P278 Treatment of Transmission Losses for Interconnector Users

Similar documents
SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented)

SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented)

EBS IT Meeting July 2016

2018 Annual Review of Availability Assessment Hours

CMP239 Workgroup meeting 2

GAMINGRE 8/1/ of 7

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

INVOICE EXPLAINER GAS

Statement of indicative wholesale water charges and charges scheme

Derogation Criteria for the Requirements for Generators Network Code

CIMA Professional

CIMA Professional

CAISO Participating Intermittent Resource Program for Wind Generation

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R

Status of the CWE Flow Based Market Coupling Project

CIMA Professional 2018

Implementation Status & Results Chad Urban Development Project (P072030)

CIMA Professional 2018

DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND (SDDC) 1 SOLDIER WAY SCOTT AFB, IL 62225

Payment of Funds

Project Name: Income Generation Project 4 Pouk District, Siem Reap Province Implementing Partner: Farmer Livelihood Development (FLD)

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

Colorado PUC E-Filings System

Colorado PUC E-Filings System

CIMA Dates and Prices Online Classroom Live September August 2016

Joint procurement of natural gas for grid operation

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time

INSPIRE Monitoring and Reporting Implementing Rule Draft v2.1

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

In Centre, Online Classroom Live and Online Classroom Programme Prices

The World Bank Haiti Business Development and Investment Project (P123974)

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4

The World Bank Decentralized Community Driven Services Project (P117764)

2017/18 Wider Cancellation Charge Statement. Version 1. Effective from 1 st April Based Upon: User Commitment Methodology.

2018/19 Wider Cancellation Charge Statement. Version 2.0. Effective from 1 st April Based Upon: User Commitment Methodology.

NSP Electric - Minnesota Annual Report Peak Demand and Annual Electric Consumption Forecast

Please see the attached document in relation to your Freedom of Information request.

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2015

Administration by the CER of the Carbon Revenue Levy

GRIPs. Overview Andrea Ćirlićová Business Area Manager, System Development

Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217)

ACCA Interactive Timetable & Fees

Chapter Management Awards

ACCA Interactive Timetable & Fees

ACCA Interactive Timetable & Fees

Implementation Status & Results Mekong Mekong Integrated Water Resources Management (P104806)

ACCA Interactive Timetable & Fees

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Outage Coordination and Business Practices

ACCA Interactive Timetable & Fees

ACCA Interactive Timetable & Fees

ACCA Interactive Timetable

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Computing & Telecommunications Services

ACCA Interactive Timetable & Fees

ACCA Interactive Timetable & Fees

Multivariate Regression Model Results

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937)

Weekly Operational Constraints Update

Distributed Generation. Retail Distributed Generation

UNC Demand Estimation Sub-committee Minutes Wednesday 07 November 2012

Demand Forecasting Reporting Period: 19 st Jun th Sep 2017

O. 3 WIND U II W JOINT PREPARED BY:

The World Bank Transport Connectivity and Asset Management Project (P132833)

Demand Estimation Sub-Committee MOD330 Phase 1 and 2. 7 th November 2012

Working Group Balancing. Monday 10 th September 2018

ACCA Interactive Timetable

Chapter 5. Transmission networks and electricity markets

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Data Standard Specification. Draft v0.1. Contact:

DESC Technical Workgroup. CWV Optimisation Production Phase Results. 17 th November 2014

ACCA Interactive Timetable

Corn Basis Information By Tennessee Crop Reporting District

Determine the trend for time series data

= observed volume on day l for bin j = base volume in jth bin, and = residual error, assumed independent with mean zero.

Implementation Status & Results Africa RCIP3 - Regional Communications Infrastructure Program - Phase 3 (P111432)

Virginia Basis Tables for Corn, Soybeans, and Wheat

ACCA Interactive Timetable

ACCA Interactive Timetable & Fees

ACCA Interactive Timetable

Sales Analysis User Manual

Satisfactory Satisfactory High

Public Disclosure Copy

Flow- based Market Coupling: Implementa9on of the CWE FB Project. Andrew Claxton APX Co- Chair, CWE Steering Commi5ee

Table 01A. End of Period End of Period End of Period Period Average Period Average Period Average

Financial Review. No member of the Board of Directors has reported accepting any gifts or incentive from any vendor contracted by the association.

