Undergraduate Student of Civil Engineering, FTSP, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia

Similar documents
METHOD OF REMOVING SECONDARY COMPRESSION ON CLAY USING PRELOADING

FUNDAMENTALS OF CONSOLIDATION

Calculation of 1-D Consolidation Settlement

Compressibility & Consolidation

CONSOLIDATION OF SOIL

METHOD FOR ESTIMATION OF COEFFICIENT OF CONSOLIDATION FOR RADIAL FLOW FROM IN-SITU TIME - SETTLEMENT PLOTS. V. Venkata Charan 1, Madhav Madhira 2

THE PREDICTION OF FINAL SETTLEMENT FROM 1D-CONSOLIDATION TEST: A CASE STUDY

Class Principles of Foundation Engineering CEE430/530

Tikrit University. College of Engineering Civil engineering Department CONSOILDATION. Soil Mechanics. 3 rd Class Lecture notes Up Copyrights 2016

Chapter 7: Settlement of Shallow Foundations

CONSOLIDATION TEST REPORT

Reinforced Soil Structures Reinforced Soil Walls. Prof K. Rajagopal Department of Civil Engineering IIT Madras, Chennai

REGRESSION ANALYSIS OF SHORT TERM TIME-SETTLEMENT RESPONSE OF SOFT CLAYEY SOIL AT CONSTANT LOADING CONDITION

INTI COLLEGE MALAYSIA

The process of consolidation and settlement

EFFECTS OF PLASTIC POTENTIAL ON THE HORIZONTAL STRESS IN ONE-DIMENSIONAL CONSOLIDATION

OPTIMAL SENSOR LOCATION FOR PARAMETER IDENTIFICATION IN SOFT CLAY

Field measurements of the settlements induced by preloading and vertical drains on a clayey deposit

TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK

PRINCIPLES OF GEOTECHNICAL ENGINEERING

SECONDARY COMPRESSION BEHAVIOR IN ONE-DIMENSIONAL CONSOLIDATION TESTS

SETTLEMENT OF AN EMBANKMENT TREATED WITH PRELOADING AND PREFABRICATED VERTICAL DRAIN OF EAST-COAST HIGHWAY PHASE 2 (A CASE STUDY)

Compression and swelling. Mechanisms of compression. Mechanisms Common cases Isotropic One-dimensional Wet and dry states

Introduction to Soil Mechanics

Geotechnical Properties of Soil

Chapter (5) Allowable Bearing Capacity and Settlement

Cubzac-les-Ponts Experimental Embankments on Soft Clay

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

TIME-DEPENDENT BEHAVIOR OF PILE UNDER LATERAL LOAD USING THE BOUNDING SURFACE MODEL

Monitoring of underground construction

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

SHEAR STRENGTH OF SOIL

Calculation types: drained, undrained and fully coupled material behavior. Dr Francesca Ceccato

Study of the behavior of Tunis soft clay

Modified Dry Mixing (MDM) a new possibility in Deep Mixing

Consolidation of a Double-Layered Compressible Foundation Partially Penetrated by Deep Mixed Columns

Design procedure for vertical drains considering a linear variation of lateral permeability within the smear zone

Proceedings of the Institution of Civil Engineers

Consolidation Properties of NAPL Contaminated Sediments

HKIE-GD Workshop on Foundation Engineering 7 May Shallow Foundations. Dr Limin Zhang Hong Kong University of Science and Technology

STUDY ON CONSOLIDATION OF ALLUVIAL CLAY IN NORTHERN QUEENSLAND

Chapter 12 Subsurface Exploration

Clayey sand (SC)

1.5 STRESS-PATH METHOD OF SETTLEMENT CALCULATION 1.5 STRESS-PATH METHOD OF SETTLEMENT CALCULATION

Background & Purpose Artificial Neural Network Spatial Interpolation of soil properties Numerical analysis of Kobe Airport Conclusions.

