Appendix Z. Groundwater Assessment Supplementary Report. Document Name i Insert Month/Year
|
|
- Abner Morrison
- 5 years ago
- Views:
Transcription
1 Appendix Z Groundwater Assessment Supplementary Report Document Name i Insert Month/Year
2 Australasian Groundwater and Environmental Consultants Pty Ltd Level 2 / 15 Mallon Street Bowen Hills, QLD 4006 Australia ABN T F brisbane@ageconsultants.com.au JST/ae (G1438A.Elimatta) 14 November 2013 RE: ELIMATTA COAL PROJECT RESPONSE TO GOVERNMENT SUBMISSIONS 1 INTRODUCTION AustralAsian Resource Consultants Pty Ltd (AARC) is coordinating the environmental approvals process for the Elimatta Coal Project on behalf of New Hope Group. Australasian Groundwater and Environmental Consultants Pty Ltd (AGE) prepared the technical report for the groundwater impact assessment. AARC has now requested AGE respond to submissions from the State Government on the groundwater impact assessment report, which is a component of the Environmental Impact Statement. 2 SCOPE OF WORK The objective of the assessment was to respond to the Government submissions below. The report needs to clearly identify the groundwater flow directions for all the aquifers in the area, both locally and regionally, any impacts of geological structures in the area. Refer also to groundwater-related comments provided elsewhere in this attachment. Regional scale studies in the Surat Basin have generally reported that groundwater flow occurs from the recharge areas (that outcrop in an arc from Warwick to Roma) to the south, south-west and west (QWC 2012). The exception to this, is the northern portion of the Surat Basin that is in Fitzroy River catchment and north the Great Dividing Range. In the Wandoan region (north of the Great Dividing Range), available data indicates groundwater generally flows towards the north, north-east. Hodgkinson et al. (2009) noted that topography controls hydraulic gradients in shallow systems with groundwater flow from recharge areas towards the south, south-west and west, but with a minor northern flow component in some aquifers. Water level measurements in the monitoring bore network installed in the Walloon Coal Measures for the Elimatta Project confirm this northerly groundwater flow direction. Asia Pacific LNG (2012) assessed flow directions in the deeper underlying Hutton Sandstone and reported a northerly flow direction (refer Figure 2.1 below) in the region north of the Great Dividing Range. Head Office Level 2 / 15 Mallon Street, Bowen Hills, QLD 4006, Australia T F brisbane@ageconsultants.com.au Newcastle Office Harbour Pier, Shop 8, 21 Merewether Street, Newcastle, NSW 2300, Australia T F newcastle@ageconsultants.com.au
3 Page 2 Figure 2.1: Groundwater levels in the Hutton Sandstone (from Australia Pacific LNG (2012) The EIS indicates that, groundwater levels indicate topographic control, rather than conductivity variability or faulting as controls on aquifer flow behaviour. It is suggested that this inconsistency be clarified in the EIS, including further details on fault style (reverse), fault mineralisation or evidence of current stress regimes that would make the faulting or conductivity variability appear more likely to impair conductivity. Further clarification is also sought to validate the model used in the EIS in relation to the predicted extent of depressurization. In greenfield areas undisturbed by significant extraction of groundwater, such as in the Elimatta region, the influence of structures such as faults, or changes in hydraulic conductivity on groundwater levels is commonly not detectable in groundwater levels. The effect of structures on water levels in greenfield sites is typically a small scale influence that cannot be detected with widely spaced drilling and monitoring bores installed for an EIS. At the scale of the investigation, topography has the most obvious influence on the groundwater levels and flow directions. It is only when mining commences and depressurisation of the coal seams and overlying strata occurs, that the influence of structure or hydraulic conductivity variability may become apparent. Faults can act as barriers to groundwater flow, or serve to enhance flow along the fault plane, but these local scale effects cannot be observed from widely spaced groundwater monitoring networks or drilling programs.