Malawi Education Sector Improvement Project (MESIP) (P154185)

EVALUATION OF ALGORITHM PERFORMANCE 2012/13 GAS YEAR SCALING FACTOR AND WEATHER CORRECTION FACTOR

ACCA Interactive Timetable

Public Disclosure Copy. First Part of the Second Phase of the Niger Basin Water Resources Development and Sustainable

The World Bank Haiti Business Development and Investment Project (P123974)

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

ACCA Interactive Timetable

Summary of Seasonal Normal Review Investigations CWV Review

ACCA Interactive Timetable & Fees

Demand Estimation Sub-Committee. Seasonal Normal Review - Updated. 17 th December 2014

2018 Project Prioritization and Budgeting Process

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Transcription:

Stage 03: Attachment A: for What stage is this document in the process? Treatment of Transmission Losses for Interconnector Users Contents 1 Workgroup s Detailed Analysis 2 2 Calculation of TLMO + and TLMO 6 3 Solution Requirements 9 4 Assessment Procedure Consultation Responses 10 5 Workgroup Details 11 About this Document This is Attachment A to the Assessment Report. It provides additional details of the Workgroup s analysis and discussions. Page 1 of 12

1 Workgroup s Detailed Analysis Measuring Interconnector flows In a given Settlement Period, different Parties may be trading in opposite directions across different Interconnectors, or even across the same Interconnector. For example, the Interconnector flows in Settlement Period 1 (00:00-00:30) of 1 April 2011 were as follows: 167.1MWh 497.2MWh 494.2MWh 227.1MWh Note: All MWh volumes are Settlement data (measured at the boundary of the GB Transmission System) So, in this example, the net flow into GB (across all Interconnectors) is 597.2MWh, while the gross-net flow (i.e. netting within each Interconnector, but not across different Interconnectors) is 764.3MWh into GB, and 167.1MWh out of GB. The difference between net and gross-net flows is the transit of electricity across GB, i.e. 167.1MWh in this period. Neither of the above ways of calculating the total Interconnector flow take account of superpositioning; i.e. logical flows of power that are in the opposite direction to the physical flow on a given Interconnector. If these are taken into account (i.e. no netting of positions, even within a single Interconnector) then this gives the gross-gross flow, which in the above example was 991.4MWh into GB and 394.2MWh out of GB. Electrical losses caused by Interconnectors It should be noted that only addresses the allocation of electrical losses caused on the GB Transmission System by Interconnector flows. It does not propose any change to the arrangements for allocating electrical losses incurred on the Interconnector itself. These remain outside the scope of the BSC (and are not visible to BSC Systems, as the BSC requires the flows on the Interconnector to be measured at the point of connection to the GB Transmission System). In practice, losses on the Interconnector itself will make themselves apparent as a discrepancy between the volumes notified to the Interconnector Administrator by Users, and the Interconnector flow metered for BSC purposes. This discrepancy will typically be addressed in the Interconnector Agreement, by scaling down notified volumes to allow for estimated losses. Any residual error will automatically be allocated to the Interconnector Error Administrator (IEA) by BSC Systems. Page 2 of 12

