1 In-Flight Operation of the Dawn Ion Propulsion System-Arrival at Ceres Charles E. Garner, 1 Marc D. Rayman 2, and John R. Brophy 3 Jet Propulsion Laboratory, California Institute of Technology, Pasadena, CA, The Dawn mission, part of NASA s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total Δ of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional Δ of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, To date the IPS has been operated for over 46,239 hours, consumed approximately 390 kg of xenon, and provided a Δ of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June This paper provides an overview of Dawn s mission objectives and the results of Dawn IPS mission operations through arrival at the first science orbit at Ceres. I. Introduction M issions using electric propulsion have attained a high level of success and reliability of operation. As of June 2012 there are over 236 spacecraft successfully using electric propulsion for attitude control, orbit raising, station keeping and for primary propulsion [1]. Deep Space 1 (DS1), the first interplanetary mission to use ion propulsion, operated its single thruster ion propulsion system for over 16,000 hours before successfully completing its primary and extended missions [2]. A PPS-1350 Hall thruster was used for primary propulsion on board the European Space Agency s SMART-1 probe, with more flights planned [3]. European and U.S. communications satellites have been launched with SPT- 100 based propulsion modules for attitude control and orbit boosting. The Hayabusa spacecraft returned to Earth after exploring asteroid Itokawa [4] and employed ion thrusters for primary propulsion. The Japanese ETS-VIII uses ion thrusters for north-south station keeping. ESA s GOCE mission, launched in March 2009, employed ion propulsion for precision orbital control in low Earth orbit [5], and ESA s 1 1 Engineer, Propulsion, Thermal, and Materials Engineering Section 2 Dawn Chief Engineer and Mission Manager 3 Engineering Fellow, Propulsion, Thermal, and Materials Engineering Section, AIAA Fellow

2 Artemis mission used the RIT-10 ion propulsion system for transfer to a geostationary orbit [6]. Approximately 148 ion thrusters (13-cm-dia and 25-cm-dia) built at L3 Communications, Torrance, CA are aboard 37 communication satellites built by Boeing Defense, Space and Security for orbit-raising and station-keeping functions, accumulating ~450,000 operating hours in flight [7]. In 2011 the U.S. Air Force satellite AEHF (Advanced Extremely High Frequency) was successfully placed into a geosynchronous orbit from a highly elliptical orbit around Earth using the spacecraft's Hall thruster station-keeping propulsion system [8] after the propulsion system originally intended for the orbit maneuver failed. Since then two additional satelites with Hall thrusters on-board were successfully launched and operated. The Dawn mission is the ninth project in NASA s Discovery Program. The goal of the Discovery Program is to achieve important space science by launching regular smaller missions using fewer resources and shorter development times than past projects with comparable objectives [9]. The combination of lowcost and short development times presents substantial challenges to an ambitious mission such as Dawn. The Dawn mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles, and the mission is managed for NASA by the California Institute of Technology- Jet Propulsion Laboratory. The Dawn mission has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and the dwarf planet Ceres for clues about the formation and evolution of the early solar system. Vesta is the second most massive main belt object with a mean diameter of 530 km. Ceres, with a diameter of 950 km, is the largest and most massive body in the asteroid belt. Ceres is classified as one of five dwarf planets in our solar system, and studies suggest it may have a large inventory of subsurface water. The science underlying the Dawn mission is described in [10,11]. To realize these science goals the Dawn spacecraft must rendezvous with and orbit each body. Dawn is the first mission to orbit a main belt object and will be the first to orbit two extraterrestrial targets. The Dawn mission is enabled by a threeengine ion propulsion system (IPS) that provided most of the velocity change needed for heliocentric transfer to Vesta and Ceres, orbit capture at Vesta and Ceres, transfer to Vesta science orbits and orbit maintenance, orbit escape and departure from Vesta, and transfer to science orbits and orbit maintenance at Ceres. Without ion propulsion, a mission to orbit Vesta alone would have been unaffordable within NASA's Discovery Program, and a mission to orbit both Vesta and Ceres would have been impossible with a single launch. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, The first 80 days of the mission were dedicated to a comprehensive spacecraft and IPS checkout [12]. Cruise operations for deterministic thrusting began December 18, 2007 leading to a Mars flyby in February 2009, and rendezvous and orbit capture at Vesta on July 16, 2011, with a science phase lasting approximately 13 months [13]. At the conclusion of the Vesta science phase in July 2012 the Dawn spacecraft departed Vesta for deterministic thrusting to Ceres, leading to a Ceres approach phase lasting approximately seven weeks, orbit capture at Ceres on March 6, 2015, and to the first science orbit on April 23, The end of the primary mission is scheduled for the summer of This paper presents a summary of the Dawn mission operations through arrival at the first science orbit at Ceres. II. MISSION AND SYSTEM FLIGHT OVERVIEW The mission and flight system are described in detail in [14, 15], and are summarized here. A schematic diagram of the Dawn flight system is shown in Figure 1, with a mass summary for the Dawn flight system in Table 1. The Jet Propulsion Laboratory (JPL) was responsible for the high voltage electronics assembly (HVEA) and science payload development, IPS development and development of other spacecraft components, safety and mission assurance, project systems engineering, mission design, and navigation development, and is responsible for mission operations system development and mission operations which are conducted from JPL. Orbital ATK (Orbital), Sterling, VA, was responsible for developing the spacecraft bus, flight system integration and testing, and launch operations. The spacecraft is based on Orbital s Geostar [16] satellite platform series. The solar array (SA) consists of two large panel assemblies approximately 18 m 2 each and measuring almost 20 m tip to tip with triple junction cells providing more than 10 kw of electrical power at one astronomical unit (AU) and 1.3 kw for operations at Ceres. Articulation of the solar arrays is about the Y-axis. 2

3 HGA CSS GRaND CSS FT2 CSS Louvers z x Battery access panel GRaND Star tracker FC y CSS Gyros z y x Reaction wheel HGA LGA CSS LGAs FT3 FT FT1 IPS thrusters 1.36 m VIR RCS thrusters IPS thruster Star tracker CSS RCS thrusters z 19.7 M x y 3

4 The spacecraft attitude control subsystem (ACS) employs four reaction wheel assemblies (RWA) for three-axis control of the spacecraft and makes use of the IPS for pitch and yaw control during normal IPS thrusting. The reaction control subsystem (RCS) uses hydrazine thrusters for direct three axis control of the spacecraft and was intended primarily for desaturating the reaction wheels. The spacecraft launched with 45 kg of hydrazine on-board for RCS use on this eight-year-long mission. Two of the four RWAs failed [17], so conservation of hydrazine has been very important, but Dawn is expected to meet its science goals for Vesta and Ceres. Description Mass, kg Dry spacecraft and avionics (except IPS) 573 Science instruments 46 Hydrazine 45 Ion Propulsion System (IPS) 129 Xenon 425 Flight system mass at launch 1218 The Dawn ion propulsion subsystem (IPS) developed at JPL is described in detail in [15] and is shown in the block diagram in Figure 2. The IPS is single-fault tolerant as configured for Dawn and is based on the single-engine ion propulsion system flown successfully on the DS1 mission [12], but modified for multiple thrusters and supporting hardware. The Dawn IPS includes three 30-cm-diameter xenon ion thrusters operated one at a time, two power processor units (PPU), two digital control interface units (DCIU), three Thruster-Gimbal Assemblies (TGA) for two-axis thrust-vector control, a Xenon Control Assembly (XCA) for controlling xenon flow to the engines, and a single xenon storage tank. The ion thrusters and the PPUs are based on technology developed by NASA Glenn Research Center (GRC), and engineered and fabricated for flight by L-3 Communications Electron Technologies (L-3), Inc., Torrance, CA, with minimal modifications to their designs from DS1. The two DCIUs, which accept commands from the spacecraft, command the PPU supplies, operate the valves on the XCA and actuators on the TGAs, return IPS telemetry and serve as a pass-through for spacecraft commands to the TGAs, were designed and fabricated at JPL. The design was modified from the DS1 design to meet the multi-engine system functionality and cross-strapping required for Dawn. Each DCIU interfaces to a single PPU, to the XCA components and xenon high pressure subassembly, and to each of the three TGAs. Each DCIU provides low voltage power to its corresponding PPU. Only one DCIU is powered up and operated at a time and the unused DCIU is left in an unpowered state. The DCIUs include software needed for automatic and autonomous control of IPS including thruster power levels, flow system valve actuation, and XCA flow control settings. Both DCIUs are mounted next to the PPUs to the same thermally-controlled plate within the core structure of the spacecraft. The Dawn ion propulsion system is designed to be single-fault-tolerant. Ion thrusters using the 30- cm-diameter NASA design were operated for 16,265 hours on the DS1 mission [2] and 30,352 hours in an extended life test [18], however the Dawn mission requires 400 kg (Table 2, xenon allocation summary) or 200 kg per ion thruster if one thruster fails at the beginning of the mission. To accomplish the mission at least two ion thrusters, two TGAs, one PPU, and one DCIU must be fully functional throughout the mission [10]. Analyses [19] and test data [18] indicate that a two-engine IPS can perform the Dawn mission with a low risk of failure due to ion thruster wear if the thrusters and PPUs are cross-strapped as shown in Figure 2 such that the loss of one thruster or PPU does not impact successful operation of the remaining two ion thrusters or PPU. Each PPU is connected to one DCIU and directly to the HVEA which provides unregulated solar array power to the PPUs. FT3 can be powered by either of the two PPUs, while FT1 is connected only to PPU-1 and FT2 is connected only to PPU-2. The high voltage harnesses connecting the PPUs to the ion thrusters appear as the red lines in Figure 2. Only one of the PPUs is powered on at any time, and the unused PPU is left in an unpowered state. The mission trajectory planned for Dawn is shown 4