4 Page 3 Insite Geology (2009) assessed the geotechnical conditions at the Elimatta Project. The geotechnical study identified five main faults interpreted from various exploration programmes at Elimatta. All faults were inferred to be sub-vertical normal faults with the distance of throw from 1 m to 35 m as shown in Figure 2.2 below. The faults generally trend down-dip, and will be gradually removed by mining. During the mining process, the faults will be exposed in the highwall and are likely to drain and depressurise along the fault plane. Features of such fault zones include the undamaged rock, the damaged (fractured) zone and the core (gouge) zone. The hydraulic properties of these zones will control the magnitude of the drainage and depressurisation. The water pressures and the cross sectional area of the fractured material around the fault plane control the volume and rate of water transferred through the fault. The cross sectional area of a fault plane is typically much less than the cross sectional area of other strata exposed by mining (including the coal seams). This implies then that faults typically only contribute in a minor way to the depressurisation and drainage induced by mining. The groundwater model developed for the EIS will be reviewed after ten years of mining to determine if the predicted zone of depressurisation and impacts are accurate. Review and recalibration of the groundwater model will be undertaken as required by the conditions of the Project s Water Licence issued under the Water Act 2000.
5 Page 4 Figure 2.2: Faults and fault throw (from Insite Geology 2008)
6 Page 5 The EIS is suggested to identify the regional groundwater resources that may be impacted by the Project. If the Juandah Coal Measures (JCM) is to be listed as a separate aquifer to the Great Artesian Basin (GAB), please specify the Juandah Coal Measures and the GAB differently. The GAB is not a geologic basin, but a hydrogeological basin comprising various parts of other geologic basins. Within the project area, the GAB includes the Surat Basin and the upper sedimentary sequences of the Bowen Basin. The main aquifer systems in the GAB in the Project area are the Gubberamunda Sandstone, Springbok Sandstone, Hutton Sandstone and Precipice Sandstone. Mining is only predicted to impact on groundwater levels in the Juandah Coal Measures, the upper unit within the Walloon Coal Measures Subgroup. Mining will not impact upon groundwater levels and the availability of water in the aquifers of the GAB. The Gubberamunda Sandstone is remote from the site, and the Hutton and Precipice Sandstones are located at significant depth below the proposed mining sequence. While the Springbok Sandstone is shown on geological maps as being present in the project area, exploration drilling within the lease did not detect an upper sandstone unit that could be classified as an aquifer. 3 REFERENCES Australia Pacific LNG, (2012), Upstream Phase 1 Reedy Creek Aquifer Injection Trial Management Plan Environmental Authority No PEN Q MP-001. Queensland Water Commission, (2012), Underground Water Impact Report for the Surat Cumulative Management Area, 18 July Hodgkinson J., Preda M., Hortle A., McKillop M. & Foster L., (2009), The Potential Impact of Carbon Dioxide Injection on Freshwater Aquifers: The Surat and Eromanga Basins in Queensland, Department of Employment, Economic Development and Innovation, Brisbane. Insite Geology, (2009), Elimatta Coal Project Southern Queensland, Report on Assessment of Geotechnical Conditions for Northern Energy Corporation Limited, February Please contact me if you have any queries, or if any clarification is required. Yours faithfully, JAMES S. TOMLIN Principal Hydrogeologist Australasian Groundwater and Environmental Consultants Pty Ltd
Galilee Basin Mining and Groundwater
Galilee Basin Mining and Groundwater Impact on the Great Artesian Basin John Hillier Acknowledgements Some diagrams used in this presentation have been obtained from: EIS for proposed mining ventures A
More informationGroundwater Systems of Gas Producing Regions. in Queensland, Australia
Groundwater Systems of Gas Producing Regions in Queensland, Australia Technical Communication 3 July 2015 About GasFields Commission Queensland The GasFields Commission is the independent statutory body
More informationREID S DOME GAS DRILLING PROGRAM TO COMMENCE
State Gas Pty Ltd (ACN 617 322 488) C/- GPO Box 525 BRISBANE QLD 4001 ASX RELEASE 22 October 2018 REID S DOME GAS DRILLING PROGRAM TO COMMENCE HIGHLIGHTS State Gas has engaged Silver City Drilling to drill
More informationAcquisition agreement to move to 100% ownership of the Ashford Coking Coal Project
Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT
More informationGalilee Basin. Galilee Basin Hydrogeological Investigations. Briefing to RAPAD Longreach, 16 May rpsgroup.com.au
Galilee Basin Galilee Basin Hydrogeological Investigations Briefing to RAPAD Longreach, 16 May 20116 1 The Galilee Basin Geologically & hydrogeological diverse sedimentary Covers 247,000 km 2 The Galilee
More informationA summary of the review s findings for the six areas, listed in Table 1, is given below.
