The Impact of Imperfect Processes on Production Run Times

Size: px
Start display at page:

Download "The Impact of Imperfect Processes on Production Run Times"

Transcription

1 The Impact of Imperfect Processes on Production Run Times Tonya Boone School of Business, College of William and Mary Williamsburg, VA Web: Ram Ganeshan School of Business, College of William and Mary Williamsburg, VA Web: Yuanming Guo Advanta Corporation Spring House, PA J. Keith Ord School of Business, Georgetown University Washington, DC,

2 Abstract This paper investigates the interaction between the economics of production and imperfections in the production process. SpeciÞcally, this paper is the Þrst to devise a model in an attempt to provide managers with guidelines to choose the appropriate production run times to buffer against both the production of defective items and stoppages occurring due to machine breakdowns. In addition to providing several structural properties of the model, we show that a manager will always incur a cost penalty when (s)he uses the results of two oft-cited models the EMQ (Economic Order/Manufacturing Quantity) and the NR-E (No-Resumption, Exponential machine breakdown) to determine production run times. KeyWords: Inventory Models; Logistics; Probability Models 2

3 1 Introduction Since its inception in Harris (1913), the EMQ (Economic Manufacturing Quantity or Economic Order Quantity (EOQ)) model has spawned research efforts primarily attempting to relax many of the idealistic assumptions built into it. Some of the more oft-cited extensions since 1970 include the incorporation of variable demand (Ritche and Tsado, 1986; Snyder, 1977); a Þnite production horizon (Schwarz, 1977); learning effects (Axäster and Elmaghraby, 1981; Chand, 1989); deteriorating items (Shah, 1977); setup reduction (Porteus, 1986); and the modeling of imperfect processes (Porteus, 1986; Groenevelt, Pintelon, and Seidmann, 1992a & b). Our primary focus in this paper is to incorporate imperfections in the production process into the classical EMQ model. Recent research analyzing the relationship between production lot sizes or run times and imperfect production processes have largely centered around two key issues: process deterioration and yield; and machine breakdowns and repairs. Porteus (1986) was perhaps the Þrst to model the relationship between production lot size and process deterioration. In his model, the production process can go outof-control (i.e., start producing defective items) each time it produces an 3

4 item. In a related paper, Rosenblatt and Lee (1986), assume that the duration of the in-control state is a random variable with an exponential failure time distribution. Both these seminal papers conclude that managers should use a smaller lot size or production run times since these lead to fewer defective items. Several researchers have since built upon these two initial studies. Notable among them are Chand (1989), who validates Porteus s (1986) model when learning effects are present. In two papers, Cheng (1989, 1991) extends the classic EMQ problem by assuming, Þrst, that the production costs are a function of reliability (proportion of defectives) and demand, and second, that they are a function of reliability and setup costs. Meanwhile, another stream of research has focused on the impact of machine breakdowns and preventive maintenance on production run times. Groenevelt et al. (1992a) show that when machine breakdown times follow an exponential distribution, the optimal lot size will always be greater than one in the classical EMQ model (intuitively this should be true for all breakdown time distributions). They later extend their model (1992b) to consider the problem of simultaneously determining lot size and safety stocks when repair times are signiþcant. Kun-Jen (1997) extends the Groenevelt et al. (1992a) model to provide bounds on the optimal lot size. With these bounds, a simple algorithm to Þnd the optimal lot size is also developed. Finally Liu 4

5 and Cao (1999) model a (m, M) production system (setup when inventory level is m, and shutoff when inventory is built up to M) thatissubjectto stochastic breakdowns. This model is similar in spirit to the classic (s, S) inventory model, i.e., Þnd the optimal reorder point (s), and order up to level (S) that minimizes inventory costs. Liu and Cao s objective, however, is to Þnd the right levels of m and M that minimize the production system costs. Although the various studies reviewed above provide considerable insight into how lot size is affected by either deterioration of the process or machine breakdowns, none of them incorporate both of these aspects into a lot-sizing model. Our goal in this paper is to model a scenario where there is both process deterioration and an eventual breakdown of the production process. The rest of the paper is organized as follows. The next section explains our notation and modeling environment. The third section further develops the model and analyzes the model structure in order to gain insight into the model and its solution. The fourth section presents detailed numerical analysis and managerial insights. Finally, in the Þfth section, we summarize the paper and suggest directions for some future research. 5

6 2 Model Development Following is the notation we use to develop our model. We defer the speciþc deþnitions of some of the variables until they are used. D = demand rate per unit time, h = the holding cost per unit per unit time, K = setup cost for each production run, M = the cost of corrective maintenance, N = random variable representing the number of defective items, R = production rate per unit time, s = cost incurred by producing a defective item, T = random variable denoting time-to-breakdown, U =Uniform distribution, θ = actual production time for each run, θ = optimal production run time, τ = time taken to transition from an in-control to an out-of-control state, f(.) = the probability distribution function (pdf) denoting the transition from an in-control to an out-of-control state, g(x) = the rate at which the production process produces defectives at time x, given that it is in an out-of-control state (in our model, g(x) = α), φ(.) =pdfoft, 6

7 Φ(.) = cumulative density function (cdf) of T, NR-E = No-Resumption, Exponential machine breakdown policy, and NR-E/U/α = NR-E policy with uniform failure time and a constant defective rate, α. We model a production system manufacturing a single item on a single machine in batches. The production rate (R) and the demand rate (D) are assumed to be constant and the production process is able to produce items at a rate faster than it is demanded (R >D). The machine requires asetup, costing $K, and is susceptible to stochastic breakdowns, with the time to breakdown described by a random variable T with probability density function φ(.). Additionally, the nature of the breakdown process follows the No-Resumption, General machine breakdown (NR-G, Groenevelt et al., 1992a) policy. Under this policy,...when a break-down takes place, the interrupted lot is aborted and a new one is to be started only when all available inventory is depleted. Maintenance of the production unit is carried out after a failure or a pre-determined amount of time, which ever comes Þrst. Each maintenance action restores the system to the same initial working conditions. As have researchers in the past, we assume that the setup and the cor- 7

8 rective maintenance (costing $M) do not take up any time. According to Groenevelt et al. (1992a), examples where such an assumption is justiþed include ßexible manufacturing system environments where setup times are rather small, or in production systems with a modular design where maintenance is fast and easy. In order to realistically incorporate the effects of process deterioration, we modify the NR-G policy the following way: at the beginning of a production lot, the process is in-control, and only items of acceptable quality are produced. In those lots where a breakdown occurs, the machine goes out of control, or, in other words, starts producing defective items prior to the breakdown. For the purposes of this study, the out of control state does not cause the breakdown, rather it precedes total machine failure. From a modeling perspective, we assume that the elapsed time, τ, until the production process shifts from the in-control to the out of control state is a random variable with pdf f(τ) and cumulative density function F (τ) withf(τ) > 0, 0 < τ T. For the purposes of exposition, we call f(τ) the failure time distribution (Barlow and Proschan, 1965). Additionally, we assume that the system produces defects at a rate g(x) atanygiventime x after the shift to the out-of-control state. We assume that g(x) is positive and non-decreasing, that is, g(x) > 0andg 0 (x) 0forx 0. The premise 8

9 is that once the system is in the out-of-control state, it produces defective items at a rate that is either a constant or increases with the time the system is in the out-of-control state. If N is the random variable representing the number of defective items produced in a production cycle where a breakdown has occurred, and if θ is the actual production time of the production run, it is easy to see that the expected number of defective items, E(N) is Z θ Z t Z t τ E(N) =R f(τ) g(x)dxdτφ(t)dt Our ultimate objective is to Þnd the production run length θ that minimizes the total cost per unit time ETC(θ). SpeciÞcally, the total cost is the sum of setup, maintenance, linear holding costs, and the cost of producing defective items. Since our production process has a renewal epoch at the start of every production run, we apply the renewal reward theorem (Ross 1981) to obtain the average total cost per unit time by taking the ratio of the expected cost per renewal cycle to its duration. = = E(cost/cycle) = Z θ 0 Z θ 0 Z 0 E(cost/cycle) T = t)φ(t)dt + h(r D)Rt2 {K + M + + sr 2D Z + {K + θ E(cost/cycle T = t)φ(t)dt (1) Z θ Z t E(cost/cycle) T = t)φ(t)dt Z t τ f(τ) g(x)dxdτ}φ(t)dt 0 0 h(r D)Rθ2 }φ(t)dt (2) 2D 9