5 in Figure 3, and a list of important mission phases is summarized in Table 3 below. The complete mission ΔV, from the initial checkout through conclusion of Ceres science operations and including the Mars gravity assist, is approximately 13.6 km/s (Table 3). IPS will provide 11.0 km/s of this ΔV and will use approximately 400 kg of xenon for the complete mission. The center-mounted thruster is designated FT3 (flight thruster 3), and can be powered by either PPU. The outboard thrusters are designated FT1 on the X panel and FT2 on the +X panel. Each thruster is mounted to a TGA with two struts to each thruster gimbal pad in a hexapod-type configuration (six struts total per ion thruster). Actuators driven by electronics cards in the DCIU that are commanded by the spacecraft ACS are used to articulate two pairs of the TGA struts for 2- axis control of the thrust pointing vector through the spacecraft center of mass and to provide pitch and yaw control during ion thrusting. A titanium-lined composite-overwrap xenon tank developed for Dawn with a volume of 267 liters was mounted inside the core structure of the spacecraft and loaded with 425 kg of xenon prior to launch, with a xenon storage density at launch of approximately 1.6 g/cm 3. The ratio of tank mass to xenon mass is 0.05 and represents a true breakthrough in total IPS mass reduction. 5

6 The xenon feed system is based on the DS1 design but was modified to operate multiple thrusters and to be single-fault tolerant. It includes the XCA placed outside the spacecraft core cylinder with two 3.7-liter plenum tanks identical to those flown on DS1, and uses the same xenon flow rate control design to control pressure to flow rate control devices (flow orifices), latch valves and solenoid valves (similar to those used on DS1), service valves, interconnecting tubing, and nine flexible propellant lines (three for each thruster across the TGA interface). The flow orifices were carefully calibrated pre-flight for flow rate determination based on pressure and temperature at the flow orifies. Total xenon consumption is calculated by integrating the pressure and temperature at the flow orifices. A different but likely less accurate method for calculating total xenon consumption makes use of the xenon storage tank pressure and estimates of the bulk xenon temperature. The two methods agree to within approximately 4 kg, or approximately one percent of the total xenon used. Xenon use appears well within the allocation for all remaining mission phases (Table 2). The mission trajectory for Dawn is shown in Figure 3, and a list of important mission phases is summarized in Table 3 below. The complete mission ΔV, from the initial checkout through conclusion of Ceres science operations and including the Mars gravity assist, is approximately 13.6 km/s (Table 3). The IPS will provide 11 km/s of this ΔV and will use approximately 400 kg of xenon for the complete mission. Description Xenon Allocation (kg) Initial Checkout- Actuals 3.1 Deterministic Thrusting To Vesta Actuals Vesta Operations Actuals 10.3 Deterministic Thrusting To Ceres Actuals Approach to Ceres Actuals 12.4 Allocation for Ceres Operations 9.1 Allocation for Leaks and Thruster Restarts 1.0 Main Tank Residuals 5.0 Margin 20.1 Totals

7 Figure 3. Dawn mission trajectory. Description Time Period Distance S/C to Sun ( AU ) Launch 09/27/ NA Power Level To IPS ( kw ) Comments Initial Check-out 09/ / ΔV = 0.07 km/s Cruise prior to MGA 12/ / ΔV = 1.80 km/s Optimal Coast and Mars Gravity Assist (MGA) 11/ / NA ΔV = 2.60 km/s (From MGA) Cruise to Vesta 06/ / ΔV = 4.84 km/s * IPS Operations at Vesta 07/ / ΔV = 0.25 km/s Cruise to Ceres and Approach 09/ / ΔV = 3.85 km/s ** Ceres Science Operations 04/ / ΔV = 0.33 km/s Total From IPS ΔV = km/s Mission Total * From start of cruise to orbit capture at Vesta ** From start of cruise to the first science orbit at Ceres (RC3) ΔV = km/s III. Overview of IPS Operations To Start of Survey Orbit 7

8 Trajectory Description The ICO, Mars flyby with gravity assist (MGA), and Vesta phases were completed successfully and are discussed in detail in [13, 20-21]. The MGA resulted in a plane change of 5.2 degrees and an increase in heliocentric velocity of 1.7 km/s. Deterministic thrusting for cruise to Vesta resumed on June 8, 2009, with the spacecraft at approximately 1.37 AU from the sun, and nominal cruise operations to Vesta were completed in May The goal for cruise to Vesta was to modify the spacecraft s heliocentric trajectory leading to capture at Vesta in July 2011 and included using IPS for deterministic thrusting and spacecraft engineering tests. Orbit capture at Vesta was followed by a science phase of just over a year [13]. The trajectory to Ceres is divided into the cruise phase, lasting from 2012 to December 26, 2014, the approach phase, lasting from December 26, 2014 to April 23, 2015, and finally the science orbits phase, from April 23, 2015 to end of mission. Thrusting for cruise to Ceres began on July 25, 2012 with the spacecraft in a high altitude mapping orbit around Vesta at an altitude of approximately 673 km, leading to escape from Vesta on September 4, 2012, and arrival to the Ceres approach trajectory on December 26, Dawn s interplanetary ion thrusting for cruise was designed to reshape its heliocentric orbit to match that of Ceres. To accomplish this part of the mission trajectory IPS was operated in 43 different thrusting segments averaging about 20.5 days of continuous thrusting per segment, totaling 19,454 hours of beam extraction time and kg of xenon throughput to provide a delta-v of approximately 3.56 km/s. The burn times per thrust segment were typically substantially longer in duration for cruise to Ceres compared to burn times used previously on Dawn, to reduce the number of spacecraft-to-earth turns, which conserved hydrazine needed for science operations at Ceres. During cruise to Ceres Dawn experienced a temporary problem with the IPS, described in the section of this paper discussing the DCIUs, resulting in a very small delay to the arrival time to the first science orbit. The approach to Ceres phase began on December 26, 2014 with the spacecraft at a distance of approximately 700,000 km from Ceres. The objective of approach was to reach the first mapping orbit at Ceres, designated RC3. During approach, the spacecraft's trajectory was adjusted for achieving orbit around Ceres, and optical navigation was performed. The approach phase differed from cruise in several operational aspects, including more frequent updates to planned IPS thrust vectors and nine periods of imaging Ceres. Imaging during this phase was principally for navigation purposes but provided other engineering and science benefits as well. An important event during approach was orbit capture, occurring on March 6, 2015 at an altitude of approximately 60,600 kilometers. Dawn s entry into orbit was much like at Vesta but entirely different from orbit insertion for missions using high-thrust propulsion. Dawn spent 92.5% of the 2.5 years from Vesta escape to Ceres capture using the IPS to gradually reshape its heliocentric orbit to match that of its destination. As a result, by the time it was in the vicinity of Ceres, the relative velocity was very low. At orbit insertion, Dawn was traveling only 45 m/s relative to Ceres. Capture occurred as a routine part of ion thrusting and was not associated with any special activities and required no real-time communications to the spacecraft. Upon entering orbit around Ceres, Dawn became the only spacecraft ever to orbit two deepspace bodies. While capture was significant, it was not the focus of the approach phase. The date, altitude, velocity, and other parameters characterizing capture were simply consequences of the trajectory that targeted Dawn to its first mapping orbit. Moreover, because the relative velocity was low, if a problem had occurred that interfered with routine operations, there would have been subsequent opportunities to get into orbit. Dawn would have remained near enough to Ceres that a new trajectory (that is, a new set of IPS thrust vectors) could have been designed that would have delivered the spacecraft to the targeted orbit. Thrusting continued after capture to reshape the orbit, although then it was the orbit around Ceres that was being modified rather than the orbit around the sun. Ion thrusting proceeded according to plan and concluded on April 23, 2015 when Dawn was in the targeted polar, circular orbit at an average altitude of 13,600 km, marking the conclusion of the approach phase. During the approach phase the IPS was operated in 14 different thrusting segments averaging about 176 hours of continuous thrusting per segment, totaling 2,458 hours of beam extraction time and kg of xenon throughput to provide a delta-v of approximately 0.29 km/s. 8