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

MPM Research Community. Anura3D MPM Software. Verification Manual

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials

Soils. Technical English - I 10 th week

Time Rate of Consolidation Settlement

OP-13. PROCEDURES FOR DESIGN OF EMBANKMENT

Soft Ground Coupled Consolidation

THE INFLUENCE OF SAND s GRADATION AND CLAY CONTENT OF DIRECT SHEART TEST ON CLAYEY SAND

1.8 Unconfined Compression Test

INFLUENCE OF SUBGRADE MODULUS AND THICKNESS ON THE BEHAVIOUR OF RAFT FOUNDATION

8.1. What is meant by the shear strength of soils? Solution 8.1 Shear strength of a soil is its internal resistance to shearing stresses.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Civil Engineering Department College of Engineering

On equal settlement plane height in piled reinforced embankments

Expressway Embankment Landslide Treatment Technology for Peat Subgrade


Deformation And Stability Analysis Of A Cut Slope

- As the water drains from the soil pores, the load increment is gradually shifted to the soil structure.

Lateral Earth Pressure

Analytical solutions for modeling soft soil consolidation by vertical drains

D1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test.

NUMERICAL ANALYSIS OF DAMAGE OF RIVER EMBANKMENT ON SOFT SOIL DEPOSIT DUE TO EARTHQUAKES WITH LONG DURATION TIME

Evaluation of dynamic behavior of culverts and embankments through centrifuge model tests and a numerical analysis

Table 3. Empirical Coefficients for BS 8002 equation. A (degrees) Rounded Sub-angular. 2 Angular. B (degrees) Uniform Moderate grading.

Destructuration of soft clay during Shield TBM tunnelling and its consequences

(Refer Slide Time 01:27)

BEARING CAPACITY SHALLOW AND DEEP FOUNDATIONS

Module 6 Lecture 37 Evaluation of Soil Settlement - 3 Topics

Unloading Test with Remolded Marine Soil Sample and Disturbance Degree Assessment

BEHAVIOR OF VACUUM CONSOLIDATION WITH AND WITHOUT SURCHARGE LOAD. September 2015

Soil Dynamics Prof. Deepankar Choudhury Department of Civil Engineering Indian Institute of Technology, Bombay

Foundation Engineering Prof. Dr N.K. Samadhiya Department of Civil Engineering Indian Institute of Technology Roorkee

Analysis of CMC-Supported Embankments Considering Soil Arching

The Ohio Department of Transportation Office of Research & Development Executive Summary Report

INTERPRETATION OF UNDRAINED SHEAR STRENGTH OF UNSATURATED SOILS IN TERMS OF STRESS STATE VARIABLES

MODIFICATION OF REINFORCED CONCRETE RETAINING WALL AT PILANGBANGO RESERVOIR CONSTRUCTION PROJECT MADIUN, EAST JAVA

7. STRESS ANALYSIS AND STRESS PATHS

Anisotropic Consolidation Behavior of Ariake Clay from Three Different CRS Tests

CREEP AND RELAXATION BEHAVIOR OF HIGHLY ORGANIC SOIL

FUNDAMENTALS SOIL MECHANICS. Isao Ishibashi Hemanta Hazarika. >C\ CRC Press J Taylor & Francis Group. Taylor & Francis Group, an Informa business

The Effects of Different Surcharge Pressures on 3-D Consolidation of Soil

ANALYSIS OF CHANGE IN THE AREA OF INUNDATION DUE TO LAND SUBSIDENCE IN SEMARANG (A Case Study: Jl. Ahmad Yani, Jl. Erlangga Tengah, Jl.

Computer-Aided Data for Machinery Foundation Analysis and Design. Galal A. Hassaan*, Maha M. Lashin** and Mohammed A. Al-Gamil***

CHARACTERISTICS OF VACUUM CONSOLIDATION COMPARING WITH SURCHARGE LOAD INDUCED CONSOLIDATION

VARIATION OF CONSOLIDATION COEFFICIENT OF EXPANSIVE CLAYS AT HIGH INITIAL WATER CONTENT

GEOTECHNICAL EVALUATION AND GEOTECHNICAL DESIGN PARAMETERS)

SHEAR STRENGTH I YULVI ZAIKA

SOIL MODELS: SAFETY FACTORS AND SETTLEMENTS

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Wick Drain

Instructor : Dr. Jehad Hamad. Chapter (7)

Nonlinear Time-Dependent Soil Behavior due to Construction of Buried Structures

UNDRAINED SHEAR STRENGTH OF SOFT CLAY REINFORCE WITH SINGLE 16MM DIAMETER ENCAPSULATED BOTTOM ASH COLUMN NABILAH BINTI MD MASHOD FAKEH

Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation

Ch 4a Stress, Strain and Shearing

Transcription:

261 August 1st-2nd 217, Surabaya Indonesia Consolidation Coefficient in Horizontal Direction (Ch) Determined from Field Settlement Data By Using Terzaghi, Asaoka, and Finite Element Methods Case Study: Reclamation for Container Yard at Kuala Tanjung, Medan, North Sumatera Yudhi Lastiasih1, Noor Endah Mochtar2, Farah Nasya3 1 Lecturer of Civil Engineering, FTSP, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia. Professor of Civil Engineering, FTSP, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia. 3 Undergraduate Student of Civil Engineering, FTSP, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia 2 * Corresponding author: yudhi.lastiasih@gmail.com, noormochtar@gmail.com Abstract - In order to predict the consolidation period in the field, consolidation coefficient in vertical direction (Cv) parameter is needed. When vertical drains installed in the compressible layer in order to shortened the consolidation period, it needs consolidation coefficient in horizontal direction (C h). This Ch parameter has to be determined from the field settlement that usually obtained from the trial embankment. However, it is very expensive to carry out the trial embankment; therefore, it is usually assumed to be 2 till 5xCv. In this paper, the assumption of the Ch value will be proven by using field settlement data taken from the trial embankment at the reclamation area for container yard at Kuala Tanjung, Medan, By choosing the Ch value, the compression vs time curves were predicted by adopting the Terzaghi, Asaoka, and Finite Element methods. Afterwards, these predicted settlement curves were plotted with the field settlement curves; from this plotting, it could be figured out the predicted curves which has C h value the same with the field C h value. The results show that from three methods adopted in this study, only the Terzaghi and the Asaoka methods give satisfactory results in settlement prediction. Consequently, only the Terzaghi and Asaoka methods are adopted to determine the Ch value. The Ch value obtained is about the same, that is 3Cv until 5Cv. When that Ch value used back to predict the settlement, the Asaoka method gives better result than the Terzaghi method. Keywords Asaoka method, consolidation coefficient Ch, finite element method, Terzaghi method, trial embankment I. INTRODUCTION Consolidation settlement is a common problem found when embankment is built on very soft to soft clay soil. It takes place in very long period of time due to permeability coefficient of the clay soil is very small. Therefore, method to accelerate the consolidation process has been developed. One of the common method is preloading combined with vertical drain. The common material used for vertical drain is prefabricated vertical drain (PVD). By installing the PVD, the excess pore water pressure will flow out in vertical and horizontal directions. For this purpose, it needs coefficient consolidation in vertical direction (Cv) and horizontal direction (Ch). The value of Ch has to be determined from the field settlement that is usually obtained from the trial embankment. However, it is very expensive to carry out the trial embankment; therefore, it is usually assumed to be 2xCv until 5xCv. In this paper, the Ch value will be determined from settlement field data taken from the trial embankment at the reclamation area for container yard at Kuala Tanjung, Medan, North Sumatera. The methods adopted to determine the Ch value were Terzaghi [1], Asaoka [2], and Finite Element [3] methods. From this study, it will be known the exact value of Ch and the best method to determine it. II. TERZAGHI, ASAOKA, AND FINITE ELEMENT METHODS A. Terzaghi Method Terzaghi formula to predict the consolidation settlement in the field has been popularly known since 1925. The existing formula has to be slightly modified if the embankment placed step by step. If load placed each step is Δp, the effective overburden stress is po, and the pre consolidation stress is pc (as shown in Figure 1) the consolidation formula [4] is 1. For [p o + Δp1] pc Sc Cs 1 e p' o p1 H log p ' o (1) 2. For [p o + Δp1 + Δp2] > pc (see Figure 1) Sc p' p p2 p' c C Cs (2) c H log 1 H log p p' p1 1 e ' 1 e c 3. For [p o + Δp1 + Δp2 + Δp3] > pc (see Figure 1)