10 Z θ Z t Z t τ = K + MΦ(θ)+sR φ(t) f(τ) g(x)dxdτ dt Z h(r D)R θ + {θ 2 (1 Φ(θ)) + t 2 φ(t)dt}, and (3) 2D 0 E(Duration of a cycle) = = Z 0 Z θ 0 = R D E(Duration of a cycle T = t)φ(t)dt Z R D tφ(t)dt + Rθ θ D φ(t)dt tφ(t)dt + Rθ (1 Φ(θ)) (4) 0 D Z θ Applying the renewal reward theorem, we get the long-term cost per unit time as ETC(θ) = E(cost/cycle) E(Duration of a cycle) K + MΦ(θ)+ h(r D)R {θ 2 (1 Φ(θ)) 2D = + R θ 0 t2 φ(t)dt} + sr R θ 0 φ(t) R t 0 f(τ) R t τ 0 g(x)dxdτ dt Rθ D (1 Φ(θ)) + R D R θ 0 tφ(t)dt. (5) The optimal production run time, θ, is determined by minimizing the cost expression (5) with respect to (wrt) θ. 3 The NR-E/U/α model In general, it is not easy to derive a closed expression for θ in (5). To make the analysis tractable but still allow us to gain sufficient insight, we 10

11 assign speciþc distributional forms for φ(.), f(.), and g(.). We assume for all future analysis that the time-to-breakdown, T, is exponentially distributed (Barlow and Proschan 1965) with mean µ. Furthermore, we assume that the failure time distribution is uniformly distributed between 0 and T,or f(τ) =1/t, T = t. The key idea behind this assumption is that the process is equally likely to fail anytime between [0, T]. Additionally, once the process is in the out-of-control state, it produces defectives at a constant rate, i.e., for a given breakdown time T = t, and a time to failure τ, g(x) =α, t τ x t (Rosenblatt and Lee, 1986; Guo, 1996). The NR-G policy with exponential time-to-breakdown is often described by the acronym NR-E policy. For the purposes of exposition, we call our model the NR-E/U/α indicating that the NR-E policy has been expanded to include the uniform failure time distribution and a constant defective rate, α. Substituting the speciþc distributional forms of φ(.), f(.), and g(.) into the total cost equation (5) and simplifying yields ETC(θ) = DµK R(1 e µθ ) + MDµ R + Dsα(eµθ µθ 1) 2(e µθ 1) + h(r D)(eµθ µθ 1). (6) µ(e µθ 1) To solve for θ, wetakethederivativeofetc(θ) with respect to θ and set it equal to zero. After some algebra, we show that the optimal solution, 11

12 θ, satisþes the equation e µθ + µθ 1= Let V (θ) =e (µθ) +µθ 1 2Dµ 2 K R(Dsαµ +2h(R D)). (7) 2Dµ 2 K R(Dsαµ+2h(R D)). Clearly, V (θ) is continuous, and V 0 (θ) =µ(1 e µθ ) > 0, implying that V (θ) is an increasing function wrt θ. Note that V (0) = (1 + 2Dµ 2 K R(Dsαµ+2h(R D)) ) < 0, and Limit θ V (θ). Hence, there is a unique point θ > 0suchthatV (θ )=0. For different distributional forms of φ(.), f(.), and g(.), one can conceivably have multiple solutions to the equation ETC(θ) θ = 0. The solution to such a scenario would be to choose the θ that produces the lowest ETC(θ). Observations and Analysis In this section, we analyze the structure of the model and the optimal production run time in order to gain insight into how the production run times are inßuenced by process deterioration and machine breakdowns. The proofs of the following propositions are available in the Appendix. Proposition 1 The minimum long range expected total cost ETC(θ ) is given by MDµ +h(r R D)θ + Dsαµ θ, where θ satisþes equation (7) 2 We note here that ETC(θ )istheaverage long-run minimum cost in a cycle and hence is a deterministic estimate of the minimum possible cost per 12

13 cycle. Therefore, it is possible for production cycles of length θ to have a cost greater than ETC(θ ). This proposition suggests that the holding and the defective costs are linear functions of the optimal lot size. Therefore, as the optimal lot size increases, so does the minimum long-range cost in a linear manner. Intuitively, an increase in the defective production rate would tend to reduce the optimal production run time. On the other hand, an increase in the failure rate would increase the production run length. We address this balance between the defective production rate and the failure rate and its impact on the production run length in the next set of propositions. Proposition 2 (a) The optimal production run size is a decreasing function of α. of α. (b) The minimum long-range cost per unit time is an increasing function (c) The optimal production run size is an increasing function of µ as long as 2π Dsαµπ 2 θ µ, where π = [e (µθ ) +µθ 1] (1 e µθ ). (d) A sufficient condition for the minimum long-range cost to increase with µ is that 2π Dsαµπ 2 θ µ. Proposition 2(a) is intuitive as α increases for a given failure rate, the cost of producing defective items increases and therefore smaller production runs are preferred. Although the optimal production run time decreases with 13

14 α, Proposition 2(b) shows that the total long-range optimal cost increases with α. The clear implication is that the penalty for ignoring process deterioration (as do the EMQ and the NR-E models) increases as the rate of deterioration increases. The condition in Proposition 2(c) is easily satisþed for low values of α relative to µ. A simple and intuitive explanation would be that as the failure rate increases, it may be the best strategy to wait until the machine fails, i.e., to perform the maintenance and the setups together. When α is large, however, its effect is large enough to start reducing the optimal production run in order to control the cost of defective items. Proposition 2(d) gives the condition under which the long-range optimal costs increase with the failure rates. The intuitive explanation of the condition is similar to the one provided for Proposition 2(c). Proposition 3 (a) θ is always less than the NR-E production run time (b) θ is greater than that for the classic EMQ only if e µθe + µθ e 1 2Dµ 2 K R(Dsαµ+2h(R D)), where θ e = q 2sD/hR(R D). Proposition 3(a) has an intuitive explanation. The NR-E model ignores the cost of process deterioration. A positive α tends to decrease the optimal production run time since shorter run times yield fewer defectives. Proposition 3(b), meanwhile, provides a condition for θ to be greater than θ EMQ the production run time for the EMQ. Unlike the NR-E model, a relatively 14

15 large α compared to µ would force smaller lot sizes, and hence lead to situations where θ < θ EMQ. On the other hand, a high µ relative to α would result in θ > θ EMQ, much like the NR-E model. Proposition 4 (a) There is always a cost penalty of using θ NR E for θ (b) The above cost penalty is always increasing in α. Proposition 4(a) shows that there is always a cost penalty for using the optimal θ NR E for θ. The importance of process deterioration costs is substantiated by Proposition 4(b) as the defective production rate increases, so does the penalty. Additionally, Groenevelt et al. (1992a) show that using the EMQ production run time instead of the NR-E run time incurs a penalty of about 2% of the total costs, indicating that using the EMQ production run time in an environment where both process deterioration and machine breakdowns exist further exacerbates the cost penalty. 4 Numerical Computation and Managerial Insights Assuming K = $450, M =$1, 000, h = $10, D = 30 items/time unit, R =35 items/time unit, and s = $100, we perform a numerical analysis to illustrate key insights from the model. Figure 1 shows how θ varies with α for different values of µ. Each point is obtained by solving for θ in equation (7) with the corresponding values of α and µ. As expected, the optimal production 15

16 run time decreases with increasing α. From a practical perspective, α can represent the type of deterioration to the production process, i.e., a wornouttoolwillhavealowervalueofα than a broken one. Such information can be used to adjust the run times correspondingly. However, this warrants constructing a database of the most frequent quality problems in order to get an estimate of the value of α. Figure 2, meanwhile, shows how the optimal production run time varies with µ for different values of α. The solutions of the NR-E model (α =0) and the EMQ (α =0,µ= 0) model are also shown in the Þgure. As in Proposition 3(a), the NR-E/U/α model always recommends a lower production run time than the NR-E model, and, in this case, is greater than the EMQ. However, contrary to the NR-E model, the NR-E/U/α solution canbesmallerthantheemq model solution, depending on the condition prescribed in Proposition 3(b). Table 1(a) gives the cost of misspecifying the NR-E/U/α model with the optimal solution of the NR-E model. When α 0, the NR-E/U/α model solution approaches that of the NR-E model. At low values of α, one would therefore expect the defective, holding, setup, and consequently expected total costs of both the models to be almost identical. For a given µ, the holding and the defective costs are increasing functions of α. Therefore, 16

