Sample Procurement Plan

Similar documents
Sample Procurement Plan

Procurement Plan for ETLP (P156590)

Procurement Plan for Eth Expressway Project ( P148850)

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Procurement Plan. Nepal Livestock Sector Innovation Project

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan for Project of Integrated Urban and Tourism Development

Sample Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

GEF Procurement Plan (WARFP LIBERIA)

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Procurement Plan. I. General

Prior Review Thresholds

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Prior Review Thresholds

Sample Procurement Plan

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Urban Productive Safety Net Project (UPSNP) Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Consultants: firms Consultants: individuals

Procurement Plan National Community Driven Development Project Department of Rural Development

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement. International Competitive Bidding;

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

procurement Plan I. General

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

PPA PROCUREMENT PLAN (Textual Part)

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Textual Procurement Plan

Procurement Plan. Procurement Method Prior Review Threshold Comments

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

The World Bank Local and Regional Competitiveness Project (P154263)

Public Disclosure Copy

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Sample Procurement Plan

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)

Implementation Status & Results Jamaica Rural Economic Development Initiative (P105122)

Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667)

Procurement Plan Poverty Alleviation Fund II- AFII

The World Bank Local and Regional Competitiveness Project (P154263)

Implementation Status & Results Belize Municipal Development (P111928)

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

Public Disclosure Copy

Public Disclosure Copy

PROCUREMENT PLAN (Textual Part)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy

The World Bank Caribbean Regional Communications Infrastructure Program (P114963)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sample Procurement Plan

Sample Procurement Plan

The World Bank Identity and Targeting for Social Protection Project (P155198)

Public Disclosure Copy

PROCUREMENT PLAN (Textual Part)

Second Tamil Nadu Road Sector Project (P143751)

Selection Method. Financing Share. Bid document submis-sion. Bank Review

The World Bank OECS Regional Tourism Competitiveness (P152117)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Implementation Status & Results Benin Agricultural Productivity and Diversification (P115886)

Sample Procurement Plan

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

Sample Procurement Plan

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original: March, 2016 : Revision: March, 2017 3. Date of General Procurement Notice: February 23, 2016 4. Period covered by this procurement plan: The procurement period of project covered from year May 1, 2016 to April 30, 2021 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Procurement method Threshold US$ 1 NCB (Goods) ; IT and Non-consulting Equivalent and Below US$ services 1,000,000 2 NCB (Works) Equivalent and Below US$ 10 million 3 Shopping (Goods) Equivalent and Below US$ 100,000 4 Shopping (Works) Equivalent and Below US$ 200,000 2. Prequalification. Bidders for Not applicable Prior Review Threshold US$ Above USD 2 mil. Above USD 10 mil. None None 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Manual, including the Matching Grants manual, for implementation of the Bank s funded Loan Project P152441 is developed by GITA on June, 2016. 5. Any Other Special Procurement Arrangements: The project include the provision of matching grants to the Georgian firms and individuals to Broadband for Development program (increasing of the innovation activity). 6. Summary of the Procurement Packages planned during the entire project implementation period (as of March, 2017) 1 2 3 4 5 6 7 Ref. No. Description Estim ated Packag es Domest ic Review Comments

Cost US$ millio n Prefere nce (yes/no) by Bank (Prior / Post) Summary of the ICB (Goods) 2.3 6 No Post Summary of the NCB (Works) 0.27 5 No Post Summary of the NCB (Goods) 0.62 4 No Post Summary of the Shopping (Goods) III. of s 0.5 21 No Post 1. Prior Review Threshold: decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Prior Review Threshold Comment 1. Competitive Methods (Firms) Above US$ 1,000,000 2. CQS Applicable for assignments with estimation below USD 300K 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: None 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Summary of number of contracts that will be let under IC Summary of number of contracts that will be let under SSS Cost US$ million Packag es Review by Bank (Prior / Post) 10.1 5 Prior Comments 1.25 17 Post LCS, FB, CQS 5.3 98 Prior/Post The contracts with the staff positions were signed on the bases of the Prior review 0.005 1 Post

