MCDR INSPECTION REPORT

Similar documents
MCDR INSPECTION REPORT

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

CONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.

IBM MANUAL FOR APPRIASAL OF MINING PLAN

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES OFFICE OF THE REGIONAL CONTROLLER OF MINES

Guidelines for preparation of Mining Plans for Coal/Lignite Blocks

5.11 MINERAL RESOURCES

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

JAI MAA SHARDA STONE CRUSHING

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Submitted to Central Coalfields Limited BHURKUNDA OCP, CCL

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

4.12 Mineral Resources

Brief Summary. Production = 4,00,000 TPA

Lessee M/s Ambaji Minerals Post- Chikla, Ambaji , State- Gujarat

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

QUARRY PLAN FOR LIMESTONE SLABS

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Roadmap to Stability

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

Early Exploration Plan Activity Information

Dilution and ore loss A short practical guide

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

DISTRICT : TIRUNELVELI

DMT Consulting Limited Technical Memorandum

Do Now - APES. Due Next Class. Mining HW. Work on QSC using today s notes

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

For personal use only

Provincial Standards for Early Exploration

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

UNFC COAL MINES CASE STUDIES

Smt. M. Hari Chandana

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

REPORT ON APPLICATION TO RECORD WORK. on the CLAIM GROUP. BY Owners. issued at Penticton, B.C. Jan 19,1976. issued at Rossland B.C. Jan.

Batu Hijau Mine Closure Cost Estimation 1

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

EXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Resource Classification Systems by Dan Alexander

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

' ov' fy plar euarry Lease (survey No: 12g\r paiki;, Y" 10. !9u:t (Survey No: 128\l Paiki), Near village: Hlsanpar, Taluka: wankaner, District:

WESTERN COALFIELDS LIMITED

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

Petra Diamonds Limited Resource Statement

Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine.

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.

FORTUNE MINERALS LIMITED

Julienne Lake Iron Deposit. History, Evaluation and Path Forward

ENVIRONMENTAL MANAGEMENT (CLUSTER)

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Krasny license: Operational update February 2016

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

Early Exploration Permit Activity Information

MINING PLAN FOR QUARTZ & FELDSPAR

SCHEME OF MINING FOR BLACK GRANITE(DOLERITE) MINE LESSEE

KRISHNA MERCHANTS PVT. LTD.

Licensed Science Officer Benchmark

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State

Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine

Institutional Control Registry - Report

APPENDIX B SAMPLE ADEQUACY EVALUATION FOR ROSEMONT GEOLOGIC MATERIALS

GEO-CRADLE Project Meeting 2 Thursday, 17 th November, 2016

ITERAMS. WP1 (& WP2) Sampling and ore and rock properties modification

FORWARD LOOKING STATEMENT

Diversification into the exciting South Africa Platinum Industry

Geology and the Aggregate Industry: The Role of Geologists

Transcription:

MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM Registration Number under rule 45 of MCDR, 1988 18221 5 Name of the lessee, Address, phone, email and fax number M/S Gangotri Lime (p) Ltd,Prop-Shri Devidayal Sharma,Daga Block,Byron Bazar,P.O.-Raipur,District- Raipur(C.G.,492001 6 Village Matia 7 Taluka/Mandal Dharsiva 8 District Raipur 9 Pincode 10 State Chhattisgarh 11 Post office Raipur 12 Nearest police station Raipur 13 Nearest Railway station Raipur 14 Date of Grant of Mining Lease 10.09.1998 15 Date of Execution 27.04.1999 16 Date of opening of Mine 01.11.2003 17 Date of first Renewal, if applicable and its period & expiry 18 Date of second Renewal, if applicable and its period & expiry 19 Date of submission of renewal application if Mining Operations are continuing under deemed extension 20 Name of the Nominated Owner with Address, phone, email, fax number and date of appointment Shri Devidayal Sharma, Daga Block,Byron Bazar,P.O.-Raipur,District- Raipur(C.G.,492001 21 Name of the Mine Agent with Address, phone, email, fax number and date of appointment 1