11 February 2010 Company Announcements Office Australian Stock Exchange 20 Bridge Street SYDNEY NSW 2000 RESULTS OF COAL PROJECT REVIEW Pacific Enviromin Limited (PEV) is pleased to release the main findings
More informationDafny E., Groundwater flow model for the Lucky-Last spring group. University of Southern Queensland, Toowoomba, Australia.
Disclaimer This document is based mainly on specific materials supplied by the OGIA. The scattered spatial and temporal data limits the accuracy of the presented model from being use for different purposes
More informationKATINGAN RIA COAL RESOURCE UPGRADE
Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 14 February 2013 Dear Sir/Madam KATINGAN RIA COAL RESOURCE UPGRADE Fivefold increase in Measured and
More informationBridger, Wyoming Maiden Coal JORC Inferred Resource of 910Mt
ASX / Media Announcement 23 January 2013 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 www.carbonenergy.com.au
More informationFor personal use only
ASX RELEASE 4 May 2012 Injune Thermal Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Injune Thermal Coal Project with the following JORC classification: A total Resource
More informationSantos CSM Activities. Steve Taylor 27 August 2004
Santos CSM Activities Steve Taylor 27 August 2004 1 Moranbah CSM Area " 50 0 50 100 km Santos Operated Permits Other Permits Denison Trough Exploration Santos CSM Activities Main Baralaba CSM Fairway Scotia
More informationASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018
ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018 TRIAL BULK SAMPLING PROGRAMME COMPLETED AT BLACKRIDGE CONGLOMERATE-HOSTED GOLD PROJECT QUEENSLAND Approx 8.5 tonnes of samples collected covering
More informationSupplementary expert report on groundwater impacts to the Land Court by Dr John Webb
Coast and Country Association of Queensland Inc. & Ors ats Hancock Coal Pty Ltd, Land Court of Queensland Proceeding MRA713-13 & EPA714-13 Objection to Mining lease and Environmental Authority for Kevin
More informationFor personal use only
COMPANY ANNOUNCEMENT Coal exploration permit granted and target of up to 155 million tonnes identified Highlights EPC 1992 ( the Etona Coal Project ) has now been granted Independent Geological sign-off
More informationCentral Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement
Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT
More informationExpert Response Report to the Land Court by Mark Stewart
Hancock Coal Pty Ltd v Kelly & Coast & Country Association of Queensland and Ors Expert Response Report to the Land Court by Mark Stewart 1. Experts Details & Qualifications 1.1 Name My name is Mark Stewart.
More informationFor personal use only
About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold: Key Projects Gold Mt Clement (WA) Yandal (WA) Rare Metals Yangibana (WA) Buchanan's Creek (QLD)
More informationFor personal use only
ASX announcement 1 July 2015 Stanmore acquires the Wotonga coking coal deposit in the Bowen Basin Highlights Stanmore has acquired the Wotonga coking coal deposit contained within Mineral Development Licence
More informationMethods of Interpreting Ground Stress Based on Underground Stress Measurements and Numerical Modelling
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2006 Methods of Interpreting Ground Stress Based on Underground Stress Measurements and
More informationBlanca Payàs 1, Ryan Morris 2, Alain Arnaud 1, David Albiol 1, John Bradshaw 3, Javier Duro 1. Abstract
Surface monitoring using radar satellite images to measure ground deformation: applied to Coal Seam Gas production areas to comply with regulatory requirements Blanca Payàs 1, Ryan Morris 2, Alain Arnaud
More information48% Increase in JORC Inferred Coal Resource to 2.0 Billion tonnes
ASX / Media Announcement 2 April 2013 Level 9, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3156 7777 fax + 61 (0) 7 3156 7776 Carbon Energy