17 as α increases, so does the cost of misspeciþcation of the holding and the defective costs. Furthermore, it is easy to see that the penalty also increases with demand rate (D), and unit defective cost (s). Another observation from Table 1(a) is that the cost of misspeciþcation decreases for higher values of µ. This is explained by virtue of the fact that when machine failures occur frequently, the actual production run time is smaller than the optimal one. Additionally, the time the production process is out-of-control also decreases, diminishing the effect of α on the total cost solution. On the other hand, since θ NR E θ and the time between setups decreases as α increases, the setup costs are higher when using θ. However as Table 1(a) shows, the misspeciþcation results in a cost penalty when all the cost components are considered. Table 1(b) meanwhile gives the cost of misspecifying the NR-E/U/α model by the optimal solution of the EMQ model. The errors of misspeciþcation, as one would expect, are much higher. In this case, the penalty decreases with increasing α and µ. Although counterintuitive, the decreasing penalty with higher α has a simple explanation. From Figure 2, as α increases, the optimal NR-E/U/α model solution is closer in magnitude to the EMQ solution than when compared to the NR-E model. One can therefore expect the cost penalty to be lower using the EMQ solution. It should be 17

18 noted that the magnitude of the penalty in using the EMQ model is higher than for the NR-E/U/α model for every µ and α combination. Another insight is that for high values of α and µ, i.e., when the process has high failure rates and defectives, there is a smaller cost penalty of misspeciþcation because of smaller production runs, and all models have high ETC 0 s. However, in a relatively reliable process, the cost of misspeciþcation is very high, illustrating the importance of including process deterioration in planning production run times. 5 Summary and Conclusions Our primary objective was to study the interaction between the economics of production and imperfections in the production process. Our key contribution is the inclusion of both process deterioration and machine breakdown into our model. In particular, we attempt to provide production managers with guidelines to choose the appropriate run times to buffer against the production of defective items and stoppages occurring due to machine breakdown. There are two primary Þndings from our model. First, when failure rates are signiþcantly higher than machine breakdown rates, our model suggests that a manager make the run times lower than the EMQ run times. Mean- 18

19 while, a relatively high machine breakdown rate would prompt an upward adjustment (relative to EMQ runtimes)intheruntimes,muchlikethe NR-E model. With exchange curves such as in Figures 1 and 2, a manager can quickly zero in on the appropriate run times with a reasonable estimate of the failure and breakdown rates. Second, we show that there is always a cost of misspecifying the production run time with the solution of either the EMQ or the NR-E models. Given that many managers still use the EMQ as a benchmark, such a misspeciþcation of run times might result in poor resource allocation decisions. Although our model integrates deterioration and breakdowns effectively, it is not without its shortcomings. Thus, we see future research in the following directions: (i) most of our results are for speciþc distributional forms of failure and breakdown distributions. They need to be extended to more general distributional forms. (ii) Our model can be extended to include inspection schedules. And (iii) future studies could include the impact of setup cost reduction on production run times, in addition to process deterioration and machine breakdown. 19

20 References Axäster, S. and Elmaghraby, S. E A note on EMQ under learning and forgetting, AIIE Transactions, 13: Barlow, R. E. and Proschan, F Mathematical theory of reliability, Wiley: New York. Chand, S Lot sizes and setup frequency with learning in setups and process quality. European Journal of Operations Research, 42: Cheng, T. C. E An economic production quantity model with ßexibility and reliability considerations. European Journal of Operations Research, 39: Cheng, T. C. E Economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions, 23: Groenevelt, H., Pinetelon, L., and Siedmann. 1992a. Production lot sizing with machine breakdowns. Management Science, 38, 1: Groenevelt, H., Pinetelon, L., and Siedmann. 1992b. Production batching with machine breakdowns and safety stocks. Operations Research, 40:

21 Harris, F. (1913). How many parts to make at once. Factory, The Magazine of Management, 10: ; 152. Kun-Jen, C Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering, 32: Liu, B. and Cao, J Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers and Operations Research, 26, 1: Porteus E. L Optimal lot-sizing, process quality improvement and setup cost reduction. Operations Research, 34: Ritche, E. and Tsado, A The penalties of using the EOQ: A comparison of lot-sizing rules for linearly increasing demand. Production and Inventory Management Journal, First Quarter: Ross, S. M Introduction of probability models, Academic Press:New York. Rosenblatt, M. J. and Lee, H. L Economic Production Cycles with imperfect production processes, IIE Transactions, 18: Schwarz, L. B A note on the near optimality of 5-EOQ s worth forecast horizons. Operations Research, 25: Shah, Y. K An order-level lot size model for deteriorating items. AIIE Transactions, 9:

22 Snyder, R. D The classical economic order quantity formula. Operations Research Quarterly, 24: Appendix: Proofs for Propositions 1-4. Proposition 1 Substituting the expression for e µθ from Equation (7) in Equation (6) we can, after some tedious algebra, obtain the result. Proposition 2 (a) Let θ 0 α = θ / α and θ 0 µ = θ / µ. To prove (a), we need to show that θ 0 α 0. Differentiating equation (7) wrt α yields: µe (µθ ) θ 0 α + µθ0 α = 2D 2 µ 3 Ks R(Dsαµ +2h(R D)) 2 Simplifying and manipulating gives which proves (a). 2D 2 µ 2 Ks θ 0 α = R(Dsαµ +2h(R D)) 2 (1 e µθ ) 0, (b) ETC(θ ) α = 2Dµ 2 K µ(1 e µθ )R(Dsαµ+2h(R D)) The required condition therefore follows. 22 [e (µθ ) +µθ 1= 1] 1= π 1. µ(1 e µθ ) µ

23 (c) Differntiating equation (7) wrt µ and manupulating the terms yields: µθ 0 µ (1 e µθ )= 4DµK R(Dsαµ +2h(R D)) 2D 2 µ 3 Ksα R(Dsαµ +2h(R D)) 2 θ (1 e µθ ) Using Equation (7), we can rewrite the above expression as: µ 2 θ 0 µ(1 e µθ )=2[e (µθ ) +µθ 1] Dsαµ[e (µθ ) +µθ 1] 2 θ µ(1 e µθ ) If π = [e (µθ ) +µθ 1], then θ 0 (1 e µθ ) µ =2π Dsαµπ 2 θ. It therefore follows µ that for θ 0 µ 0, 2π Dsαµπ 2 θ µ. (d) This is a straight-forward result in lieu of (c) Proposition 3 (a) Let ω(z) =e µz + µz 1. It is easy to see that ω(z) isanincreasing function and hence if z 1 >z 2, ω(z 1 ) > ω(z 2 ) and vice-versa. We know that the NR-E production run time, θ NR E is a solution to ω(θ NR E )= 2Dµ2 K 2hR(R D)). Note that ω(θ )= θ θ NR E. 2Dµ 2 K R(Dsαµ+2h(R D)) ω(θ NR E ). It therefore follows that (b) As before, recognizing that ω(z) is an increasing function, it is easy to see that for θ θ e, ω(θ )= Proposition 4 2Dµ 2 K R(Dsαµ+2h(R D)) ω(θ e)=e µθ e + µθ e 1. The long range cost of using the NR-E production run time in the NR- E/U/α model can be shown as MDµ +h(r D)θ R NR E+ Dsα(eµθ NR E µθnr E 1). 23 2(e µθ NR E 1)

24 The cost penalty is therefore Dsα(eµθ NR E µθ NR E 1), a positive value, which 2(e µθ NR E 1) proves (a). Additionally, Dsα(eµθ NR E µθ NR E 1) is an increasing function in 2(e µθ NR E 1) α, which proves (b). 24

25 Figure 1: How the Optimal Run Time (θ*) Varies with Failure Rate (α) Optimal Run Time (θ ) µ =0.9 µ =0.7 µ =0.5 µ =0.3 µ =0.1 µ values Failure Rate (α )

