HARD ROCK TBMs. Levent Ozdemir. Tunneling Consultant

Size: px
Start display at page:

Download "HARD ROCK TBMs. Levent Ozdemir. Tunneling Consultant"

Transcription

1 HARD ROCK TBMs Levent Ozdemir Tunneling Consultant

2 HARD ROCK TBM TYPES Main-Beam (open, gripper) Single Shield Double Shield

3 MAIN-BEAM HARD ROCK TBM

4 MAIN-BEAM HARD ROCK TBM

5 SINGLE SHIELD CROSS-SECTION

6 SINGLE SHIELD TBM

7 DOUBLE-SHIELD CROSS-SECTION 2 3 1

8 DOUBLE-SHIELD TBM

9 COMPARISON BETWEEN HARD ROCK TBM TYPES Single shield Double shield Open type For the poorest ground condition Used with pre-cast segments (required for thrust reaction) Pro s Relatively inexpensive Crew not exposed to rock Short shield, less prone to trapping Better steering ability No need of shotcrete Con s Slow advance rates Cyclic operation since machine forces are reacted via tunnel lining (cut/ring build) For poor to medium quality rock May be used with or without pre-cast segments Crew not exposed to rock Can erect lining while boring High advance rates Can operate as a Single Shield in poor ground Expensive Prone to becoming stuck in high overburden Large turn radius Large thrust force required (due to shield friction) For medium to high quality rock, gripper reaction needed to advance machine High advance rates Tight turn radius Inexpensive Easy mob/demob. Crew more exposed to rock Gripper pressure (~4MPa)

10 TBM SELECTION Very poor rock RQD <25% Poor rock RQD 25-50% Fair rock RQD 50-75% Good rock RQD 75-90% Very good rock RQD %

11 EXCAVATION BY HARD ROCK TBMS

12 DISC CUTTER COMPONENTS

13 TBM CUTTING FACE

14 DISC CUTTING

15 CHIPS GENERATED BY DISC CUTTERS

16 DISC CUTTER DEVELOPMENT HISTORY Cutter Diameter (in) Cutter Load (lbs.) Year Introduced 13 20, , , , ,

17 WHY USE BIGGER CUTTERS?

18 CUTTER WEAR AND REPLACEMENT

19 NORMAL WEAR VERY HARD ABRASIVE ROCK

20 CHIPPING

21 MECHANICAL FAILURES BLOCKED CUTTERS, BAD BEARINGS OR SEALS

22 HARD FACING OF DISC CUTTER RINGS (HERRENKNECHT)

23 CUTTER CHANGE OPERATION

24 CUTTER CHANGE OPERATION

25 CUTTER INSTRUMENTATION ( Cutter RPM, temperature and Vibration)

26 TBM BACKUP SYSTEM Energy supply Transformer Electrical cabinets Cable drum Hydraulic systems Compressed air system TBM operation & guidance systems TBM operators station Laser guidance system Ventilation Main ventilation air ducts Dust suppression system Air cooler Safety system Unobstructed walkways Work platforms Emergency rescue cabin Fire suppression system Fire/gas detection system Rock support Segment/ring erector Segment storage Grouting Drill equipment Material transport Conveyor belt Belt storage and extension Temporary muck storage

27 MUCK TRANSPORTATION (BELT CONVEYOR) Tunnel Conveyor Installation Tunnel Conveyor

28 MUCK TRANSPORTATION (RAIL HAULAGE)

29 TBM ASSEMBLY

30 PORTAL ASSEMBLY

31 UNDERGROUND ASSEMBLY

32

33 NIAGARA TUNNEL PROJECT ON-SITE ASSEMBLY (OFTA)

34 COMPLETED TBM ASSEMBLY NIAGARA TUNNEL PROJECT

35 GROUND SUPPORT

36 ROCK BOLTING

37 Wire Mesh Erector WIRE MESH

38 SHOTCRETE ROBOT

39 Wire Mesh Erector as Steel Support Erector STEEL SUPPORT Ring Beams

40 PRE-CAST SEGMENTAL LINING

41 PRE-EXCAVATION GROUTING

42 PROBE DRILLING AND PRE-EXCAVATION GROUTING

43 TBM PERFORMANCE PREDICTION TBM Predictor Model University of Trondheim (NTNU) Model Proprietary Models by Manufacturers