Page 1 PROCUREMENT PLAN Georgia : Georgia National Innovation Ecosystem (GENIE) Project General Information Country: Georgia Banks Approval Date of the Original Procurement Plan: 2016-08-11 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-04-06 Project ID: P152441 GPN Date: Project Name: Georgia National Innovation Ecosystem (GENIE) Project Loan / Credit No: IBRD / 85950 Executing Agency(ies): Georgias Innovation & Technology Agency WORKS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-GITA-2037-CW-RFQ / Renovation Works for 3 pilot RIH 66,000.00 0.00 2017-07-06 2017-08-03 2017-11-01 GE-GITA-2036-CW-RFQ / Renovation Works for 5 pilot RIH 110,000.00 0.00 2019-04-06 2019-05-04 2019-08-02 GE-GITA-2016-CW-RFB / Renovation Works for 40 CICs Bids 360,000.00 0.00 2018-06-01 2018-06-06 2018-07-06 2018-08-05 2018-09-04 2018-11-03 GE-GITA-2014-CW-RFQ / Renovation Works for 5 CICs 45,000.00 0.00 2017-08-06 2017-09-03 2017-11-02 GE-GITA-2013-CW-RFQ / Renovation Works for 4 CICs 36,000.00 0.00 2017-08-04 2017-09-01 2017-10-31 GE-GITA-2015-CW-RFQ / Renovation Works for 1 CICs 9,000.00 0.00 2017-05-15 2017-06-26 2017-08-25 GOODS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GE-GITA-2022-GO-RFQ / Equipment replacement/upgrades for CICs 68,040.00 0.00 2020-02-28 2020-03-27 2020-04-26 GE-GITA-2023-GO-RFB / Equipment replacement for RIHs Bids 336,510.00 0.00 2019-03-28 2019-04-02 2019-05-14 2019-06-13 2019-06-20 2019-07-20 GE-GITA-2002-GO-RFQ / equipment for 5 CICs 22,000.00 0.00 Canceled 2017-01-20 2017-02-17 2017-03-04 GE-GITA-2042-GO-RFB / Specialized Lab equipment for RIHs Bids 240,000.00 0.00 2017-12-01 2017-12-06 2018-01-05 2018-02-04 2018-03-06 2018-06-04 GE-GITA-2648-GO-RFB / Bids equipment for 5 CICs and 3 pilot RIH 112,150.00 0.00 2017-06-01 2017-06-06 2017-07-06 2017-08-05 2017-09-04 2017-11-03 GE-GITA-5753-GO-RFB / Fablab equipment for 3 pilot RIH - phase Bids II 216,000.00 0.00 2017-11-01 2017-11-06 2017-12-06 2018-01-05 2018-02-04 2018-04-05 GE-GITA-2011-GO-RFQ / Media equipment for 5 CICs 5,000.00 0.00 2017-09-06 2017-10-11 2017-12-10 GE-GITA-2025-GO-RFQ / Basic equipment for maker-space for 5 CICs 5,000.00 0.00 2017-07-25 2017-08-22 2017-10-21 GE-GITA-2024-GO-RFQ / Basic equipment for maker-space for 5 CICs 5,000.00 0.00 2017-07-20 2017-08-17 2017-10-16 GE-GITA-2007-GO-RFQ / Furniture for 5 CICs - Phase II 35,000.00 0.00 2017-09-06 2017-10-04 2017-11-18 GE-GITA-2029-GO-RFQ / Software for 3 pilot RIH 3,000.00 0.00 2017-10-06 2017-11-03 2017-12-03 GE-GITA-2032-GO-RFQ / Furniture for 3 pilot RIH 43,500.00 0.00 2017-09-06 2017-10-04 2017-11-18 GE-GITA-2010-GO-RFQ / Media equipment for 5 CICs 5,000.00 0.00 2017-06-06 2017-07-04 2017-09-02 GE-GITA-2006-GO-RFQ / Furniture for 5 CICs - Phase I 35,000.00 0.00 2017-05-06 2017-06-03 2017-07-18 GE-GITA-2012-GO-RFQ / Media equipment for 40 CICs 40,000.00 0.00 2019-02-06 2019-03-06 2019-05-05 GE-GITA-2026-GO-RFQ / Basic equipment for maker-space for 40 CICs 40,000.00 0.00 2018-04-06 2018-05-04 2018-07-03 GE-GITA-2031-GO-RFQ / Software for 5 RIH 5,000.00 0.00 2019-07-06 2019-08-03 2019-09-02