22 Name of the Mines Manager with Address, phone, email, fax number and date of appointment in mines No Mines Manager as the mine is non working 23 Name of the Mining Engineer, Qualification and total experience with Address, phone, email, fax number and date of appointment in mine No Mining Engineer. 24 Whether Geologist and Mining Engineer appointed in mines No Mining Engineer & Geologist at present satisfy the rule 42 & carrying out their duties as per rule 43 & 44. and mine is nonworking 25 Date of Approval of Mining Plan/Modified Mining Plan with 14.10.1997 five-year period and specific condition in approval letter, if any. 26 Date of Approval of Scheme of Mining/Modified Scheme of Mining with five-year period and specific condition in approval letter, if any. 29.06.2015 for the scheme period 2013-14 to 2017-18 with proposal period 2015-16 to 2017-18. 27 Mineral(s) granted in lease and proved for mining Limestone 28 Method of Mining(Opencast, Underground) Opencast 29 Category (Fully Mechanised, Others or Manual) Category -A 30 Captive/Non Captive Non Captive Scientific Mining: Compliance of proposals of approved mining plan/scheme of mining. (Duplication of information in existing TMIS data sheets and draft write up has been avoided.) Exploration 1a Backlog of previous year Nil Nil No proposal of exploration. 1b 1c Exploration over lease area for Geological axis 1 or 2. Exploration Agency & Expenditure in lakh Rupees during the year Total three bore holes drill in 2013-14 to 2014-15 BH-1 upto depth of 30 m,bh-2 upto depth of 45 m and BH-3 upto depth of 30 m. 2

1d Balance area to be explored to bring Geological axis in 1 or 2 1e Balance reserves as on 01.04.2015 1.232 Million Tons in 121 category & 8.291 Million Tons in 122 category 1f General remarks of inspecting officer on geology, exploration etc. 1.232 Million Tons in 121 category & 8.291 Million Tons in 122 category Only 3 boreholes drilled and maximum area of lease is exposed upto depth of 4-5 meter. Development 2a Location of development w.r.t. lease area NE & SE corner of ML No working done in lease area. 2b Separate benches in topsoil, Thin layer of top soil overburden and mineral (Rule 15) will be removed and single bench in ore is proposed. 2c Stripping ratio or ore to OB ratio 1:0.10 Nil 2d Quantity of topsoil generation in m 3 4660 cu.m. Nil 2e Quantity of overburden generation Intercalated clay in m 3 2330 Nil 2f General remarks of inspecting officer on development of pit w.r.t. type of deposit etc. The is not working Exploitation 3a Number of pits proposed for production Two Nil 3b Quantity of ROM mineral production proposed 116504.75 tons Nil 3c Recovery of salable/usable mineral from ROM production 116504.75 tons 3d Quantity of mineral reject generation 5825 tons 3e Grade of mineral reject generation and Not mentioned threshold value declared specifically. 3f Quantity of sub-grade mineral Nil generation 3g Grade of sub-grade mineral generation 3h Manual / Mechanised method adopted Mechanised for segregating from ROM 3i Any analysis or beneficiation study proposed & carried out for sub-grade mineral and reject No beneficiation study proposed 3j Provision of drilling & blasting in mineral benches Drilling blasting proposed with Jack hammer/drifter wagon Drill of 65 mm 3

3k 3l 3m 3n 3o 3p 3q Provision of mining machineries in mineral benches Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM Total area covered under excavation/pits Ore to OB ratio for the pit/mine during the year Total area put in use under different heads at the end of year Production of ROM mineral during last five-year period, as applicable General remarks of inspecting officer on method of mining etc. diameter. J.C.B. excavator of 0.8 cu.m. bucket capacity and tipper of 10 tons Height of bench is proposed 5 meter in ore body and it is suitable for proposed method of mining. 2.762 ha. For scheme period. 1:0.01 2.762 ha. For excavation,0.460 ha. Storage of top soil/ob,0.172 ha. Waste dump,0.265 ha. For mineral storage,0.010 ha. For roads & 0.16 ha for green belt for scheme period 2015-16 116504 MT 2014-15---No Proposal 2013-14---No Proposal 2012-13---25002 MT 2011-12---20835 MT Nil The mine was suspended letter no. CHG/RAP/LST- 55/NGP dated 09/03/2012 under rule 45(7)(i)(a) and revocation of order of mining operation letter no. CHG/RAP/LST- 55/NGP dated 10/06/2015 There is no mining activity going on. 4

