1 ATS A fuzzy logic model to predict the performance of hard rock tunnel boring machine Mansour Hedayatzadeh 1, Kourosh Shahriar 2, Jafar Khademi Hamidi 2 1 Mining Engineering Group, Islamic Azad University, Tehran South Branch, Iran 2 Departments of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran ABSTRACT Prediction of tunnel boring machine (TBM) is one of the most crucial and decisive issues in underground excavation projects. Precise estimation of machine performance can significantly mitigate the capital costs of mechanical excavation project. The main objective of this study is to estimate the TBM penetration rate by constructing a fuzzy inference system analysis. For this purpose, rule-based (Mamdani model) fuzzy logic were employed to build a fuzzy model and 34 TBM field datasets including Q rock mass classification system, rock material properties and machine characteristics along the route of the tunnel were compiled. Hence, the F Q (fabric index of Q rock mass classification system), F f (the ratio of uniaxial compressive strength and load per cutter) and Fα were determined as input parameters In order to verify the validity of the two models, the predicted penetration rate and the measured penetration rate gained from the field records were compared. Results picked out form this predictor model revealed that this model has a strong capability for estimation of TBM performance with a correlation coefficient of 81.5%.. KEYWORDS Keywords: Tunnel boring machine; rate of penetration (PR); advance rate (AR); fuzzy inference system; rock mass classification system. 1. INTRODUCTION Performance prediction of tunnel boring machine is one of the engineering geological problems that commonly have complexity and ambiguity. This issue is crucial because a precise estimation of machine performance can considerably influence the capital costs of mechanical excavation project. Performance prediction of TBM strictly relies on the estimation of the rate of penetration (PR), defined as the ratio of excavated distance to the operating time during continuous excavation phase, and advance rate (AR), the ratio of both mined and supported actual distance to the total time. To date, many attempts were made for the development of the accurate prediction models [1-10]. In addition to these models in recent years some prediction models have been developed using artificial intelligences including artificial neural network (ANN), fuzzy logic and Neuro-Fuzzy hybrid techniques [11-20]. Taking into consideration the nature of problem, the main purpose of the present study is to develop a model by utilizing the fuzzy logic for predicting TBM performance. In order to achieve this aim, a database composed of rock mass properties such as fabric indices of four rock mass classification and the angle between plane of weakness and tunnel axis, intact rock properties including uniaxial compressive strength, machine specification including net thrust per cutter together with actual measured TBM penetration rate, was compiled along the 6.5 km bored Alborz service tunnel.
2 2. PROJECT DESCRIPTION AND GEOLOGY OF THE STUDY AREA The Alborz service tunnel is the longest tunnel section (6.5 km) along Tehran-Shomal Freeway, situated in the high elevation portions of Alborz Mountain Range, connecting the capital city of Tehran to the Caspian Sea in the North (Figure. 1). The service tunnel as a pilot tunnel with a diameter of 5.20 m was excavated by an open gripper TBM in advance of two main tunnel tubes to be excavated subsequently. The purpose of the service tunnel is to carry out site investigations, drainage of the rock mass, providing access for main tunnel excavations and service, ventilation and drainage during operation of the complete tunnel system ROCK MATERIAL PROPERTIES Intact rock strength (Uniaxial compressive strength, Brazilian tensile strength, Point load index, etc.) Toughness (Punch penetration index, Fracture toughness index) Hardness and drillability (Siever s J-value, Total and Taber hardness indices, Schmidt hammer hardness) Brittleness (Swedish brittleness S 20, brittle indices (BI 1 = σ c / σ t and BI 2 = [(σ c - σ t ) / (σ c + σ t )] where σ c and σ t are uniaxial compressive and tensile strengths of intact rock, respectively) Abrasiveness indices (Cerchar Abrasivity Index CAI and Abrasion Value AV ) Others parameters such as (Poisson ratio, Elasticity module, internal friction angle, Porosity, Grain size, etc.) ROCK MASS PROPERTIES GSI rock mass classification system which indicates rock mass properties RMR rock mass rating classification system defined Figure. 1 Geographical location of Alborz tunnel Site investigation for the service tunnel included a geological surface mapping, a geophysical investigation along the alignment from the surface and some index laboratory tests on rock samples. Based on the results of geological site investigations, the main lithological units through which the tunnel was driven consist of sandstone, tuff, gypsum, shale and limestone layers (Figure. 2). as, where, R 1 is the rating for intact rock strength, R 2 is the rating for RQD, R 3 is the rating for discontinuity spacing, R 4 is the rating for discontinuity conditions, R 5 is the rating for ground water, and R 6 is the rating for discontinuity orientation. The rock mass properties could be defined as R 2 +R 3 +R 4 in RMR system [3]. In Q rock mass classification system, Q = ( RQD/J n ). (J r /J a ).)J w /SRF). The rock mass properties are considered as (RQD/J n ). (J r /J a ) [2]. In RMi classification system, RMi = σ ci * JP the rock mass properties could be determined as Jp that related to Jv (volumetric joint count), V b the block volume (m 3 ), L (the mean block diameter ), S (spacing of joints within a set) and jc (the joint conditions rating) [14] ROCK MASS CONDITIONS Figure. 2 Longitudinal geological profile of Alborz service tunnel 3. PARAMETERS AFFECTING THE TUNNEL BORING MACHINE PERFORMANCE There are many factors affecting the TBM performance such as rock material, rock mass parameters, machine characteristics and operational parameters. The following list gives an overview of variables that are taken into account as potential inputs to the prediction model: Joint condition, joint orientation such as R 6, the partial rating for the adjustment of discontinuity orientation in RMR system, and the angle between the tunnel axis and the planes of weakness In-situ stress status, such as SRF, the stress reduction factor, in Q system, σ v and σ h (in situ stress condition) Groundwater conditions such as R 5 parameter, the rating for groundwater, in RMR system and J w parameter, the factor for joint water pressure or inflow, in Q classification system MACHINE CHARACTERISTICS Thrust (cutter load)
