $ 9,513,363.00 348 vertical holes, 82 angled holes, 18,333 yds³ Barrier Concrete Grout, 52,620 yds³ Production grout, Mob/Demob + Misc. TOTAL MINE REMEDIATION $ 26,163,544

Land Bridge Alternative Segmental Concrete Box Girder

Steel Plate Girder Land Bridge Alternative

Shift SR-2: Alternative 3A Overpass reconstructed Avoid Mines Modify existing roadway Modify existing roadway

Shift SR-2: Alternative 3B Avoid Mines Overpass reconstructed Modify existing roadway Modify existing roadway

Shift SR-2: Alternative 3C Overpass reconstructed Avoid Mines Maintain existing connectivity Constructed on existing mines

Shift SR-2: Alternative 3D Overpass maintained Maintain existing connectivity Constructed on existing mines

Conclusions and Recommendations Land Bridge Eliminated from further consideration High construction cost Long construction schedule High impact to existing traffic Mine Stabilzation Continued for further consideration Minimally satisfy all key elements of the Purpose & Need

Conclusions and Recommendations Shift SR-2: Alt. 3A and 3B Eliminated from further consideration High right-of-way needs Long construction schedule Alter existing roadway network Shift SR-2: Alt. 3A and 3B Continued for further consideration Minimally satisfy all key elements of the Purpose & Need

Next Steps PREPARE A DESIGN FOR A SMALL PILOT PROJECT, THERE IS A CONCERN REGARDING THE GROUTING AND BARRIERS FOR VOIDS POSSIBLY EXCEEDING 13 FEET IN HEIGHT EVALUATE THE RESULTS OF THE PILOT PROJECT TO DETERMINE THE MOST FEASIBLE APPROACH TO STABILIZING THESE MASSIVE VOIDS DEVELOP DESIGN DOCUMENTS IN ACCORDANCE WITH THE BEST ALTERNATIVE

QUESTIONS?