Solid Waste Management-Dumping 4a Separate dumping of topsoil, OB & mineral reject (Rule 32, 33) yes 4b Location of topsoil, OB & mineral Top soil dump in E reject dumps corner along the lease boundary of 7.5 meter barrier. OB dump in NW corner along the lease boundary of 7.5 meter barrier. 4c Number of dumps within lease area and outside lease area Two 4d Location of dumps w.r.t. ultimate pit limit (Rule 16) Top soil dump in E corner along the lease boundary of 7.5 meter barrier. OB dump in NW corner along the lease boundary of 7.5 meter barrier. 4e Number of active & alive dumps Two active & one old dump 4f Number of dead dumps Nil 4g Number of dumps stabilished Nil 4h Whether Retaining wall or garland Nil drain all along dumps are there 4i Length of Retaining wall or garland drain all along dump 4j Number of settling ponds Nil 4k Specific comments of inspecting officer on waste dump management Solid Waste Management-Backfilling 5a Status on part or full extraction of No proposal mineral from mined out area before starting backfilling 5b Area under backfilling of mined out Nil area 5c Concurrent use of topsoil for E of ML in 705 restoration or rehabilitation of mined out area (Rule 32) meter barrier for afforestation. 5d Total area fully reclaimed & rehabilitated Nil 5e General remarks of inspecting officer on backfilling, reclamation etc Reason mentioned above as there is no working. Progressive Mine Closure Plan 6a Whether Annual report on PMCP No Nil 5

6b 6c 6d 6e 6f submitted on time and correctly - Rule 23E(2). Details should be given in the format as given in Annexure-20. Management of worked/mined out benches i) Area available for rehabilitation (ha) ii) Afforestation done (ha) iii) No. of saplings planted during the year iv) Cumulative no. of plants v) Any other specific method of rehabilitation vi) Cost incurred on watch & care during the year Compliance on reclamation and rehabilitation by backfilling i) Voids available for backfilling (L *B * D) ii) Void filled by waste/tailings iii) Afforestation on the backfilled area iv) Rehabilitation by making water reservoir v) Any other specific means Compliance of Rehabilitation of waste land within lease i) Afforestation ii) Area rehabilitated (ha) iii) Method of rehabilitation Compliance of Environmental monitoring (core zone & buffer zone) General remarks of inspecting officer on PMCP compliance & progressive closure operations i) i) i) i) Mineral Conservation 7a ROM Mineral dispatch or grade-wise sorting within lease area 116504 Nil 7b Method of grade-wise mineral sorting i.e. manual or mechanical mechanical 7c Different grade of mineral sorted out at mines Not mentioned specifically. 7d Any beneficiation process at mines No beneficiation. 7e General remarks of inspecting officer on Mineral conservation & beneficiation issues Environment 8a Separate removal and utilization of Yes No working topsoil (Rule 32) 8b Concurrent use or storage of topsoil For afforestation 6

8c 8d 8e 8f Separate dumps for overburden, waste rock, rejects and fines (Rule 33) Use of overburden, waste rock, rejects and fines dumps for restoring the land to its original use Phased restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc) Baseline information on existence of plantation & additional plantation done (Rule 41) Dump for waste proposed No proposal No proposal Afforestation on dump 8g Survival rate No specific proposal 8h Water sprinkling on roads to control No specific airborne dust proposal 8i General remarks of inspecting officer on aesthetic beauty in and around mines area Compliance of Rule 45 Nil No working obsersed therefore no adverse impact on environment S.N. Item COMMENTS Remarks 9a Status of submission of Monthly and Annual returns Not Submitted Violation issued. S.N. Item Details GIVEN in Observation of Remarks A.R. I/Officer 9b Scrutiny of Annual return for information on Mining Engineer, Geologist and Manager 9c Scrutiny of Annual return on land use pattern for area under pits, reclaimed area, dumps etc. 9d Scrutiny of Annual return on afforestation 9e Scrutiny of Annual return on mineral reject generation (Grade & quantity) 9f Scrutiny of Annual return on ROM stock and/or graded ore 9g Scrutiny of Annual return on sale value, Ex. Mine price & production cost 9i Scrutiny of Annual return on fixed assets 9k Scrutiny of Annual return on mining machineries Details of violations observed during current inspection and compliance position of earlier violation pointed out:- Violation for non submission of AR and MR under Rule 45 of MCDR,2017issued. 7

(Name of inspecting officer with designation and date) Rajesh Kumar Das, Senior Assistant Controller of Mines, Date of inspection-16.12.2016 8