44 TBM PERFORMANCE PREDICTION AR = ROP x Utilization x Total shift hours AR: Daily advance rate (ft/day) ROP: Rate of Penetration (ft/hr) CL = Cutter life (cubic yards per cutter change)

45 TBM PREDICTOR MODEL ROCK DATA Uniaxial Compressive Strength (UCS) Brazilian (Indirect) Tensile Strength (BTS) Cerchar Abrasivity Index (CAI) Punch Penetration Index

46 UNIAXIAL COMPRESSIVE STRENGTH (ASTM D ) Non-structural Failure Structural Failure BEFORE AFTER BEFORE AFTER

47 BRAZILIAN TENSILE STRENGTH (ASTM D ) Normal Failure Structural Failure T Tensile Strength (psi) F Failure Load (lbs.) L Thickness of the disk (in.) D Diameter of the disk (in.) Effect of Foliation on Tensile Strength

48 PUNCH PENETRATION TEST

49 CERCHAR ABRASIVITY TEST Cerchar Abrasivity Index (CAI) has proven to be fairly accurate and is commonly used for cutter life estimation. A series of sharp 90 hardened pins of heat-treated alloy steel are pulled across a freshly broken surface of the rock. The average dimensions of the resultant wear flats are related directly to cutter life in field operation. The geometry of the planned excavation then allows calculation of the expected cutter costs per unit volume of material. 10 CAI d i 1 i

50 CERCHAR Abrasivity Index (CAI) for various rocks Quartzite 5.9 Norway Rock type CAI Location Shale 0.9 New York Shale 1.1 Ohio Limestone 1.1 Illinois Barea Sandstone 1.2 Ohio Indiana Limestone 1.3 Indiana Phyllite 1.3 Norway Mica Schist 2.2 Washington, D.C. Andesite 2.3 Arizona Quartz Diorite 3.2 Norway Red Sandstone 3.6 Kentucky Anphibolite 3.6 Norway Gabbro 3.7 Norway Granediorite 3.9 North Carolina Granite 4.0 Sweden Diorite 4.1 North Carolina Gneiss 4.1 Georgia Quartz Gneiss 4.3 Georgia Quartzite 4.3 East Africa Gneiss 4.4 Norway Sandstone 4.7 Kentucky Quartz Gneiss 4.8 Norway Granite Gneiss 4.8 Norway Mica Schist 5.3 New York

51 DISC CUTTER LIFE vs.cerchar INDEX

52 TBM MODEL ADJUSTMENT FACTORS Cutter wear Brittleness Petrographic features (suturing/interlocking) Foliation/bedding Porosity Joints/fissures

53 USES OF TBM PREDICTOR MODEL Develop estimates of TBM penetration rates Develop estimates of cutter life and costs Evaluate different TBM proposals Develop specs for ideal TBM for a project Evaluate different size cutters for ROP and life Optimize TBM performance

54 CAUSES OF REDUCED ROP AND/OR HIGHER CUTTER WEAR Rock is harder/tougher and/or more abrasive than anticipated Less and/or adverse jointing, bedding and foliation than anticipated Cutterhead design, cutter layout, stability, steering, vibration, etc. TBM operation at reduced capacity-lower cutter load Optimistic TBM performance estimates

55 WORLD TBM RECORDS - PERFORMANCE Indianapolis Deep Rock Tunnel ( 20.2 ft. diam., 7.6 mile long, limestone/dolomite) Be st day = 410 ft Be st week = ft Be st Mont h = 5755 ft.