August 1st-2nd 217, Surabaya Indonesia Δt : time interval Sc p' o p1 p2 p3 (3) Cc H log 1 e p' o p1 p2 where: Cc = compression index Cs = swelling index 262 Ch : consolidation coefficient in horizontal direction de : diameter of area influence by one PVD F(n) : restriction factor due to spacing of PVD Figure 2. Plotting of field settlement data and example to determine the values of ρ1, ρ2, ρ3,..., ρn for the same time interval Δt. Figure1. Diagram of the overburden stress (po ), pre consolidation stress (pc ), and step loading (Δp). If PVD is installed to accelerate the consolidation period, the formula to calculate the degree of consolidation caused by excess pore water flows into the PVD (Uh) [5] is: 1 U h 1 1x 8 x, 2654 e 157,52 x 2 x 2,122 (4) Figure 3. Prediction of final consolidation settlement using Asaoka method B. Asaoka Method For Asaoka Method, settlement data from the trial embankment are plotted as shown in Figure 2. By taking the same time interval, Δt, the settlement ρ1, ρ2, ρ3,..., ρn can be determined. The values of ρn and ρn-1, then plotted in Y-axis and X-axis, respectively, as shown Figure 3. From the data plotted, it is constructed a straight line that intersect the Y-axis at β. This straight line is also intersect the line which make angle of 45 (ρn = ρn-1) at ρf; where ρf is the final settlement. From the values of ρf and β, the angle of the constructed straight line β1 can be determined: β1 = ρf β ρf (5) By adopting the Hausmann theory [6], the value of Ch can be determined as follows: ln 1 2 Cv 8Ch 2 t d F ( n) 4 H 2 (6) where: Cv : consolidation coefficient in vertical direction; H : the compressible soil layer thickness β1 : slope of the straight line (Equation [5]) C. Finite Element Method In this method, the settlement is predicted by using the Finite Element Method (FEM). Soil parameters adopted in FEM model: Young modulus (E) and Poisson s Ratio (μ) were taken from Bowles [7] based on the soil type; the other soil data were determined in soil laboratory. In order to predict the consolidation magnitude using FEM, soil model is constructed as the real condition in the field and the soil displacement determined is as shown in Figure 4. III. LABORATORY AND FIELD DATA Case study presented in this paper is the reclamation area for container yard at Kuala Tanjung, Medan. The soil data were determined from laboratory and collected from trial embankment taken from the field. The Standard Penetration Test (SPT) data and soil samples were taken from bore holes BH-1 and BH-2. The SPT data as shown

263 August 1st-2nd 217, Surabaya Indonesia Soil Parameters in Figure 5 and other soil data are tabulated in Table 1. Soil data of embankment materials are given in Table 2. From Figure 5, it is seen that thickness of soft soil layer (NSPT < 1) is about 15 meters. The data from Table 1 where the samples taken until 15. meters depth confirmed that the soil is soft cohesive soil. Soil for the trial embankment is c-φ soil, as shown in Table 2. For the trial embankment, soil was placed layer by layer; thickness of each layer was 5. cm. Settlement data taken for this study were from SP-1 and SP-5. The embankment height was 5. meters at SP-1 and 4.8 meters at SP-5. The loading schedule and settlement data plotting from SP-1 and SP-5 are shown in Figures 6 and 7, respectively. From those figures, it can be figured out that the final height of embankment reached at 2 weeks and the settlement becomes constant when the preloading is already applied about 39 weeks. At t= 336 days (48 weeks) the total settlement at SP-1 was 1.77 meters and 1.493 meters at SP-5. Value t ton/m3 1.85 sat ton/m3 1.85 2 25 E ton/m.4 2 c ton/m 1 3-5 -1-15 Depth (m) Figure 4. Soil displacement at SP-1 determined using the Finite Element Method (FEM) Unit -2-25 -3-35 -4 1 2 3 4 BH - 1 Table 1. Soil Parameters from BH-1 and BH-2 Soil Parameters Unit Specific gravity Moist unit weight Saturated unit weight ton/m3 Values. to -6. -6. to -15. Depth Depth 2.67 2.67 1.482 1.482 1.548 1.548 Liquid limit % 58.65 56.92 Plasticity index % 24.84 12.982 Water content % 58.34 43.84 1.79 1.53.96.77 Void ratio Compression index Consolidation coefficient cm2/s.98.1 Young modulus ton/m2 5 1.2.2 m/s 3.8E-4 2.E-4 m/s 3.8E-4 2.E-4 ton/m2 1.9 13 Permeability coefficient in x-direct Permeability coefficient in y-direct Cohesion 6 7 8 BH - 2 Figure 5. SPT data of soil from BH-1 and BH-2 ton/m3 Poisson ratio 5 N-SPT IV. PREDICTION OF THE CONSOLIDATION MAGNITUDE BY USING TERZAGHI, ASAOKA, AND FINITE ELEMEN METHODS As mention previously that the settlement data of trial embankment studied were from SP-1 and SP-5. Therefore, the settlement prediction was carried out for SP-1 and SP-5 by adopting the soil data from Table 1 and Table 2. By using the Terzaghi, Asaoka, and Finite Element methods, the prediction consolidation settlement magnitudes for t=48 weeks are presented in Table 3. Table 3. Field Settlement Data and Settlement Prediction at SP-1 and SP-5 for t = 336 days (48 weeks) Methods to Predict Settlement Prediction (meter) for Ch= 4Cv. SP-1 SP-5 Terzaghi 1.687 1.626 Asaoka 1.776 1.518 Finite Element 1.576 1.415 Field Settlement Data (meter) Settlement Plate Table 2. Data of Embankment Soil SP-1 SP-5 1.77 1.493