9 During cruise to Ceres all three thrusters were used, with FT2 used the most followed by FT3 and FT1. The Dawn mission can be accomplished with just two ion thrusters, but thruster operation was intentionally divided between the three thrusters to minimize wear in a single engine. Only FT3 was used for Vesta escape and approach to Ceres, and FT3 is planned for use for all subsequent orbit maneuvers at Ceres. Although any thruster can in principle be selected for orbit maneuvers, using the center-mounted thruster includes several advantages over using the outboard thrusters including reduced coupling between the RCS and IPS system thrusts. IPS System Power and PPU Performance Spacecraft heliocentric range for the complete mission is plotted in Figure 4. The blue line color in the figure depicts periods during the mission when IPS was used for thrusting, and the figure does not include thrusting planned for operations at Ceres. As expected for a low thrust mission, the IPS is on and thrusting for the majority of mission time. The IPS duty cycle, defined as beam-on time divided by total time, was approximately 72.1% for the time period from the start of cruise to Vesta on December 17, 2007 through end of approach on April 23, The duty cycle for cruise to Ceres, spanning approximately 21,211 hours (start of Vesta departure on July 25, 2012 through December 26, 2014) was 91.7%. The IPS duty cycle for cruise to Ceres was maintained at a high level due to a high degree of IPS reliability and by minimizing the number and duration of high gain antenna passes to Earth, all which served to minimize hydrazine consumption. The IPS duty cycle could have been increased, but this was not necessary-dawn's mission operation processes allowed ample time for spacecraft engineering and spacecraft testing activities. Data on power to the PPUs for operation of the thrusters are plotted in Figure 5. Data points in Figure 5 are the values averaged at a fixed power level for approximately hours. The data include telemetry for unregulated high voltage and current from the solar array to the PPUs and do not include PPU housekeeping power of approximately 20 W. Until approximately August 2010 there was sufficient power generated by the solar arrays to supply all spacecraft functions (about 700 W average power), periodic high power usage when certain spacecraft events occur such as simultaneous use of many heaters, and the approximately 2.5 kw IPS required for full power IPS operation. Power throttling commenced in August 2010 as spacecraft heliocentric range increased to 2.6 AU. Initially lower power level allocations to IPS were based on very conservative projections of spacecraft power demand during thrusting; spacecraft power estimates were later refined leading to an increased power allocation to IPS. During its 2.75-year transit from Vesta to Ceres the spacecraft/solar distance (Figure 4) varied from a minimum of 2.44 AU in mid-october 2013 to 2.9 AU upon arrival to the first science orbit (RC3). Unregulated solar array voltage to the PPUs varied from approximately 97 V to V, well within the input voltage range limits for the PPUs (Figure 5). Solar array power available to the IPS varied from approximately 1.43 kw in October 2013 to 0.5 kw upon arrival at Ceres. For both PPUs power initially increased and then stabilized, following changes to discharge power utilization due likely to thruster wear. Both PPUs have operated perfectly throughout the mission to date, and PPU performance throughout the mission has been excellent. PPU efficiencies at kw are similar to the efficiencies measured preflight and are consistently in excess of 93% at full power. PPU efficiencies at lower power are greater than measured pre-flight, likely due to telemetry calibration inaccuracies at low power. Beam currents controlled by the beam supplies in both PPUs were typically within of the setpoint values, and neutralizer current and accelerator grid voltage were at the setpoint. In Figure 6 data (averaged over individual thrust arcs) from temperature sensors inside the PPU indicate that PPU temperatures changed a few degrees C during cruise at full power, and decreased upon start of power throttling. The PPU baseplate temperature sensors are mounted to the part of the PPU chassis in contact with the spacecraft thermal control surface, and have ranged between 27 degrees C with the thrusters operating at full power to 12.7 degrees C with PPU-1 operating at 0.52 kw. The fact that the PPU baseplate temperatures are near room temperatures even for full power operation is a reflection of the excellent thermal heat rejection system on the Dawn spacecraft. Temperatures of the harness connectors mating the thrusters to the PPUs are shown in Figure 7. The data indicate that at full power operation connector temperatures ranged between 10 to 45 degrees C, and at lower power the harness connector temperatures were as low as -6 degrees C, well within 9

10 operational temperature limits of -55 to +90 degrees C. The temperature excursion experienced by the FT3 harness connector in 2011 is due primarily to changing solar exposure to the Z deck of the spacecraft where FT3 is mounted, a consequence of orbiting Vesta. XFS Performance The xenon flow system has operated perfectly throughout cruise, with the exception of the higher than expected solenoid valve cycling rates as described in [12]. These higher cycling rates do not pose a threat to mission reliability. Total xenon stored in the xenon tank can not be determined accurately using the tank temperature and pressure telemetry because of the non-ideal gas properties of the pressurized xenon and to uncertainties in the bulk xenon temperature. The uncertainty in the bulk xenon temperature and pressure measurements require that the xenon consumption be estimated by integrating total xenon flow over time. Xenon flow rates to the thrusters are calculated from plenum tank pressure/flow control device (FCD) temperature telemetry based on curve fits to FCD calibrations obtained in ground testing. Figure 4. Spacecraft heliocentric range from launch through arrival to RC3 science orbit. Blue line color denotes IPS thrusting. 10

11 Figure 5. Solar array input voltage and PPU operating power from start of cruise to Vesta through arrival to RC3 science orbit. Figure 6. PPU-1 and PPU-2 temperatures from start of cruise to Vesta through arrival to RC3 science orbit. 11

12 Plenum tank pressures are controlled by actuation of the solenoid valve pairs between the main xenon tank and plenum tanks. To date the primary solenoid valve pair used to regulate main plenum pressure has been cycled open and closed approximately 1.16 million times in cruise, and the primary solenoid valve pair for cathode plenum tank pressure regulation has cycled approximately 532,000 times (Figure 8). It is expected that solenoid valve cycling rates at a given throttle level will increase as the density of the xenon in the main tank decreases and as the pressure differences between the inter-solenoid valve space and plenum tanks decrease. The solenoid valves on the Dawn XFS have a flight allocation of 1.4 million cycles, and there are redundant valves that have not yet been cycled in flight but could be used in the event of primary valve failure. The controlling temperature for the xenon control assembly plate was reduced early in cruise to reduce the solenoid valve cycle rate [20]. There are no indications of solenoid valve or latch valve leakage based on observations of steady-state pressure measurements of both plenum tanks. Differences in pressure measurements between the three pressure transducers on each plenum tank have remained at low values. A check performed in 2009 for changes in the pressure transducer readings at near-zero pressure indicated the pressure transducer values had virtually no measurable shift in output with respect to their pre-launch values. Figure 7. Harness connector temperatures from start of cruise to Vesta through arrival to RC3 science orbit. Flight allowable lower limit is -55 o C. 12

13 Figure 8. Cumulative number of discharge and cathode SV cycles vs. xenon consumed from launch through arrival to the RC3 science orbit. TGA Performance The TGAs have also operated very well in cruise. Each TGA consisting of two each motor/tripod assemblies (side A and side B) per FT is used to move the ion thruster vector to control the two axes normal to the thrust direction. This mode is known as thrust vector control (TVC). RWAs or RCS hydrazine thrusters are used to control the axis around the thrust vector. Cumulative TGA actuator motor revolutions for the A-side motors for each FT are shown in Figure 9. The B-side motors have almost the same number of revolutions. The data indicate that through arrival to RC3 the TGA motors have accumulated the equivalent of over 1.28 million motor revolutions for TGA-1, 1.81 million motor revolutions for TGA-2, and 2.26 million motor revolutions for TGA-3. The motors were qualified to 30 million revolutions. The spacecraft is operated in TVC mode during normal thrusting, including during desaturations of the RWAs, which are typically sequenced approximately every 12 hours. TGA duty cycle has varied between 0.05% and 1%, which is at or less than the expected mission duty cycle of 1%. In normal operation the TGAs dither, or rotate, a small amount around a target center. The duty cycle and number of TGA actuations per kg of xenon used are greater with RWA control. In Figure 9, the actuation rate for FT2 and FT3 decreased when the spacecraft switched to hydrazine thrusters for attitude control starting in June In May 2011 the spacecraft switched to the wheels for attitude control as part of operations for Vesta approach and the TGA duty cycle increased substantially. TGA duty cycle rates under RWA control may increase because under RWA control the spacecraft issues more correcting commands to slew the TGAs than is done under jet control. Approximately every two months for TGAs in use (and six months for unused TGAs) lubricant in the actuators is redistributed by vectoring the thrusters from their null locations to the hard stops and then back to their null locations. 13

14 Figure 9. Cumulative number of TGA side A cycles vs. xenon consumed, from launch through arrival to the RC3 science orbit. Thruster Performance Through Arrival to RC3 Thruster performance data from the ICO were presented in [12] and detailed thruster performance from the start of cruise to Vesta to arrival at RC3 are presented here. Voltage measurements are determined from telemetry at the PPU and the data have not been corrected for the power drop across the harness, which is estimated to be approximately 15 W for the discharge and 18W for the thruster at full power. During operations at Vesta and for some of cruise to Ceres thrusting sequences the discharge cathode and neutralizer flow rate for operation of the FTs at all power levels was changed to 3.7 sccm, the flow rate for full power operation, for thrust stability issues that are described in the thrust performance section of this paper. IPS Operating Time and Xenon Consumption Table 4 summarizes operating time for each thruster/ppu and xenon throughput from launch through arrival to RC3 on April 23, FT3 has accumulated the most number of operating hours and xenon throughput, and Dawn has operated all three thrusters to more evenly distribute the total xenon throughput for each thruster. For transfers from one science orbit to another around Vesta and Ceres, in which the operational schedule requires a rapid design and implementation of the thrust profile, FT3 is preferred because FT3's thruster axis is aligned with the principal axis of the spacecraft. Nevertheless, transfers with the other thrusters are feasible and any of the three Dawn thrusters can be used for any maneuver. FT2/PPU-2 is the preferred backup to FT3, to distribute operating time for the PPUs as well. 14

15 IPS Element Neutralizer On-Time ( Hours ) Beam On-Time ( Hours ) Xenon Throughput ( kg ) Thruster Starts FT FT FT Thruster Totals PPU-1 (Hours) PPU-2 (Hours) PPU Totals (Hours) All Dawn FTs have reached end of life (EOL) operation, which is defined as reaching a total thruster throughput of 70 kg of xenon. It is expected based on analysis that each FT can process at least 195 kg [19]. Input power to the FTs from start of cruise to Vesta through arrival to RC3 is plotted in Figure 10 as a function of propellant throughput for each thruster, and in Figure 11 as a function of beam-on time for each thruster. It is likely that thruster power telemetry calibrations at low power are inaccurate. Input power varied from about 2.3 kw at the start of cruise to 0.5 kw at arrival to RC3. All three FTs exhibited increases in thruster power of approximately W over the first approximately 20 kg of xenon throughput then leveled off. By the end of full-power operation each FT had increased in power by W compared to thruster power used at the start of cruise. Increased thruster power may be related to thruster wear including enlargement of grid holes and the discharge cathode keeper orifice diameter. During normal cruise operations to Ceres all thrusters were operated at end of life conditions, where the accelerator grid voltage was decreased to approximately -275 V to enhance margin to electron backstreaming. In Figure power used by FT3 during cruise to Ceres increased due to decreasing heliocentric range (Figure 4) resulting in more power available to IPS. 15