56 WORLD TBM RECORDS LONGEST TUNNEL Gotthard Base Tunnel, Switzerland

57 LIMMERN PUMP STORAGE TUNNEL 5.2 M. Hard Rock TBM 40 degree incline Double anti-reverse lock system

58 DELAWARE AQUEDUCT BYPASS TUNNEL

59 DELAWARE AQUEDUCT BYPASSTUNNEL Reach 1-2,560lf Sha le (Normanski ll For m at i on ) Reach 2-3,900lf Limestone & Do lo m i te (Wappi ng er Formati on ) Reach 3 3,500lf Limestone & Do lo m i te (Wappi ng er Formati on ) Reach 4 2,540lf Sha le (M ou nt Merin o Formati on )

60

61 Muck chute closure doors for controlling high water inflows

62 THANK YOU Levent Ozdemir

Hard Rock TBM Tunneling Technical Developments and Recent Experience

Hard Rock TBM Tunneling Technical Developments and Recent Experience Hard Rock TBM Tunneling Technical Developments and Recent Experience *Jean-Daniel Brabant 1) and Ruben Duhme 1) 1), Herrenknecht Asia Headquarters, Singapore 1) duhme.ruben@herrenknecht.com ABSTRACT The

More information

TBM "Boreability" in Hard Rock

TBM Boreability in Hard Rock JMConsulting-Rock Engineering TBM "Boreability" in Hard Rock Javier Macias, PhD Rock Engineering Consultant and Researcher JMConsulting-Rock Engineering AS Anvendt bergmekanikk 10.01.2018, Trondheim Outline

More information

Comparative study of TBM performance prediction models

Comparative study of TBM performance prediction models Comparative study of TBM performance prediction models *Tae Young KO 1), Seung Mo SON 2) and Taek Kon KIM 3) 1), 2, 3) SK Engineering & Construction, Seoul, 04534, Korea * tyko@sk.com ABSTRACT In this

More information

TBM FOR MINING APPLICATIONS

TBM FOR MINING APPLICATIONS TBM FOR MINING APPLICATIONS TBM DESIGN EVOLUTION NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960 s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: SOFT GROUND SLURRY AND EPB SHIELDED TBMS SHIELDED TBM FOR

More information

Geotechnical considerations on TBM tunneling in rock mass

Geotechnical considerations on TBM tunneling in rock mass Geotechnical considerations on TBM tunneling in rock mass Saffet Yağız Pamukkale University, Engineering Faculty, Geological Engineering Department, Denizli 20020 Turkey KEYWORDS: Performance, rock mass,

More information

GEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA

GEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA GEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA Isidoro Tardáguila Geocontrol S.A. Benjamín Celada Geocontrol S.A. José Miguel Galera Geocontrol S.A. ABSTRACT: The tunnels of Guadarrama

More information

H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company

H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company RISK MANAGEMENT: H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S Tyler Sandell The Robbins Company PRESENTATION OUTLINE RISK MANAGEMENT IN DIFFICULT

More information

Pressurised TBMs and their interaction with weathered rock. Nick Shirlaw

Pressurised TBMs and their interaction with weathered rock. Nick Shirlaw Pressurised TBMs and their interaction with weathered rock Nick Shirlaw Pressurised TBMs Two basic types: slurry or Earth Pressure Balance (EPB) Fundamental differences in how they provide pressure to

More information

Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel

Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Pablo Salazar Robbins Connor Maxon Kenny-Obayashi JV ABSTRACT: The Ohio Canal Interceptor Tunnel

More information

Underground Excavation Design Classification

Underground Excavation Design Classification Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling

More information

Influence of rock mass properties on TBM penetration rate in Karaj-Tehran water conveyance tunnel

Influence of rock mass properties on TBM penetration rate in Karaj-Tehran water conveyance tunnel Journal of Geology and Mining Research Vol. (), pp. -, October Available online http://www.academicjournals.org/jgmr ISSN 97 Academic Journals Full Length Research Paper Influence of rock mass properties

More information

Session 3: Geology and Rock Mechanics Fundamentals

Session 3: Geology and Rock Mechanics Fundamentals Session 3: Geology and Rock Mechanics Fundamentals Geotechnical Engineering Appreciation Course (Jointly organised by IES Academy and GeoSS) Dr Zhou Yingxin, Senior Principal Engineer, DSTA Adjuct Associate