26 Figure 2: Comparing EMQ, NR-E, and the NR-E/U/ α Solution for Varying µ Optimal Optimal Run Time ( *) NR-E (α =0) α =.03 α =.05 θ EMQ =1.851 α =.07 α = Breakdown Rate (µ ) α values

27 Table 1(a): Misspecification Cost as % of the NR-E/U/α model cost for using the NR-E model solution α values % 0.03% 0.06% 0.11% 0.16% 0.23% 0.31% 0.39% 0.49% 0.59% % 0.08% 0.17% 0.28% 0.43% 0.59% 0.78% 0.99% 1.21% 1.45% % 0.12% 0.26% 0.43% 0.65% 0.90% 1.17% 1.47% 1.79% 2.13% % 0.14% 0.31% 0.52% 0.77% 1.07% 1.39% 1.74% 2.11% 2.51% µ values % 0.14% 0.31% 0.52% 0.78% 1.08% 1.41% 1.77% 2.15% 2.56% % 0.12% 0.27% 0.46% 0.69% 0.96% 1.26% 1.59% 1.95% 2.33% % 0.09% 0.20% 0.35% 0.54% 0.76% 1.01% 1.29% 1.60% 1.93% % 0.05% 0.13% 0.24% 0.38% 0.55% 0.74% 0.97% 1.21% 1.48% % 0.03% 0.08% 0.15% 0.24% 0.37% 0.51% 0.68% 0.87% 1.09% % 0.01% 0.04% 0.08% 0.15% 0.23% 0.34% 0.47% 0.61% 0.78% Table 1(b): Misspecification Cost as % of the NR-E/U/α model cost for using the EMQ model solution α values % 19.83% 19.16% 18.52% 17.90% 17.31% 16.73% 16.18% 15.65% 15.14% % 14.89% 14.03% 13.22% 12.46% 11.75% 11.08% 10.45% 9.86% 9.31% % 11.83% 10.92% 10.08% 9.31% 8.61% 7.95% 7.35% 6.79% 6.27% % 9.67% 8.79% 7.99% 7.26% 6.60% 5.99% 5.44% 4.94% 4.47% % 8.04% 7.22% 6.48% 5.81% 5.21% 4.66% 4.17% 3.72% 3.31% µ values % 6.74% 6.00% 5.33% 4.73% 4.19% 3.71% 3.27% 2.88% 2.52% % 5.66% 5.01% 4.43% 3.90% 3.42% 3.00% 2.61% 2.27% 1.96% % 4.76% 4.20% 3.70% 3.24% 2.82% 2.45% 2.11% 1.81% 1.54% % 4.00% 3.53% 3.10% 2.70% 2.34% 2.02% 1.72% 1.46% 1.23% % 3.36% 2.97% 2.60% 2.26% 1.95% 1.67% 1.42% 1.19% 0.99%

Optimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time

Optimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time Optimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time YUAN-SHYI PETER CHIU, SHUN-SHENG WANG, CHIA-KUAN TING*, HSIEN-JU CHUANG, YU-LUNG LIEN Department

More information

Manufacturing Lot Sizing with Backordering, Scrap, and Random Breakdown Occurring in Inventory-Stacking Period

Manufacturing Lot Sizing with Backordering, Scrap, and Random Breakdown Occurring in Inventory-Stacking Period Manufacturing Lot Sizing with ackordering, Scrap, and Random reakdown Occurring in Inventory-Stacking Period SINGA WANG CHIU a, JYH-CHAU YANG a,, SHU-YING CHEN KUO b a Department of usiness Administration,

More information

Research Article Investing in Lead-Time Variability Reduction in a Quality-Adjusted Inventory Model with Finite-Range Stochastic Lead-Time

Research Article Investing in Lead-Time Variability Reduction in a Quality-Adjusted Inventory Model with Finite-Range Stochastic Lead-Time Hindawi Publishing Corporation Journal of Applied Mathematics and Decision Sciences Volume 2008, Article ID 795869, 13 pages doi:10.1155/2008/795869 Research Article Investing in Lead-Time Variability

More information

Integrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time

Integrating Quality and Inspection for the Optimal Lot-sizing Problem with Rework, Minimal Repair and Inspection Time Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 Integrating Quality and Inspection for the Optimal Lot-sizing

More information

A Non-Random Optimization Approach to a Disposal Mechanism Under Flexibility and Reliability Criteria

A Non-Random Optimization Approach to a Disposal Mechanism Under Flexibility and Reliability Criteria The Open Operational Research Journal, 2011, 5, 1-18 1 Open Access A Non-Random Optimization Approach to a Disposal echanism Under Flexibility and Reliability Criteria P.K. Tripathy 1 and. Pattnaik *,2

More information

OPTIMAL LOT SIZING WITH SCRAP AND RANDOM BREAKDOWN OCCURRING IN BACKORDER REPLENISHING PERIOD

OPTIMAL LOT SIZING WITH SCRAP AND RANDOM BREAKDOWN OCCURRING IN BACKORDER REPLENISHING PERIOD Mathematical and Computational Applications, Vol. 6, No., pp. 39-339, 0. Association for Scientific Research OIMAL LO SIZING WIH SCRA AND RANDOM BRAKDOWN OCCURRING IN BACKORDR RLNISHING RIOD Chia-Kuan

More information

Fuzzy Inventory Model for Imperfect Quality Items with Shortages

Fuzzy Inventory Model for Imperfect Quality Items with Shortages Annals of Pure and Applied Mathematics Vol. 4, No., 03, 7-37 ISSN: 79-087X (P), 79-0888(online) Published on 0 October 03 www.researchmathsci.org Annals of Fuzzy Inventory Model for Imperfect Quality Items

More information

Mitigating end-effects in Production Scheduling

Mitigating end-effects in Production Scheduling Mitigating end-effects in Production Scheduling Bachelor Thesis Econometrie en Operationele Research Ivan Olthuis 359299 Supervisor: Dr. Wilco van den Heuvel June 30, 2014 Abstract In this report, a solution

More information

Effect of repair cost on the rework decision-making in an economic production quantity model

Effect of repair cost on the rework decision-making in an economic production quantity model Effect of repair cost on the rework decision-making in an economic production quantity model Singa Wang Chiu Department of Business Administration Chaoyang University of Technology 68, Gifeng E. Rd. Wufeng,

More information

Single-part-type, multiple stage systems

Single-part-type, multiple stage systems MIT 2.853/2.854 Introduction to Manufacturing Systems Single-part-type, multiple stage systems Stanley B. Gershwin Laboratory for Manufacturing and Productivity Massachusetts Institute of Technology Single-stage,

More information

64 The imperfect production systems have been investigated by many researchers in the literature under the relaxed assumption that the production proc

64 The imperfect production systems have been investigated by many researchers in the literature under the relaxed assumption that the production proc 212 2 Chinese Journal of Applied Probability and Statistics Vol.28 No.1 Feb. 212 Optimal Periodic Preventive Overhaul Policy for Degenerate Production Systems under a Free-Repair Warranty Hu Fei (Department

More information

Production Policies for Multi-Product Systems with Deteriorating. Process Condition

Production Policies for Multi-Product Systems with Deteriorating. Process Condition Production Policies for Multi-Product Systems with Deteriorating Process Condition Burak Kazaz School of Business, University of Miami, Coral Gables, FL 3324. bkazaz@miami.edu Thomas W. Sloan College of

More information

2001, Dennis Bricker Dept of Industrial Engineering The University of Iowa. DP: Producing 2 items page 1

2001, Dennis Bricker Dept of Industrial Engineering The University of Iowa. DP: Producing 2 items page 1 Consider a production facility which can be devoted in each period to one of two products. For simplicity, we assume that the production rate is deterministic and that production is always at full capacity.