More informationFor personal use only
30 April 2012 Highlights: MARCH QUARTERLY REPORT Comet Ridge plans three wells and moves towards pilot scheme as gas supply tightens in Queensland and coal mine power demand in Galilee Basin drives gas
More informationJV PROJECT UPDATE JORC COAL RESOURCE
29 May 2012 ASX Announcement JV PROJECT UPDATE JORC COAL RESOURCE Dynasty Metals Australia (ASX:DMA) holds a minority interest of approximately 8.65 in a joint venture company with a subsidiary of Tiaro
More informationTrouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development
ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com
More informationTIARO COAL JOINT VENTURE IRWIN RIVER COAL & COAL SEAM GAS QUEENSLAND TCJV AND WEST AUSTRALIAN COAL SEAM GAS PROJECT
Suite 2, Mezanine Level, 35-37 Havelock Street WestPerth WA 6000 Telephone (08) 9481 8668 Facsimile: (08) 9322 7211 ASX ANNOUNCEMENT/MEDIA RELEASE 30th September 2008 TIARO COAL JOINT VENTURE IRWIN RIVER
More informationHow NSW and Queensland Coalfields Differ - What We Need To Do Better
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2001 How NSW and Queensland Coalfields Differ - What We Need To Do Better B. Nicholls
More informationFor personal use only
ASX RELEASE 3 May 2012 For personal use only Wilpeena PCI Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Wilpeena PCI Coal Project with the following JORC classification:
More informationFor personal use only
29 July 2011 ASX RELEASE ACN 008 901 380 ABN 35 008 901 380 Level 1 460 Roberts Road Subiaco, Western Australia 6008 P.O. Box 66 Floreat Forum WA 6014 Email:wally@stratmin.com.au Website: www.stratmin.com.au
More informationGeotechnical modelling based on geophysical logging data
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 Geotechnical modelling based on geophysical logging data Peter Hatherly Coalbed
More informationSTRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS
National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m
More informationFor personal use only
1.74 Billion Tonne JORC Resource 17 th September 2012 East Energy Resources are pleased to announce updated JORC Resource of 1.74Bt East Energy Resources Limited (ASX:EER) is pleased to announce their
More informationFor personal use only
6 March 2013 New Concept Mining Study for Belview Coking Coal Project Highlights 3.5Mtpa ROM production over 64 year mine life single underground longwall project High quality coking coal plus secondary
More informationAustralia Pacific LNG Upstream Phase 1
Rev Date Details By Check Eng/QA App 2 11/3/2014 Updated following DoE review R. Morris A. Moser J. Long 1 10/2/2014 Updated following DoE review R. Morris A. Moser J. Long 0 21/3/2013 Issued for Use R.
More informationMain Means of Rock Stress Measurement
Real Stress Distributions through Sedimentary Strata and Implications for Reservoir Development and Potential Gas and Coal Development Strategies Ian Gray Sigra Pty Ltd 93 Colebard St West, Acacia Ridge,
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More informationFor personal use only
ENERGY to GROW Second project expands South Pentland by more than 50% to 3.6 5.0 Bt thermal coal JORC Exploration Target October 8, 2012 ASX: BWD Level 8 102 Adelaide Street Brisbane, QLD, 4000 T: +61
More informationFor personal use only
ASX Code: HDG Fully paid s hares: 74,854,029 Announcement to the Australian Stock Exchange 7 th June 2011 Unlisted options: 7,000,000 Increased Exploration Target of 1.4 to 1.6 Billion Tonnes of Coal for
More informationN. J. Macala. C ONTENT S. LIST OF PLATES.
REPORT ON WATER SUikLY AT MANBULLOO STATION, NORTHERN TERRITORY. by N. J. Macala. Records 1957/62. C ONTENT S. Page. Introduction. 1. General Geology, 1. Hydrology. 1. New Bore Sites Selected. 2. Reference.
More informationVISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT
ASX ANNOUNCEMENT November 10, 2010 Highlights: VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT Coal Resource on the flagship Vista Coal Project increases by 297.1Mt
More informationHigh Grade Gold Intercepts at Bangaba
20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com
More informationMalachite Resources Limited ABN
Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (
More informationDIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT
ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned
More informationFor personal use only
ASX ANNOUNCEMENT 13 August 2012 INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 2.6 BILLION TONNES ADDITIONAL INFERRED RESOURCE DEFINED Key Points: 2.6 Billion Tonnes classified over the initial Phase
More informationFor personal use only
ASX Announcement Moorlands Project Concept Mining Study Update Concept Mining Study confirms the proposed South Pit as initial mining focus at the Moorlands Project with: Strip ratios of 2 to 4 bcm/tonne,
More informationMAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY
24 April 2013 ASX: AOH, FSE: A2O MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 1,000 hole RAB drilling programme directed at large copper-gold anomalies Altona Mining Limited ( Altona ) has commenced
More informationQueensland Mining Corporation Limited
Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced
More informationHYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX
R. Gebrekristos, P.Cheshire HYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX R. Gebrekristos Digby Wells Environmental P. Cheshire Groundwater Monitoring Services Abstract
More informationASX Announcements & Media Release
ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing
More informationNarrabri Coal Operations Pty Ltd
Narrabri Coal Operations Pty Ltd ABN: 15 129 850 139 Narrabri Coal Mine Stage 2 Longwall Project Hydrogeological Assessment Prepared by: Aquaterra Consulting Pty Ltd November 2009 Specialist Consultant
More informationFor personal use only
ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress
More informationSTEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE
November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE
More informationMethodology: Ranking, Site Assessments & Volumetrics
Methodology: Ranking, Site Assessments & Volumetrics INTRODUCTION Queensland CO 2 Storage Atlas Aim to identify with highest possible certainty prospective basins for geological storage in onshore Queensland
More informationYELLOW ROCK RESOURCES LIMITED ABN
YELLOW ROCK RESOURCES LIMITED ABN 90 116 221 740 16 October 2007 Companies Announcement Office ASX Limited 20 Bridge Street Sydney NSW 2000 DOUGLAS RANGE URANIUM PROJECT UPDATE Yellow Rock Resources Ltd
More informationTWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT
ABN 17 124 444 122 10 June 2009 The Manager Company Announcements Office Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam HIGHLIGHTS TWO HIGH-GRADE GOLD ZONES DISCOVERED AT
More informationFor personal use only
15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill
More informationAxiom Announces First Energy Project Eden Vale Sedimentary Uranium
ASX / Media Release 4 June 2013 Axiom Announces First Energy Project Eden Vale Sedimentary Uranium HIGHLIGHTS An application lodged for exploration of known sedimentary hosted uranium deposit over 330km
More informationFor personal use only
Tuesday, 1 March 2011 Companies Announcement Office Australian Securities Exchange Limited Level 6, 20 Bridge Street Sydney NSW 2000 Via E-lodgement Re-commencement of Fe Resource definition drilling at
More informationKURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE
ABN 61 119 966 353 17 June 2008 ASX RELEASE KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE Northern Uranium Limited (ASX: NTU) will immediately commence an investigation of phosphate potential at its Kurundi
More informationFor personal use only
ASX RELEASE 31 May 2011 Eagle Downs Hard Coking Coal Project Study Results Highlights: The Manager of the Eagle Downs Hard Coking Coal Project (the Project ) has released a Study detailing the outcomes
More informationGEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,
20 June 2008 Companies Announcement Office Via Electronic Lodgement GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, Fiji. (Geopacific
More informationEncouraging drill results from Paroo Range