Apr-2010 May-2010 Jun-2010 Jul-2010 Aug-2010 Sep-2010 Oct-2010 Nov-2010 Dec-2010 Jan-2011 Feb-2011 Mar-2011 Apr-2011 May-2011 Jun-2011 Jul-2011 Aug-2011 Sep-2011 Current allocation of transmission losses Under the current BSC baseline, the total GB transmission losses in each Settlement Period are shared uniformly amongst users of the Transmission System (45% going to delivery, which for this purpose includes Interconnector Users bringing power into GB; and 55% going to offtake, which for this purpose includes Interconnector Users taking power out of GB). In practice this means that the volume of GB transmission losses allocated to Interconnector BM Units is approximately 9,000MWh per month, which equates to just over 2% of the total (see graph below). The financial impact of this volume adjustment depends on the imbalance position of the Lead Party for each Interconnector BM Unit: If they do not make any adjustment to their contractual position to cover the losses, they will (assuming they were otherwise in balance) be exposed to System Buy Price (SBP) on the volume of losses. The graph below therefore uses SBP to convert the loss volume into financial terms. On this basis, the financial value of the GB transmission losses allocated to Interconnector BM Units is approximately 500k per month. Alternatively, the Lead Parties for Interconnector BM Units may be able to buy energy to cover the losses (avoiding the exposure to SBP). The 500k per month cost (which is based on SBP) should therefore be regarded as a worst case. 3.30% 3.10% 2.90% 2.70% 2.50% 2.30% 2.10% 1.90% 1.70% 1.50% 750,000 700,000 650,000 600,000 550,000 500,000 450,000 400,000 350,000 300,000 %age of total Transmission Losses Value ( ) at System Buy Price It should be noted that the share of GB transmission losses currently allocated to Interconnectors is proportional to the gross-gross flow volume (i.e. superpositions on the same Interconnector are treated as both offtake and delivery for transmission loss purposes). The BSC does allow Interconnector Users on a single Interconnector to combine their BM Units into a single Trading Unit for purposes of transmission losses. This mechanism would potentially allow Interconnector Users to reduce their share of GB transmission losses, so that it was based on the gross-net flow volume (i.e. netting off superpositions). However, no Interconnector Users have so far applied to form Trading Units of this type. Page 3 of 12

Distributional impact of The graph above shows that the volume of GB transmission losses allocated to Interconnector BM Units associated with current Interconnectors (i.e. IFA, Moyle and BritNed) is approximately 9,000MWh per month (equating to approximately 500k per month if valued at SBP). The distributional impact of would therefore be to reallocate that volume of losses to non-interconnector (i.e. generator and Supplier) BM Units. Of course, this does not take into account new Interconnectors that may be built over the next few years. The pilot version of the ENTSO-E Ten Year Network Development Plan 1 (TYNDP), published in 2010, identifies four such projects: Potential new Interconnectors identified in the TYNDP Description East West Interconnector Project Nemo (Richborough to Zeebrugge) New subsea DC link, between GB and FR, possibly with a capacity of 1000MW (still to be determined) New connection between Western Norway and UK TYNDP Status (as of Ref 2010) 461 Under Construction Commissioning Capacity (as of 2010) 2011 500MW 443 Planned 2016 1,000MW 62 Under ~ 2017 1,000MW Consideration 424 Under 2017-2020 1,400MW Consideration Inter-TSO Compensation Scheme (ITC) The mandatory Inter-TSO compensation mechanism (regulation 838/2010 2 ) includes provisions for TSOs (including National Grid in the GB context) to be compensated for losses caused on their systems by transit flows. The relevant volume of losses is established through load flow modelling (with the transit flows included, and with the transit flows removed) for a number of snapshot periods (72 per annum). These loss volumes are then compensated at a price reflecting the value of power in that specific country. In the case of GB, National Grid establishes the price for losses from an average forward baseload price for generation, and submits it to the European Network of Transmission System Operators for Electricity (ENTSO-E) in November (for use in the following year). Although the Workgroup was unable to find published results from the ENTSO-E load flow modelling, it seems safe to assume that this approach to modelling losses will lead to the conclusion that transit flows reduce the total losses on the GB system. This is because the GB system generally carries power from North to South, whereas transit flows are overwhelmingly in the opposite direction i.e. South to North. The following table summarises how many Settlement Periods exhibited each type of transit flow in the eighteen months from April 2010 to September 2011 3 : 1 https://www.entsoe.eu/index.php?id=232 2 http://eur-lex.europa.eu/lexuriserv/lexuriserv.do?uri=oj:l:2010:250:0005:0011:en:pdf 3 Note that the BritNed Interconnector was not operational for most of this period (with first significant power flows recorded in February 2011). Page 4 of 12