More information

A Statistical Model for Prediction TBM Performance using Rock Mass Characteristics in the TBM Driven Alborz Tunnel Project

A Statistical Model for Prediction TBM Performance using Rock Mass Characteristics in the TBM Driven Alborz Tunnel Project Research Journal of Applied Sciences, Engineering and Technology 4(23): 5048-5054, 2012 ISSN: 2040-7467 Maxwell Scientific Organization, 2012 Submitted: March 12, 2012 Accepted: April 03, 2012 Published:

More information

Using Tunnel Boring Machine Penetration Tests to Quantify Performance in Hard Rock

Using Tunnel Boring Machine Penetration Tests to Quantify Performance in Hard Rock Villeneuve, M.C. (2017) Using Tunnel Boring Machine Penetration Proc. 20 th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier Using Tunnel Boring Machine Penetration Tests to Quantify Performance

More information

Boring with no. 3 EPB TBMs in chaotic Lahar formations under variable cover

Boring with no. 3 EPB TBMs in chaotic Lahar formations under variable cover World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) Boring with no. 3 EPB TBMs in chaotic Lahar formations under variable cover (1), R. Grandori (1) (1)

More information

Stress and Wear Analysis of the Disc Cutter of Rock Tunnel Boring Machine

Stress and Wear Analysis of the Disc Cutter of Rock Tunnel Boring Machine Send Orders for Reprints to reprints@benthamscience.ae The Open Mechanical Engineering Journal, 2015, 9, 721-725 721 Open Access Stress and Wear Analysis of the Disc Cutter of Rock Tunnel Boring Machine

More information

Kishanganga hydroelectric project (J&K India) head race tunnel tunneling by Tbm under Himalaya mountains dealing with adverse conditions

Kishanganga hydroelectric project (J&K India) head race tunnel tunneling by Tbm under Himalaya mountains dealing with adverse conditions World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) Kishanganga hydroelectric project (J&K India) head race tunnel tunneling by Tbm under Himalaya mountains

More information

ROADHEADER IN TUNNELING TODAY S STATE-OF-THE-ART-ROADHEADER

ROADHEADER IN TUNNELING TODAY S STATE-OF-THE-ART-ROADHEADER ROADHEADER IN TUNNELING TODAY S STATE-OF-THE-ART-ROADHEADER SAFETY FIRST Sandvik s objective is zero harm to our people, the environment we work in, our customers and our suppliers. PROTECTIVE EQUIPMENT

More information

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NZQA unit standard New US6 to replace and version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

Rock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL

Rock Material. Chapter 3 ROCK MATERIAL HOMOGENEITY AND INHOMOGENEITY CLASSIFICATION OF ROCK MATERIAL Chapter 3 Rock Material In all things of nature there is something of the marvelous. Aristotle ROCK MATERIAL The term rock material refers to the intact rock within the framework of discontinuities. In

More information

Boring Hard, Abrasive Gneiss with a Main Beam TBM at the Atlanta Water Supply Program

Boring Hard, Abrasive Gneiss with a Main Beam TBM at the Atlanta Water Supply Program Boring Hard, Abrasive Gneiss with a Main Beam TBM at the Atlanta Water Supply Program Tom Fuerst Robbins Don Del Nero Stantec ABSTRACT: Atlanta, Georgia s water supply program is a priority project involving

More information

Real-time prediction during TBM advance.