17 July 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Encouraging drill results from Paroo Range Highlights Significant uranium mineralisation at the 100%
More informationFor personal use only
29 July 2011 The Manager Company Announcements Office Australian Securities Exchange Exchange Centre 20 Bridge Street SYDNEY NSW 2000 Dear Sir Quarterly Activities Report for the period ended 30 June 2011
More informationLAND AND WATER. Using Numerical Groundwater Modelling to Constrain Flow Rates and Flow Paths in the Surat Basin through Environmental Tracer Data
LAND AND WATER Using Numerical Groundwater Modelling to Constrain Flow Rates and Flow Paths in the Surat Basin through Environmental Tracer Data Adam Siade, Henning Prommer, Axel Suckow, Matthias Raiber
More informationFor personal use only
ASX:LEG 10 July 2014 Fraser Range Aeromagnetic Survey Identifies Targets Seven priority targets considered prospective for nickel-copper Targets interpreted to relate to intrusive mafic/ultramafic bodies
More informationASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION
Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE
More informationANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE
ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE 1. Background In 1996 a slope failure occurred at the Round Hill open pit mine, operated by Macraes Mining Company Ltd. The failure as shown
More informationFor personal use only
ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks
More informationMilford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT
Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street
More informationWater Inflow Issues above Longwall Panels
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2006 Water Inflow Issues above Longwall Panels W. Gale SCT Operations, Australia Publication
More informationCOOMALIE RIDGES RADIOMETRIC SURVEY, RUM JUNGLE AREA,
COMMONWEALTH OF AUSTRALIA DEPARTMENT OF NATIONAL DEVELOPMENT BUREAU OF MINERAL RESOURCES, GEOLOGY AND GEOPHYSICS RECORD No. 1966/51 500917 COOMALIE RIDGES RADIOMETRIC SURVEY, RUM JUNGLE AREA, NORTHERN
More informationSepola Project Area in Mali Extended
ASX Release 4 June 2009 Golden Rim Resources Ltd ABN 39 006 710 774 www.goldenrim.com.au Head Office Level 2 10 Outram Street WEST PERTH WA 6872 AUSTRALIA T: + 61 8 9481 5758 F: + 61 8 9481 5759 Exploration
More informationFor personal use only
28 th November 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 AMENDMENT ANNOUCEMENT AUROCH STAKES HIGHLY-PROSPECTIVE IOCG PROJECT AT LAKE TORRENS Auroch
More informationGeology, Coal and Gas Resources of the Clarence Moreton Basin. Mark Dawson 05/04/2017
Geology, Coal and Gas Resources of the Clarence Moreton Basin Mark Dawson 05/04/2017 2 Talk Outline Who am I? Regional Geology Stratigraphy Previous Mining Future Resource Areas 3 Who am I? Graduated from
More informationNSW MINING Health, Safety, Environment & Community
NSW MINING Health, Safety, Environment & Community Developing Natural Landform in Mine Overburden Rehabilitation Tasman Willis Land Management Officer Mangoola Open Cut - Glencore Developing Natural Landform
More informationQuarterly Report Quarter ended 30 June 2010
28 July 2010 The Company Announcement Officer Australian Securities Exchange Ltd via electronic lodgement Quarterly Report Quarter ended 30 June 2010 Highlights PhosEnergy - Uranium Extraction Technology
More informationMAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND
Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 15 October 2014 MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT
More informationI have prepared a memorandum in response to the Second Supplementary Report. This memorandum is annexed as Annexure A.
1 LAND COURT OF QUEENSLAND REGISTRY: Brisbane NUMBER: EPA495-15 MRA496-15 MRA497-15 Applicant: New Acland Coal Pty Ltd ACN 081 022 380 AND Respondents: Frank Ashman & Ors AND Statutory Party: Chief Executive,
More informationPreliminary containment evaluation in the Surat Basin, Queensland, Australia
Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 4910 4918 GHGT-11 Preliminary containment evaluation in the Surat Basin, Queensland, Australia A. Garnett 1*, S. Gonzalez 2, S. Guiton
More informationGOULAMINA DRILLING AND GENERAL PROGRESS UPDATE
21 November 2017 GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE HIGHLIGHTS RC drilling at Danaya and Yando completed. RC drilling at Danaya intersects very wide (>117m) spodumene bearing pegmatite zone.