Frequency of different types of transit flow (Apr 10 Sep 11) Type of Transit Flow No of Settlement Periods South to North transit: power flowing in from IFA and out 11,890 (45.2%) from Moyle (with BritNed inactive) No transit flows power flowing into GB only 6,298 (23.9%) South to North transit: power flowing in from IFA and 4,760 (18.1%) BritNed, and out from Moyle No transit flows power flowing out of GB only 2,306 (8.8%) Power flowing in from IFA, out from BritNed and Moyle 717 (2.7%) Power flowing in from IFA, out from BritNed 207 (0.8%) All other configurations (including North to South transits) 126 (0.5%) So, under the ITC scheme, National Grid is compensating other TSOs for the reduction in GB transmission losses caused by transit flows. These payments (together with other elements of compensation payable under the ITC) are included in the costs recovered through Transmission Network Use of System (TNUoS), which means that the cost is borne by GB Suppliers and generators. Potential impact of Trading Units on Interconnector losses Currently, Interconnector BM Units have the ability to form Trading Units with other BM Units related to the relevant Interconnector (i.e. other Interconnector BM Units on that Interconnector and any other BM Units with Dedicated or Contiguous Assets linked to the Interconnector). To date, no Interconnector BM Units have ever elected to form such a Trading Unit. Over the 18-month period from April 2010 to September 2011, with no Interconnector Trading Units, the total Interconnector Metered Volumes were 13,612,064MWh in delivering Trading Units, and -7,251,262MWh in offtaking Trading Units. If Interconnector Users took full advantage of the Trading Unit rules by forming a single Trading Unit per Interconnector, this would reduce to 12,789,834MWh in delivering Trading Units (6.04% reduction), and -6,429,032MWh in offtaking Trading Units (11.34% reduction). In summary, the total reduction in losses allocated to Interconnector Users that could be achieved through forming Trading Units would be less than 10%. Potential Impact of Trading Units on Interconnector Metered Volumes (Apr 10 Sep 11) Trading Unit No Interconnector Trading Units Single Trading Unit per Interconnector Reduction in Metered Volumes Delivering 13,612,064MWh 12,789,834MWh 6.04% Offtaking -7,251,262MWh -6,429,032MWh 11.34% Page 5 of 12

2 Calculation of TLMO + and TLMO TLM algebra The existing calculation of the Transmission Loss Multiplier (TLM) in BSC Section T2 is as follows: TLM ij = 1 + TLF ij + TLMO + j (for BM Units which are in delivering Trading Units in the Settlement Period); or TLM ij = 1 + TLF ij + TLMO j (for BM Units which are in offtaking Trading Units in the Settlement Period). TLF ij is currently zero for all BM Units. will set the value of TLM to 1 for all Interconnector BM Units in all Settlement Periods, regardless of whether they are in delivering or offtaking Trading Units. TLMs for all other BM Units will continue to be calculated using the above equations, and will be <1 for BM Units in delivering Trading Units and >1 for BM Units in offtaking Trading Units. Current equations for TLMO + and TLMO The current equations for calculating the Delivering and Offtaking Transmission Losses Adjustment (TLMO + and TLMO ), which are given in Section T2.3 of the Code, are as follows: TLMO + j = {α (Σ + QM ij + Σ QM ij ) + Σ + (QM ij * TLF ij )} / Σ + QM ij TLMO j = {(α 1) (Σ + QM ij + Σ QM ij ) Σ (QM ij * TLF ij )} / Σ QM ij Calculation Parameters The Transmission Loss Factor (TLF ij ) is fixed at zero for all BM Units. The value of α is fixed at 0.45. Where: Σ + is the sum over all BM Units which are in delivering Trading Units in the Settlement Period; Σ is the sum over all BM Units which are in offtaking Trading Units in the Settlement Period; and All other symbols and acronyms are as defined in the BSC. For TLMO +, this equates to: 45% of the total metered volumes of all BM Units total metered volumes of all delivering BM Units For TLMO, this equates to: 55% of the total metered volumes of all BM Units total metered volumes of all offtaking BM Units Page 6 of 12