Real-time prediction during TBM advance. Real-time prediction during TBM advance. Risk management through the BEAM in Doha Metro Project F. Bove Seli Overseas S.p.A., Rome, Italy. R. Grandori Seli Overseas S.p.A., Rome, Italy. ABSTRACT: The Bore

More information

JME Journal of Mining & Environment, Vol.3, No.2, 2012,

JME Journal of Mining & Environment, Vol.3, No.2, 2012, JME Journal of Mining & Environment, Vol.3, No.2, 2012, 89-98. Evaluation of TBM utilization using rock mass rating system: a case study of Karaj-Tehran water conveyance tunnel (lots 1 and 2) O. Frough

More information

Excavating Turkey s Most Challenging Project: The Gerede Water Transmission Tunnel

Excavating Turkey s Most Challenging Project: The Gerede Water Transmission Tunnel Excavating Turkey s Most Challenging Project: The Gerede Water Transmission Tunnel Brad Grothen 1, Yunus Alpagut 2 1 The Robbins Company, 5866 S. 194 th St., Kent, WA, 98032 USA, grothenb@robbinstbm.com

More information

TBM erection chamber HALLANDSÅS TUNNELS. Mid-adit. Hallandsås ridge. Probe hole. 06 June 2009

TBM erection chamber HALLANDSÅS TUNNELS. Mid-adit. Hallandsås ridge. Probe hole. 06 June 2009 TBM erection chamber HALLANDSÅS TUNNELS Mid-adit Hallandsås ridge 06 June 2009 Probe hole General project information Part of the West coast line railway project in South Sweden 2 tunnels 8.5 km long with

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

Statistical Analysis on Field Penetration Index in Shield TBM

Statistical Analysis on Field Penetration Index in Shield TBM Proceedings of the 2 nd World Congress on Civil, Structural, and Environmental Engineering (CSEE 17) Barcelona, Spain April 2 4, 2017 Paper No. ICGRE 131 ISSN: 2371-5294 DOI: 10.11159/icgre17.131 Statistical

More information

ROCK MASS PROPERTIES FOR TUNNELLING

ROCK MASS PROPERTIES FOR TUNNELLING ROCK MASS PROPERTIES FOR TUNNELLING Robert Bertuzzi 2 nd November 2017 1 Driver Estimating the strength and deformation characteristics of a rock mass for tunnel design is generally based on empiricism

More information

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ENGINEERING GEOLOGY AND ROCK ENGINEERING 1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:

More information

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE August 14, 2017 Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE Gregory.Raines@Stantec.com Develop Preliminary Geologic / Geotech Conceptual Model for the Project

More information

This chapter introduces the description of the surface interaction mechanism based on the friction, wear and excavation laws.

This chapter introduces the description of the surface interaction mechanism based on the friction, wear and excavation laws. Chapter 5 Surface interaction 5.1 Introduction This chapter introduces the description of the surface interaction mechanism based on the friction, wear and excavation laws. Whenever two solids touch each

More information

Fracture pattern of anisotropic rock by drilling or cutting using the PFC

Fracture pattern of anisotropic rock by drilling or cutting using the PFC Fracture pattern of anisotropic rock by drilling or cutting using the PFC N. Schormair & K. Thuro Engineering Geology, Technische Universität München, Germany ABSTRACT: Anisotropy plays a key role in fracture

More information

ISTANBUL STRAIT ROAD TUBE CROSSING

ISTANBUL STRAIT ROAD TUBE CROSSING ISTANBUL STRAIT ROAD TUBE CROSSING One of the three major projects at cross path of Europe and Asia 3 rd Bosphorous Bridge Crossing New International Airport Eurasia Tunnel Total Length 14.6 km Part 1

More information

Swelling Pressure Due to volumetric Expansion of a rock mass having swelling minerals when comes in contact with water

Swelling Pressure Due to volumetric Expansion of a rock mass having swelling minerals when comes in contact with water Basic Definitions Swelling Pressure Due to volumetric Expansion of a rock mass having swelling minerals when comes in contact with water Primitivestress Stress in the state of equilibrium Induced stress

More information

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION CHAMBER OF MINES OS SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION 1. PART 1 : THEORY 1.1 Basic principles of rock engineering 1.1.1 Terms, definitions and basic

More information

Suitability of Brisbane Rock Conditions to Roadheader Excavation

Suitability of Brisbane Rock Conditions to Roadheader Excavation by Jody Herley Roadheader excavation has typically been limited in its ability to cut hard rock. Despite this, a number of tunnelling projects being implemented in South-East Queensland are utilising roadheaders

More information

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6)