16 Figure 10. Dawn thruster input power from start of cruise to Vesta through arrival to RC3 science orbit. Figure 11. Dawn thruster input power from start of cruise to Vesta through arrival to RC3 science orbit. 16

17 Discharge Voltage Discharge voltage and current for the three Dawn ion engines are shown in Figure 12. Telemetry with closed symbols indicate operation of an engine at high cathode flow rates, and during approach to Ceres through arrival to RC3 both high cathode and discharge flow rates were used while thrusting with FT3. Voltage measurements are determined from telemetry at the PPU and the data have not been corrected for the power drop across the harness. Full power (rich) cathode flow rates were used for Vesta operations to address the thrust stability issues that are described in [20]. This change resulted in extremely reliable and consistent maneuvers, and suppressed the discharge voltage (Figure 12). Operation with nominal cathode flow rates was resumed beginning October 1, 2012, until April 2014 when all three engines were switched to operations at rich cathode flow rates (the closed symbols in Figure 12). For all three engines at full power, discharge voltage initially increased then stabilized. This is likely related to accelerator grid hole wear characteristics, which result in higher grid transparency to ions. Abrupt changes in discharge voltage exceeding approximately one volt are related to changes to the cathode flow rates from nominal values to full power values or to power level changes. For example during the Ceres approach phase using FT3 when the power level changed by approximately 16 W (one level in a power throttle table consisting of 112 power levels), the discharge voltage changed by approximately 2.4 V. At approximately 101 kg of xenon throughput for FT2 and 111 kg of xenon throughput for FT3 the discharge voltage for both FT2 and FT3 began to increase at a rate of approximately 0.1 V per kg of xenon throughput. Both engines were operating at nominal cathode flow rates when the discharge voltage characteristics began changing. The most significant differences in operations on FT2 vs. FT3 are that FT2 has more operating time at lower power levels, fewer starts and substantially less operating time at rich cathode flow rates. The mission plan had called for operations on FT3, the preferred thruster for Ceres maneuvers, during the Ceres approach phase, requiring the use of an additional 25 kg of xenon through end of mission, possibly resulting in an increase in the discharge voltage. Excessively high discharge voltage over a sustained period of time can lead to increased wear and reduced thruster life. A test performed on FT3 operating with the discharge only (diode mode) at rich cathode flow rates confirmed that although the discharge voltage on FT3 had changed substantially at nominal cathode flow rates, the discharge voltage at rich cathode flow rates was virtually unchanged. This test and the fact that the mission had ample xenon reserves led to a decision to operate all thrusters for the remainder of the mission at rich cathode flow rates, where it was expected that both the magnitude and rate of increase of the discharge voltage would decrease. Since the change in flow rates to the cathodes, FT2 has processed 25.3 kg and FT3 has processed 12.5 kg. Data from thrusting performed since the change to rich cathode flow rates indicate that the magnitude of the discharge voltage decreased by approximately 2.7 V, and at fixed power levels the rate of increase of the discharge voltage dropped to approximately V/kg, confirming that operation at rich cathode flow rates had mitigated the unexpected change in discharge voltage behavior. Presently at approximately 500 W of thruster input power the discharge voltage is at 19.4 V. Dawn can expect substantial margin to the discharge voltage for orbital operations at Ceres. Thruster Starts From launch through arrival to RC3 there have been a total of 649 thruster starts in flight, with 122 starts using FT1, 165 starts using FT2, and 362 starts using FT3. Almost half of these engine starts were on the discharge only for one hour (called "diode mode) to prepare the engine thermally for beam extraction. The cathode heater preheat duration for all starts was six minutes. Data taken at one second intervals indicate that in every start attempt in flight after the ICO, the discharge and neutralizer cathodes ignited within one second of the command for application of the igniter voltage pulses. Discharge cathode and neutralizer cathode heater power appear unchanged over time, possibly indicating low levels of keeper electrode erosion over time. Beginning in December 2014 all thrusters were started without using a thruster discharge pre-heat cycle. The highest power level for a thruster start without a thruster discharge pre-heat was at approximately 800 W on FT3. 17

18 Figure 12. Dawn thruster discharge voltage from start of cruise to Vesta through arrival to RC3 science orbit. Neutralizer Operation Dawn thruster neutralizer keeper voltage data for operation from start of cruise to Vesta through arrival to RC3 are shown in Figure 13. From the start of cruise to approximately 80 kg of xenon throughput neutralizer keeper voltages decreased in a similar way for all three Dawn thrusters. Dawn thruster neutralizer voltage changes may be related to improved cathode conditioning over time in the clean environment of space. Smaller changes to the neutralizer voltage appear to be due to thruster power changes, while larger changes are related to operating the engines at moderate to low power with rich cathode flow rates, which suppresses the neutralizer voltage (Figure 13). The neutralizer cathode must be operated at the proper flow rate and neutralizer keeper emission current to result in the nominal operating mode referred to as spot mode. A potentially damaging neutralizer operating condition called plume mode" is characterized by greater than nominal neutralizer keeper voltage and greater alternating current (AC) noise in the direct-current (DC) neutralizer keeper plasma. This mode can lead to life-limiting erosion in the neutralizer. A plume mode detection circuit in each Dawn PPU converts variations in the AC component of the neutralizer keeper voltage to a DC voltage. The plume mode circuit voltage telemetry is monitored in flight to evaluate the health of the neutralizer. Dawn thruster plume mode circuit output data for each engine averaged over individual thrust segments are shown in Figure 14. In normal operation the plume mode circuit voltage increases after cathode ignition, when the neutralizer cathode is known to operate in plume mode. Plume mode circuit output then decreases to a lower, steady-state voltage during normal neutralizer operation, with the plume voltage decreasing at lower power levels and rich cathode flow rates. During all of Dawn IPS operations since launch there have been no indications of neutralizer cathode operation in plume mode after the initial start-up transients. 18

19 Figure 13. Dawn thruster neutralizer voltage from start of cruise to Vesta through arrival to RC3 science orbit. orbit. Figure 14. Dawn thruster plume mode circuit output voltage from start of cruise to Vesta through arrival to RC3 science 19

20 Accelerator Grid Current and Thruster Recycles Accelerator grid current data for Dawn ion thrusters from start of cruise to Vesta through arrival to RC3 are plotted in Figure 15. The accelerator grid current increased during the first 1,700 hours of operation at full power and leveled off after that. This is unlike the behavior of the accelerator grid impingement current noted in the ELT [18], which started at a higher level and then decreased over a period of approximately 1,000 hours to approximately 6.5 ma after that. It appears from thruster ground testing that the higher values of the accelerator grid current are due to hole cusp wear that decreases over time as the cusps are eroded away. The accelerator grid current behavior observed during cruise is not understood at this time. The observed behavior could be a result of changes to grid-to-grid hole spacing, but there has been no indication from flight telemetry of electron backstreaming. Step changes in accelerator grid current are related to changes in thruster operating power and accelerator grid voltage. At a fixed flow rate and beam current thruster power can be finely controlled with step changes of approximately 10 V in beam voltage, which explains the step changes in accelerator grid current. All Dawn FTs have reached end of life (EOL) xenon throughput, which is defined as reaching a total thruster throughput of 70 kg of xenon. After reaching approximately kg of xenon throughput the accelerator grid voltage was changed for each FT, from -200 V to -272 V, to provide additional margin to electron backstreaming from thruster wear. The effect of changing the accelerator grid voltage was a slight increase in beam divergence and reduced discharge loss, caused by an increase in the grid transparency to ions. Arcing or other faults can occur from grid spacing changes or from debris that bridges the gaps between the grids. The PPU is designed to clear these faults by quickly reducing discharge power, power-cycling the beam supplies, then re-establishing the discharge and beam currents to their nominal values, a process called high voltage recycling. High voltage recycles from start of cruise through arrival to RC3 are shown in Figure 16. FT1 accumulated 66 recycles, FT2 34 recycles, and FT3 64 recycles. The data indicate that after initially increasing over a period of thousands of hours of operation, recycle rates have decreased over time and with decreasing power levels. There have been very few recycles from cold starts with the thruster front masks at temperatures below -80 degrees C. There have been a very few recycles on thrusters that were unused over periods of years and then re-started. Figure 15. Dawn thruster accelerator grid currents from start of cruise to Vesta through arrival to RC3 science orbit. 20

21 Figure 16. Dawn thruster grid recycles from start of cruise to Vesta through arrival to RC3 science orbit. Thrust Measurements Thrust calculated from thruster telemetry and reconstructed using navigation data as described in [20] from start of cruise to Vesta through arrival to RC3 are shown in Figures Thrust values calculated from thruster telemetry were averaged over a time period where thruster operating parameters were stable. During approach to Vesta FT2 and FT3 were operated using full power cathode flow rates to minimize thrust variations arising from cathode flow transients which contribute to maneuver execution errors (20). During some portions of cruise to Ceres the thrusters were operated with rich cathode flow rates, and for approach to Ceres FT3 was operated with rich cathode and discharge flow rates, again to minimize maneuver execution errors. Nominal cathode flow rates were used for cruise to Ceres except for the last two thrust segments where rich cathode flow rates were used as described in the Discharge Characteristics section of this paper. With full power cathode flow rates, thrust values determined by radiometric means for each of the three engines were the same or slightly greater (by 1-2%) as values determined using thruster electrical parameters, the opposite of results from nominal cathode flow rates. At nominal cathode flow rates reconstructed thrust values were % of the thrust values expected from thruster electrical parameters depending upon the thruster, thruster throughput, and input power level. The Dawn mission uses a worst-case thrust degradation factor of 97% of the expected thrust for long-term planning. During IPS operation the attitude control subsystem uses the ion thrusters to control the spacecraft in the two axes perpendicular to the thrust direction (pitch and yaw). The thrusters, however, produce a roll torque about the thruster axis that must be nulled by the RCS or the RWAs. Roll torque values have been the same or lower than pre-launch estimates throughout the mission. The combination of low roll torque values and use of the IPS for pitch and yaw control have resulted in a very small demand for hydrazine consumption during normal IPS thrusting. Hydrazine consumption during normal IPS thrusting is presently estimated to be approximately 4.4 kg for all of cruise to Ceres. 21

22 Figure 17. Dawn FT1 thrust from start of cruise to Vesta through arrival to RC3 science orbit. 22 Joint Conference of 30th ISTS, S, 34th IEPC and 6th NSAT, Kobe-Hyogo, Japan July 4 10, 2015 Figure 18. FT2 thrust from start of cruise to Vesta through arrival to RC3 science orbit.