August 1st-2nd 217, Surabaya Indonesia GRAPHIC OF PRELOAD HEIGHT ( SP - 1 ) PRELOAD HEIGHT (m) PRELOAD HEIGHT (m) 6. 5. 5. 4. GRAPHIC OF PRELOAD HEIGHT ( SP - 5 ) 4. 3. 3. 2. 1. 2.. 1.. DATE GRAPHIC OF SETTLEMENT CUMULATIVE ( SP - 1 ) DATE SETTLEMENT CUMULATIVE (mm) SETTLEMENT CUMULATIVE (mm) -25 GRAPHIC OF SETTLEMENT CUMULATIVE ( SP - 5 ) -5-75 -25-1 -5-125 -75-15 -1-175 -125-2 -15-175 DATE Figure 6. Step loading and settlement data from settlement plate SP-1 (for t = 48 weeks) DATE Figure 7. Step loading and settlement data from settlement plate SP-5 (for t = 48 weeks) 264

August 1st-2nd 217, Surabaya Indonesia 265 Figure 8. Soil settlement predicted using the Terzaghi, Asoka, and Finite Element methods with Ch = 4xCv and field settlement data taken from SP-1 Figure 9. Soil settlement predicted using the Terzaghi, Asoka, and Finite Element methods with Ch = 4xCv and field settlement data taken from SP-5 From the settlement data shown in Table 3, the settlement at t=48 weeks of SP-1 is bigger than that of SP-5 although thickness of the compressible layer and the soil data at SP-1 and SP-5 are the same. This condition could be due to the embankment height of SP-5 is 2cm lower than that of SP-1 and could be there are incompressible lenses in SP-5. In order to see which of Terzaghi, Asaoka, and Finite Element methods that give better result in settlement prediction, the settlement is predicted by assuming that Ch = 4xCv and then plotted as shown in Figures 8 and 9. The settlement curves show that the curves predicted using Asaoka method gives better prediction compared to the other two methods. At the beginning of the loading period, however, it gives much bigger prediction settlement than the others; it is because the settlement prediction is determined by using the field data where the load is already constant or the final load. The Terzaghi method gives smaller settlement prediction in SP-1 but it gives bigger prediction in SP-5. It is due to the settlement prediction is based on the assumption that the compressible layer is 15 meters by neglecting the existing of incompressible lenses. The finite element method, however, does not give any good prediction results in SP-1 and SP-5. It could be because the soil parameters, Young Modulus (E) and Poisson s Ratio (μ), are based on the assumption. Because of that the accuracy of settlement prediction using the finite element method is really depending on the soil parameter assumed. V. DETERMINATION OF Ch VALUE BY USING TERZAGHI, ASAOKA, AND FINITE ELEMEN METHODS In order to determine the value of consolidation coefficient in horizontal direction (Ch) using the three