Geology 229 Engineering Geology. Lecture 7. Rocks and Concrete as Engineering Material (West, Ch. 6) Geology 229 Engineering Geology Lecture 7 Rocks and Concrete as Engineering Material (West, Ch. 6) Outline of this Lecture 1. Rock mass properties Weakness planes control rock mass strength; Rock textures;

More information

Analysis of Soil Machine Interactions (Part 1): Processing of TBM-Machine-Data and Extraction of excavation-specific Data

Analysis of Soil Machine Interactions (Part 1): Processing of TBM-Machine-Data and Extraction of excavation-specific Data EURO:TUN 2013 3 rd International Conference on Computational Methods in Tunnelling and Subsurface Engineering Ruhr University Bochum, 17-19 April 2013 Analysis of Soil Machine Interactions (Part 1): Processing

More information

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM

GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM IL FUTURO DI SELI SPECIAL DESIGNS AND MEASURES IMPLEMENTED TO FACE ONE OF THE MOST DIFFICULT EVENT IN THE HISTORY OF TUNNELING Condivisione

More information

Design and Implementation of a Large-Diameter, Dual-Mode Crossover TBM for the Akron Ohio Canal Interceptor Tunnel

Design and Implementation of a Large-Diameter, Dual-Mode Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Design and Implementation of a Large-Diameter, Dual-Mode Crossover TBM for the Akron Ohio Canal Interceptor Tunnel E. Comis The Robbins Company D. Chastka Kenny/Obayashi JV ABSTRACT The Ohio Canal Interceptor

More information

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants Introduction to Coal Mining History of Coal in the United States Coal was one of man s earliest sources of heat and light Coal was first

More information

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998 CHAMBER OF MINES OF SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE METALLIFEROUS MINING OPTION Updated November 1998 1 PART 1 : THEORY 1.1 Basic principles of rock engineering

More information

STRENGTH PROPERTIES OF ROCKS AND ROCK MASSES 4. FAILURE CRITERIA FOR INTACT ROCKS AND ROCK MASSES

STRENGTH PROPERTIES OF ROCKS AND ROCK MASSES 4. FAILURE CRITERIA FOR INTACT ROCKS AND ROCK MASSES STRENGTH PROPERTIES OF ROCKS AND ROCK MASSES 1. INTRODUCTION 2. TESTING OF INTACT ROCK FOR STRENGTH 2.1 Uniaxial Compression 2.2 Point Load Testing 2.3 Uniaxial Tension 2.4 Indirect Tension Tests 2.5 Shear

More information

An introduction to the Rock Mass index (RMi) and its applications

An introduction to the Rock Mass index (RMi) and its applications Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering

More information

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS PART 2: CORRELATIONS OF THE THREE SYSTEMS by Arild Palmström, Ph.D. RockMass AS, Oslo, Norway In Part 1, it was shown how the input parameters to the

More information

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME:

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME: MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY EXAMINER: WM BESTER SUBJECT CODE: COMRMC EXAMINATION DATE: OCTOBER 2017 TIME: MODERATOR: H YILMAZ TOTAL MARKS: [100] PASS MARK: (60%)

More information

POSTER PAPER PROCEEDINGS

POSTER PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE POSTER PAPER PROCEEDINGS Unrelieved Spesific Energy Estimation from PLCM and FLCM Linear Rock

More information

Evaluation of TBM performance in a Himalayan tunnel

Evaluation of TBM performance in a Himalayan tunnel World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India Evaluation of TBM performance in a Himalayan tunnel R.K. Goel Central Institute of Mining and Fuel Research,

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

The Tunnel Boring Machine Advancements in Horizontal and Up-Hill Tunnels

The Tunnel Boring Machine Advancements in Horizontal and Up-Hill Tunnels American Journal of Applied Sciences 6 (6): 1126-1132, 2009 ISSN 1546-9239 2009 Science Publications The Tunnel Boring Machine Advancements in Horizontal and Up-Hill Tunnels 1 Stefano Fuoco and 2 Pierpaolo