3 Torque RPM (Rotation per Minute) Power Disc specifications including number and spacing of disc cutters on the cutterhead, disc geometrical specifications such as diameter, tip width and angle of tip, and disc mechanical specifications such as maximum load capacity, allowable velocity. Knowledge about the relationships among some of these factors and their effect on the TBM performance are available from the previous researches [8, 7, 9]. These experiences were the primary source of information for designing the rule bases of the fuzzy model. The reasoning behind the choice of the most related factors and the translation of the expert knowledge into the fuzzy if-then rules is described in detail in Section 5. Numerical measurements from field observations of 34 tunnel sections were used to validate the model. 4. THE FUZZY MODEL In order to predict the performance of TBM based on the data set compiled along the route of tunnel, a fuzzy logic model was developed. Generally, the construction of the fuzzy model has several steps that are illustrated in Figure 5. More detailed information about these steps including, selection of related input variables, and design of the membership functions, translation of the expert knowledge into if-then rules and determination of defuzzification method are given in this section. Operation of Fuzzy system Crisp input Fuzzification Fuzzy input Rule evaluation Fuzzy output Defuzzification Crisp output Figure. 3 Description of operation system 5. FUZZY LOGIC METHOD Input function Rules/Inference Output membership function The fuzzy logic advantage in comparison with traditional methods, such as statistics, is the capability of this model to describe complex and nonlinear multivariable problems that have an ambiguity and complexity [23]. Many researchers have satisfyingly used the fuzzy approach in the engineering geology. The Mamdani, the Tagaki-Sugeno-Kang, the Tsukamoto and the singleton fuzzy are the popular models wildly applied in all aspect of engineering. However, the Mamdani fuzzy algorithm is the most appropriate fuzzy method employed in engineering geological problems [25]. Generally, a fuzzy model is constructed by expert opinion in the form of linguistic rules. In a classical set, an element belongs to, or does not belong to, a set. Because fuzzy sets describe vague concepts based on the premise that the elements used are not numbers but belong to words or the value of a linguistic variable, an element of a fuzzy set naturally belongs to the set with membership values from the interval [0, 1] Fuzzy logic model to predict rate of penetration of tunnel boring machine Determination of input variables As mentioned previously, many different factors affect the TBM performance, but not all of them are exerted in the fuzzy model. Some of these variables are not included because the knowledge about their influence is still insufficient and the experts consider them of a minor importance. Considering the above mentioned issues and based upon existing facilities in the site, an attempt is made to consider some of these parameters for predicting TBM penetration rate in this study. Among the rock material characteristics, UCS was selected in the model, because it could be measured simply and relatively represents intact rock property. Also, cutter load was selected as a machine parameter in the model. Rock mass properties can be extracted form part of the Q, RMR, RMi and GSI classification systems. Among these systems, the fabric index of Q system (F Q ), which is defined as (RQD/J n ).(J r /J a ) was selected. Hence, three distinct parameters were finally taken into account to construct the fuzzy logic model for TBM penetration rate considering all influencing parameters on TBM performance as the followings: - F Q that is representative of rock mass properties - F f as the ratio UCS/F, represents intact rock characteristic and machine specifications - F α = log ArcSin (Sin α f * Sin (α t α s )) that demonstrates the rock mass condition. α f and α s are dip and strike of encountered planes of discontinuities in rock mass, and α t is the direction of the tunnel axis in degrees[14]. Descriptive statistical distribution of mentioned variables in the database and input parameters for developed model is summarized in Table 1. Influence of each variable in obtained model has been investigated by performing multiple linear regression analysis. Table 1.descriptive statistics of generated database Variables N Min. Max. Mean Variance F Q F f (MPa/tonf) F alpha (degree) PR (m/h) Figures 4-6 illustrate the correlations between the individual independent variables and the actual measured ROP. The
4 Figures also, include the coefficients of correlation (R 2 ) which is an indicator of correlation strength. As illustrated in Figure 7, to set up input and output variables in the MATLAB environment, fuzzy inference system (FIS) editor was implemented. Both input and output variables were fuzzified with membership function graphically designed with a MATLAB toolbox. The fuzzy membership function defines how each point in the input space is mapped to a membership value (or degree of membership) between 0 and 1. Both input and output variables were fuzzy proposition in Mamdani model Fuzzification of input and output variables and selection of membership function Figure.4 Relation between measured PR and F f Figure.5 Relation between measured PR and F Q In construction of a fuzzy model, the use of the proper membership function (MF) is a critical and crucial issue because MFs express the fuzziness of the models variables. There are many suggestions on how to build the appropriate MF for a particular model. Ross [22] describes seven procedures for this task (i.e. Intuition, inference, rank ordering, angular fuzzy sets, neural networks genetic algorithms, and inductive reasoning). Tsoukalas and Uhrig [23] add the use of statistical data as a method to determine an MF. Liberatore [24] also adopts a similar approach in an application for assessing project schedule. Advantage of MFs is that they can be produced based on subjective judgment and intuition especially in cases where there is a lack of data. The shape of the membership function of fuzzy sets can be either linear (trapezoidal or triangular) or various forms of nonlinear, depending on the nature of the system being studied. In this paper the triangular membership function is selected among a set of functions that the FLT provides, including the trapezoidal, the generalized bell-shaped, Gaussian, Sigmoidal, and polynominal MFs. Triangular MF is selected because it presents the following characteristics[24]: A. it is simple to understand and handle B. it is computationally affordable. Figure 6. Relation between measured PR and F α With considering the good relationship between Ff, FQ and Fα with PR, To predict ROP, three parameter including F Q, F f and F α could be used as input parameters that they were gained from 34 sections of Alborz tunnel. 0, x< a MD A (x) = (x-a)/ (b-a) a x < b (1) (c-x)/(c-b) b x < c 0, x> c MD A (x) is the membership function of a fuzzy set; a, b, c are the constant. In this study for construction and determination of the membership function parameters, the statistical method, considering the performed statistical analysis, were utilized. Hence, the first input, F Q, had five member functions: min, min-med, med, med-max and max with respect to the range of F Q, which is ranged from 0.8 to 24. Figure. 8 presents the shape and range of each membership function for this input. Figure. 7 Determination of input and output parameters