23 Figure 19. Dawn FT3 thrust from start of cruise to Vesta through arrival to RC3 science orbit. DCIU Operation The DCIUs control the PPUs and the XFS, including valve control and flow rates to the engines. The DCIUs include fault protection software to turn off the power supplies and close the solenoid valves and certain latch valves if certain fault conditions are detected. Generally one of the DCIUs is kept powered on because main xenon storage tank and plena tank pressure and temperature telemetry come from the DCIU. Only one DCIU is powered on at any time. Since being powered on during the initial check out phase in the fall of 2007 the DCIUs have been on for approximately 66,000 hours. In that time, a period spanning just over 7.5 years, the DCIUs have operated almost flawlessly. All DCIU commands were accepted and executed, and there were no operational errors, with the exception of two incidents regarding DCIU-1, one in 2011, and the other in These operational errors were likely related to Dawn s space environment. Recovery from these faults was performed quickly, and new operational plans were implemented including revising the trajectory of the spacecraft, resulting in no loss of science to the mission. IPS Operations Plan at Ceres A top-level summary of planned use of the IPS for orbit maneuvering and maintenance at Ceres is shown in Table 4. The Dawn spacecraft completed cruise to Ceres on December 26, 2014, entered orbit around Ceres on March 6, 2015, and completed the approach phase reaching the first science orbit at Ceres, called RC3, on April 23, RC3 is a circular, polar orbit at an altitude of approximately 13,500 km and an orbital period of about 15.3 days. Science collection included high-phase observations as Ceres is backlit by the Sun, gravity measurements to refine the mass estimate, spin axis, spin rate, and shape, and search for plumes. In early May 2015, Dawn will be on the sun-lit side collecting full-frame observations of the fully illuminated surface. This first science acquisition phase will complete on May 9 and Dawn will then use the IPS to spiral down to the next science orbit, called Survey orbit, at an altitude of approximately 23

The Dawn Ion Propulsion System Getting to Launch

The Dawn Ion Propulsion System Getting to Launch The Dawn Ion Propulsion System Getting to Launch IEPC-27-83 Presented at the 3 th International Electric Propulsion Conference, Florence, Italy John R. Brophy *, M. Andy Etters, Jason Gates, Charles E.

More information

ETS-Ⅷ Ion Engine and its Operation on Orbit

ETS-Ⅷ Ion Engine and its Operation on Orbit ETS-Ⅷ Ion Engine and its Operation on Orbit IEPC-2009-048 Presented at the 31st International Electric Propulsion Conference, University of Michigan Ann Arbor, Michigan USA Kenichi Kajiwara 1, Masafumi

More information

Hayabusa Status and Proximity Operation. As of September 2nd, 2005

Hayabusa Status and Proximity Operation. As of September 2nd, 2005 Hayabusa Status and Proximity Operation As of September 2nd, 2005 2005/9/2 0 What is Hayabusa? World s First Round-trip Interplanetary Flight HAYABUSA Challenge to Asteroid Sample Return Touch-down + Dimensions

More information

End of Life Re-orbiting The Meteosat-5 Experience

End of Life Re-orbiting The Meteosat-5 Experience End of Life Re-orbiting The Meteosat-5 Experience Milan EUMETSAT, Darmstadt, Germany This article illustrates the orbit maneuver sequence performed during Meteosat- 5 End of Life (EOL) re-orbiting operations

More information

John Dankanich NASA s In-Space Propulsion Technology Project November 18, 2009

John Dankanich NASA s In-Space Propulsion Technology Project November 18, 2009 Electric Propulsion Options for Small Body Missions John Dankanich NASA s In-Space Propulsion Technology Project November 18, 2009 1 How is EP Relevant to Small Body Missions? Nearly all small body missions

More information

Development of Microwave Engine

Development of Microwave Engine Development of Microwave Engine IEPC-01-224 Shin SATORI*, Hiroyuki OKAMOTO**, Ted Mitsuteru SUGIKI**, Yoshinori AOKI #, Atsushi NAGATA #, Yasumasa ITO** and Takayoshi KIZAKI # * Hokkaido Institute of Technology

More information

DARE Mission and Spacecraft Overview

DARE Mission and Spacecraft Overview DARE Mission and Spacecraft Overview October 6, 2010 Lisa Hardaway, PhD Mike Weiss, Scott Mitchell, Susan Borutzki, John Iacometti, Grant Helling The information contained herein is the private property

More information

Hayabusa Asteroid Explorer Powered by Ion Engines on the way to Earth

Hayabusa Asteroid Explorer Powered by Ion Engines on the way to Earth Hayabusa Asteroid Explorer Powered by Ion Engines on the way to Earth IEPC-2009-267 Presented at the 31st International Electric Propulsion Conference, University of Michigan Ann Arbor, Michigan USA Hitoshi

More information

SELENE TRANSLUNAR TRAJECTORY AND LUNAR ORBIT INJECTION

SELENE TRANSLUNAR TRAJECTORY AND LUNAR ORBIT INJECTION SELENE TRANSLUNAR TRAJECTORY AND LUNAR ORBIT INJECTION Yasuihiro Kawakatsu (*1) Ken Nakajima (*2), Masahiro Ogasawara (*3), Yutaka Kaneko (*1), Yoshisada Takizawa (*1) (*1) National Space Development Agency

More information

Powered Space Flight

Powered Space Flight Powered Space Flight KOIZUMI Hiroyuki ( 小泉宏之 ) Graduate School of Frontier Sciences, Department of Advanced Energy & Department of Aeronautics and Astronautics ( 基盤科学研究系先端エネルギー工学専攻, 工学系航空宇宙工学専攻兼担 ) Scope

More information

Electric Propulsion Survey: outlook on present and near future technologies / perspectives. by Ing. Giovanni Matticari

Electric Propulsion Survey: outlook on present and near future technologies / perspectives. by Ing. Giovanni Matticari Electric Propulsion Survey: outlook on present and near future technologies / perspectives by Ing. Giovanni Matticari Electric Propulsion: a concrete reality on many S/C GOCE ARTEMIS ARTEMIS SMART-1 EP

More information

Satellite Components & Systems. Dr. Ugur GUVEN Aerospace Engineer (P.hD) Nuclear Science & Technology Engineer (M.Sc)

Satellite Components & Systems. Dr. Ugur GUVEN Aerospace Engineer (P.hD) Nuclear Science & Technology Engineer (M.Sc) Satellite Components & Systems Dr. Ugur GUVEN Aerospace Engineer (P.hD) Nuclear Science & Technology Engineer (M.Sc) Definitions Attitude: The way the satellite is inclined toward Earth at a certain inclination

More information

GRAIL Takes A Roundabout Route To Lunar Orbit

GRAIL Takes A Roundabout Route To Lunar Orbit The Gravity Recovery and Interior Laboratory (GRAIL) mission departed Earth from Cape Canaveral Air Force Station Space Launch Complex 17B on 2011 September 10 at 13:08 UTC, carried by a Delta II Heavy

More information

Flight Demonstration of Electrostatic Thruster Under Micro-Gravity

Flight Demonstration of Electrostatic Thruster Under Micro-Gravity Flight Demonstration of Electrostatic Thruster Under Micro-Gravity Shin SATORI*, Hiroyuki MAE**, Hiroyuki OKAMOTO**, Ted Mitsuteru SUGIKI**, Yoshinori AOKI # and Atsushi NAGATA # * Hokkaido Institute of

More information

New 2d Far Field Beam Scanning Device at DLR s Electric Propulsion Test Facility

New 2d Far Field Beam Scanning Device at DLR s Electric Propulsion Test Facility New 2d Far Field Beam Scanning Device at DLR s Electric Propulsion Test Facility IEPC-2015-b/IEPC-388 Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th

More information

LRO Lunar Reconnaissance Orbiter

LRO Lunar Reconnaissance Orbiter LRO Lunar Reconnaissance Orbiter Launch Date: June 18, 2009 Destination: Earth s moon Reached Moon: June 23, 2009 Type of craft: Orbiter Intended purpose: to map the moon like never before, add additional

More information

ESSE Payload Design. 1.2 Introduction to Space Missions

ESSE Payload Design. 1.2 Introduction to Space Missions ESSE4360 - Payload Design 1.2 Introduction to Space Missions Earth, Moon, Mars, and Beyond Department of Earth and Space Science and Engineering Room 255, Petrie Science and Engineering Building Tel: 416-736

More information

Appendix I. NASA s Evolutionary Xenon Thruster (NEXT)