Page 2 GE-GITA-2033-GO-RFQ / Furniture for 5 RIH 72,500.00 0.00 2019-05-06 2019-06-03 2019-08-02 GE-GITA-2005-GO-RFB / equipment for 40 CICs Bids 176,000.00 0.00 2018-06-01 2018-06-06 2018-07-06 2018-08-05 2018-09-04 2018-11-03 GE-GITA-2009-GO-RFB / Furniture for 40 CICs Bids 280,000.00 0.00 2018-07-01 2018-07-06 2018-08-05 2018-09-04 2018-10-04 2018-11-18 GE-GITA-2030-GO-RFB / equipment for 5 RIH Bids 139,450.00 0.00 2019-02-01 2019-02-06 2019-03-08 2019-04-07 2019-05-07 2019-08-05 GE-GITA-2041-GO-RFB / Fabrication materials for 5 remaining RIH Bids 540,000.00 0.00 2019-04-01 2019-04-06 2019-05-06 2019-06-05 2019-07-05 2019-09-03 GE-GITA-2040-GO-RFQ / Fabrication materials for 3 pilot RIH - Phase II 30,000.00 0.00 2018-02-06 2018-03-06 2018-05-05 GE-GITA-2039-GO-RFB / FabLab equipment for 5 RIH Bids 660,000.00 0.00 2019-04-01 2019-04-06 2019-05-06 2019-06-05 2019-07-05 2019-09-03 GE-GITA-2143-GO-RFQ / Fabrication materials for 3 pilot RIH - Phase I 60,000.00 0.00 2017-08-06 2017-09-03 2017-11-02 GE-GITA-2038-GO-RFB / FabLab equipment for 3 pilot RIH Bids - phase I 180,000.00 0.00 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-07-24 2017-09-22 GE-GITA-2003-GO-RFQ / equipment for 1 CIC (10 Notebooks) 4,400.00 0.00 2017-04-02 2017-04-18 2017-05-18 GE-GITA-2004-GO-RFQ / equipment for 4 CIC 17,600.00 0.00 2017-08-06 2017-09-03 2017-11-02 NON CONSULTING SERVICES Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Contract Type Amount Status Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GENIE/CS/CQS-10 / International market assessment for Georgia's ICT and Innovation Open - International 150,000.00 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-25 2018-04-25 GENIE/CS/CQS-12 / RIH evaluation expert IBRD / 85950 Project Support Post Open - International 160,000.00 0.00 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-06-25 2018-08-24 GENIE/CS/CQS-13 / CIC evaluation expert IBRD / 85950 Project Support Post Open - International 50,000.00 0.00 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-06-25 2018-08-14 GENIE/CS/CQS-01 / Preparation of design documentation for 10 CICs + 3 RIHs 25,000.00 33,907.39 Signed 2016-11-10 2016-10-28 2016-12-01 2016-11-04 2017-01-14 2016-12-21 2017-02-13 2017-01-17 2017-02-20 2017-01-23 2017-07-20 GENIE/CS/CQS-05 / Assessment of Structural Safety for 10 CICs + 3 RIHs 20,000.00 0.00 Canceled 2016-10-20 2016-11-10 2016-12-24 2017-01-23 2017-01-30 2017-07-29 GE-GITA-2784-CS-CQS / Assesment of Structural Safety IBRD / 85950 Innovation Infrastructure Prior for 10 CICs + 3 RIHs 20,000.00 20,859.93 Under 2016-10-30 2016-10-31 2016-11-20 2016-11-03 2017-01-03 2016-12-02 2017-02-02 2017-01-13 2017-02-09 2017-01-15 2017-08-08 GENIE/CS/LCS-02 / Project audit (2016 and 2017 years) IBRD / 85950 Project Support Post Least Cost Open - International 30,000.00 0.00 2017-10-25 2017-11-15 2017-12-29 2018-01-26 2018-02-25 2018-04-01 2018-04-15 2018-05-15 GE-GITA-2643-CS-CQS / Impact evaluation for ecommerce IBRD / 85950 Project Support Post Open - International 135,000.00 0.00 2017-12-05 2017-12-26 2018-02-08 2018-03-10 2018-03-31 2018-07-09 GENIE/CS/CQS-08 / Development of matching grants web portal IT system 50,000.00 0.00 2017-04-15 2017-05-06 2017-06-19 2017-07-19 2017-08-09 2017-11-07 GENIE/CS/CQS-11 / Development of RIH/CIC IBRD / 85950 Project Support Post beneficiary management system 45,000.00 0.00 2017-04-15 2017-05-06 2017-06-19 2017-07-19 2017-08-09 2019-08-09 GENIE/CS/CQS-09 / Assessment of regulatory framework and policy recommendations 30,000.00 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-25 2018-03-26 GENIE/CS/QCBS-03 / PR and Media Management IBRD / 85950 Innovation Services Prior Based 1,600,000.00 0.00 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-13 2019-03-01