5 5.1.3 Description of If Then rules Figure. 8 Membership function of the PR input parameter, F Q The F f as the second parameter had three membership functions which are min, med and max. It varies from 1.8 to 5.9 MPa/tonf and the shape and range of its membership functions are shown in Figure. 9. Figure. 9 Membership function of the PR input parameter, F f F α was taken into account as the third parameter ranging between 9 and 79 degrees, has five membership functions including min, min-med, med, med-max, max. Figure. 10 demonstrates the shape and range of membership function of F α parameter. Figure. 10 Membership function of the PR input parameter, F α The penetration rate (PR) was considered as the output parameter that varies from 2.2 to 5.3 m/h. The shape and range of each membership function of the output are illustrated in Figure. 11 Figure. 11 Membership function of the PR input parameters (1) Input output relationship by fuzzy conditional rules is a significant concept in fuzzy logic. A fuzzy conditional rule is generally composed of a premise and a consequent part (IF premise THEN consequent), for example, if the level1 is high, then level2 is low, where the terms high and low can be represented by fuzzy sets or more specifically by membership functions. Zadeh introduced the inference mechanism of fuzzy logic reasoning, which is based on the compositional rule of inference [25]. By using this inference mechanism, an output set is obtained given the rules and the input variables. The Mamdani algorithm is one of the most common algorithms used in fuzzy logic. Mamdani and Assilian showed that the concepts of fuzzy sets and fuzzy logic can translate an entirely unstructured set of linguistic heuristics into an algorithm [23]. This algorithm is one of the most used fuzzy methods to apply in complex engineering geological problems, since most geological processes are defined with linguistic variables or simple vague predicates. The Mamdani fuzzy algorithm takes the following form: If X I is A ii... and X r is A ir then Y is B i for I = 1, 2,..., K (2) X I, X r : Input variables A ii, A ir, B i : Linguistic terms (fuzzy sets) Y: Output variables, K: number of rules In the Mamdani fuzzy model, different fuzzy set operators, such as and, or and not, can be used to combine the premise propositions of the rules. In this algorithm, the contribution of each rule to the output of the model is a fuzzy set. The inference reasoning mechanism in the Mamdani fuzzy model is based on the compositional rule of inference. To perform inference in a rule based fuzzy model, the fuzzy proposition needs to be represented by an implication function. The implication function is called a fuzzy if then rule or a fuzzy conditional statement. The general form of fuzzy if then rule is as follows: If X is A then Y is B Where A and B are linguistic values represented by fuzzy sets. The use of fuzzy set provides the generalization of the information used to describe the behavior system. The if-part of the rule is called premise and the then-part of the rule is called consequence. Generally 34 rules with combining of input membership functions (premise part) to output membership functions (consequent part) were utilized in the model.some of the rules are as follows: 1. IF(FQ is MINMED)AND(Ff is MED)AND(Falpha isminmed)then(pr is MEDMAX) 2. IF(FQ is MINMED)AND(Ff is MED)AND(Falpha is MAX)THEN(PR is MED) 3. IF(FQ is MIN)AND(Ff is MIN)AND(Falpha is
6 MEDMAX)THEN(PR is MAX) 4. IF(FQ is MIN)AND(Ff is MIN)AND(Falpha is MEDMAX)THEN(ROP is MEDMAX) 5. IF(FQ is MIN)AND(Ff is MED)AND(Falpha is MINMED)THEN(PR is MEDMAX) 6. IF(FQ is MINMED)AND(Ff is MED)AND(Falpha is MEDMAX)THEN(PR is MED) Selection of defuzzification method There are several different ways to define the result of a rule, but one of the most common and simplest is the "max-min" inference method, in which the output membership function is given the truth value generated by the premise. Rules can be solved in parallel in hardware, or sequentially in software. The results of all the rules that have fired are "defuzzified" to a crisp value by one of the several existing methods. There are dozens in theory, each with various advantages and drawbacks. The "centroid" method is very popular, in which the "center of mass" of the result provides the crisp value. The example below demonstrates max-min inferencing and centroid defuzzification for a system with input variables "x", "y", and "z" and an output variable "n". Note that "mu" is standard fuzzy-logic nomenclature for "truth value": Fig. 13, when input parameters are F Q =6.1, F f =3.23 MPa/tonf, and F alpha =55 degrees, ROP of 4.27 m/h is predicted. To assess the validation of the model, the actual values of ROPs from the 34 sections in the field were compared with predicted values from fuzzy model as illustrated in Fig. 13. The figure shows that the predicted values are in a good agreement with actual ROPs (R 2 = 0.815). Hence, the fuzzy model also has a strong capability to predict the penetration rate of TBM. Fig. 13 Correlation between measured and predicted ROPs Fig. 12 Centriod of area defuzzification technique[24]. In this study the centeriod method was employed because of its simplicity and popularity that calculated the centroid of the area under the membership function as: z * COA = (z) z dz A * Z COA (z)dz A Where is the crisp value for the "z" output and A(z) is the aggregated output membership function Result of developed fuzzy model In this part of study to access the estimation of TBM penetration rate, Mamdani model was performed. This model is capable to predict PR using input variable conditions, since it can interpolate input parameters. For instance, as illustrated in (3) 3. CONCLUSIONS A fuzzy model has been developed for the prediction of hard rock TBM penetration rate based on expert knowledge, experience, and data obtained from 34 sections along the route of Alborz service tunnel. In order to predict TBM ROPs, three input variables including fabric index of Q classification system, uniaxial compressive strength of intact rock, cutter load and the angle between tunnel axis and discontinuity planes were utilized. Results obtained from fuzzy model showed that it has a stronger capability to predict penetration rate, with correlation coefficient of However, the range of the input data used for development of the proposed prediction model were very limited and as such, the results cannot be considered to be universal and more in depth study is required to extend the finding of this study to develop a universal model. REFERENCES [1] Bamford, W.F Rock test indices are being successfully correlated with tunnel boring machine performance. Proc. 5 th Australian Tunneling Conference, Vol. 2, [2] Barton, N TBM tunneling in jointed and faulted rock. Rotterdam: Balkema, Brookfield, p [3] Bieniawski, Z.T., Tamames, B.C., Fernandez, J.M.G., Hernandez, M.A Rock Mass Excavability (RME) Indicator: new way to selecting the optimum tunnel construction method, ITA-AITES World Tunnel Congress & 32nd ITA General Assembly, Seoul. [4] Blindheim, O.T Boreability predictions for tunneling. PhD Thesis, The Norwegian Institute of Technology, p [5] Bruland, A Hard rock tunnel boring. PhD Thesis, Norwegian University of Science and Technology, Trondheim. [6] Cassinelli, F., Cina, S., Innaurato, N., Mancini, R., Sampaolo, A Power consumption and metal wear in tunnel-boring machines: analysis of tunnel-boring operation in hard rock. Tunnelling 82, Inst.