Appendix I. NASA s Evolutionary Xenon Thruster (NEXT) Appendix I. NASA s Evolutionary Xenon Thruster (NEXT) I.1 Starshade Propulsion A key functional element of the starshade spacecraft is to move, within the Lagrange space, from observation state vector

More information

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites Item Type text; Proceedings Authors Losik, Len Publisher International Foundation for Telemetering

More information

Science planning and operations for Mars Express

Science planning and operations for Mars Express Science planning and operations for Mars Express René Pischel and Tanja Zegers ESA/ESTEC, Research and Scientific Support Department, Postbus 299, 2200 AG Noordwijk, The Netherlands I. Introduction The

More information

SP-1291 June Mars Express. The Scientific Investigations

SP-1291 June Mars Express. The Scientific Investigations SP-1291 June 2009 Mars Express The Scientific Investigations Operations and Archiving Mars Express Science Planning and Operations R. Pischel & T. Zegers ESA/ESTEC, Research and Scientific Support Department,

More information

Cold Gas Thruster Qualification for FORMOSAT 5

Cold Gas Thruster Qualification for FORMOSAT 5 Cold Gas Thruster Qualification for FORMOSAT 5 By Hans-Peter HARMANN 1), Tammo ROMBACH 2) and Heiko DARTSCH 1) 1) AST Advanced Space Technologies GmbH, Stuhr, Germany 2) SpaceTech GmbH, Immenstaad, Germany

More information

New Worlds Observer Final Report Appendix E. Section E: Starshades Subsection E.6: Starshade Spacecraft Lead Author: Amy Lo

New Worlds Observer Final Report Appendix E. Section E: Starshades Subsection E.6: Starshade Spacecraft Lead Author: Amy Lo Section E: Starshades Subsection E.6: Starshade Spacecraft Lead Author: Amy Lo Introduction Starshade Spacecraft Functional Requirements The main function of the starshade spacecraft is to: 1) support

More information

Multiple Thruster Propulsion Systems Integration Study. Rusakol, A.V..Kocherpin A.V..Semenkm A.V.. Tverdokhlebov S.O. Garkusha V.I.

Multiple Thruster Propulsion Systems Integration Study. Rusakol, A.V..Kocherpin A.V..Semenkm A.V.. Tverdokhlebov S.O. Garkusha V.I. IEPC-97-130 826 Multiple Thruster Propulsion Systems Integration Study Rusakol, A.V..Kocherpin A.V..Semenkm A.V.. Tverdokhlebov S.O. Garkusha V.I. Central Research Institute of Machine Building (TsNIIMASH)

More information

Paper Session III-B - Mars Global Surveyor: Cruising to Mars

Paper Session III-B - Mars Global Surveyor: Cruising to Mars The Space Congress Proceedings 1997 (34th) Our Space Future - Uniting For Success May 1st, 1:00 PM Paper Session III-B - Mars Global Surveyor: Cruising to Mars Glenn E. Cunningham Project Manager Mars

More information

AIM RS: Radio Science Investigation with AIM

AIM RS: Radio Science Investigation with AIM Prepared by: University of Bologna Ref. number: ALMARS012016 Version: 1.0 Date: 08/03/2017 PROPOSAL TO ESA FOR AIM RS Radio Science Investigation with AIM ITT Reference: Partners: Radio Science and Planetary

More information

A Simple Semi-Analytic Model for Optimum Specific Impulse Interplanetary Low Thrust Trajectories

A Simple Semi-Analytic Model for Optimum Specific Impulse Interplanetary Low Thrust Trajectories A Simple Semi-Analytic Model for Optimum Specific Impulse Interplanetary Low Thrust Trajectories IEPC-2011-010 * Presented at the 32nd International Electric Propulsion Conference, Wiesbaden Germany David

More information

ANALYSIS OF CHEMICAL, REP, AND SEP MISSIONS TO THE TROJAN ASTEROIDS

ANALYSIS OF CHEMICAL, REP, AND SEP MISSIONS TO THE TROJAN ASTEROIDS AAS 05-396 ANALYSIS OF CHEMICAL, REP, AND SEP MISSIONS TO THE TROJAN ASTEROIDS Eugene P. Bonfiglio *, David Oh, and Chen-Wan Yen Recent studies suggest significant benefits from using 1 st and 2 nd generation

More information

New Worlds Observer Operations Concept NEW WORLDS OBSERVER OPERATIONS CONCEPT (OPSCON)

New Worlds Observer Operations Concept NEW WORLDS OBSERVER OPERATIONS CONCEPT (OPSCON) NEW WORLDS OBSERVER OPERATIONS CONCEPT (OPSCON) 1 Table of Contents 1.0 Mission Overview... 1 1.1 NWO scope... 1 2.0 System Overview... 2 2.1 System constituents... 2 2.2 system functional architecture...

More information

Systems Engineering in Venus Satellite

Systems Engineering in Venus Satellite Systems Engineering in Venus Satellite How to benefit from system engineering process in designing a microsatellite Jacob Herscovitz Venus Project Manager RAFAEL - Israel 1 Presentation Contents Introduction

More information

BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013

BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013 BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission with Novel Plasma Propulsion Technology Sara Spangelo, NASA JPL, Caltech Benjamin Longmier, University of Michigan Interplanetary Small

More information

Mission Trajectory Design to a Nearby Asteroid

Mission Trajectory Design to a Nearby Asteroid Mission Trajectory Design to a Nearby Asteroid A project present to The Faculty of the Department of Aerospace Engineering San Jose State University in partial fulfillment of the requirements for the degree

More information

Spacecraft Bus / Platform

Spacecraft Bus / Platform Spacecraft Bus / Platform Propulsion Thrusters ADCS: Attitude Determination and Control Subsystem Shield CDH: Command and Data Handling Subsystem Payload Communication Thermal Power Structure and Mechanisms

More information

Boeing Low-Thrust Geosynchronous Transfer Mission Experience

Boeing Low-Thrust Geosynchronous Transfer Mission Experience Boeing Low-Thrust Geosynchronous Transfer Mission Experience Mark Poole and Monte Ho Boeing Satellite Development Center, 2260 E. Imperial Hwy, El Segundo, CA, 90245 mark.t.poole@boeing.com, yiu-hung.m.ho@boeing.com,

More information

Miniature Vacuum Arc Thruster with Controlled Cathode Feeding

Miniature Vacuum Arc Thruster with Controlled Cathode Feeding Miniature Vacuum Arc Thruster with Controlled Cathode Feeding Igal Kronhaus and Matteo Laterza Aerospace Plasma Laboratory, Faculty of Aerospace Engineering, Technion - Israel Institute of Technology,

More information

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft.

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft. ASE 379L Group #2: Homework #4 James Carlson Due: Feb. 15, 2008 Henri Kjellberg Leah Olson Emily Svrcek Requirements The spacecraft shall be launched to Earth orbit using a launch vehicle selected by the

More information

Grid Wear Analysis of a Miniature Ion Engine

Grid Wear Analysis of a Miniature Ion Engine Grid Wear Analysis of a Miniature Ion Engine IEPC-05-87 /ISTS-05-b-87 Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th International Electric Propulsion

More information

Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu. Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA)

Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu. Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA) Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA) Highlights of Hayabusa2 Hayabusa2 is the 2nd Japanese sample return

More information

LOW-COST LUNAR COMMUNICATION AND NAVIGATION

LOW-COST LUNAR COMMUNICATION AND NAVIGATION LOW-COST LUNAR COMMUNICATION AND NAVIGATION Keric Hill, Jeffrey Parker, George H. Born, and Martin W. Lo Introduction Spacecraft in halo orbits near the Moon could relay communications for lunar missions

More information

Development and qualification of Hall thruster KM-60 and the flow control unit

Development and qualification of Hall thruster KM-60 and the flow control unit Development and qualification of Hall thruster KM-60 and the flow control unit IEPC-2013-055 Presented at the 33rd International Electric Propulsion Conference, The George Washington University Washington,

More information

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team Team X Study Summary for ASMCS Theia Jet Propulsion Laboratory, California Institute of Technology with contributions from the Theia Team P. Douglas Lisman, NASA Jet Propulsion Laboratory David Spergel,

More information

Pico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites

Pico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites 1/25 Pico-Satellite Orbit Control by Vacuum Arc Thrusters as Enabling Technology for Formations of Small Satellites Igal Kronhaus, Mathias Pietzka, Klaus Schilling, Jochen Schein Department of Computer

More information

LAUNCHES AND LAUNCH VEHICLES. Dr. Marwah Ahmed

LAUNCHES AND LAUNCH VEHICLES. Dr. Marwah Ahmed LAUNCHES AND LAUNCH VEHICLES Dr. Marwah Ahmed Outlines 2 Video (5:06 min) : https://youtu.be/8t2eyedy7p4 Introduction Expendable Launch Vehicles (ELVs) Placing Satellite into GEO Orbit Introduction 3 Introduction

More information

Orbital Dynamics and Impact Probability Analysis

Orbital Dynamics and Impact Probability Analysis Orbital Dynamics and Impact Probability Analysis (ISAS/JAXA) 1 Overview This presentation mainly focuses on a following point regarding planetary protection. - How to prove that a mission satisfies the

More information

New Worlds Observer Final Report Appendix J. Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon

New Worlds Observer Final Report Appendix J. Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon The two NWO spacecraft will orbit about the libration point created by the Sun and Earth/Moon barycenter at the far side

More information

Technical Proposal: Self-Assembling Space Structures

Technical Proposal: Self-Assembling Space Structures Excerpt For Public Release: Technical Proposal: 2018 Marcus van Bavel All rights Reserved Part 1: Table of Contents Part 1: Table of Contents... 1 Part 2: Significance of...1 Theory of Operation...3 Example