More information

Research Article A Deterministic Inventory Model of Deteriorating Items with Two Rates of Production, Shortages, and Variable Production Cycle

Research Article A Deterministic Inventory Model of Deteriorating Items with Two Rates of Production, Shortages, and Variable Production Cycle International Scholarly Research Network ISRN Applied Mathematics Volume 011, Article ID 657464, 16 pages doi:10.540/011/657464 Research Article A Deterministic Inventory Model of Deteriorating Items with

More information

Replenishment Decision Making with Permissible Shortage, Repairable Nonconforming Products and Random Equipment Failure

Replenishment Decision Making with Permissible Shortage, Repairable Nonconforming Products and Random Equipment Failure Research Journal of Applied Sciences, ngineering and echnology (0): 07-080, 0 ISSN: 00-767 Maxwell Scientific Organization, 0 Submitted: March, 0 Accepted: March 6, 0 Published: October, 0 Replenishment

More information

Supply planning optimization for linear production system with stochastic lead-times and quality control

Supply planning optimization for linear production system with stochastic lead-times and quality control Supply planning optimization for linear production system with stochastic lead-times and quality control O Ben Ammar, B Bettayeb, Alexandre Dolgui To cite this version: O Ben Ammar, B Bettayeb, Alexandre

More information

A Continuous-Review Inventory Model with Disruptions at Both Supplier and Retailer

A Continuous-Review Inventory Model with Disruptions at Both Supplier and Retailer A Continuous-Review Inventory Model with isruptions at Both Supplier and Retailer Lian Qi epartment of Business Administration, Missouri University of Science & Technology, Rolla, MO Zuo-Jun Max Shen epartment

More information

Stochastic Renewal Processes in Structural Reliability Analysis:

Stochastic Renewal Processes in Structural Reliability Analysis: Stochastic Renewal Processes in Structural Reliability Analysis: An Overview of Models and Applications Professor and Industrial Research Chair Department of Civil and Environmental Engineering University

More information

SYMBIOSIS CENTRE FOR DISTANCE LEARNING (SCDL) Subject: production and operations management

SYMBIOSIS CENTRE FOR DISTANCE LEARNING (SCDL) Subject: production and operations management Sample Questions: Section I: Subjective Questions 1. What are the inputs required to plan a master production schedule? 2. What are the different operations schedule types based on time and applications?

More information

An EPQ Model of Deteriorating Items using Three Parameter Weibull Distribution with Constant Production Rate and Time Varying Holding Cost"

An EPQ Model of Deteriorating Items using Three Parameter Weibull Distribution with Constant Production Rate and Time Varying Holding Cost An EPQ Model of Deteriorating Items using Three Parameter Weibull Distribution with Constant Production Rate and Time Varying Holding Cost" KIRTAN PARMAR, U. B. GOTHI Abstract - In this paper, we have

More information

ISyE 6201: Manufacturing Systems Instructor: Spyros Reveliotis Spring 2006 Solutions to Homework 1

ISyE 6201: Manufacturing Systems Instructor: Spyros Reveliotis Spring 2006 Solutions to Homework 1 ISyE 601: Manufacturing Systems Instructor: Spyros Reveliotis Spring 006 Solutions to Homework 1 A. Chapter, Problem 4. (a) D = 60 units/wk 5 wk/yr = 310 units/yr h = ic = 0.5/yr $0.0 = $0.005/ yr A =

More information

An Inventory Model for Gompertz Distribution Deterioration Rate with Ramp Type Demand Rate and Shortages

An Inventory Model for Gompertz Distribution Deterioration Rate with Ramp Type Demand Rate and Shortages International Journal of Statistics and Systems ISSN 0973-675 Volume, Number (07), pp. 363-373 Research India Publications http://www.ripublication.com An Inventory Model for Gompertz Distribution Deterioration

More information

Transient Analysis of Single Machine Production Line Dynamics

Transient Analysis of Single Machine Production Line Dynamics International Journal of Operations Research International Journal of Operations Research Vol. 11, No. 2, 040 050 (2014) Transient Analysis of Single Machine Production Line Dynamics Farhood Rismanchian

More information

FUZZY CONTINUOUS REVIEW INVENTORY MODEL WITHOUT BACKORDER FOR DETERIORATING ITEMS. Ajanta Roy *, G.P. Samanta

FUZZY CONTINUOUS REVIEW INVENTORY MODEL WITHOUT BACKORDER FOR DETERIORATING ITEMS. Ajanta Roy *, G.P. Samanta Electronic Journal of Applied Statistical Analysis EJASA, Electron. J. App. Stat. Anal. Vol., Issue 1 (9), 58 66 ISSN 7-5948, DOI 1.185/i75948vn1p58 8 Università del Salento SIBA http://siba-ese.unile.it/index.php/ejasa/index

More information

Retailer s Optimal Ordering Policy for Deteriorating Items with Ramp-Type Demand under Stock-Dependent Consumption Rate

Retailer s Optimal Ordering Policy for Deteriorating Items with Ramp-Type Demand under Stock-Dependent Consumption Rate Information and Management Sciences Volume 19, Number 2, pp. 245-262, 28 Retailer s Optimal Ordering Policy for Deteriorating Items with Ramp-Type Demand under Stock-Dependent Consumption Rate Kun-Shan

More information

Inventory Management of Time Dependent. Deteriorating Items with Salvage Value

Inventory Management of Time Dependent. Deteriorating Items with Salvage Value Applied Mathematical Sciences, Vol., 008, no. 16, 79-798 Inventory Management of ime Dependent Deteriorating Items with Salvage Value Poonam Mishra and Nita H. Shah* Department of Mathematics, Gujarat

More information

Research Article A Partial Backlogging Inventory Model for Deteriorating Items with Fluctuating Selling Price and Purchasing Cost

Research Article A Partial Backlogging Inventory Model for Deteriorating Items with Fluctuating Selling Price and Purchasing Cost Advances in Operations Research Volume 2012, Article ID 385371, 15 pages doi:10.1155/2012/385371 Research Article A Partial Backlogging Inventory Model for Deteriorating Items with Fluctuating Selling

More information

A new condition based maintenance model with random improvements on the system after maintenance actions: Optimizing by monte carlo simulation

A new condition based maintenance model with random improvements on the system after maintenance actions: Optimizing by monte carlo simulation ISSN 1 746-7233, England, UK World Journal of Modelling and Simulation Vol. 4 (2008) No. 3, pp. 230-236 A new condition based maintenance model with random improvements on the system after maintenance

More information

Q = (c) Assuming that Ricoh has been working continuously for 7 days, what is the probability that it will remain working at least 8 more days?

Q = (c) Assuming that Ricoh has been working continuously for 7 days, what is the probability that it will remain working at least 8 more days? IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2005, Professor Whitt, Second Midterm Exam Chapters 5-6 in Ross, Thursday, March 31, 11:00am-1:00pm Open Book: but only the Ross

More information

Single-part-type, multiple stage systems. Lecturer: Stanley B. Gershwin

Single-part-type, multiple stage systems. Lecturer: Stanley B. Gershwin Single-part-type, multiple stage systems Lecturer: Stanley B. Gershwin Flow Line... also known as a Production or Transfer Line. M 1 B 1 M 2 B 2 M 3 B 3 M 4 B 4 M 5 B 5 M 6 Machine Buffer Machines are

More information

On service level measures in stochastic inventory control

On service level measures in stochastic inventory control On service level measures in stochastic inventory control Dr. Roberto Rossi The University of Edinburgh Business School, The University of Edinburgh, UK roberto.rossi@ed.ac.uk Friday, June the 21th, 2013

More information

A Dynamic Programming Approach for Sequential Preventive Maintenance Policies with Two Failure Modes

A Dynamic Programming Approach for Sequential Preventive Maintenance Policies with Two Failure Modes Chapter 1 A Dynamic Programming Approach for Sequential Preventive Maintenance Policies with Two Failure Modes Hiroyuki Okamura 1, Tadashi Dohi 1 and Shunji Osaki 2 1 Department of Information Engineering,

More information

MIT Manufacturing Systems Analysis Lecture 10 12

MIT Manufacturing Systems Analysis Lecture 10 12 2.852 Manufacturing Systems Analysis 1/91 Copyright 2010 c Stanley B. Gershwin. MIT 2.852 Manufacturing Systems Analysis Lecture 10 12 Transfer Lines Long Lines Stanley B. Gershwin http://web.mit.edu/manuf-sys

More information

Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation

Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation H. Zhang, E. Cutright & T. Giras Center of Rail Safety-Critical Excellence, University of Virginia,

More information

Mixture inventory model in fuzzy demand with controllable lead time

Mixture inventory model in fuzzy demand with controllable lead time Mixture inventory model in fuzzy demand with controllable lead time Jason Chao-Hsien Pan Department of Industrial Management National Taiwan University of Science and Technology Taipei 106 Taiwan R.O.C.