7 Min. Metall., [7] Dollinger, G.L., Handewith, J.H., Breeds, C.D Use of punch tests for estimating TBM performance. Tunnell. Undergr. Space Technol. 13(4), [8] Farmer, I.W., Glossop, N.H Mechanics of disc cutter penetration. Tunnels Tunnel. Int., 12(6), [9] Gong, Q.M. & Zhao, J Development of a rock mass characteristics model for TBM penetration rate prediction. Int. J. Rock Mech. Min. Sci. 46(1), [10] Graham, P.C Rock exploration for machine manufacturers. In: Bieniawski, Z.T., (Ed.), Exploration for rock engineering. Johannesburg, Balkema, [11] Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., Tavakoli, H.R TBM performance analysis in pyroclastic rocks: A case history of Karaj water conveyance tunnel. Rock Mech Rock Eng, doi: /s [12] Innaurato, N., Mancini, R., Rondena, E., Zaninetti, A Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy. Proc. 7 th Int. Congress ISRM, Aachen, [13] Ozdemir, L., Miller, R., Wang, F.D Mechanical Tunnel Boring Prediction and Machine Design. Final Project Report to NSF APR A03, Colorado School of Mines. [14] Palmström, A RMi-a rock mass characterization system for rock engineering purposes. PhD Thesis, University of Oslo, p [15] Ribacchi, R. & Lembo-Fazio, A Influence of rock mass parameters on the performance of a TBM in a gneissic formaton (Varzo Tunnel). Rock Mech Rock Eng 38, [16] Rostami, J. & Ozdemir, L A new model for performance prediction of hard rock TBM. Proc. Rapid Excavation and Tunnelling Conference, [17] Roxborough, F.F. & Phillips, H.R Rock excavation by disc cutter. Int. J. Rock Mech. Min. Sci. Geomech. Abstr. 12, [18] Sanio, H.P Prediction of the performance of disc cutters in anisotropic rock. Int. J. Rock Mech. Min. Sci. Geomech. Abstr. 22, [19] Sapigni, M., Berti, M., Behtaz, E., Busillo, A., Cardone, G TBM performance estimation using rock mass classification. Int. J. Rock Mech. Min. Sci. 39, [20] Snowdon, R.A., Ryley, M.D., Temporal, J A study of disc cutting in selected British rocks. Int. J. Rock Mech. Min. Sci. 19, [21] Tzamos, S. & Sofianos, A.I A correlation of four rock mass classification systems through their fabric indices. Int. J. Rock Mech. Min. Sci., [22] Ross TJ (1995) Fuzzy logic with engineering applications. McGraw-Hill, New York, 600 pp [23] Tsoukalas LH, Uhrig RE (1996). Fuzzy and neural approach in engineering, Wiley, New York. [24] Liberatore, M., Critical Path Analysis with Fuzzy Activity Times, IEEE Transactions on Engineering Management,Vol. 55, No. 2 (May 2008), [25] Grima, M.A., Verhoef, P.N.W., Forecasting rock trencher performance using fuzzy logic. Int. J. Rock Mech. Mining Sci. Geomech. 36(4),
A Statistical Model for Prediction TBM Performance using Rock Mass Characteristics in the TBM Driven Alborz Tunnel Project
Research Journal of Applied Sciences, Engineering and Technology 4(23): 5048-5054, 2012 ISSN: 2040-7467 Maxwell Scientific Organization, 2012 Submitted: March 12, 2012 Accepted: April 03, 2012 Published:
More informationTBM performance prediction in basalt and pyroclastic rocks of Deccan traps, a case study of Maroshi-Ruparel water supply tunnel
Rock Mechanics and Rock Engineering: From the Past to the Future Ulusay et al. (Eds) 2016 Taylor & Francis Group, London, ISBN 978-1-138-03265-1 TBM performance prediction in basalt and pyroclastic rocks
More informationInfluence of rock mass properties on TBM penetration rate in Karaj-Tehran water conveyance tunnel
Journal of Geology and Mining Research Vol. (), pp. -, October Available online http://www.academicjournals.org/jgmr ISSN 97 Academic Journals Full Length Research Paper Influence of rock mass properties
More informationTBM "Boreability" in Hard Rock
JMConsulting-Rock Engineering TBM "Boreability" in Hard Rock Javier Macias, PhD Rock Engineering Consultant and Researcher JMConsulting-Rock Engineering AS Anvendt bergmekanikk 10.01.2018, Trondheim Outline
More informationComparative study of TBM performance prediction models
Comparative study of TBM performance prediction models *Tae Young KO 1), Seung Mo SON 2) and Taek Kon KIM 3) 1), 2, 3) SK Engineering & Construction, Seoul, 04534, Korea * tyko@sk.com ABSTRACT In this
More informationJME Journal of Mining & Environment, Vol.3, No.2, 2012,
JME Journal of Mining & Environment, Vol.3, No.2, 2012, 89-98. Evaluation of TBM utilization using rock mass rating system: a case study of Karaj-Tehran water conveyance tunnel (lots 1 and 2) O. Frough
More informationPredicting penetration rate of hard rock tunnel boring machine using fuzzy logic
Bull Eng Geol Environ (204) 73:23 35 DOI 0.007/s0064-03-0497-0 ORIGINAL PAPER Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic Ebrahim Ghasemi Saffet Yagiz Mohammad Ataei
More informationGeotechnical considerations on TBM tunneling in rock mass
Geotechnical considerations on TBM tunneling in rock mass Saffet Yağız Pamukkale University, Engineering Faculty, Geological Engineering Department, Denizli 20020 Turkey KEYWORDS: Performance, rock mass,
More informationPerformance Prediction Models for Hard Rock Tunnel Boring Machines
تهران ششمین کنفرانس تونل 7-9 بهمن 1382 دانشکده عمران دانشگاه علم و صنعت ایران Performance Prediction Models for Hard Rock Tunnel Boring Machines Ahmad Ramezanzadeh, PhD student, URGC, INSA of Lyon, France
More informationUncertainty determination in rock mass classification when using FRMR Software
Uncertainty determination in rock mass classification when using FRMR Software by F. Samimi Namin*, M. Rinne, and M. Rafie* http://dx.doi.org/10.17159/2411-9717/2015/v115n11a12 Rock mass classification
More informationBLOCK SIZE AND BLOCK SIZE DISTRIBUTION
Paper presented at the Workshop on "Reliablity of classification systems" in connection with the GeoEng000 conference, Melbourne, 8 November 000 BLOCK SIZE AND BLOCK SIZE DISTRIBUTION by Arild Palmström,
