Plows Truck Drivers. tations. Winter Maintenance Report. 30,546 Lane Miles 87% 174,000 40,000. Total Cost of Winter $ Million

Similar documents
Winter Maintenance Report

Drivers % Winter Maintenance Report 30,517 46, , Statewide Snowfall Average. Truck Stations. Full-time Backup.

APWA Public Works Expo August 29 th, 2016

Using Winter Severity Indices for Winter Maintenance Performance Management. TRB Winter Maintenance Committee AHD65

10 th Annual Road Salt Symposium. Thursday, February 3, 2011

Town of Oconomowoc Snow & Ice Control Policy

Evaluation of Epoke Bulk Spreader for Winter Maintenance

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

$2,696 per lane-mile.

Severe Weather Watches, Advisories & Warnings

Effects of Utilizing Liquids In a Pre-mix Application Method. Gerald Peterson Manager Manistee County Road Commission, MI

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

Winter Roads Maintenance

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

MTO s Road Weather Information System (RWIS)

Motorists are urged to drive wisely and cautiously in all winter weather situations:

National Symposium on Extreme Weather Event Impacts on Transportation Infrastructure

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

A Guideline for Training Patrol Staff Ontario Good Roads Association

Severe Winter Weather in

Winter Plowing and Deicing: Saving Money, Salt and Labor by Distinguishing Best Practices From Urban Legends. Stephen J. Druschel, PhD, PE, F.

Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study

Seasonal Hazard Outlook

1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

Dunn County Snow Removal Policy

Winter Maintenance on Provincial Highways

Winter Maintenance on Ontario s Highways

Salt Reduction using Innovative

HAZARD DESCRIPTION... 1 LOCATION... 1 EXTENT... 1 HISTORICAL OCCURRENCES...

SNOW & ICE CONTROL Winter Operations Conference. October 18, 2017 Renae Kuehl, SRF Consulting Group

Educational Objectives

SNOW CREW CALL IN SHEET

Center for Transportation Research and Education. Winter Maintenance Operations & Maintenance Decision Support System TRANS 691 Seminar March 5, 2004

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

Snow Response in an Urban Setting

RESOLUTION NO INTRODUCTION

CLEARING THE WAY CAUTION. brampton.ca/snow

MDSS and Advanced Forecasting STSMO Weather Workshop Dave Huft, SDDOT Research Program Manager September 12, 2017

Snow Removal Winchester Department of Public Works

UDOT Weather Program Traffic Operations Center

SNOW CONTROL OPERATIONS

WINTER STORM Annex II

Establishing Winter Standard Operating Procedures

Effect of Environmental Factors on Free-Flow Speed

Epic Roanoke, Blacksburg snow day halts work, spurs play

2010/2011 Winter Weather Summary

Wind Events. Flooding Events. T-Storm Events. Awareness Alerts / Potential Alerts / Action Alerts / Immediate Action Alerts / Emergency Alerts.

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS

CEDAR COUNTY ORDINANCE NO. 6

John A. Carlson Snow and Ice Removal

Winter Maintenance Best Practices and Sustainability

City of Lee s Summit Public Works Operations

SNOW REMOVAL & ICE CONTROL POLICY

Multi-Jurisdictional Hazard Mitigation Plan. Table C.17 Disaster Declarations or Proclamations Affecting Perry County Presidential & Gubernatorial

City of Camrose Winter Road Maintenance Policy

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION

Snow Measurement Guidelines for National Weather Service Snow Spotters

National Winter Maintenance Peer Exchange Vancouver, Washington September 10 th & 11 th, 2013 Steve Spoor Maintenance Services Manager

17 th Annual Snow & Ice Symposium Columbus, OH. Snow & Ice Management Association Copyright 2014 SALT BRINE & SNOW AND ICE CONTROL.

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

DELAWARE COUNTY ORDINANCE NO. 3

The Climate of Grady County

The Climate of Murray County

Federal Maintenance Decision Support System (MDSS) Prototype Update

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

The Climate of Bryan County

The Climate of Marshall County

Materials in Snow and Ice Control MATERIALS. Winter Maintenance Materials 1/9/2015. OTA Winter Conference 2014

CITY OF SPARKS SNOW and ICE CONTROL PLAN

Denver International Airport MDSS Demonstration Verification Report for the Season

Why Now is the Time to Use Organic-Based Performance Enhancers to Treat Winter Roads Purdue Road School

Weather Information for Road Managers

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

NEWS RELEASE. Province boosts winter highway safety measures

HIGHWAY DEPARTMENT POLICIES Center Harbor, New Hampshire

Winter Weather. National Weather Service Buffalo, NY

The Climate of Pontotoc County

Emergency Traffic Management In the Case of Severe Winter Conditioins

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)