Proposed equations for TLMO + and TLMO requires a change to the TLMO algebra to ensure that the total volume of GB transmission losses is recovered from non-interconnector BM Units. To do this requires excluding the Interconnector BM Units from some (but not all) of the summations. 4 The proposed equations for calculating TLMO + and TLMO, which would be used if is implemented, are as follows: TLMO + j = {α (Σ + QM ij + Σ QM ij ) + Σ + (non-i) (QM ij * TLF ij )} / Σ + (non-i) QM ij Where: TLMO j = {(α 1) (Σ + QM ij + Σ QM ij ) Σ (non-i) (QM ij * TLF ij )} / Σ (non-i) QM ij Σ + (non-i) is the sum over all BM Units other than Interconnector BM Units which are in delivering Trading Units in the Settlement Period; Σ (non-i) is the sum over all BM Units other than Interconnector BM Units which are in offtaking Trading Units in the Settlement Period; Σ + and Σ are as defined above; and All other symbols and acronyms are as defined in the BSC. For TLMO +, this equates to: 45% of the total metered volumes of all BM Units total metered volumes of all non-interconnector delivering BM Units For TLMO, this equates to: 55% of the total metered volumes of all BM Units total metered volumes of all non-interconnector offtaking BM Units Impact on Section T data items and BSC Trading Charges directly impacts the calculation of the Transmission Loss Multiplier (TLM ij ), which then feeds through into the following data items: Credited Energy Volumes (QCE iaj ) values for Interconnector BM Units will no longer be adjusted for GB transmission losses, while QCE iaj values for other BM Units will have larger transmission losses adjustments applied to them. TLM ij values are also applied to Bid-Offer volumes for purposes of calculating Period BM Unit Cashflow (CBM ij ) and the main cash-out price. So will slightly decrease Bid-Offer payments to non-interconnector BM Units in delivering Trading Units, and slightly increase Bid-Offer payments to non-interconnector BM Units in offtaking Trading Units. (Bid-Offer Acceptances from Interconnector BM Units would no longer be adjusted for GB transmission losses, but this is hypothetical only as the cross-border balancing arrangements needed to issue BOAs against Interconnector BM Units are not currently in place). 4 The only summation that still includes Interconnector BM Units is (Σ + QM ij + Σ QM ij), which is calculating the total volume of GB transmission losses and therefore remains unchanged. Page 7 of 12

These changes then feed through into the calculation of Account Energy Imbalance Volume (QAEI aj ) and Account Energy Imbalance Cashflow (CAEI aj ). means that Interconnector Users will no longer have to take account of GB transmission losses in managing their BSC imbalance charges, while other Parties will have to allow for increased transmission losses adjustments. Impact on Settlement Reports The above calculation and data item changes will be reflected in the SAA-I014 Settlement Reports issued to Parties. One possible impact is that it will no longer be apparent from the SAA-I014 whether an Interconnector BM Unit was in a delivering Trading Unit or an offtaking Trading Unit (as it is the TLM ij value that currently indicates this). However, this is mitigated by the fact that all Interconnector BM Units are currently in Sole Trading Units and so their delivery or offtake status is dependent only on their own BM Unit Metered Volume. Page 8 of 12

