Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan for ETLP (P156590)

Sample Procurement Plan

Procurement Plan for Eth Expressway Project ( P148850)

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Plan. Procurement Method Prior Review Threshold Comments

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Sample Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. Nepal Livestock Sector Innovation Project

PROCUREMENT PLAN (Textual Part)

Procurement Plan for Project of Integrated Urban and Tourism Development

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Sample Procurement Plan

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Procurement Plan. I. General

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Prior Review Thresholds

Procurement Plan. Procurement Method Prior Review Threshold Comments

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. NCB < 1 RfQ<0.1

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

P Safety Nets Project Procurement Plan June 1 st 2017

Sample Procurement Plan

GEF Procurement Plan (WARFP LIBERIA)

PROCUREMENT PLAN (Textual Part)

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

PROCUREMENT PLAN (Textual Part)

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Prior Review Thresholds

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Sample Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan National Community Driven Development Project Department of Rural Development

Procurement. International Competitive Bidding;

Textual Procurement Plan

Consultants: firms Consultants: individuals

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Sample Procurement Plan

PPA PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

PROCUREMENT PLAN (Textual Part)

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sample Procurement Plan

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Procurement Plan. I. General

PE Cusco Transport Improvement Project (P132505) Procurement Plan

Public Disclosure Copy

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Procurement Plan. I. General

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

PROCUREMENT PLAN (Textual Part)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

PROCUREMENT PLAN (Textual Part)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank s approval Date of the procurement Plan [Original: April 29]: Revision 1 of Updated Procurement Plan, April 2017] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year April 2016 to December 2017 Public Disclosure Authorized Public Disclosure Authorized II. Goods and Works and non-consulting services. 1. Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency s capacity.] Procurement Method Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,000,000 All 2. NCB (Goods) Above US$ 100,000 No prior review 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 10 million ICB prior review 5. (Non- Services) Below US$ 100,000 First contract 6. Sole Source selection (Works) Above US$ 100,000 All contracts 6. Request for Quotation (Works) No prior review 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: TBD July 9, 2010

5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 6. the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description the ICB (Works) the ICB (Goods) the NCB (Works) the NCB (Goods) the ICB (Non- Services) Cost US$ million Packages Domest ic Prefere nce (yes/no) Review by Bank ( / ) 67.436 2 yes No 8.843 10 No No 1 st No Comments contract for Review III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: July 9, 2010 Method Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]

4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment number of contracts that will be let under QCBS number of contracts that will be let under other methods Cost US$ million Packages Review by Bank ( / ) 8.14 19 for one package of 2.3 million US 0.95 12 review Comments The remaining 18 are under post review CQS and INDV July 9, 2010