Page 3 GENIE/CS/QCBS-04 / Innovation acceleration training IBRD / 85950 Innovation Services Prior Based Open - International 1,500,000.00 0.00 2017-08-01 2017-08-22 2017-10-05 2017-11-02 2017-12-02 2018-01-06 2018-01-27 2018-08-15 GENIE/CS/QCBS-05 / IT skills training pilot/it skills training IBRD / 85950 Innovation Services Prior (first location) Based Open - International 2,200,000.00 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-02 2018-02-01 2018-03-08 2018-03-29 2018-10-15 GENIE/CS/QCBS-06 / IT skills training pilot/it skills training IBRD / 85950 Innovation Services Prior (second location) Based Open - International 2,200,000.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-05 2018-06-04 2018-07-09 2018-07-30 2019-07-25 GENIE/CS/CQS-02 / Preparation of design documentation for 40 CICs + 5 RIHs 65,000.00 0.00 2017-12-01 2017-12-22 2018-02-04 2018-03-06 2018-03-13 2019-03-13 GENIE/CS/CQS-04 / RIH/CIC Management Company 2 95,100.00 0.00 2017-10-01 2017-10-22 2017-12-05 2018-01-04 2018-01-11 2021-01-10 GENIE/CS/LCS-01 / Financial Auditor for MG recipients Least Cost Open - International 200,000.00 0.00 2017-10-15 2017-11-05 2017-12-19 2018-01-16 2018-02-15 2018-03-22 2018-04-12 2021-04-11 GENIE/CS/QCBS-01 / ecommerce training IBRD / 85950 Innovation Infrastructure Prior Based Open - International 2,497,000.00 0.00 2017-12-01 2017-12-22 2018-02-04 2018-03-04 2018-04-03 2018-05-08 2018-05-29 2018-12-15 GENIE/CS/CQS-03 / RIH/CIC Management Company 1 95,100.00 0.00 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2017-12-26 2020-12-25 GE-GITA-5815-CS-CQS / Development of Online BfD portal 50,000.00 0.00 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-09-25 2018-04-13 GENIE/CS/CQS-07 / Start-up / Entrepreneurship bootcamps 48,115.00 0.00 2017-05-15 2017-06-05 2017-07-19 2017-08-18 2017-09-08 2018-03-27 INDIVIDUAL CONSULTANTS Contract Type Amount Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GENIE/CS/ICS-03 / FM Specialist IBRD / 85950 Innovation Infrastructure Project Support Prior Innovation Financing Innovation Services Open N 0.00 30,542.99 Under 2016-05-11 2016-05-10 GENIE/CS/ICS-02 / Procurement Specialist IBRD / 85950 Innovation Infrastructure Project Support Prior Innovation Financing Innovation Services Open N 0.00 30,542.99 Under 2016-05-11 2016-05-10 