More informationENGINEERING GEOLOGY AND ROCK ENGINEERING
1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:
More informationCorrelation between Rock mass rating, Q-system and Rock mass index based on field data
Correlation between Rock mass rating, Q-system and Rock mass index based on field data Amine SOUFI, Lahcen BAHI, Latifa OUADIF, Jamal Eddine KISSAI Laboratory of Applied Geophysics, Geotechnics, Engineering
More informationSuitability of Brisbane Rock Conditions to Roadheader Excavation
by Jody Herley Roadheader excavation has typically been limited in its ability to cut hard rock. Despite this, a number of tunnelling projects being implemented in South-East Queensland are utilising roadheaders
More informationCorrelation of Revised BQ System in China and the International Rock Mass Classification Systems
Journal of Civil Engineering Research 2015, 5(2): 33-38 DOI: 10.5923/j.jce.20150502.03 Correlation of Revised BQ System in China and the Yan Rui-Xin, Shen Yan-Jun * School of Architecture and Civil Engineering,
More informationCOMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS
COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS PART 2: CORRELATIONS OF THE THREE SYSTEMS by Arild Palmström, Ph.D. RockMass AS, Oslo, Norway In Part 1, it was shown how the input parameters to the
More informationExperimental Study on Rock Fragmentation by the 19-inch TBM Cutter and Statistical Analysis of Debris
Experimental Study on Rock Fragmentation by the 19-inch TBM Cutter and Statistical Analysis of Debris Wenliang. Yang a,b, Yadong. Xue a,b * and Xueqiang. Zhang c a Department of Geotechnical Engineering,
More informationStatistical Analysis on Field Penetration Index in Shield TBM
Proceedings of the 2 nd World Congress on Civil, Structural, and Environmental Engineering (CSEE 17) Barcelona, Spain April 2 4, 2017 Paper No. ICGRE 131 ISSN: 2371-5294 DOI: 10.11159/icgre17.131 Statistical
More informationUsing Tunnel Boring Machine Penetration Tests to Quantify Performance in Hard Rock
Villeneuve, M.C. (2017) Using Tunnel Boring Machine Penetration Proc. 20 th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier Using Tunnel Boring Machine Penetration Tests to Quantify Performance
More informationABSTRACT I. INTRODUCTION II. FUZZY MODEL SRUCTURE
International Journal of Scientific Research in Computer Science, Engineering and Information Technology 2018 IJSRCSEIT Volume 3 Issue 6 ISSN : 2456-3307 Temperature Sensitive Short Term Load Forecasting:
More informationHARD ROCK TBMs. Levent Ozdemir. Tunneling Consultant
HARD ROCK TBMs Levent Ozdemir Tunneling Consultant HARD ROCK TBM TYPES Main-Beam (open, gripper) Single Shield Double Shield MAIN-BEAM HARD ROCK TBM MAIN-BEAM HARD ROCK TBM SINGLE SHIELD CROSS-SECTION
More informationOPTIMAL CAPACITOR PLACEMENT USING FUZZY LOGIC
CHAPTER - 5 OPTIMAL CAPACITOR PLACEMENT USING FUZZY LOGIC 5.1 INTRODUCTION The power supplied from electrical distribution system is composed of both active and reactive components. Overhead lines, transformers
More informationPrediction of Ultimate Shear Capacity of Reinforced Normal and High Strength Concrete Beams Without Stirrups Using Fuzzy Logic
American Journal of Civil Engineering and Architecture, 2013, Vol. 1, No. 4, 75-81 Available online at http://pubs.sciepub.com/ajcea/1/4/2 Science and Education Publishing DOI:10.12691/ajcea-1-4-2 Prediction
More information10. GEOTECHNICAL EXPLORATION PROGRAM
Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in
More informationThis chapter introduces the description of the surface interaction mechanism based on the friction, wear and excavation laws.
Chapter 5 Surface interaction 5.1 Introduction This chapter introduces the description of the surface interaction mechanism based on the friction, wear and excavation laws. Whenever two solids touch each
More informationSOFT COMPUTING TECHNIQUES FOR MAJOR ROOF FALLS IN BORD AND PILLAR IN UNDERGROUND COAL MINES USING MAMDANI FUZZY MODEL
SOFT COMPUTING TECHNIQUES FOR MAJOR ROOF FALLS IN BORD AND PILLAR IN UNDERGROUND COAL MINES USING MAMDANI ABSTRACT FUZZY MODEL Singam Jayanthu 1, Rammohan Perumalla 2 1 Professor, Mining department National
More informationCivil Engineering. Elixir Civil Engg. 112 (2017)
48886 Available online at www.elixirpublishers.com (Elixir International Journal) Civil Engineering Elixir Civil Engg. 112 (2017) 48886-48891 Prediction of Ultimate Strength of PVC-Concrete Composite Columns
More informationGEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA
GEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA Isidoro Tardáguila Geocontrol S.A. Benjamín Celada Geocontrol S.A. José Miguel Galera Geocontrol S.A. ABSTRACT: The tunnels of Guadarrama
More informationis implemented by a fuzzy relation R i and is defined as
FS VI: Fuzzy reasoning schemes R 1 : ifx is A 1 and y is B 1 then z is C 1 R 2 : ifx is A 2 and y is B 2 then z is C 2... R n : ifx is A n and y is B n then z is C n x is x 0 and y is ȳ 0 z is C The i-th
More informationReduced Size Rule Set Based Fuzzy Logic Dual Input Power System Stabilizer
772 NATIONAL POWER SYSTEMS CONFERENCE, NPSC 2002 Reduced Size Rule Set Based Fuzzy Logic Dual Input Power System Stabilizer Avdhesh Sharma and MLKothari Abstract-- The paper deals with design of fuzzy
More informationAn introduction to the Rock Mass index (RMi) and its applications
Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering
More informationComparison of Fuzzy Logic and ANFIS for Prediction of Compressive Strength of RMC
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP : 07-15 www.iosrjournals.org Comparison of Fuzzy Logic and ANFIS for Prediction of Compressive Strength of RMC Dheeraj S.