Page 1 PROCUREMENT PLAN Burkina Faso : Transport and Urban Development Project General Information Country: Burkina Faso Banks Approval Date of the Original Procurement Plan: 2017-05-16 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-03 Project ID: P151832 GPN Date: 2017-04-23 Project Name: Transport and Urban Development Project Loan / Credit No: Executing Agency(ies): Deuxieme Programme Sectoriel des Transports et du Tourisme WORKS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award BF-PST2-9856-CW-RFQ / Construction du marché du secteur 6 de Dédougou Request for Quotations Limited 180,000.00 0.00 2018-11-17 2019-01-12 2019-07-11 BF-PST2-12319-CW-RFB / Travaux de bitumage du tronçon -Zabré (79km) et voirie urbaine a Request for Bids Open - International 51,000,000.00 51,182,006.42 Signed 2016-12-27 2017-01-16 2017-03-02 2017-05-22 2017-06-21 2017-08-10 2017-09-04 2019-07-31 BF-PST2-9850-CW-RFB / Aménagement de canaux d'assainissement pluvial à Koudougou (2,5km) Request for Bids Open - National 1,200,000.00 0.00 2018-11-12 2018-11-17 2018-12-29 2019-01-28 2019-04-12 2019-10-09 BF-PST2-9852-CW-RFB / Aménagement de canaux d'assainissement pluvial à Koudougou (2,5km) Request for Bids Open - National 1,200,000.00 0.00 2018-12-04 2018-12-09 2019-01-20 2019-02-19 2019-05-04 2019-11-30 BF-PST2-9854-CW-RFB / Construction de la gare routière de Dédougou Request for Bids Open - National 1,270,700.00 0.00 2018-10-22 2018-10-27 2018-12-08 2019-01-07 2019-03-22 2019-10-18 BF-PST2-9325-CW-RFB / Travaux Dindeogo zonse Request for Bids Open - National 622,000.00 0.00 2018-02-20 2018-02-21 2018-04-04 2018-05-04 2018-06-08 2018-12-05 BF-PST2-9841-CW-RFB / Aménagement d'une zone de maraichage à Ouahigouya Request for Bids Open - National 820,000.00 0.00 2018-12-12 2018-12-13 2019-01-24 2019-02-23 2019-03-13 2019-09-09 BF-PST2-9857-CW-RFB / Construction de la gare routière de Request for Bids Open - National 910,000.00 0.00 2018-05-22 2018-05-27 2018-05-30 2018-06-29 2018-08-12 2018-08-21 BF-PST2-9858-CW-RFB / Construction d'un marché à bétail à Request for Bids Open - National 910,000.00 0.00 2018-05-09 2018-05-19 2018-06-18 2018-07-18 2018-08-31 2018-09-01 BF-PST2-9859-CW-RFB / Mise à niveau de l'abattoir de Request for Bids Open - National 910,000.00 0.00 2018-02-08 2018-02-13 2018-03-27 2018-04-26 2018-07-09 2019-01-05 BF-PST2-9826-CW-RFB / Bitumage de voies primaires et assainissement à Koudougou Ouahigouya et Tenkodogo Request for Bids Open - International 16,436,363.00 0.00 2018-12-05 2018-12-10 2019-02-08 2019-02-23 2019-05-09 2019-11-05 BF-PST2-9848-CW-RFB / Aménagement d'une zone de maraichage à Request for Bids Open - National 820,000.00 0.00 2018-04-19 2018-04-24 2018-05-24 2018-06-23 2018-08-06 2018-12-04 GOODS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award BF-PST2-43142-GO-RFB / Acquisition d'équipements de bureau et matériels informatiques pour les structures impliquées dans le projet Request for Bids Open - National 1,090,909.00 0.00 2018-01-22 2018-02-05 2018-03-19 2018-04-18 2018-06-06 2018-09-04 BF-PST2-43500-GO-RFB / Acquisition dun logiciel de comptabilité Request for Bids Limited 40,000.00 41,023.68 Completed 2016-12-27 2016-08-30 2017-01-10 2016-08-29 2017-02-21 2016-09-15 2017-03-23 2016-09-15 2017-06-05 2017-01-17 2017-08-04 2017-05-05 BF-PST2-64631-GO-RFQ / Acquisition de mobilier et fourniture de bureau au profit du SP-PST Request for Quotations Limited 90,000.00 0.00 2018-07-10 2018-09-16 2018-10-16 NON CONSULTING SERVICES Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award CONSULTING FIRMS Contract Type Amount Status Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract

Page 2 BF-PST2-10036-CS-QCBS / économiques de 100km de pistes en HIMO Based 0.00 Under Open - International 236,000.00 2017-03-13 2017-08-04 2017-04-03 2017-05-17 2017-11-10 2017-06-14 2017-12-18 2017-07-14 2018-01-18 2017-08-18 2018-06-28 2017-09-22 2018-04-20 BF-PST2-12242-CS-QCBS / économiques pour le maraichage à Ouahigouya Based Open - National 82,000.00 0.00 Canceled 2017-05-18 2017-06-08 2017-07-02 2017-07-12 2017-07-22 2017-08-01 2017-09-14 2017-12-13 BF-PST2-12256-CS-QCBS / économiques pour le maraichage à Based Open - National 82,000.00 0.00 Canceled 2017-06-22 2017-07-13 2017-08-06 2017-08-11 2017-08-21 2017-08-31 2017-10-14 2018-01-12 BF-PST2-12262-CS-CQS / travaux pour l'aménagement d'une zone de maraichage à 0.00 Open - National 82,000.00 2018-02-05 2018-02-26 2018-03-22 2018-04-05 2018-05-19 2018-12-15 BF-PST2-12286-CS-QCBS / Etude de mise en place d'un plan de jalonnement favorisant les itinéraires de contournement Support and Sector Governance Based Open - International 545,455.00 0.00 Canceled 2017-10-11 2017-11-01 2017-11-25 2017-11-30 2017-12-10 2017-12-29 2018-02-11 2018-11-08 BF-PST2-12287-CS-QCBS / Etude de restructuration et extension du réseau de la SOTRACO Support and Sector Governance Based Open - National 91,000.00 0.00 Canceled 2017-11-27 2017-12-18 2018-01-11 2018-01-16 2018-01-26 2018-02-14 2018-03-30 2018-12-25 BF-PST2-12318-CS-QCBS / travaux de construction et de bitumage de 79 km Route Principale et 9km de bretelle et terre Based Open - International 2,300,000.00 1,485,902.76 Signed 2016-10-30 2016-11-20 2017-02-03 2017-03-03 2017-05-03 2017-03-13 2017-07-13 2017-04-17 2017-10-03 2017-06-30 2017-10-20 2019-08-19 BF-PST2-12316-CS-QCBS / Élaboration dune stratégie et dun plan de communication Based Open - National 36,000.00 27,109.48 Signed 2016-03-09 2015-04-03 2016-03-30 2016-05-13 2015-08-06 2016-06-10 2015-10-02 2016-07-10 2015-11-05 2016-08-14 2016-04-20 2016-09-18 2017-09-25 2016-12-17 BF-PST2-16754-CS-CQS / Recrutement d'un consultant pour la réalisation de l'enquête origine-destination à Ouaga Support and Sector Governance Open - National 181,818.00 173,878.34 Signed 2017-06-22 2017-05-24 2017-07-13 2017-08-26 2017-10-11 2017-09-25 2017-11-22 2017-10-30 2017-12-21 2018-04-28 BF-PST2-16752-CS-QCBS / travaux de construction et de bitumage de 79 km Route