More informationNimrodel Resources Limited Takatokwane Project Resource Estimation J_1265
Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265 Principal Author: Ian Blayden PhD, MBA, BSc, MAusIMM, MMICA, MAIG, MGSA Principal Reviewer: Christine Standing BSc Hons, MAusIMM,
More informationLAKE VERMONT NORTHERN EXPANSION EPBC REFERRAL RESPONSE TO INFORMATION REQUEST
LAKE VERMONT NORTHERN EXPANSION EPBC REFERRAL RESPONSE TO INFORMATION REQUEST PREPARED FOR BOWEN BASIN COAL PTY LTD NOVEMBER 2016 Document History and Status Issue Rev. Issued To Qty Date Reviewed Approved
More informationFor personal use only
ACN. 000 317 251 MARKET RELEASE 8 th November 2011 ROCKLANDS COPPER PROJECT (CDU 100%) ROCKLANDS GROUP COPPER PROJECT UPDATE MINE PLAN, PIT OPTIMISATION AND MINING SCHEDULE PIT DEWATERING - WATER BORE
More informationJORC COAL RESOURCE MILESTONE
QUEENSLAND UPDATE GUILDFORD EXCEEDS 2PROJECTS BILLION TONNE JORC COAL RESOURCE MILESTONE 5th March 2012 ASX: GUF SHARE INFORMATION Issued Shares: 439.6m Listed Options: N/A Unlisted Options: N/A BOARD
More informationCOKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA
T +61 7 3312 6299 E info@cokal.com.au Level 10, 110 Mary Street, Brisbane QLD 4000 PO Box 7122, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT 30 September 2016 COKAL
More informationCOAL EXPLORATION AND GEOSTATISTICS. Moving from the 2003 Guidelines to the 2014 Guidelines for the Estimation and Classification of Coal Resources
COAL EXPLORATION AND GEOSTATISTICS Moving from the 2003 Guidelines to the 2014 Guidelines for the Estimation and Classification of Coal Resources Britmindo Australia Pty Ltd 35 Bottlebrush Street, Heathwood
More informationWESTCARB Phase I Results Review
WESTCARB Phase I Results Review Arizona Geologic Characterization Errol Montgomery Principal Errol L. Montgomery & Associates (520) 881-4912 emontgomery@elmontgomery.com November 9, 2005 Site Characterization
More informationJune 2017 Quarterly Report
ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western
More informationFor personal use only
31 January 2014 Quarterly Report for the period ending 31 December 2013 Premier transaction completed with improved terms Due diligence drilling completed and exploration continues in 2014 Significant
More informationDelineation of Zones at Risk from Groundwater Inflows at an Underground Platinum Mine in South Africa
Delineation of Zones at Risk from Groundwater Inflows at an Underground Platinum Mine in South Africa Mr Andreas Stoll andreas.stoll@erm.com Environmental Resources Management Swiss GmbH (ERM), Switzerland
More informationFor personal use only
INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.
More informationUndermining Surface Water Resources at Goedehoop South and North Collieries Addendum 1
Undermining Surface Water Resources at Goedehoop South and North Collieries Addendum 1 Report Prepared for Anglo American Thermal Coal Report Number 445324 Addendum 1) Report Prepared by May 2016 SRK Consulting:
More informationAusgold awarded EIS grant for Jinkas deep drilling
ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four
More informationResource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*
Resource upgrade at Greater Whitewash Project to 242mt @ 604 Moly Equivalent* 240% increase in tonnage Date: Monday 30 May, 2011 ASX: AQR Share Price: $0.40 Shares on issue: 145,022,440 Market Capitalisation:
More informationREPORT ON ESTIMATES OF GROUNDWATER INFLOW INTO AND DRAWDOWN AROUND THE PROPOSED OPEN PIT SOUTHDOWN IRON ORE PROJECT. Submitted to:
Pty Ltd A.B.N. 64 6 17 87 1 Havelock Street, West Perth, WA 6 Australia (PO Box 19, West Perth, WA 6872 Australia) Telephone (8) 92 76 Fax (8) 92 7611 http://www.golder.com REPORT ON ESTIMATES OF GROUNDWATER
More informationDiamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the Sorpresa Project
23 rd May 2013 Company Announcements Platform Australian Securities Exchange Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the
More information704,000 OUNCE MIYABI GOLD PROJECT UPDATE
704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director
More informationASX RELEASE. WMN Enters Agreement to Acquire Four Thermal Coal Tenements
WESTERN MANGANESE LIMITED 15 November, 2012 ASX Market Announcements Company Announcements Platform ASX RELEASE WMN Enters Agreement to Acquire Four Thermal Coal Tenements The board of Western Manganese
More informationConsolidated Tin Mines Limited
Snapshot: Current CSD Share Price: $0.060 Current LME Tin Price: $22,950 Key Points Detailed information at www.csdtin.com.au Additional Tin Resource Acquired at Jeannie River Additional 13,440 tonne tin
More informationHelix Resources Limited A.C.N Incorporated in Western Australia
Helix Resources Limited A.C.N. 009 138 738 Incorporated in Western Australia 3 rd June 2008 Australian Stock Exchange Limited Via Electronic Lodgement Dear Sirs INITIAL INFERRED RESOURCE ESTIMATE OF 112
More informationNew Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso
ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from
More information