More information

Non-observable failure progression

Non-observable failure progression Non-observable failure progression 1 Age based maintenance policies We consider a situation where we are not able to observe failure progression, or where it is impractical to observe failure progression:

More information

7.1 INTRODUCTION. In this era of extreme competition, each subsystem in different

7.1 INTRODUCTION. In this era of extreme competition, each subsystem in different 7.1 INTRODUCTION In this era of extreme competition, each subsystem in different echelons of integrated model thrives to improve their operations, reduce costs and increase profitability. Currently, the

More information

Chap 4. Software Reliability

Chap 4. Software Reliability Chap 4. Software Reliability 4.2 Reliability Growth 1. Introduction 2. Reliability Growth Models 3. The Basic Execution Model 4. Calendar Time Computation 5. Reliability Demonstration Testing 1. Introduction

More information

Forecasting Wind Ramps

Forecasting Wind Ramps Forecasting Wind Ramps Erin Summers and Anand Subramanian Jan 5, 20 Introduction The recent increase in the number of wind power producers has necessitated changes in the methods power system operators

More information

Research Article Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times

Research Article Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times Advances in Operations Research Volume 2009, Article ID 153910, 10 pages doi:10.1155/2009/153910 Research Article Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times Lika Ben-Dati,

More information

MACHINE DEDICATION UNDER PRODUCT AND PROCESS DIVERSITY. Darius Rohan. IBM Microelectonics Division East Fishkill, NY 12533, U.S.A.

MACHINE DEDICATION UNDER PRODUCT AND PROCESS DIVERSITY. Darius Rohan. IBM Microelectonics Division East Fishkill, NY 12533, U.S.A. Proceedings of the 1999 Winter Simulation Conference P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds. MACHINE DEDICATION UNDER PRODUCT AND PROCESS DIVERSITY Darius Rohan IBM Microelectonics

More information

CENTER FOR MULTIMODAL SOLUTIONS FOR CONGESTION MITIGATION (CMS)

CENTER FOR MULTIMODAL SOLUTIONS FOR CONGESTION MITIGATION (CMS) Final Report to the CENTER FOR MULTIMODAL SOLUTIONS FOR CONGESTION MITIGATION (CMS) CMS Project Number: 2011-023 Project Title: The Impacts of Freight Mode Splitting on Congestion, Risk, and Delivery Reliability

More information

Introduction to Reliability Theory (part 2)

Introduction to Reliability Theory (part 2) Introduction to Reliability Theory (part 2) Frank Coolen UTOPIAE Training School II, Durham University 3 July 2018 (UTOPIAE) Introduction to Reliability Theory 1 / 21 Outline Statistical issues Software

More information

Cost models for lot streaming in a multistage flow shop

Cost models for lot streaming in a multistage flow shop Omega 33 2005) 435 450 www.elsevier.com/locate/omega Cost models for lot streaming in a multistage flow shop Huan Neng Chiu, Jen Huei Chang Department of Industrial Management, National Taiwan University

More information

IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2011, Professor Whitt Class Lecture Notes: Tuesday, March 1.

IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2011, Professor Whitt Class Lecture Notes: Tuesday, March 1. IEOR 46: Introduction to Operations Research: Stochastic Models Spring, Professor Whitt Class Lecture Notes: Tuesday, March. Continuous-Time Markov Chains, Ross Chapter 6 Problems for Discussion and Solutions.

More information

Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection

Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection J Journal of Mathematics and Statistics Original Research Paper Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection alip Singh

More information

Online Appendix Liking and Following and the Newsvendor: Operations and Marketing Policies under Social Influence

Online Appendix Liking and Following and the Newsvendor: Operations and Marketing Policies under Social Influence Online Appendix Liking and Following and the Newsvendor: Operations and Marketing Policies under Social Influence Ming Hu, Joseph Milner Rotman School of Management, University of Toronto, Toronto, Ontario,

More information

Optimal production lots for items with imperfect production and screening processes without using derivatives

Optimal production lots for items with imperfect production and screening processes without using derivatives 7 Int. J. anagement and Enterprise Development, Vol. 4, No., 05 Optimal production lots for items with imperfect production and screening processes without using derivatives Hui-ing Teng Department of

More information

A Brief Introduction to Proofs

A Brief Introduction to Proofs A Brief Introduction to Proofs William J. Turner October, 010 1 Introduction Proofs are perhaps the very heart of mathematics. Unlike the other sciences, mathematics adds a final step to the familiar scientific

More information

An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time

An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time IOP Conference Series: Materials Science and Engineering PAPER OPE ACCESS An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual

More information

Testing Restrictions and Comparing Models

Testing Restrictions and Comparing Models Econ. 513, Time Series Econometrics Fall 00 Chris Sims Testing Restrictions and Comparing Models 1. THE PROBLEM We consider here the problem of comparing two parametric models for the data X, defined by

More information

Chapter 16 focused on decision making in the face of uncertainty about one future

Chapter 16 focused on decision making in the face of uncertainty about one future 9 C H A P T E R Markov Chains Chapter 6 focused on decision making in the face of uncertainty about one future event (learning the true state of nature). However, some decisions need to take into account

More information

Integrated Production and Maintenance Policies in Produce-to-Stock Systems with Information Sharing

Integrated Production and Maintenance Policies in Produce-to-Stock Systems with Information Sharing Integrated Production and Maintenance Policies in Produce-to-Stock Systems with Information Sharing Boray Huang and Seyed M.R. Iravani Department of Industrial Engineering and Management Sciences Northwestern

More information

Integrated Production Scheduling and Preventive Maintenance Planning for a Single Machine Under a Cumulative Damage Failure Process

Integrated Production Scheduling and Preventive Maintenance Planning for a Single Machine Under a Cumulative Damage Failure Process Integrated Production Scheduling and Preventive Maintenance Planning for a Single Machine Under a Cumulative Damage Failure Process Yarlin Kuo, Zi-Ann Chang Department of Industrial Engineering and Management,

More information

Optimal lot sizing for deteriorating items with expiration date

Optimal lot sizing for deteriorating items with expiration date Optimal lot sizing for deteriorating items with expiration date Ping-Hui Hsu 1 Hui Ming Wee Hui-Ming Teng 3 1, Department of Industrial Engineering Chung Yuan Christian University Chungli Taiwan R.O.C.

More information

Preventive maintenance decision optimization considering maintenance effect and planning horizon

Preventive maintenance decision optimization considering maintenance effect and planning horizon 30 2 2015 4 JOURNAL OF SYSTEMS ENGINEERING Vol30 No2 Apr 2015 1, 2, 3 (1, 010021; 2, 611130; 3, 610041) :,,,,,,, :;; ; : O2132 : A : 1000 5781(2015)02 0281 08 doi: 1013383/jcnkijse201502016 Preventive

More information

MITOCW MITRES6_012S18_L23-05_300k

MITOCW MITRES6_012S18_L23-05_300k MITOCW MITRES6_012S18_L23-05_300k We will now go through a beautiful example, in which we approach the same question in a number of different ways and see that by reasoning based on the intuitive properties

More information

Recap. Probability, stochastic processes, Markov chains. ELEC-C7210 Modeling and analysis of communication networks

Recap. Probability, stochastic processes, Markov chains. ELEC-C7210 Modeling and analysis of communication networks Recap Probability, stochastic processes, Markov chains ELEC-C7210 Modeling and analysis of communication networks 1 Recap: Probability theory important distributions Discrete distributions Geometric distribution

More information

Representation and Analysis of Transfer Lines. with Machines That Have Different Processing Rates

Representation and Analysis of Transfer Lines. with Machines That Have Different Processing Rates March, 1985 Revised November, 1985 LIDS-P-1446 Representation and Analysis of Transfer Lines with Machines That Have Different Processing Rates by Stanley B. Gershwin 35-433 Massachusetts Institute of

More information

Buyer - Vendor incentive inventory model with fixed lifetime product with fixed and linear back orders

Buyer - Vendor incentive inventory model with fixed lifetime product with fixed and linear back orders National Journal on Advances in Computing & Management Vol. 5 No. 1 April 014 1 Buyer - Vendor incentive inventory model with fixed lifetime product with fixed and linear back orders M.Ravithammal 1 R.