Principale et 9km de bretelle et terre Based Open - International 2,300,000.00 0.00 Canceled 2016-10-30 2017-06-04 2016-11-29 2017-01-02 2017-02-16 2017-03-02 2017-04-11 2017-06-24 2019-08-13 BF-PST2-16762-CS-CQS / Recrutement d'un consultant pour la révision du code de l'urbanisme Support and Sector Governance Under Open - National 136,363.00 0.00 2018-03-12 2018-03-09 2018-04-02 2018-05-16 2018-07-03 2018-06-15 2018-08-19 2019-02-15 BF-PST2-12273-CS-CQS / sociales de la gare routière, du marché à bétail, mise à niveau de l'abattoir a Open - National 82,000.00 0.00 Canceled 2017-08-21 2017-09-11 2017-10-05 2017-10-15 2017-11-28 2018-01-27 BF-PST2-12272-CS-QCBS / économiques de la gare routière, du marché à bétail, mise à niveau de l'abattoir a Based Open - National 272,000.00 0.00 Canceled 2017-07-18 2017-08-08 2017-09-21 2017-09-26 2017-10-06 2017-10-25 2017-12-08 2018-03-08 BF-PST2-12275-CS-QCBS / travaux de construction de la gare routière, du marché à bétail, mise à niveau de l'abattoir a Based Open - National 272,000.00 0.00 Canceled 2018-03-13 2018-04-03 2018-04-27 2018-05-02 2018-05-12 2018-05-22 2018-07-05 2019-01-31 BF-PST2-10058-CS-QCBS / Etudes de faisabilité techniques et économiques de la voirie (Koudougou, Ouahigouya, Tenkodogo) y compris l'assainissement de Koudougou Based Open - National 357,000.00 0.00 Canceled 2017-06-12 2017-05-22 2017-07-03 2017-07-31 2017-08-14 2017-08-24 2017-09-28 2017-11-16 2018-05-15 BF-PST2-41731-CS-CQS / Etudes de faisabilite techniques et économiques de la voirie (Koudougou, Ouahigouya, Tenkodogo) Open - National 357,000.00 0.00 Under 2018-01-30 2018-03-07 2018-02-20 2018-04-05 2018-07-03 2018-05-05 2018-06-18 2018-11-15 BF-PST2-10033-CS-QCBS / économiques construction de 40 ouvrages Based Open - International 327,000.00 0.00 Canceled 2017-04-17 2017-05-08 2017-06-21 2017-07-19 2017-08-18 2017-09-22 2017-12-05 2018-06-03 BF-PST2-41738-CS-CQS / economiques et DAO pour la construction de 40 ouvrages de franchissement et des remblais de raccordement Open - National 3,237,000.00 0.00 Canceled 2018-01-25 2018-02-15 2018-03-31 2018-04-30 2018-06-13 2018-11-10 BF-PST2-10039-CS-QCBS / économiques de 200km de pistes Based Open - National 364,000.00 0.00 Canceled 2017-03-30 2017-04-20 2017-06-03 2017-07-01 2017-07-31 2017-09-04 2017-11-17 2018-09-13