The Climate of Payne County

The Climate of Kiowa County

Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

Idaho Transportation Department Winter Performance Measures Bob Koeberlein, HQ Operations Engineer. WSRTTIF June

The Climate of Seminole County

MUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS

TOWN OF GRAND FALLS WINDSOR

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

The Climate of Texas County

Snow and Ice Management

Jin Guk Kim Korea Institute of Civil Engineering and Building Technology KICT, South Korea January 21, 2016

Traffic Control Weather Policy

SNOWPLOWING/ICE CONTROL POLICY

Deploying the Winter Maintenance Support System (MDSS) in Iowa

Understanding Weather and Climate Risk. Matthew Perry Sharing an Uncertain World Conference The Geological Society, 13 July 2017

Evaluation of Phase I of the 24-Hour Snow Clearing Pilot Project. Policy and Planning Division. Department of Transportation and Works

Transcription:

2014-15 Winter Maintenance Report 30,546 Lane Miles At A Glance Total Cost of Winter $ 87.9 Million 87% Frequency Achieving Bare Lanes 1,514 Full-time 327 Backup Drivers 839 Plows 39.4 Statewide Snowfall Average 40,000 Tons Sand 174,000 Tons Salt 148 Truck tations

Introduction The 2014-15 winter was considered an average one in terms of few heavy and prolonged snow and ice events. MnDOT spent fewer dollars on snow and ice than 2013-14, but resources were still used for the 23 to 39 winter events (depending on the district). Whether the state gets a lot of snow and ice in a season or smaller amounts, resources are still expended to keep roads clear, pay wages and maintain equipment. Snapshot of winter: 2-year comparison Category Measure 2013-14 2014-15 Infrastructure Lane Miles 30,597 30,546 Weather Snowfall, MSP Airport 69.9 32.6 Snowfall, statewide across districts 75.6 39.4 Number of winter events, statewide average and range across districts 34 28 Materials Salt used 275,857 tons 173,888 tons Average weighted cost of salt per ton $71.14 $74.36 Salt brine used 2.7 million gallons 2.2 million gallons Costs and Performance Total plowing, salting and sanding costs $136 million* $87.9 million* Total plowing, salting and sanding $4,435 $2,878 costs per lane mile, statewide average Frequency of achieving bare lane after winter event (70% target) 79% 87% Labor and Services Regular labor hours 718,591 501,095 *Based on fiscal year Overtime winter labor hours 222,624 94,461 2

Weather The 2014-15 season snowfall, reported at the Minneapolis - St. Paul Airport, was 33 inches. That compares to 70 inches in 2013-14. The 10-year average season snowfall is 49 inches. District 1 reported the most snowfall with 59 inches at International Falls. The District 1 average was 45 inches. District 8 reported the second highest average with 44 inches. District snowfall levels are determined by averaging measurements from four locations within the district. 2014-2015 Average District Snowfall D2 37 D1 45 D4 42 D3 41 D8 44 METRO 36 D7 33 D6 37 A winter event is. Any winter weather occurrence that consumes resources necessary to prevent, minimize or regain the loss of bare lanes. Winter events can include freezing rain, drizzle/sleet, snow, drifting/blowing snow, frost, ice/black ice, refreeze or any combination of these conditions. 3

Winter Severity Index MnDOT uses a Winter Severity Index to simplify the comparison of winter severity from year to year. At the end of each season, each district uses these factors to calculate a single relative number: Official weather reporting station snowfall MSP Airport* Statewide Average 2010-11 86.6 77.4 2011-12 22.3 29.5 2012-13 67.7 72.3 2013-14 69.9 75.6 Dewpoint/ relative humidity Wind speed, gusts, direction 2014-15 32.6 39.4 *The MSP Airport is the state s official weather station. Frost/ black ice Precipitation type, duration amounts Air temperature Road temperature Cloud cover Surface pressure Blowing snow Winter Severity Index by district for past 3 years District 2012-13 2013-14 2014-15 1 92 158 93 2 101 125 85 3 79 112 69 4 112 129 92 Metro 75 92 66 6 74 134 88 7 75 110 97 8 83 115 92 Statewide 90 128 87 4