3 Solution Requirements Operational requirements This section summarises the operational solution requirements for. The solution does not impact any reporting flows. For example, the SAA-I014 will still report each BM Unit s TLM value in the same way as currently. Requirement 1 The Transmission Loss Multiplier (TLM) for Interconnector BM Units will be fixed at 1 Settlement Administration Agent (SAA) systems will be amended to allocate a TLM of 1 to all Interconnector BM Units from the first Settlement Period on the Implementation Date. The TLM calculations for non-interconnector BM Units will be unchanged, except for the revised calculations of TLMO + j and TLMO j (see draft legal text in Attachment B). Any Parties who load the TLM values into their systems may need to amend their systems to accept TLM values of 1 for their Interconnector BM Units. The Balancing Mechanism Reporting Agent (BMRA) will need to revise the calculation of Estimated TLMs (ETLMs) used in the derived data calculations on the Balancing Mechanism Reporting Service (BMRS), so that these are set to 1 for Interconnector BM Units. Detailed Solution Requirements For the full detailed solution requirements, please refer to the Draft Solution to Identify Impacts Document which was issued for industry impact assessment and which is available on the page of the ELEXON website. Requirement 2 The losses previously allocated to Interconnector BM Units will be redistributed across all other BM Units The SAA systems will be amended to use the revised equations for TLMO + j and TLMO j in the calculations of TLMO + j and TLMO j from the first Settlement Period on the Implementation Date. The revised TLMO calculation will redistribute the GB transmission losses that would have been allocated to Interconnector BM Units across all other BM Units instead, in proportion to their Metered Volumes and according to whether they are part of a delivering or offtaking Trading Unit in a given Settlement Period. ELEXON will need to develop a revised methodology for calculating the Estimated TLMOs (ETLMOs) used on the BMRS, and will need to present this to the Imbalance Settlement Group for approval. The BMRA will need to use the revised ETLMOs provided by ELEXON in the BMRS calculations. Equations for TLMO + and TLMO The current and proposed calculations for TLMO + j and TLMO j can be found in Section 2 of this document. Page 9 of 12

4 Assessment Procedure Consultation Responses Summary of responses The table below summarises the responses received to the Assessment Procedure Consultation. You can find the full set of responses in Attachment B. Summary of Assessment Procedure Consultation Responses Question Yes No Neutral/ No Comment Do you agree with the Workgroup s initial unanimous view that better facilitates the Applicable BSC Objectives when compared with the current BSC rules? Do you agree with the Workgroup that there is no Alternative Modification within the scope of which would better facilitate the Applicable BSC Objectives than the Proposer s solution? Do you agree with the Workgroup that the draft legal text delivers the intent of? Do you agree with the Workgroup s recommended Implementation Date? Other 9 0 0 1 9 1 0 0 8 0 2 0 9 0 0 1 Do you have any further comments on? 1 9 0 0 Page 10 of 12

5 Workgroup Details Workgroup s Terms of Reference Specific areas set by the BSC Panel in the Terms of Reference What changes are needed to BSC documents, systems and processes to support (including any impact on Parties systems), and what are the related costs and lead times? Should the BSC still charge Interconnector Users for transmission losses? Is the original principle behind the existing BSC rules still appropriate within the wider context of Europe? Should be implemented in a BSC Systems Release or on another date (e.g. to coincide with Parties contract rounds)? What are the benefits to the Applicable BSC Objectives? Are there any wider benefits or principles that Ofgem should consider? Would treating Interconnector Users differently to other Parties be due or undue discrimination? What would be the cashflow implications of? (The Workgroup should provide clear worked examples of how the ITC works and how it interacts with TNUoS and the BSC s losses allocation.) Assessment Procedure timetable Assessment Timetable Activity Date Panel submits to Assessment Procedure 13 Oct 11 Workgroup Meeting 1 25 Oct 11 15WD Impact Assessment undertaken 14 Nov 11 05 Dec 11 Workgroup Meeting 2 (Joint with P277) 08 Dec 11 15WD Industry Consultation undertaken 13 Jan 12 03 Feb 12 Workgroup Meeting 3 (Joint with P277) 14 Feb 12 Panel considers Workgroup s Assessment Report 08 Mar 12 Page 11 of 12

Workgroup membership and attendance Workgroup attendance Name Organisation Meeting 1 25/10/11 Members Meeting 2 08/12/11 Meeting 3 14/02/12 Kathryn Coffin ELEXON (Chair) David Kemp ELEXON (Lead Analyst) Iain Pielage National Grid Electricity Transmission plc (Proposer) Gary Henderson IBM for Scottish Power Esther Sutton E.ON Martin Mate EDF Mark Thomas RWE Supply & Trading Kris Kennedy SONI Vince Hammond Attendees National Grid Interconnectors Limited John Lucas ELEXON (Design Authority) Andy Colley SSE Charlotte Ramsey Ofgem Matthew Grant Ofgem Evridiki Kaliakatsou Ofgem Alan Brady SONI Page 12 of 12