GENIE/CS/ICS-04 / Safeguards Specialist IBRD / 85950 Innovation Infrastructure Project Support Prior Innovation Financing Innovation Services Open N 0.00 28,784.65 Under 2016-07-08 2016-07-08 GENIE/CS/ICS-01 / Project Coordinator IBRD / 85950 Innovation Infrastructure Project Support Prior Innovation Financing Innovation Services Open N 0.00 38,009.05 Under 2016-05-11 2016-05-10 GENIE/CS/ICS-10 / Project Assistant IBRD / 85950 Project Support Post Open 24,000.00 22,623.17 Signed 2016-09-07 2016-09-04 2016-09-30 2016-10-03 2016-10-02 2016-10-04 2016-10-23 2016-11-03 2017-10-18 GENIE/CS/ICS-09 / IT skills needs assessment and program IBRD / 85950 Innovation Services Prior design consultant Open 100,000.00 47,948.97 Under 2016-09-15 2016-09-16 2016-10-20 2017-02-13 2016-11-03 2017-02-22 2016-11-24 2017-02-23 2017-06-22 GENIE/CS/ICS-14 / Renovation Works Technical Supervisor 2 Open 43,200.00 0.00 Under 2017-08-15 2017-02-24 2017-10-03 2017-10-24 2017-10-31 2019-10-31 GENIE/CS/ICS-19 / CIC managers for 40 CICs Open 297,000.00 0.00 2018-08-15 2018-10-03 2018-10-24 2018-11-14 2021-11-13 GENIE/CS/ICS-25 / RIH staff for 5 additional RIHs Open 287,400.00 0.00 2018-08-15 2018-10-03 2018-10-24 2018-11-14 2019-06-02 GENIE/CS/ICS-28 / Training of trainers for olympiads Open 5,000.00 0.00 2017-04-01 2017-05-20 2017-06-10 2017-06-17 2018-01-03 GENIE/CS/ICS-94 / GITA techincal advisor 3 IBRD / 85950 Project Support Post Open 50,000.00 0.00 2017-10-10 2017-11-28 2017-12-19 2017-12-26 2019-12-26 GENIE/CS/ICS-95 / GITA techincal advisor 4 IBRD / 85950 Project Support Post Open 50,000.00 0.00 2017-10-10 2017-11-28 2017-12-19 2017-12-26 2019-12-26 GENIE/CS/ICS-96 / GITA techincal advisor 5 IBRD / 85950 Project Support Post Open 50,000.00 0.00 2017-10-10 2017-11-28 2017-12-19 2017-12-26 2019-12-26 GENIE/CS/ICS-102 / Civil Engineer IBRD / 85950 Project Support Post Open 60,000.00 30,248.30 Signed 2016-10-20 2016-11-03 2016-12-08 2016-12-26 2016-12-29 2017-01-03 2017-01-05 2017-01-03 2019-01-05 GENIE/CS/ICS-97 / Innovation center analyst IBRD / 85950 Project Support Post Open 30,000.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-10-17 2019-10-17 GENIE/CS/ICS-101 / BfD program analyst IBRD / 85950 Project Support Post Open 45,000.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-10-17 2020-10-16