Page 3 BF-PST2-41739-CS-CQS / economiques et DAO pour les travaux d' amenagements de 200km de pistes Open - National 364,000.00 0.00 Under 2018-02-05 2018-01-20 2018-02-26 2018-04-11 2018-05-14 2018-05-11 2018-06-27 2018-06-24 2018-12-21 BF-PST2-10086-CS-QCBS / sociales de la voirie (Koudougou, Ouahigouya, Tenkodogo) y compris l'assainissement de Koudougou Based Open - National 357,000.00 0.00 Canceled 2017-11-07 2017-11-28 2017-12-26 2018-01-30 2018-02-09 2018-03-16 2018-04-29 2018-12-25 BF-PST2-10138-CS-QCBS / travaux de la voirie (Koudougou, Ouahigouya, Tenkodogo) y compris l'assainissement de Koudougou Based Open - National 357,000.00 0.00 2018-10-24 2018-11-14 2018-12-13 2019-01-12 2019-02-01 2019-03-08 2019-04-21 2019-10-18 BF-PST2-12238-CS-CQS / sociales pour l'aménagement d'une zone de maraichage à Open - National 90,909.00 0.00 Canceled 2017-08-10 2017-08-31 2017-09-24 2017-10-24 2017-11-28 2018-01-27 BF-PST2-12265-CS-QCBS / économiques pour gare routière, et marche secteur 6 de Dedougou Based Open - National 127,000.00 0.00 Canceled 2017-05-30 2017-06-20 2017-07-14 2017-07-24 2017-08-03 2017-09-07 2017-10-21 2018-01-19 BF-PST2-12276-CS-QCBS / Elaboration d'un schéma de drainage des eaux pluviales dans 12 villes et Evaluation environnementale et sociale Support and Sector Governance Based Under Open - International 801,818.00 0.00 2018-05-09 2018-04-09 2018-05-30 2018-07-06 2018-06-23 2018-06-26 2018-07-06 2018-07-25 2018-09-22 2019-03-21 BF-PST2-42112-CS-CQS / Etude de restructuration et extension du réseau de la SOTRACO Open - National 136,000.00 0.00 2018-05-15 2018-06-05 2018-07-19 2018-08-18 2018-10-01 2019-02-28 BF-PST2-12284-CS-QCBS / Politique de stationnement des véhicules particulier, des 2 roues et des véhicules et des véhicules de liaisons dans le centre Ouaga (plan de circulation et de stationnement dans le centre-ville de Ouagadougou) Based 0.00 Under Open - International 272,727.00 2017-06-06 2017-07-12 2017-07-06 2017-09-14 2017-12-29 2017-10-04 2018-02-07 2017-10-24 2018-03-07 2017-11-17 2018-06-28 2017-12-23 2018-07-21 BF-PST2-42109-CS-CQS / Plan de jalonnement favorisant les itineraires de contournement Open - National 200,000.00 0.00 2018-04-24 2018-05-15 2018-06-28 2018-07-28 2018-09-10 2019-03-09 BF-PST2-12281-CS-QCBS / faisabilité pour mise en place TCSP à Ouagadougou Based Open - International 454,545.00 0.00 2018-05-17 2018-06-07 2018-07-05 2018-08-19 2018-08-29 2018-09-22 2018-11-05 2019-03-05 BF-PST2-12270-CS-CQS / Contrôle construction gare routière marché Dedougou Open - National 145,000.00 0.00 2018-10-15 2018-11-05 2018-11-29 2018-12-29 2019-02-11 2019-02-12 BF-PST2-12253-CS-CQS / Contrôle pour l'aménagement à Ouahigouya zone maraichage Open - National 80,000.00 0.00 2018-10-24 2018-11-14 2018-12-08 2018-12-22 2019-02-04 2019-08-03 BF-PST2-45003-CS-CQS / Études techniques et économiques de 40 ouvrages de franchissement 0.00 Under Open - National 327,000.00 2018-01-25 2018-01-19 2018-02-15 2018-03-31 2018-04-11 2018-04-30 2018-06-04 2018-12-01 BF-PST2-52652-CS-CQS / Etude faisabilité construction canal drainage Koudougou Under Open - National 120,455.00 0.00 2018-03-07 2017-10-27 2018-04-06 2018-07-05 2018-08-14 2018-10-28 2019-02-25 BF-PST2-41697-CS-CQS / Etudes de faisabilité technique, économique de la gare routière, du marché à bétail, mise à niveau de l'abattoir a Open - National 272,727.00 0.00 Canceled 2018-02-14 2018-03-07 2018-04-20 2018-05-20 2018-06-24 2018-06-25 BF-PST2-41745-CS-CQS / Etudes de faisabilite techniques, économiques gare routiere et marche secteur 6 Open - National 127,000.00 0.00 Canceled 2018-02-12 2018-03-05 2018-04-18 2018-05-18 2018-07-01 2018-10-29 BF-PST2-66968-CS-CQS / Etudes pour l'aménagementzone de maraichage à sur 20 hectares et à Ouahigouya sur 50 hectares Open - National 163,636.00 0.00 2018-07-05 2018-07-26 2018-09-24 2018-10-24 2018-12-28 2019-04-27 BF-PST2-66971-CS-QCBS / Etudes de faisabilité pour les travaux de construction d'équipements structurants : gare routière à et Dédougou, marché à bétail à, la réhabilitation de l'abattoir Based Open - National 549,000.00 0.00 2018-07-16 2018-08-06 2018-10-20 2018-11-19 2018-12-19 2019-02-08 2019-04-14 2019-08-12 BF-PST2-12278-CS-QCBS / Etude de faisabilité pour l'aménagement de zones d'activités économiques dans 12 villes (aménagement initialement prévu) et Evaluation environnementale et sociale Based Open - International 801,818.00 0.00 Canceled 2018-05-09 2018-05-30 2018-06-23 2018-06-27 2018-07-07 2018-07-31 2018-09-28 2019-03-27