More informationA Hybrid Approach For Air Conditioning Control System With Fuzzy Logic Controller
International Journal of Engineering and Applied Sciences (IJEAS) A Hybrid Approach For Air Conditioning Control System With Fuzzy Logic Controller K.A. Akpado, P. N. Nwankwo, D.A. Onwuzulike, M.N. Orji
More informationAlgorithms for Increasing of the Effectiveness of the Making Decisions by Intelligent Fuzzy Systems
Journal of Electrical Engineering 3 (205) 30-35 doi: 07265/2328-2223/2050005 D DAVID PUBLISHING Algorithms for Increasing of the Effectiveness of the Making Decisions by Intelligent Fuzzy Systems Olga
More informationA PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN OF THE NEW METRO DO PORTO
AITES-ITA 2001 World Tunnel Congress PROGRESS IN TUNNELING AFTER 2000 Milano, June 10-13, 2001 Volume III, pp. 463-470 A PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN
More informationPOSTER PAPER PROCEEDINGS
ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE POSTER PAPER PROCEEDINGS Unrelieved Spesific Energy Estimation from PLCM and FLCM Linear Rock
More informationInstitute for Advanced Management Systems Research Department of Information Technologies Åbo Akademi University. Fuzzy Logic Controllers - Tutorial
Institute for Advanced Management Systems Research Department of Information Technologies Åbo Akademi University Directory Table of Contents Begin Article Fuzzy Logic Controllers - Tutorial Robert Fullér
More informationInternational Journal of Scientific & Engineering Research Volume 8, Issue 10, October-2017 ISSN
433 Review of Rock Properties Based on Drilling Parameters Rekha Tomar and D. Kumbhakar Asstt. Professor, Department of Mechanical Engineering, JBIT, Dehardun Principal Scientist, CSIR- Central Institute
More informationCollection and use of geological data in rock engineering
Published in ISRM News Journal, 997, pp. - Collection and use of geological data in rock engineering by Arild Palmström "I see almost no research effort being devoted to the generation of the basic input
More informationCHAPTER V TYPE 2 FUZZY LOGIC CONTROLLERS
CHAPTER V TYPE 2 FUZZY LOGIC CONTROLLERS In the last chapter fuzzy logic controller and ABC based fuzzy controller are implemented for nonlinear model of Inverted Pendulum. Fuzzy logic deals with imprecision,
More informationHandling Uncertainty using FUZZY LOGIC
Handling Uncertainty using FUZZY LOGIC Fuzzy Set Theory Conventional (Boolean) Set Theory: 38 C 40.1 C 41.4 C 38.7 C 39.3 C 37.2 C 42 C Strong Fever 38 C Fuzzy Set Theory: 38.7 C 40.1 C 41.4 C More-or-Less
More informationA Fuzzy Logic Approach for Optimization of Hardness in Induction Hardening Process
A Fuzzy Logic Approach for Optimization of Hardness in Induction Hardening Process AMIT KOHLI a, HARI SINGH b a Department of Mechanical Engineering, D.A.V Institute of Engineering & Technology, Jalandhar
More informationHuaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT
Managing and validating limited borehole geotechnical information for rock mass characterization purposes experience in Peruvian practice for open pit mine projects Huaman A., Cabrera J. and Samaniego
More informationHamidreza Rashidy Kanan. Electrical Engineering Department, Bu-Ali Sina University
Lecture 3 Fuzzy Systems and their Properties Hamidreza Rashidy Kanan Assistant Professor, Ph.D. Electrical Engineering Department, Bu-Ali Sina University h.rashidykanan@basu.ac.ir; kanan_hr@yahoo.com 2
More informationA New Method to Forecast Enrollments Using Fuzzy Time Series
International Journal of Applied Science and Engineering 2004. 2, 3: 234-244 A New Method to Forecast Enrollments Using Fuzzy Time Series Shyi-Ming Chen a and Chia-Ching Hsu b a Department of Computer
More informationFUZZY CONTROL CONVENTIONAL CONTROL CONVENTIONAL CONTROL CONVENTIONAL CONTROL CONVENTIONAL CONTROL CONVENTIONAL CONTROL
Eample: design a cruise control system After gaining an intuitive understanding of the plant s dynamics and establishing the design objectives, the control engineer typically solves the cruise control
More informationRelationship between RMR b and GSI based on in situ data
Relationship between RMR b and GSI based on in situ data F. Ceballos Civil Engineer, Técnicas y Proyectos S.A. (TYPSA), Madrid, Spain. C. Olalla, R. Jiménez Professors, Technical University of Madrid,
More informationME 534. Mechanical Engineering University of Gaziantep. Dr. A. Tolga Bozdana Assistant Professor
ME 534 Intelligent Manufacturing Systems Chp 4 Fuzzy Logic Mechanical Engineering University of Gaziantep Dr. A. Tolga Bozdana Assistant Professor Motivation and Definition Fuzzy Logic was initiated by
More informationThe effect of discontinuities on stability of rock blocks in tunnel
International Journal of the Physical Sciences Vol. 6(31), pp. 7132-7138, 30 November, 2011 Available online at http://www.academicjournals.org/ijps DOI: 10.5897/IJPS11.777 ISSN 1992-1950 2011 Academic
More informationReal-time prediction during TBM advance.
Real-time prediction during TBM advance. Risk management through the BEAM in Doha Metro Project F. Bove Seli Overseas S.p.A., Rome, Italy. R. Grandori Seli Overseas S.p.A., Rome, Italy. ABSTRACT: The Bore
More informationFuzzy Systems. Introduction
Fuzzy Systems Introduction Prof. Dr. Rudolf Kruse Christoph Doell {kruse,doell}@iws.cs.uni-magdeburg.de Otto-von-Guericke University of Magdeburg Faculty of Computer Science Department of Knowledge Processing
More informationApplication of Core Logging Data to generate a 3D Geotechnical Block Model
Application of Core Logging Data to generate a 3D Geotechnical Block Model Engineering Geology and Innovation: Research Infrastructure - Sustainable Development (I.A.E.G) Eleftheria Vagkli, M.Sc. Senior
More informationEFFECT OF VARYING CONTROLLER PARAMETERS ON THE PERFORMANCE OF A FUZZY LOGIC CONTROL SYSTEM
Nigerian Journal of Technology, Vol. 19, No. 1, 2000, EKEMEZIE & OSUAGWU 40 EFFECT OF VARYING CONTROLLER PARAMETERS ON THE PERFORMANCE OF A FUZZY LOGIC CONTROL SYSTEM Paul N. Ekemezie and Charles C. Osuagwu
More informationRule-Based Fuzzy Model
In rule-based fuzzy systems, the relationships between variables are represented by means of fuzzy if then rules of the following general form: Ifantecedent proposition then consequent proposition The
More informationPredicting rock conditions ahead of the face
Predicting rock conditions ahead of the face Dr Thomas Dickmann, Product Manager Geophysics, Amberg Technologies AG Seismic methods of predicting rock conditions ahead of the tunnel face have developed