More information

STOCHASTIC REPAIR AND REPLACEMENT OF A STANDBY SYSTEM

STOCHASTIC REPAIR AND REPLACEMENT OF A STANDBY SYSTEM Journal of Mathematics and Statistics 0 (3): 384-389, 04 ISSN: 549-3644 04 doi:0.3844/jmssp.04.384.389 Published Online 0 (3) 04 (http://www.thescipub.com/jmss.toc) STOCHASTIC REPAIR AND REPLACEMENT OF

More information

The Stochastic Economic Lot Sizing Problem for Continuous Multi-Grade Production

The Stochastic Economic Lot Sizing Problem for Continuous Multi-Grade Production STOCHASTIC MODELS OF MANUFACTURING AND SERVICE OPERATIONS SMMSO 2009 The Stochastic Economic Lot Sizing Problem for Continuous Multi-Grade Production George Liberopoulos, Dimitrios Pandelis and Olympia

More information

EOQ Model For Deteriorating Items Under Two And Three Parameter Weibull Distribution And Constant IHC With Partially Backlogged Shortages

EOQ Model For Deteriorating Items Under Two And Three Parameter Weibull Distribution And Constant IHC With Partially Backlogged Shortages International Journal of Science, Engineering and Technology Research (IJSETR), Volume 4, Issue 0, October 205 EOQ Model For Deteriorating Items Under Two And Three Parameter Weibull Distribution And Constant

More information

Computing Consecutive-Type Reliabilities Non-Recursively

Computing Consecutive-Type Reliabilities Non-Recursively IEEE TRANSACTIONS ON RELIABILITY, VOL. 52, NO. 3, SEPTEMBER 2003 367 Computing Consecutive-Type Reliabilities Non-Recursively Galit Shmueli Abstract The reliability of consecutive-type systems has been

More information

Technical Companion to: Sharing Aggregate Inventory Information with Customers: Strategic Cross-selling and Shortage Reduction

Technical Companion to: Sharing Aggregate Inventory Information with Customers: Strategic Cross-selling and Shortage Reduction Technical Companion to: Sharing Aggregate Inventory Information with Customers: Strategic Cross-selling and Shortage Reduction Ruomeng Cui Kelley School of Business, Indiana University, Bloomington, IN

More information

Advanced Computer Networks Lecture 3. Models of Queuing

Advanced Computer Networks Lecture 3. Models of Queuing Advanced Computer Networks Lecture 3. Models of Queuing Husheng Li Min Kao Department of Electrical Engineering and Computer Science University of Tennessee, Knoxville Spring, 2016 1/13 Terminology of

More information

Cost Analysis of a vacation machine repair model

Cost Analysis of a vacation machine repair model Available online at www.sciencedirect.com Procedia - Social and Behavioral Sciences 25 (2011) 246 256 International Conference on Asia Pacific Business Innovation & Technology Management Cost Analysis

More information

Calculation exercise 1 MRP, JIT, TOC and SOP. Dr Jussi Heikkilä

Calculation exercise 1 MRP, JIT, TOC and SOP. Dr Jussi Heikkilä Calculation exercise 1 MRP, JIT, TOC and SOP Dr Jussi Heikkilä Problem 1: MRP in XYZ Company fixed lot size Item A Period 1 2 3 4 5 6 7 8 9 10 Gross requirements 71 46 49 55 52 47 51 48 56 51 Scheduled

More information

A novel repair model for imperfect maintenance

A novel repair model for imperfect maintenance IMA Journal of Management Mathematics (6) 7, 35 43 doi:.93/imaman/dpi36 Advance Access publication on July 4, 5 A novel repair model for imperfect maintenance SHAOMIN WU AND DEREK CLEMENTS-CROOME School

More information

Input control in a batch production system with lead times, due dates and random yields

Input control in a batch production system with lead times, due dates and random yields European Journal of Operational Research 126 (2) 371±385 www.elsevier.com/locate/dsw Theory and Methodology Input control in a batch production system with lead times, due dates and random yields Yunzeng

More information

CHAPTER 10 RELIABILITY

CHAPTER 10 RELIABILITY CHAPTER 10 RELIABILITY Failure rates Reliability Constant failure rate and exponential distribution System Reliability Components in series Components in parallel Combination system 1 Failure Rate Curve

More information

CHAPTER 1 A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS AND IMPERFECT REPAIR

CHAPTER 1 A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS AND IMPERFECT REPAIR CHAPTER 1 A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS AND IMPERFECT REPAIR Helge Langseth and Bo Henry Lindqvist Department of Mathematical Sciences Norwegian University of

More information

JRF (Quality, Reliability and Operations Research): 2013 INDIAN STATISTICAL INSTITUTE INSTRUCTIONS

JRF (Quality, Reliability and Operations Research): 2013 INDIAN STATISTICAL INSTITUTE INSTRUCTIONS JRF (Quality, Reliability and Operations Research): 2013 INDIAN STATISTICAL INSTITUTE INSTRUCTIONS The test is divided into two sessions (i) Forenoon session and (ii) Afternoon session. Each session is

More information

A CONDITION-BASED MAINTENANCE MODEL FOR AVAILABILITY OPTIMIZATION FOR STOCHASTIC DEGRADING SYSTEMS

A CONDITION-BASED MAINTENANCE MODEL FOR AVAILABILITY OPTIMIZATION FOR STOCHASTIC DEGRADING SYSTEMS A CONDITION-BASED MAINTENANCE MODEL FOR AVAILABILITY OPTIMIZATION FOR STOCHASTIC DEGRADING SYSTEMS Abdelhakim Khatab, Daoud Ait-Kadi, Nidhal Rezg To cite this version: Abdelhakim Khatab, Daoud Ait-Kadi,

More information

Replenishment Planning for Stochastic Inventory System with Shortage Cost

Replenishment Planning for Stochastic Inventory System with Shortage Cost Replenishment Planning for Stochastic Inventory System with Shortage Cost Roberto Rossi UCC, Ireland S. Armagan Tarim HU, Turkey Brahim Hnich IUE, Turkey Steven Prestwich UCC, Ireland Inventory Control

More information

Decision Sciences, Vol. 5, No. 1 (January 1974)

Decision Sciences, Vol. 5, No. 1 (January 1974) Decision Sciences, Vol. 5, No. 1 (January 1974) A PRESENT VALUE FORMULATION OF THE CLASSICAL EOQ PROBLEM* Robert R. Trippi, California State University-San Diego Donald E. Lewin, Joslyn Manufacturing and

More information

Group Acceptance Sampling Plans using Weighted Binomial on Truncated Life Tests for Inverse Rayleigh and Log Logistic Distributions

Group Acceptance Sampling Plans using Weighted Binomial on Truncated Life Tests for Inverse Rayleigh and Log Logistic Distributions IOSR Journal of Mathematics (IOSRJM) ISSN: 78-578 Volume, Issue 3 (Sep.-Oct. 01), PP 33-38 Group Acceptance Sampling Plans using Weighted Binomial on Truncated Life Tests for Inverse Rayleigh and Log Logistic

More information

DESIGN OF PREVENTIVE MAINTENANCE SCHEDULING MODEL FOR DETERIORATING SYSTEMS

DESIGN OF PREVENTIVE MAINTENANCE SCHEDULING MODEL FOR DETERIORATING SYSTEMS DESIGN OF PREVENTIVE MAINTENANCE SCHEDULING MODEL FOR DETERIORATING SYSTEMS P.A. Ozor a, S.O. Onyegegbu Department of Mechanical Engineering, University of Nigeria, Nsukka, NIGERIA. a Email: paul.ozor@unn.edu.ng

More information

A Two Stage Group Acceptance Sampling Plans Based On Truncated Life Tests For Inverse And Generalized Rayleigh Distributions

A Two Stage Group Acceptance Sampling Plans Based On Truncated Life Tests For Inverse And Generalized Rayleigh Distributions Vol-, Issue- PP. 7-8 ISSN: 94-5788 A Two Stage Group Acceptance Sampling Plans Based On Truncated Life Tests For Inverse And Generalized Rayleigh Distributions Dr. Priyah Anburajan Research Scholar, Department