Page 4 GENIE/CS/ICS-100 / Matching grants program analyst IBRD / 85950 Project Support Post Open 30,000.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-10-17 2019-10-17 GENIE/CS/ICS-90 / Developer of angel investor network Open 20,000.00 0.00 2017-07-01 2017-08-19 2017-09-09 2017-09-16 2017-12-15 GENIE/CS/ICS-29 / Communications Specialist Open 50,000.00 0.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2019-07-01 GENIE/CS/ICS-27 / PR manager for BfD program Open 50,000.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-10-17 2018-05-05 GENIE/CS/ICS-91 / M&E consultant IBRD / 85950 Project Support Post Open 72,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-01-17 2020-01-17 GENIE/CS/ICS-57 / Business innovation services manager Open 50,000.00 0.00 2017-04-05 2017-05-24 2017-06-14 2017-06-21 2019-06-21 GENIE/CS/ICS-63 / for TA to MG recipients 1 Open 16,000.00 0.00 GENIE/CS/ICS-89 / Peer reviewers for later phase Open 120,000.00 0.00 2017-11-30 2018-01-18 2018-02-08 2018-02-15 2018-04-16 GENIE/CS/ICS-59 / MG trainer 2 Open 800.00 0.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-09-29 GENIE/CS/ICS-58 / MG trainer 1 Open 800.00 0.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-09-29 GENIE/CS/ICS-83 / Peer reviewer 5 GENIE/CS/ICS-60 / MG trainer 3 Open 800.00 0.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-09-29 GENIE/CS/ICS-73 / Investment committee member 1 Open 15,900.00 0.00 GENIE/CS/ICS-77 / Investment committee member 5 Open 15,900.00 0.00 GENIE/CS/ICS-79 / Peer reviewer 1 GENIE/CS/ICS-82 / Peer reviewer 4 GENIE/CS/ICS-85 / Peer reviewer 7 GENIE/CS/ICS-86 / Peer reviewer 8 GENIE/CS/ICS-80 / Peer reviewer 2 GENIE/CS/ICS-84 / Peer reviewer 6 GENIE/CS/ICS-81 / Peer reviewer 3 GENIE/CS/ICS-87 / Peer reviewer 9 GENIE/CS/ICS-88 / Peer reviewer 10 GENIE/CS/ICS-64 / for TA to MG recipients 2 Open 16,000.00 0.00 GENIE/CS/ICS-66 / for TA to MG recipients 4 Open 16,000.00 0.00 GENIE/CS/ICS-65 / for TA to MG recipients 3 Open 16,000.00 0.00 GENIE/CS/ICS-68 / Local recipients 1 Open 5,000.00 0.00 GENIE/CS/ICS-70 / Local recipients 3 Open 5,000.00 0.00 GENIE/CS/ICS-69 / Local recipients 2 Open 5,000.00 0.00 GENIE/CS/ICS-62 / MG trainers for later phases Open 35,200.00 0.00 2017-11-30 2018-01-18 2018-02-08 2018-03-01 2018-05-30 GENIE/CS/ICS-75 / Investment committee member 3 Open 15,900.00 0.00 GENIE/CS/ICS-74 / Investment committee member 2 Open 15,900.00 0.00