More information

INTERSTELLAR PRECURSOR MISSIONS USING ADVANCED DUAL-STAGE ION PROPULSION SYSTEMS

INTERSTELLAR PRECURSOR MISSIONS USING ADVANCED DUAL-STAGE ION PROPULSION SYSTEMS INTERSTELLAR PRECURSOR MISSIONS USING ADVANCED DUAL-STAGE ION PROPULSION SYSTEMS David G Fearn, 23 Bowenhurst Road, Church Crookham, Fleet, Hants, GU52 6HS, UK dg.fearn@virgin.net Roger Walker Advanced

More information

Small Satellite Aerocapture for Increased Mass Delivered to Venus and Beyond

Small Satellite Aerocapture for Increased Mass Delivered to Venus and Beyond Small Satellite Aerocapture for Increased Mass Delivered to Venus and Beyond Adam Nelessen / Alex Austin / Joshua Ravich / Bill Strauss NASA Jet Propulsion Laboratory Ethiraj Venkatapathy / Robin Beck

More information

HEMP Thruster Assembly Performance with increased Gas Tubing Lengths of Flow Control Unit

HEMP Thruster Assembly Performance with increased Gas Tubing Lengths of Flow Control Unit HEMP Thruster Assembly Performance with increased Gas Tubing Lengths of Flow Control Unit IEPC-2015-346 Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th

More information

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION P.S. Jørgensen (1), J.L. Jørgensen (1), T. Denver (1), Pieter van den Braembuche (2) (1) Technical University of Denmark, Ørsted*DTU, Measurement

More information

Development of the Psyche Mission for NASA s Discovery Program

Development of the Psyche Mission for NASA s Discovery Program Development of the Psyche Mission for NASA s Discovery Program IEPC-2017-153 Presented at the 35th International Electric Propulsion Conference Georgia Institute of Technology Atlanta, Georgia USA David

More information

Electric Propulsion System using a Helicon Plasma Thruster (2015-b/IEPC-415)

Electric Propulsion System using a Helicon Plasma Thruster (2015-b/IEPC-415) Electric Propulsion System using a Helicon Plasma Thruster (2015-b/IEPC-415) Presented at Joint Conference of 30th International Symposium on Space Technology and Science 34th International Electric Propulsion

More information

Effect of Plasma Plume on CubeSat Structures as a Function of Thrust Vectoring

Effect of Plasma Plume on CubeSat Structures as a Function of Thrust Vectoring Effect of Plasma Plume on CubeSat Structures as a Function of Thrust Vectoring IEPC-2015-157 /ISTS-2015-b-157 Presented at Joint Conference of 30th International Symposium on Space Technology and Science

More information

Evaluation of Radioisotope Electric Propulsion for Selected Interplanetary Science Missions

Evaluation of Radioisotope Electric Propulsion for Selected Interplanetary Science Missions Evaluation of Radioisotope Electric Propulsion for Selected Interplanetary Science Missions IEPC-2005-181 Presented at the 29 th International Electric Propulsion Conference, Princeton University October

More information

Mars Sample Return Mission

Mars Sample Return Mission Mars Sample Return Mission Ryan Supler Saylor.org: SSE101 MSRM Project April 15, 2014 2 Table of Contents The Scoping Elements of the Mars Sample Return Mission page 3 The High-Level Concept of Operations

More information

XENON RESISTOJETS AS SECONDARY PROPULSION ON EP SPACECRAFTS AND PERFORMANCE RESULTS OF RESISTOJETS USING XENON

XENON RESISTOJETS AS SECONDARY PROPULSION ON EP SPACECRAFTS AND PERFORMANCE RESULTS OF RESISTOJETS USING XENON XENON RESISTOJETS AS SECONDARY PROPULSION ON EP SPACECRAFTS AND PERFORMANCE RESULTS OF RESISTOJETS USING XENON D. Nicolini (a), D. Robertson (a), E. Chesta (a), G. Saccoccia (a), D. Gibbon (b), A. Baker

More information

Electric Propulsion Research and Development at NASA-MSFC

Electric Propulsion Research and Development at NASA-MSFC Electric Propulsion Research and Development at NASA-MSFC November 2014 Early NEP concept for JIMO mission Dr. Kurt Polzin (kurt.a.polzin@nasa.gov) Propulsion Research and Development Laboratory NASA -

More information

ORBIT DETERMINATION OF THE SMART-1 MISSION

ORBIT DETERMINATION OF THE SMART-1 MISSION ORBIT DETERMINATION OF THE SMART-1 MISSION Ruaraidh Mackenzie (1), David Lazaro Salvador (2), David Milligan (3) (1) Scisys Ltd., European Space Operations Centre, Robert-Bosch Strasse 5, 64293, Germany,

More information

ISIS Impactor for Surface and Interior Science

ISIS Impactor for Surface and Interior Science ISIS Impactor for Surface and Interior Science ISIS Mission Concept!! Send an independent, autonomous impactor spacecraft to the target of the OSIRIS-REx mission!! Launch as secondary payload with InSight!!

More information

PRELIMINAJ3.:( 6/8/92 SOFTWARE REQUIREMENTS SPECIFICATION FOR THE DSPSE GUIDANCE, NAVIGATION, AND CONTROL CSCI. Prepared by

PRELIMINAJ3.:( 6/8/92 SOFTWARE REQUIREMENTS SPECIFICATION FOR THE DSPSE GUIDANCE, NAVIGATION, AND CONTROL CSCI. Prepared by PRELIMINAJ3.:( SOFTWARE REQUIREMENTS SPECIFICATION FOR THE DSPSE GUIDANCE, NAVIGATION, AND CONTROL CSCI Prepared by Space Applications Corporation 6/8/92.. 1 SCOPE 1.1 IDENTIFICATION 1.2 OVERVIEW This

More information

BINARY ASTEROID ORBIT MODIFICATION

BINARY ASTEROID ORBIT MODIFICATION 2013 IAA PLANETARY DEFENSE CONFERENCE BEAST BINARY ASTEROID ORBIT MODIFICATION Property of GMV All rights reserved TABLE OF CONTENTS 1. Mission Concept 2. Asteroid Selection 3. Physical Principles 4. Space

More information

Feasible Mission Designs for Solar Probe Plus to Launch in 2015, 2016, 2017, or November 19, 2008

Feasible Mission Designs for Solar Probe Plus to Launch in 2015, 2016, 2017, or November 19, 2008 Feasible Mission Designs for Solar Probe Plus to Launch in 2015, 2016, 2017, or 2018 2007 Solar Probe Study & Mission Requirements Trajectory study and mission design trades were conducted in the fall

More information

ROBOTIC MARS EXPLORATION TRAJECTORIES USING HALL THRUSTERS

ROBOTIC MARS EXPLORATION TRAJECTORIES USING HALL THRUSTERS AAS 14-364 ROBOTIC MARS EXPLORATION TRAJECTORIES USING HALL THRUSTERS Theresa D. Kowalkowski, * Zachary J. Bailey, Robert E. Lock, Erick J. Sturm, and Ryan C. Woolley ** INTRODUCTION A variety of Mars

More information

MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30.

MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30. MAE 180A: Spacecraft Guidance I, Summer 2009 Homework 4 Due Thursday, July 30. Guidelines: Please turn in a neat and clean homework that gives all the formulae that you have used as well as details that

More information

Service Life Assessment for Ion Engines

Service Life Assessment for Ion Engines IEPC-97-049 303 IEPC-97-049 Service Life Assessment for Ion Engines John R. Anderson*, James E. Polk** and John R. Brophy Jet Propulsion Laboratory California Institute of Technology Pasadena, California

More information

(b) Analyzed magnetic lines Figure 1. Steady state water-cooled MPD thruster.

(b) Analyzed magnetic lines Figure 1. Steady state water-cooled MPD thruster. A. MPD thruster In this study, as one of the In-Space Propulsion projects by JAXA (Japan Aerospace exploration Agency), a practical MPD propulsion system was investigated. We planned to develop MPD thrusters

More information

Proton Launch System Mission Planner s Guide SECTION 2. LV Performance

Proton Launch System Mission Planner s Guide SECTION 2. LV Performance Proton Launch System Mission Planner s Guide SECTION 2 LV Performance 2. LV PERFORMANCE 2.1 OVERVIEW This section provides the information needed to make preliminary performance estimates for the Proton

More information

Mission Overview. EAGLE: Study Goals. EAGLE: Science Goals. Mission Architecture Overview

Mission Overview. EAGLE: Study Goals. EAGLE: Science Goals. Mission Architecture Overview Mission Overview OPAG Meeting November 8 th, 2006 Ryan Anderson & Daniel Calvo EAGLE: Study Goals Develop a set of science goals for a flagship mission to Enceladus Investigate mission architectures that

More information

The post launch assessment review confirmed the following previous assertions about the mission status:

The post launch assessment review confirmed the following previous assertions about the mission status: 1 GRACE Newsletter No. 2 August 15, 2003 Topics: http://www.csr.utexas/grace/ http://www.gfz-potsdam.de/grace 1. Editorial 2. Major events in Mission Operations since last Newsletter 3. Current status

More information

Propulsion means for CubeSats

Propulsion means for CubeSats Propulsion means for CubeSats C. Scharlemann and D. Krejci 2009 CubeSat Developers Workshop, San Louis Obispo, CA Welcome to the Austrian Research Centers Space Propulsion & Advanced Concepts Staff: 11

More information

Solar Thermal Propulsion

Solar Thermal Propulsion AM A A A01-414 AIAA 2001-77 Solar Thermal Propulsion SOLAR THERMAL PROPULSION FOR AN INTERSTELLAR PROBE Ronald W. Lyman, Mark E. Ewing, Ramesh S. Krishnan, Dean M. Lester, Thiokol Propulsion Brigham City,

More information

- 581 IEPC the ion beam diagnostics in detail such as measurements of xenon with double charges, Introduction

- 581 IEPC the ion beam diagnostics in detail such as measurements of xenon with double charges, Introduction - 581 IEPC-95-89 300 HOURS ENDURANCE TEST OF MICROWAVE ION THRUSTER Shin Satori*, Hitoshi Kuninaka* and Kyoichi Kuriki** Institute of Space and Astronautical Science 3-1-1, Yoshinodai, Sagamihara, Kanagawa

More information

Orbiter Element Brian Cooke

Orbiter Element Brian Cooke Orbiter Element Brian Cooke 47 from orbit Payload focused primarily to address Ocean objective: Radio Subsystem (RS) Laser Altimeter (LA) Magnetometer (MAG) Langmuir Probe (LP) Mapping Camera (MC) Have

More information

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil) BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN Jose Sergio Almeida INPE (Brazil) 1 st International Academy of Astronautics Latin American Symposium on Small

More information

Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results

Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results 13 th Annual Summer CubeSat Developer s Workshop August 6-7, 2016, Logan, Utah Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results Presented by Shufan Wu Guowen Sun,

More information

On-Orbit Performance of KOMPSAT-2 AOCS Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D.