More informationConsidering Creep Parameters of Rock Mass to Evaluate the Necessity Thrust for Excavation in Squeezing Ground
ORIGINAL ARTICLE Received 28 Apr. 2014 Accepted 06 May. 2014 Copyright 2014 Scienceline Publication Journal of Civil Engineering and Urbanism Volume 4, Issue 4: 370-377 (2014) ISSN-2252-0430 Considering
More informationEstimates of rock mass strength and deformation modulus
Discussion paper # 4 Estimates of rock mass strength and deformation modulus In the preliminary stages of a rock engineering design the need for approximate estimates of rock mass strength and deformation
More informationExcavation method in Goushfill mine
International Journal of Engineering and Technology, 2 (3) (2013) 225-229 Science Publishing Corporation www.sciencepubco.com/index.php/ijet Excavation method in Goushfill mine Masoud Cheraghi Seifabad*,
More informationPREDICTION OF CUTTER WEAR USING RME
PREDICTION OF CUTTER WEAR USING RME Bieniawski, Z. T. Bieniawski Design Enterprises (USA); profztb@cableone.com Celada, B.Universidad Politécnica de Madrid (Spain); bcelada@geocontrol.es Galera, J.M. Geocontrol
More informationMODELLING OF TOOL LIFE, TORQUE AND THRUST FORCE IN DRILLING: A NEURO-FUZZY APPROACH
ISSN 1726-4529 Int j simul model 9 (2010) 2, 74-85 Original scientific paper MODELLING OF TOOL LIFE, TORQUE AND THRUST FORCE IN DRILLING: A NEURO-FUZZY APPROACH Roy, S. S. Department of Mechanical Engineering,
More informationRevision: Fuzzy logic
Fuzzy Logic 1 Revision: Fuzzy logic Fuzzy logic can be conceptualized as a generalization of classical logic. Modern fuzzy logic aims to model those problems in which imprecise data must be used or in
More informationImprovement of Process Failure Mode and Effects Analysis using Fuzzy Logic
Applied Mechanics and Materials Online: 2013-08-30 ISSN: 1662-7482, Vol. 371, pp 822-826 doi:10.4028/www.scientific.net/amm.371.822 2013 Trans Tech Publications, Switzerland Improvement of Process Failure
More informationThickness Measuring of Thin Metal by Non Destructive with Fuzzy Logic Control System
Thickness Measuring of Thin Metal by Non Destructive with Fuzzy Logic Control System Sayed Ali Mousavi 1* 1 Department of Mechanical Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran
More informationSimulation of the cutting action of a single PDC cutter using DEM
Petroleum and Mineral Resources 143 Simulation of the cutting action of a single PDC cutter using DEM B. Joodi, M. Sarmadivaleh, V. Rasouli & A. Nabipour Department of Petroleum Engineering, Curtin University,
More informationGeological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN
ATS11-02113 ABSTRACT Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN Mahdi Zolfaghari, Ehsan Mokhtari, Massoud Morsali Sahel consultant engineers,
More informationEvaluation of TBM performance in a Himalayan tunnel
World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India Evaluation of TBM performance in a Himalayan tunnel R.K. Goel Central Institute of Mining and Fuel Research,
More informationDeformability Characteristics of Garnetiferous Quartzo-Feldspathic Gneiss Rock Mass A Case Study
IJIRST International Journal for Innovative Research in Science & Technology Volume 3 Issue 09 February 2017 ISSN (online): 2349-6010 Deformability Characteristics of Garnetiferous Quartzo-Feldspathic
More informationROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS. G P Dyke AngloGold Ashanti 1
ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS AngloGold Ashanti 1 Synopsis The MRMR Classification System was developed specifically for mining applications, namely
More informationFuzzy Logic. An introduction. Universitat Politécnica de Catalunya. Departament de Teoria del Senyal i Comunicacions.
Universitat Politécnica de Catalunya Departament de Teoria del Senyal i Comunicacions Fuzzy Logic An introduction Prepared by Temko Andrey 2 Outline History and sphere of applications Basics. Fuzzy sets
More informationFuzzy Systems. Introduction
Fuzzy Systems Introduction Prof. Dr. Rudolf Kruse Christian Moewes {kruse,cmoewes}@iws.cs.uni-magdeburg.de Otto-von-Guericke University of Magdeburg Faculty of Computer Science Department of Knowledge
More informationFuzzy Logic Approach for Short Term Electrical Load Forecasting
Fuzzy Logic Approach for Short Term Electrical Load Forecasting M. Rizwan 1, Dinesh Kumar 2, Rajesh Kumar 3 1, 2, 3 Department of Electrical Engineering, Delhi Technological University, Delhi 110042, India
More informationRock Mechanical Aspects of Roadheader Excavation
Rock Mechanical Aspects of Roadheader Excavation Uwe Restner Sandvik Mining and Construction G.m.b.H., Hard Rock Continuous Mining, Zeltweg, Austria Ralf J. Plinninger Dr. Plinninger Geotechnik, Bernried,
More informationFracture pattern of anisotropic rock by drilling or cutting using the PFC
Fracture pattern of anisotropic rock by drilling or cutting using the PFC N. Schormair & K. Thuro Engineering Geology, Technische Universität München, Germany ABSTRACT: Anisotropy plays a key role in fracture
More informationROCK MASS PROPERTIES FOR TUNNELLING
ROCK MASS PROPERTIES FOR TUNNELLING Robert Bertuzzi 2 nd November 2017 1 Driver Estimating the strength and deformation characteristics of a rock mass for tunnel design is generally based on empiricism
More informationEmpirical Design in Geotechnical Engineering
EOSC433: Geotechnical Engineering Practice & Design Lecture 5: Empirical Design (Rock Mass Classification & Characterization) 1of 42 Erik Eberhardt UBC Geological Engineering EOSC 433 (2013) Empirical
More informationRock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL
Chapter 3 Rock Material In all things of nature there is something of the marvelous. Aristotle ROCK MATERIAL The term rock material refers to the intact rock within the framework of discontinuities. In
More informationLecture 06. (Fuzzy Inference System)
Lecture 06 Fuzzy Rule-based System (Fuzzy Inference System) Fuzzy Inference System vfuzzy inference is the process of formulating the mapping from a given input to an output using fuzzy logic. Fuzzy Inference
More informationTEMPERATUTE PREDICTION USING HEURISTIC DATA MINING ON TWO-FACTOR FUZZY TIME-SERIES
TEMPERATUTE PREDICTION USING HEURISTIC DATA MINING ON TWO-FACTOR FUZZY TIME-SERIES Adesh Kumar Pandey 1, Dr. V. K Srivastava 2, A.K Sinha 3 1,2,3 Krishna Institute of Engineering & Technology, Ghaziabad,