266 nd August 1st-2Terzaghi, 217, Surabaya Indonesia methods, Asaoka, and Finite Element methods, prediction for SP-5 is not used to determine the Ch the settlements are predicted using different Ch values value. (Ch = 2Cv; Ch=3Cv; Ch = 3.5Cv; Ch = 4Cv; and Ch = 5Cv). From this settlement prediction curves (Figure 1), it Those settlement curves are then plotted as shown in can be concluded that by using the Terzaghi method, the Figures 1 (SP-1) and Figure 11 (SP-5) for Terzaghi Ch value that gives a good result in settlement prediction method; Figure 12 (SP-1) and Figure 13 (SP-5) for is equal to 3Cv until 5Cv. Asaoka method; and Figure 14 (SP-1) and Figure 15 (SP-5) for Finite Element method. Figure 1. Plotting of settlement predicted using the Terzaghi method with different Ch values and field settlement taken from SP-1 A. The Terzaghi Method Figures 1 and 11 show that curves of the settlement prediction using the Terzaghi method are close to each other except for Ch = 2Cv. At loading period reaches 28 weeks, all of the settlement predictions for SP-1 are slightly smaller than the field settlement. On the other hand, the settlement prediction for SP-5 (Figure 11) is always bigger than the field settlement. It could be due to (as mention previously) the incompressible lenses occurred in the SP-5. Because of that, the settlement B. The Asaoka Method The settlement prediction using the Asaoka method (Figures 12 and 13) shows better results than that using the Terzaghi method although the settlement prediction at SP-1 is still slightly better than that at SP-5, as the Terzaghi method. The settlement prediction gives a good result for all Ch values except for Ch=2Cv. From this settlement prediction curves (Figure 12), it can be concluded that by using the Asaoka method, the Ch value that gives a good result in settlement prediction is equal to 3Cv until 5Cv. Figure 11. Plotting of settlement predicted using the Terzaghi method with different Ch values and field settlement taken from SP-5

267 August 1st-2nd 217, Surabaya Indonesia field settlement curve. As mention previously that the accuracy of settlement prediction using the finite element method is really depending on the soil parameter assumed. Because of that the FEM is not used to determine the Ch value in this study; otherwise the soil parameters have to be changed. C. The Finite Element Method (FEM) In this study, the FEM does not give a good results in predicting the settlement, as shown in Figures 14 and 15. All of the settlement prediction curves plotted above the Figure 12. Plotting of settlement predicted using the Asaoka method with different Ch values and field settlement taken from SP-1 Figure 13. Plotting of settlement predicted using the Asaoka method with different Ch values and field settlement taken from SP-5

268 August 1st-2nd 217, Surabaya Indonesia VI. CONCLUSSIONS From the data and analysis presented above, it can be concluded as follows: 1. Thickness of the soft soil layer (NSPT < 1) in the study area, container yard at Kuala Tanjung, Medan, Indonesia, is about 15 meters; soil for the trial embankment is c-φ soil. 2. The embankment height was 5. meters at SP-1 and 4.8 meters at SP-5; the soil of embankment was placed layer by layer where thickness of each layer was 5 cm; the final height of embankment reached at 2 weeks. 3. The total settlement in 336 days (48 weeks) at SP-1 is 1.77 meters and 1.493 meters at SP-5; the settlement becomes constant when the preloading was applied about 39 weeks. 4. The Terzaghi and the Asaoka methods give a good results in predicting the soil settlement; the Finite Element method, however, does not give a good result in settlement prediction. 5. The Ch value obtained from the Terzaghi and the Asaoka methods is about the same, that is 3Cv until 5Cv; the Finite Element method is not adopted to determine the Ch value. 6. Using the Ch value obtained, the Asaoka method gives better result in predicting the settlement compared to the Terzaghi method. REFERENCE [1] [2] [3] K. Terzaghi, Theoretical Soil Mechanics. New York: Wiley & Sons, 1943. A. Asaoka, Observational Procedure of Settlement Prediction. Soil and Foundations. H. Nawir, Prediksi Penurunan Tanah Menggunakan Figure 14. Plotting of settlement predicted using the Finite Element method with different Ch values and field settlement taken from SP-1 Figure 15. Plotting of settlement predicted using the Finite Element method with different Ch values and field settlement taken from SP-5 Prosedur Observasi Asaoka Studi Kasus: Timbunan di

August 1st-2nd 217, Surabaya Indonesia [4] [5] [6] [7] Bontang, Kalimantan Timur, J. Teor. dan Terap. Bid. Rekayasa Sipil, 212. N. E. Mochtar, Modul Ajar Metode Perbaikan Tanah, Jur. Tek. Sipil, 212. S. Hansbo, Consolidation of Clay by Band Shaped Prefabricated Drains, Gr. Eng., no. 5, pp. 16 25, 1979. M.. Hausmann, Engineering Principles of Ground Modification. McGraw-Hill, 199. J. E. Bowles, Foundation Analysis and Design, 5th ed. 1977. 269