On-Orbit Performance of KOMPSAT-2 AOCS Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D. SSC07-VII-9 On-Orbit Performance of AOCS 2007. 8. Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D. 1 Program - is Low Earth Orbit Satellite - Mission : Cartographic Mission of Korean Peninsula

More information

FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING

FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING Elias F. Solorzano University of Toronto (Space Flight Laboratory) Toronto, ON (Canada) August 10 th, 2016 30 th AIAA/USU

More information

Abstract. Objectives. Theory

Abstract. Objectives. Theory A Proposal to Develop a Two-Stage Gridless Ion Thruster with Closed Electron Drift Richard R. Hofer Plasmadynamics and Electric Propulsion Laboratory (PEPL) Department of Aerospace Engineering University

More information

What s Up in Space? Dean W McCall, Ed.D.

What s Up in Space? Dean W McCall, Ed.D. What s Up in Space? Dean W McCall, Ed.D. In no particular order Brief aerospace CV Systems Engineering Space mission types Examples Gotchas Terminology & Slang Please ask questions McCall Background Hughes

More information

Overview of Astronautics and Space Missions

Overview of Astronautics and Space Missions Overview of Astronautics and Space Missions Prof. Richard Wirz Slide 1 Astronautics Definition: The science and technology of space flight Includes: Orbital Mechanics Often considered a subset of Celestial

More information

Asteroid Robotic Mission Overview: A First Step in the Journey of Human Space Exploration and Settlement

Asteroid Robotic Mission Overview: A First Step in the Journey of Human Space Exploration and Settlement Asteroid Robotic Mission Overview: A First Step in the Journey of Human Space Exploration and Settlement Dan Mazanek Senior Space Systems Engineer NASA Langley Research Center Virginia Space Grant Consortium

More information

VHITAL-160 thermal model building and 3D thermal modeling carrying-out

VHITAL-160 thermal model building and 3D thermal modeling carrying-out VHITAL-160 thermal model building and 3D thermal modeling carrying-out IEPC-2005-108 Presented at the 29 th International Electric Propulsion Conference, Princeton University, Svetlana A. Tverdokhlebova

More information

ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS

ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS Pascal GARNERO, Olivier DULAU ALCATEL SPACE 100, Bd. du Midi, BP 99 06156 CANNES LA BOCCA Cedex FRANCE Contact : pascal.garnero@space.alcatel.fr,

More information

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury BepiColombo Project and MPO Status Comprehensive Explora1on of Planet Mercury Joe Zender BepiColombo Deputy PS, ESA/ESTEC BepiColombo Previously: Ø Proba2 Science Coordinator, until 12/2013 Ø ProbaV, Project

More information

Toward Venus orbit insertion of Akatsuki

Toward Venus orbit insertion of Akatsuki Toward Venus orbit insertion of Akatsuki Takeshi Imamura (JAXA, Japan) Lightning and Airglow Camera Mid-IR Camera UV Imager Ultra-Stable Oscillator 1µm Camera 2µm Camera Development and launch Objective:

More information

Astrodynamics of Moving Asteroids

Astrodynamics of Moving Asteroids Astrodynamics of Moving Asteroids Damon Landau, Nathan Strange, Gregory Lantoine, Tim McElrath NASA-JPL/CalTech Copyright 2014 California Institute of Technology. Government sponsorship acknowledged. Capture

More information

Spacecraft motion and attitude control in the high elliptic orbit

Spacecraft motion and attitude control in the high elliptic orbit Spacecraft motion and attitude control in the high elliptic orbit IEC-2007-30 resented at the 30 th International Electric ropulsion Conference, Florence, Italy V.A. bukhov *, A.I. okryshkin, G.A. opov

More information

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010 Orbit Design Marcelo Suárez Orbit Design Requirements The following Science Requirements provided drivers for Orbit Design: Global Coverage: the entire extent (100%) of the ice-free ocean surface to at

More information

InSight Spacecraft Launch for Mission to Interior of Mars

InSight Spacecraft Launch for Mission to Interior of Mars InSight Spacecraft Launch for Mission to Interior of Mars InSight is a robotic scientific explorer to investigate the deep interior of Mars set to launch May 5, 2018. It is scheduled to land on Mars November

More information

A Concept Study of the All-Electric Satellite s Attitude and Orbit Control System in Orbit Raising

A Concept Study of the All-Electric Satellite s Attitude and Orbit Control System in Orbit Raising Journal of Automation and Control Engineering Vol., No., December A Concept Study of the All-Electric Satellite s Attitude and Orbit Control System in Orbit Raising Yoshinobu Sasaki Japan Aerospace Exploration

More information

FLIGHT TESTING OF VOLUME-IONIZATION ION THRUSTERS ON METEOR SATELLITE

FLIGHT TESTING OF VOLUME-IONIZATION ION THRUSTERS ON METEOR SATELLITE FLIGHT TESTING OF VOLUME-IONIZATION ION THRUSTERS ON METEOR SATELLITE Vladimir P. Khodnenko NPP Russian scientific and Research Institute of Electromechanics Moscow 101000, P.O. Box 496, Russia Phone:

More information

NASA s Evolutionary Xenon Thruster (NEXT) Ion Propulsion Technology Development Status in 2009

NASA s Evolutionary Xenon Thruster (NEXT) Ion Propulsion Technology Development Status in 2009 NASA s Evolutionary Xenon Thruster (NEXT) Ion Propulsion Technology Development Status in 2009 IEPC-2009-150 Presented at the 31st International Electric Propulsion Conference, University of Michigan Ann

More information

OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION. +49(0) ,

OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION. +49(0) , OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION Francisco Sancho (1), David Lázaro (2), Pier Luigi Righetti (3) (1) GMV at EUMETSAT, Eumetsat-Allee 1,

More information

Interplanetary Mission Opportunities

Interplanetary Mission Opportunities Interplanetary Mission Opportunities Introduction The quest for unravelling the mysteries of the universe is as old as human history. With the advent of new space technologies, exploration of space became

More information

Toward Venus orbit insertion of Akatsuki

Toward Venus orbit insertion of Akatsuki Toward Venus orbit insertion of Akatsuki Takeshi Imamura (JAXA, Japan) Lightning and Airglow Camera Mid-IR Camera UV Imager Ultra-Stable Oscillator 1µm Camera 2µm Camera Development and launch Objective:

More information

Learning Lab Seeing the World through Satellites Eyes

Learning Lab Seeing the World through Satellites Eyes Learning Lab Seeing the World through Satellites Eyes ESSENTIAL QUESTION What is a satellite? Lesson Overview: Engage students will share their prior knowledge about satellites and explore what satellites

More information

Performance characteristics are based on customer requirements. As such, they are not representative of component capabilities or limitations.

Performance characteristics are based on customer requirements. As such, they are not representative of component capabilities or limitations. ADN Micro Propulsion System 13066300-01 The VACCO / ECAPS CubeSat ADN Delta-V Propulsion System is a high performance micro propulsion system (MiPS) specifically designed for CubeSats. The ADN Delta-V

More information

Thermal and structural design constraints for radiometers operating in geostationary orbits. G. E. Zurmehly, R. A. Hookman

Thermal and structural design constraints for radiometers operating in geostationary orbits. G. E. Zurmehly, R. A. Hookman Thermal and structural design constraints for radiometers operating in geostationary orbits G. E. Zurmehly, R. A. Hookman ITT Aerospace/Communications Division Fort Wayne, Indiana ABSTRACT For a radiometer

More information

GRID EROSION MODELING OF THE NEXT ION THRUSTER OPTICS

GRID EROSION MODELING OF THE NEXT ION THRUSTER OPTICS 39th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit 20-23 July 2003, Huntsville, Alabama AIAA 2003-4868 GRID EROSION MODELING OF THE NEXT ION THRUSTER OPTICS ABSTRACT Results from several different

More information

Prospector-1: A Low-Cost Commercial Asteroid Mission Grant Bonin SmallSat 2016

Prospector-1: A Low-Cost Commercial Asteroid Mission Grant Bonin SmallSat 2016 Prospector-1: A Low-Cost Commercial Asteroid Mission Grant Bonin SmallSat 2016 About DSI A space technology and resources company Vision to enable the human space development by harvesting asteroid materials

More information