Page 4 BF-PST2-67549-CS-QCBS / Etude de faisabilité pour l'aménagement de zones d'activités économiques dans 12 villes capitales régionales du Burkina Faso Based Open - International 801,818.00 0.00 2018-06-28 2018-07-28 2018-09-16 2018-10-31 2018-11-20 2018-12-20 2019-02-17 2019-08-16 BF-PST2-12267-CS-CQS / Etudes environnementales gare routière et marché de Dedougou Open - National 64,000.00 0.00 Canceled 2018-08-12 2018-09-16 2018-11-20 2018-12-30 2019-03-30 2019-05-29 BF-PST2-12260-CS-CQS / Etudes environnementales aménagement maraichage à Open - National 90,909.00 0.00 Canceled 2018-05-23 2018-06-13 2018-08-02 2018-09-01 2018-11-15 2019-01-14 BF-PST2-41741-CS-CQS / sociales de la voirie (Koudougou, Ouahigouya, Tenkodogo) Open - National 357,000.00 0.00 Canceled 2018-02-15 2018-03-08 2018-04-21 2018-05-21 2018-07-04 2018-10-02 INDIVIDUAL CONSULTANTS Contract Type Amount Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PST2-12293-CS-INDV / Recrutement d'un consultant pour l'élaboration d'un plan d'action de lutte VIH/SIDA Individual Limited 54,545.00 0.00 Canceled 2017-06-07 2017-06-12 2017-07-03 2017-08-07 2017-09-06 BF-PST2-12317-CS-INDV / Etudes de définition des besoins de connectivité virtuelle ainsi que impact environnemental et social dans les agglomérations Individual Limited 45,000.00 45,223.91 Signed 2016-10-30 2016-09-21 2016-11-29 2017-05-24 2016-12-20 2017-06-28 2017-02-02 2017-10-17 2017-04-03 BF-PST2-39408-CS-INDV / Recrutement d'un Spécialiste en développement social Individual Open 76,364.00 0.00 Canceled 2017-12-28 2018-02-15 2018-03-08 2018-04-12 2018-04-30 BF-PST2-9861-CS-INDV / travaux de connectivité Individual Limited 50,000.00 0.00 Canceled 2018-03-21 2018-03-26 2018-04-16 2018-05-21 2018-11-17 BF-PST2-42117-CS-INDV / Etude diagnostic du système de passation des marchés des activités du PTDIU Individual Limited 25,000.00 27,552.46 Signed 2018-01-30 2018-02-21 2018-02-04 2018-03-06 2018-02-25 2018-04-20 2018-04-10 2018-05-26 2018-05-25 BF-PST2-43470-CS-INDV / Etude de préfaisabilité des investissements du volet urbain à Dédougou, Koudougou, Ouahigouya lot 1 Individual Limited 45,000.00 53,888.66 Signed 2016-11-20 2016-07-28 2016-12-20 2016-11-03 2017-01-24 2016-12-29 2017-04-18 2017-04-19 2017-07-17 BF-PST2-43469-CS-INDV / Etude de préfaisabilité des investissements du volet urbain à et Tenkodogo ( lot 2) Individual Limited 45,000.00 30,839.78 Signed 2016-11-20 2016-07-26 2016-12-04 2016-11-03 2017-01-18 2016-12-29 2017-04-07 2017-04-19 2017-07-06 BF-PST2-59641-CS-INDV / Impact social pour la délimitation du zonage des SDAU Individual Open 98,181.00 0.00 Under 2018-04-17 2018-07-02 2018-07-11 2018-08-10 2018-10-04 2019-01-02 BF-PST2-66969-CS-INDV / Notices d'impact environnemental et social (NIES) pour les activités du volet urbain du PTDIU à, Tenkodogo, Koudougou, Dédougou et à Ouahigouya Individual Open 150,000.00 0.00 2018-07-10 2018-09-08 2018-10-08 2018-11-21 2019-02-19 BF-PST2-66980-CS-INDV / PAR des personnes affectées par les activités du volet urbain du PTDIU à, Tenkodogo, Koudougou, Dédougou et à Ouahigouya Individual Open 150,000.00 0.00 2018-07-02 2018-09-20 2018-10-25 2018-12-23 2019-03-23 BF-PST2-41682-CS-INDV / sociales de la gare routière, du marché à bétail, mise à niveau de l'abattoir a Individual Limited 82,000.00 0.00 Canceled 2018-02-13 2018-02-14 2018-03-07 2018-04-11 2018-04-20