Page 5 GENIE/CS/ICS-76 / Investment committee member 4 Open 15,900.00 0.00 GENIE/CS/DS-01 / Design documentation review for 10 CICs Direct Direct 5,000.00 5,200.00 Signed 2017-02-10 2017-02-20 2017-02-15 2017-02-27 2017-03-22 2017-03-10 2017-08-19 + 3 RIHs GENIE/CS/ICS-13 / Renovation Works Technical Supervisor 1 Open 43,200.00 0.00 Under 2017-02-15 2017-02-24 2017-04-05 2017-04-26 2017-05-03 2019-05-03 GENIE/CS/ICS-15 / CIC manager 1 Open 9,900.00 0.00 2017-05-15 2017-07-03 2017-07-24 2017-07-31 2020-07-30 GENIE/CS/ICS-26 / Staff for specialized RIH labs Open 103,200.00 0.00 2017-09-01 2017-10-20 2017-11-10 2017-11-17 2018-06-05 GENIE/CS/ICS-35 / Programming and digital design trainer for pilot RIH 1 Open 3,208.00 0.00 2017-10-01 2017-11-19 2017-12-10 2017-12-17 2018-07-05 GENIE/CS/ICS-47 / Local Coach 4 Open 10,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-01-17 2018-07-16 GENIE/CS/ICS-22 / RIH fab lab manager 1 Open 13,800.00 0.00 2017-07-01 2017-08-19 2017-09-09 2017-09-16 2018-04-04 GENIE/CS/ICS-24 / RIH ilab manager 1 Open 13,800.00 0.00 2017-07-01 2017-08-19 2017-09-09 2017-09-16 2018-04-04 GENIE/CS/ICS-23 / RIH ilab technical staff 1 Open 12,000.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-10-17 2018-05-05 GENIE/CS/ICS-21 / RIH fab lab technical staff 1 Open 12,000.00 0.00 2017-07-01 2017-08-19 2017-09-09 2017-09-16 2018-04-04 GENIE/CS/ICS-16 / CIC manager 2 Open 9,900.00 0.00 2017-05-15 2017-07-03 2017-07-24 2017-07-31 2020-07-30 GENIE/CS/ICS-17 / CIC manager 3 Open 9,900.00 0.00 2017-05-15 2017-07-03 2017-07-24 2017-07-31 2020-07-30 GENIE/CS/ICS-18 / CIC manager 4 Open 9,900.00 0.00 2017-05-15 2017-07-03 2017-07-24 2017-07-31 2020-07-30 GENIE/CS/ICS-48 / Local Coach 5 Open 10,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-01-17 2018-07-16 GENIE/CS/ICS-39 / International Coach 1 Open 32,000.00 0.00 GENIE/CS/ICS-40 / International Coach 2 Open 32,000.00 0.00 GENIE/CS/ICS-41 / International Coach 3 Open 32,000.00 0.00 GENIE/CS/ICS-42 / International Coach 4 Open 32,000.00 0.00 GENIE/CS/ICS-92 / GITA techincal advisor 1 IBRD / 85950 Project Support Post Open 50,000.00 0.00 2017-06-01 2017-07-20 2017-08-10 2017-08-17 2019-08-17 GENIE/CS/ICS-93 / GITA techincal advisor 2 IBRD / 85950 Project Support Post Open 50,000.00 0.00 2017-10-10 2017-11-28 2017-12-19 2017-12-26 2019-12-26 GENIE/CS/ICS-56 / Mentoring network coordinator Open 30,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-05-17 2019-05-17 GENIE/CS/ICS-32 / Olympiad trainer 3 Open 24,000.00 0.00 2018-04-01 2018-05-20 2018-06-10 2018-06-17 2019-01-03 GENIE/CS/ICS-36 / Programming and digital design trainer for pilot RIH 2 Open 3,208.00 0.00 2018-02-01 2018-03-22 2018-04-12 2018-04-19 2018-11-05 GENIE/CS/ICS-37 / Programming and digital design trainer for pilot RIH 3 Open 3,208.00 0.00 2018-02-01 2018-03-22 2018-04-12 2018-04-19 2018-11-05 GENIE/CS/ICS-38 / Programming and digital design trainers for 5 RIHs Open 75,828.00 0.00 2019-03-01 2019-04-19 2019-05-10 2019-05-17 2019-12-03 GENIE/CS/ICS-51 / Technical consultant 1 Open 16,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-05-17 2018-10-14 GENIE/CS/ICS-99 / CIC/RIH needs assessment consultant 4 IBRD / 85950 Project Support Post 0.00 Open 9,500.00 2017-06-01 2017-07-20 2017-08-10 2017-08-17 2018-02-13 GENIE/CS/ICS-98 / CIC/RIH needs assessment consultant 3 IBRD / 85950 Project Support Post 0.00 Open 9,500.00 2017-06-01 2017-07-20 2017-08-10 2017-08-17 2018-02-13 GENIE/CS/ICS-103 / IT Analyst IBRD / 85950 Project Support Post Open 15,000.00 21,169.36 Signed 2017-02-15 2017-01-17 2017-04-05 2017-03-10 2017-04-26 2017-03-15 2017-05-03 2017-03-20 2018-05-03 GENIE/CS/ICS-52 / Technical consultant 2 Open 16,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-05-17 2018-10-14 GENIE/CS/ICS-53 / Technical consultant 3 Open 16,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-05-17 2018-10-14