Materials usage Salt and Sand (in thousands of tons) 2014-15 district by district average salt/sand usage for the past 5 years (in thousands of tons) 268 305 276 District Material 2010-11 2011-12 2012-13 2013-14 2014-15 1 Salt 40.7 29.0 50.0 40.7 27.4 Sand 23.4 7.6 14.0 23.4 11.7 2 Salt 9.8 12.0 16.9 9.8 12.6 154 174 Sand 7.4 7.8 7.6 7.4 8.2 3 Salt 35.0 17.1 39.9 35 22.2 Sand 3.9 8.4 3.0 3.9 1.5 4 Salt 11.4 10.1 22.0 11.4 11.1 Sand 6.4 4.9 3.7 6.4 5.5 2010-11 2011-12 2012-13 2013-14 2014-15 Metro Salt 97.0 38.6 79.9 97 44.9 Sand 7.3 0.1 1.0 7.3 1.1 65 26 44 69 40 6 Salt 43.0 24.1 49.7 43 30.5 Sand 12.0 3.5 8.3 12.1 6.8 7 Salt 23.9 16.1 27.8 23.9 15.0 Salt Sand 1.8 0.2 1.4 1.8 0.6 Sand 8 Salt 14.9 6.7 17.4 14.9 10.3 Sand 6.8 1.2 5.5 6.9 4.5 Statewide Salt 267.8 154.1 304.6 275.9 173.9 Sand 65.2 26.1 44.3 69.1 39.8 Factors affecting use of material during winter event: Precipitation type Air Temperature Cloud cover Blowing snow Dew point/relative humidity Wind speed Road temperature Frost/black ice Surface pressure Variation in salt usage from district to district depends on: Winter severity Road classification Level of service Physical environment conditions 5

Cost and performance of winter operations Snow and ice expenditures were about 35 percent or $48 million less than the previous winter. A total of $87.9 million was spent on materials, labor and equipment. The severe winter of 2013-14 had MnDOT planning early for its 2014-15 salt supplies. MnDOT bought salt in the summer, so while other agencies might have paid record prices and experienced shortages, MnDOT bought at reasonable prices to get the best value possible. Corresponding with the less severe winter was the reduction in salt, sand and brine usage from the previous year. Salt costs* (cost per ton 5 year average) 2010-11 $67.04 2011-12 $70.51 2012-13 $69.81 2013-14 $71.14 2014-15 $74.36 $7/ton more than in 2010-11 *Based on fiscal year Historical snow and ice expenditures trend** (costs in thousands) Office 2010-11 2011-12 2012-13 2013-14 2014-15 5 Year Average 1 $11,174 $8,860 $14,784 $16,902 $10,321 $12,408 2 $6,965 $5,833 $8,882 $9,051 $6,963 $7,539 3 $13,232 $7,255 $14,300 $16,466 $10,259 $12,302 4 $8,620 $5,713 $11,003 $9,867 $7,622 $8,565 6 $12,274 $8,177 $14,628 $18,790 $12,838 $13,341 7 $9,936 $6,324 $10,027 $12,760 $8,279 $9,465 8 $6,725 $2,982 $7,905 $9,242 $6,281 $6,627 Metro $37,453 $16,134 $30,253 $42,558 $23,872 $30,054 Maintenance $585 $672 $401 $495 $1,346 $700 Other $117 $33 $96 $98 $126 $94 Statewide $107,079 $61,983 $112,279 $136,228 $87,914 $101,095 $13 million less than 5 year average *Based on fiscal year 6

Total spent for snow and ice control and winter severity (cost in millions; includes materials, labor and equipment.) Cost Severity 2012-13 $112 90 2013-14 $136 128 2014-15 $88 87 $48 million less than 2013-14 Factors affecting winter maintenance costs: Timing of storms Change in labor costs Inflation Fuel prices Salt, sand prices Winter severity index 2014-15 winter costs by category Materials 27% Labor 31% Equipment 42% 7

Bare Lane Targets Frequency of meeting bare lane targets (cost in millions) 77.4 2010-11 88% 82% 79% 29.5 2011-12 2012-13 72.3 75.6 $112 $107 $62 79% $136 2013-14 39.4 87% 2014-15 $88 Meeting bare lane targets MnDOT met its overall performance target for the season. The statewide average for meeting this target for all road classifications was 87 percent. MnDOT met or exceeded the 70 percent target the past nine out of 10 years. MnDOT worked to reduce chemicals used on roadways and invested in updates to systems and technologies. Bare lane regain time - This is measured from the time a winter event ends to when MnDOT s snow and ice operations regain bare-lane driving conditions. The target for this measure varies by road classification, ranging from 0 to 3 hours for the state s most heavily traveled roadways to 9 to 36 hours for the least traveled secondary roads. Statewide snowfall average Costs of winter season Frequency Frequency of meeting bare lane target - This measure reports how often crews met the bare-lane target over an entire winter season. This target is set at 70 percent. 8