More informationGeotechnical data from optical and acoustic televiewer surveys
Geotechnical data from optical and acoustic televiewer surveys by Farrin De Fredrick MAusIMM, Senior Geotechnical Engineer; Ta Nguyen AIG, Geotechnical Engineer; Clive Seymour MAusIMM, Principal; and Gary
More informationIntelligent Systems and Control Prof. Laxmidhar Behera Indian Institute of Technology, Kanpur
Intelligent Systems and Control Prof. Laxmidhar Behera Indian Institute of Technology, Kanpur Module - 2 Lecture - 4 Introduction to Fuzzy Logic Control In this lecture today, we will be discussing fuzzy
More informationCAPACITOR PLACEMENT USING FUZZY AND PARTICLE SWARM OPTIMIZATION METHOD FOR MAXIMUM ANNUAL SAVINGS
CAPACITOR PLACEMENT USING FUZZY AND PARTICLE SWARM OPTIMIZATION METHOD FOR MAXIMUM ANNUAL SAVINGS M. Damodar Reddy and V. C. Veera Reddy Department of Electrical and Electronics Engineering, S.V. University,
More informationEvaluation of the relationships between Schmidt rebound number and strength of rocks
Evaluation of the relationships between Schmidt rebound number and strength of rocks H. Suha Aksoy Assistant Professor Firat University Engineering Faculty Civil Engineering Dept. saksoy@firat.edu.tr Ufuk
More informationWind Turbine Power Generation: Response Prediction
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 78-1684,p-ISSN: 30-334X, Volume 7, Issue 1 (May. - Jun. 013), PP 31-39 Wind Turbine Power Generation: Response Prediction Akash Deep
More informationUSE OF FUZZY LOGIC TO INVESTIGATE WEATHER PARAMETER IMPACT ON ELECTRICAL LOAD BASED ON SHORT TERM FORECASTING
Nigerian Journal of Technology (NIJOTECH) Vol. 35, No. 3, July 2016, pp. 562 567 Copyright Faculty of Engineering, University of Nigeria, Nsukka, Print ISSN: 0331-8443, Electronic ISSN: 2467-8821 www.nijotech.com
More informationTowards Smooth Monotonicity in Fuzzy Inference System based on Gradual Generalized Modus Ponens
8th Conference of the European Society for Fuzzy Logic and Technology (EUSFLAT 2013) Towards Smooth Monotonicity in Fuzzy Inference System based on Gradual Generalized Modus Ponens Phuc-Nguyen Vo1 Marcin
More informationEEE 8005 Student Directed Learning (SDL) Industrial Automation Fuzzy Logic
EEE 8005 Student Directed Learning (SDL) Industrial utomation Fuzzy Logic Desire location z 0 Rot ( y, φ ) Nail cos( φ) 0 = sin( φ) 0 0 0 0 sin( φ) 0 cos( φ) 0 0 0 0 z 0 y n (0,a,0) y 0 y 0 z n End effector
More informationUnderground Excavation Design Classification
Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index
More information1. Brief History of Intelligent Control Systems Design Technology
Acknowledgments We would like to express our appreciation to Professor S.V. Ulyanov for his continuous help, value corrections and comments to the organization of this paper. We also wish to acknowledge
More informationCalculation of periodic roof weighting interval in longwall mining using finite element method
Calculation of periodic roof weighting interval in longwall mining using finite element method Navid Hosseini 1, Kamran Goshtasbi 2, Behdeen Oraee-Mirzamani 3 Abstract The state of periodic loading and
More informationFuzzy Logic Controller Based on Association Rules
Annals of the University of Craiova, Mathematics and Computer Science Series Volume 37(3), 2010, Pages 12 21 ISSN: 1223-6934 Fuzzy Logic Controller Based on Association Rules Ion IANCU and Mihai GABROVEANU
More informationFUZZY LOGIC CONTROL Vs. CONVENTIONAL PID CONTROL OF AN INVERTED PENDULUM ROBOT
http:// FUZZY LOGIC CONTROL Vs. CONVENTIONAL PID CONTROL OF AN INVERTED PENDULUM ROBOT 1 Ms.Mukesh Beniwal, 2 Mr. Davender Kumar 1 M.Tech Student, 2 Asst.Prof, Department of Electronics and Communication
More information2010/07/12. Content. Fuzzy? Oxford Dictionary: blurred, indistinct, confused, imprecisely defined
Content Introduction Graduate School of Science and Technology Basic Concepts Fuzzy Control Eamples H. Bevrani Fuzzy GC Spring Semester, 2 2 The class of tall men, or the class of beautiful women, do not
More informationComparison of Drilling Performance of Chisel and Button Bits on the Electro Hydraulic Driller
Rock Mech Rock Eng (2013) 46:1577 1587 DOI 10.1007/s00603-012-0358-3 ORIGINAL PAPER Comparison of Drilling Performance of Chisel and Button Bits on the Electro Hydraulic Driller Okan Su Olgay Yarali Nuri
More informationOpen Pit Rockslide Runout
EOSC433/536: Geological Engineering Practice I Rock Engineering Lecture 5: Empirical Design & Rock Mass Characterization 1of 46 Erik Eberhardt UBC Geological Engineering EOSC 433 (2017) Open Pit Rockslide
More informationFuzzy Controller. Fuzzy Inference System. Basic Components of Fuzzy Inference System. Rule based system: Contains a set of fuzzy rules
Fuzz Controller Fuzz Inference Sstem Basic Components of Fuzz Inference Sstem Rule based sstem: Contains a set of fuzz rules Data base dictionar: Defines the membership functions used in the rules base
More informationNumerical analysis of K0 to tunnels in rock masses exhibiting strain-softening behaviour (Case study in Sardasht dam tunnel, NW Iran)
International Research Journal of Applied and Basic Sciences 2013 Available online at www.irjabs.com ISSN 2251-838X / Vol, 4 (6): 1572-1581 Science Explorer Publications Numerical analysis of K0 to tunnels
More informationSTRENGTH PROPERTIES OF ROCKS AND ROCK MASSES 4. FAILURE CRITERIA FOR INTACT ROCKS AND ROCK MASSES
STRENGTH PROPERTIES OF ROCKS AND ROCK MASSES 1. INTRODUCTION 2. TESTING OF INTACT ROCK FOR STRENGTH 2.1 Uniaxial Compression 2.2 Point Load Testing 2.3 Uniaxial Tension 2.4 Indirect Tension Tests 2.5 Shear
More informationHard Rock TBM Tunneling Technical Developments and Recent Experience
Hard Rock TBM Tunneling Technical Developments and Recent Experience *Jean-Daniel Brabant 1) and Ruben Duhme 1) 1), Herrenknecht Asia Headquarters, Singapore 1) duhme.ruben@herrenknecht.com ABSTRACT The
More informationModels for Inexact Reasoning. Fuzzy Logic Lesson 8 Fuzzy Controllers. Master in Computational Logic Department of Artificial Intelligence
Models for Inexact Reasoning Fuzzy Logic Lesson 8 Fuzzy Controllers Master in Computational Logic Department of Artificial Intelligence Fuzzy Controllers Fuzzy Controllers are special expert systems KB
More informationRULE-BASED FUZZY EXPERT SYSTEMS
University of Waterloo Department of Electrical and Computer Engineering E&CE 457 Applied Artificial Intelligence RULE-BASED FUZZY EXPERT SYSTEMS July 3 rd, 23 Ian Hung, 99XXXXXX Daniel Tse, 99XXXXXX Table
More information