More information

1 Production Planning with Time-Varying Demand

1 Production Planning with Time-Varying Demand IEOR 4000: Production Management Columbia University Professor Guillermo Gallego 28 September 1 Production Planning with Time-Varying Demand In this lecture we present a few key results in production planning

More information

Reliability of Safety-Critical Systems 5.1 Reliability Quantification with RBDs

Reliability of Safety-Critical Systems 5.1 Reliability Quantification with RBDs Reliability of Safety-Critical Systems 5.1 Reliability Quantification with RBDs Mary Ann Lundteigen and Marvin Rausand mary.a.lundteigen@ntnu.no &marvin.rausand@ntnu.no RAMS Group Department of Production

More information

A Note on Ending Inventory Valuation in Multiperiod. Production Scheduling

A Note on Ending Inventory Valuation in Multiperiod. Production Scheduling A Note on Ending Inventory Valuation in Multiperiod Production Scheduling Wilco van den Heuvel Albert P.M. Wagelmans 1 Econometric Institute Report EI 2002-25 Econometric Institute, Erasmus University

More information

A Proof of the EOQ Formula Using Quasi-Variational. Inequalities. March 19, Abstract

A Proof of the EOQ Formula Using Quasi-Variational. Inequalities. March 19, Abstract A Proof of the EOQ Formula Using Quasi-Variational Inequalities Dir Beyer y and Suresh P. Sethi z March, 8 Abstract In this paper, we use quasi-variational inequalities to provide a rigorous proof of the

More information

Chapter 2 SOME ANALYTICAL TOOLS USED IN THE THESIS

Chapter 2 SOME ANALYTICAL TOOLS USED IN THE THESIS Chapter 2 SOME ANALYTICAL TOOLS USED IN THE THESIS 63 2.1 Introduction In this chapter we describe the analytical tools used in this thesis. They are Markov Decision Processes(MDP), Markov Renewal process

More information

Zero-Inventory Conditions For a Two-Part-Type Make-to-Stock Production System

Zero-Inventory Conditions For a Two-Part-Type Make-to-Stock Production System Zero-Inventory Conditions For a Two-Part-Type Make-to-Stock Production System MichaelH.Veatch Francis de Véricourt October 9, 2002 Abstract We consider the dynamic scheduling of a two-part-type make-tostock

More information

Technical Memorandum Number 758. The Multiple-Family ELSP with Safety Stocks. Serge M. Karalli and A. Dale Flowers

Technical Memorandum Number 758. The Multiple-Family ELSP with Safety Stocks. Serge M. Karalli and A. Dale Flowers Technical Memorandum Number 758 The Multiple-Family ELSP with Safety Stocks by Serge M. Karalli and A. Dale Flowers January 2003 Department of Operations Weatherhead School of Management Case Western Reserve

More information

Research Article Binomial Schedule for an M/G/1 Type Queueing System with an Unreliable Server under N-Policy

Research Article Binomial Schedule for an M/G/1 Type Queueing System with an Unreliable Server under N-Policy Advances in Decision Sciences, Article ID 819718, 6 pages http://dx.doi.org/10.1155/2014/819718 Research Article Binomial Schedule for an M/G/1 Type Queueing System with an Unreliable Server under N-Policy

More information

37.3. The Poisson Distribution. Introduction. Prerequisites. Learning Outcomes

37.3. The Poisson Distribution. Introduction. Prerequisites. Learning Outcomes The Poisson Distribution 37.3 Introduction In this Section we introduce a probability model which can be used when the outcome of an experiment is a random variable taking on positive integer values and

More information

Online Appendices: Inventory Control in a Spare Parts Distribution System with Emergency Stocks and Pipeline Information

Online Appendices: Inventory Control in a Spare Parts Distribution System with Emergency Stocks and Pipeline Information Online Appendices: Inventory Control in a Spare Parts Distribution System with Emergency Stocks and Pipeline Information Christian Howard christian.howard@vti.se VTI - The Swedish National Road and Transport

More information

MIT Manufacturing Systems Analysis Lectures 6 9: Flow Lines

MIT Manufacturing Systems Analysis Lectures 6 9: Flow Lines 2.852 Manufacturing Systems Analysis 1/165 Copyright 2010 c Stanley B. Gershwin. MIT 2.852 Manufacturing Systems Analysis Lectures 6 9: Flow Lines Models That Can Be Analyzed Exactly Stanley B. Gershwin

More information

A Multi-Item Inventory Control Model for Perishable Items with Two Shelves

A Multi-Item Inventory Control Model for Perishable Items with Two Shelves The Eighth International Symposium on Operations Research and Its Applications (ISORA 9) Zhangjiajie, China, September 2 22, 29 Copyright 29 ORSC & APORC, pp. 36 314 A Multi-Item Inventory Control Model

More information

M/M/1 Queueing systems with inventory

M/M/1 Queueing systems with inventory Queueing Syst 2006 54:55 78 DOI 101007/s11134-006-8710-5 M/M/1 Queueing systems with inventory Maike Schwarz Cornelia Sauer Hans Daduna Rafal Kulik Ryszard Szekli Received: 11 August 2004 / Revised: 6

More information

Expected Time Delay in Multi-Item Inventory Systems with Correlated Demands

Expected Time Delay in Multi-Item Inventory Systems with Correlated Demands Expected Time Delay in Multi-Item Inventory Systems with Correlated Demands Rachel Q. Zhang Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, Michigan 48109 Received

More information

Implementation of Weibull s Model for Determination of Aircraft s Parts Reliability and Spare Parts Forecast

Implementation of Weibull s Model for Determination of Aircraft s Parts Reliability and Spare Parts Forecast Implementation of Weibull s Model for Determination of Aircraft s Parts Reliability and Spare Parts Forecast Nataša Kontrec, Milena Petrović, Jelena Vujaković, and Hranislav Milošević University of Priština,

More information

Optimal Backlogging Over an Infinite Horizon Under Time Varying Convex Production and Inventory Costs

Optimal Backlogging Over an Infinite Horizon Under Time Varying Convex Production and Inventory Costs Optimal Backlogging Over an Infinite Horizon Under Time Varying Convex Production and Inventory Costs Archis Ghate Robert L. Smith Industrial Engineering, University of Washington, Box 352650, Seattle,

More information

Calculus Review Session. Rob Fetter Duke University Nicholas School of the Environment August 13, 2015

Calculus Review Session. Rob Fetter Duke University Nicholas School of the Environment August 13, 2015 Calculus Review Session Rob Fetter Duke University Nicholas School of the Environment August 13, 2015 Schedule Time Event 2:00 2:20 Introduction 2:20 2:40 Functions; systems of equations 2:40 3:00 Derivatives,

More information

Optimal Time and Random Inspection Policies for Computer Systems

Optimal Time and Random Inspection Policies for Computer Systems Appl. Math. Inf. Sci. 8, No. 1L, 413-417 214) 413 Applied Mathematics & Information Sciences An International Journal http://dx.doi.org/1.12785/amis/81l51 Optimal Time and Random Inspection Policies for

More information

Maintenance is a hidden and often ignored expense for all businesses, impacting every industry

Maintenance is a hidden and often ignored expense for all businesses, impacting every industry QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL Qual. Reliab. Engng. Int. 2005; 21:355 366 Published online 27 January 2005 in Wiley InterScience (www.interscience.wiley.com). DOI: 10.1002/qre.616 Research

More information

Online Supplement to Delay-Based Service Differentiation with Many Servers and Time-Varying Arrival Rates

Online Supplement to Delay-Based Service Differentiation with Many Servers and Time-Varying Arrival Rates Online Supplement to Delay-Based Service Differentiation with Many Servers and Time-Varying Arrival Rates Xu Sun and Ward Whitt Department of Industrial Engineering and Operations Research, Columbia University

More information

Network design for a service operation with lost demand and possible disruptions

Network design for a service operation with lost demand and possible disruptions Network design for a service operation with lost demand and possible disruptions Opher Baron, Oded Berman, Yael Deutsch Joseph L. Rotman School of Management, University of Toronto, 105 St. George St.,

More information