Page 6 GENIE/CS/ICS-31 / Olympiad trainer 2 Open 24,000.00 0.00 2017-12-05 2018-01-23 2018-02-13 2018-02-20 2018-09-08 GENIE/CS/ICS-30 / Olympiad trainer 1 Open 24,000.00 0.00 2017-12-05 2018-01-23 2018-02-13 2018-02-20 2018-09-08 GENIE/CS/ICS-20 / RIH general manager 1 Open 13,800.00 0.00 2017-12-01 2018-01-19 2018-02-09 2018-02-16 2018-09-04 GE-GITA-8841-CS-INDV / E- Business Trainer #1 for Pilot Stage Open 3,000.00 0.00 Under 2017-03-10 2017-03-06 2017-04-05 2017-04-10 2017-04-15 2017-05-30 GENIE/CS/ICS-49 / Local Coach 6 - It is expected to hire in addition 19 local coaches in the later phase. $190,000 for Local Coaches are included in "unallocated" Procurement category and will be depreciated gradually as needed Open 10,000.00 0.00 2017-11-01 2017-12-20 2018-01-10 2018-01-17 2018-07-16 GENIE/CS/ICS-43 / International Coach 5-It is expected to hire in addition 20 International coaches in the later phase. $640,000 for International Coaches are included in "unallocated" Procurement category and will be depreciated gradually as needed." Open 32,000.00 0.00 GENIE/CS/ICS-33 / Olympiad trainer 4-It is expected to hire in addition 6 trainers in the later phase. $144,000 for trainers are included in "unallocated" Procurement category and will be depreciated gradually as needed." Open 24,000.00 0.00 2018-04-01 2018-05-20 2018-06-10 2018-06-17 2019-01-03 GENIE/CS/ICS-54 / Technical consultant 4-It is expected to hire in addition 71 Technical s in the later phase. $1,136,000 for Technical s are included in "unallocated" Procurement category and will be depreciated gradually as needed." Open 16,000.00 0.00 2018-03-01 2018-04-19 2018-05-10 2018-05-17 2018-10-14 GENIE/CS/ICS-71 / Local recipients - It is expected to hire in addition 27 local coaches in the later phase. $136,250 for TA to MG Recipients are included in "unallocated" Procurement category and will be depreciated gradually as needed Open 5,000.00 0.00 GENIE/CS/ICS-61 / MG trainer 4 Open 800.00 0.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-09-29 GENIE/CS/ICS-34 / Olympiad trainers in later phases Open 144,000.00 0.00 2018-01-31 2018-03-21 2018-04-11 2018-04-18 2018-11-04 GENIE/CS/ICS-78 / Investment committee for later phases Open 175,800.00 0.00 2017-11-30 2018-01-18 2018-02-08 2018-03-01 2018-04-30 GENIE/CS/ICS-72 / Local recipients in later phases Open 136,250.00 0.00 2017-09-04 2017-10-23 2017-11-13 2017-12-04 2018-03-04 GENIE/CS/ICS-44 / Local Coach in Innovation and Technology #1 0.00 Open 10,000.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-12-28 GENIE/CS/ICS-45 / Local Coach in Innovation and Technology #2 0.00 Open 10,000.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-12-28 GENIE/CS/ICS-46 / Local Coach in Innovation and Technology #3 0.00 Open 10,000.00 2017-04-15 2017-06-03 2017-06-24 2017-07-01 2017-12-28 GENIE/CS/ICS-67 / for TA to MG recipients in later IBRD / 85950 Innovation Financing Prior phases Open 336,000.00 0.00 2017-09-04 2017-10-23 2017-11-13 2017-12-04 2018-03-04