More information

Olympic Games 2014 transportation system The TBM tunnelling story

Olympic Games 2014 transportation system The TBM tunnelling story Olympic Games 2014 transportation system The TBM tunnelling story Lars Langmaack 1, Alexander P. Severin 2, André Germann 3 1 BASF Construction Chemicals, Switzerland 2 Bamtonnelstroy, Director General

More information

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining Coal Mining Methods Underground Mining Longwall & Room and Pillar Mining Longwall mining and room-and-pillar mining are the two basic methods of mining coal underground, with room-and-pillar being the

More information

Strata Control in Shale Roof- A Case Study of Tummalapalle Uranium Mine

Strata Control in Shale Roof- A Case Study of Tummalapalle Uranium Mine Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 159 164 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

TBM performance prediction in basalt and pyroclastic rocks of Deccan traps, a case study of Maroshi-Ruparel water supply tunnel

TBM performance prediction in basalt and pyroclastic rocks of Deccan traps, a case study of Maroshi-Ruparel water supply tunnel Rock Mechanics and Rock Engineering: From the Past to the Future Ulusay et al. (Eds) 2016 Taylor & Francis Group, London, ISBN 978-1-138-03265-1 TBM performance prediction in basalt and pyroclastic rocks

More information

PREDICTION OF CUTTER WEAR USING RME

PREDICTION OF CUTTER WEAR USING RME PREDICTION OF CUTTER WEAR USING RME Bieniawski, Z. T. Bieniawski Design Enterprises (USA); profztb@cableone.com Celada, B.Universidad Politécnica de Madrid (Spain); bcelada@geocontrol.es Galera, J.M. Geocontrol

More information

Punch Penetration Tests The Better Input Parameter for TBM Performance Prediction?

Punch Penetration Tests The Better Input Parameter for TBM Performance Prediction? Punch Penetration Tests The Better Input Parameter for TBM Performance Prediction? Hartmut Erben Table of contents 1. Introduction... 1 1.1 Objectives, tasks and definition of the problem... 1 1.2 PPT

More information

Building on Past Experiences Worker Safety

Building on Past Experiences Worker Safety EOSC433: Geotechnical Engineering Practice & Design Lecture 11: Rock Stabilization Principles 1 of 43 Erik Eberhardt UBC Geological Engineering EOSC 433 (2016) Building on Past Experiences Worker Safety

More information

Performance Prediction Models for Hard Rock Tunnel Boring Machines

Performance Prediction Models for Hard Rock Tunnel Boring Machines تهران ششمین کنفرانس تونل 7-9 بهمن 1382 دانشکده عمران دانشگاه علم و صنعت ایران Performance Prediction Models for Hard Rock Tunnel Boring Machines Ahmad Ramezanzadeh, PhD student, URGC, INSA of Lyon, France

More information

Deep tunnelling in hardrock with large diameter TBM: What s up? An experience from the Gotthard Base Tunnel

Deep tunnelling in hardrock with large diameter TBM: What s up? An experience from the Gotthard Base Tunnel Underground Space the 4 th Dimension of Metropolises Barták, Hrdina, Romancov & Zlámal (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-40807-3 Deep tunnelling in hardrock with large diameter

More information

ENGINEERING GEOLOGY AND ROCK MECHANICS

ENGINEERING GEOLOGY AND ROCK MECHANICS ENGINEERING GEOLOGY AND ROCK MECHANICS SKAA 2712 ENGINEERING PROPERTIES OF ROCK MASSES PROF. MADYA DR. EDY TONNIZAM BIN MOHAMAD DEPT. OF GEOTECHNICS AND TRANSPORTATION FACULTY OF CIVIL ENGINEERING UTM

More information

GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS

GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS Ground IGC 2009, Response Guntur, and INDIA Support Measures for Pir Panjal Tunnel in the Himalayas GROUND RESPONSE AND SUPPORT MEASURES FOR PIR PANJAL TUNNEL IN THE HIMALAYAS K.S. Rao Professor, Department

More information

ORAL PAPER PROCEEDINGS

ORAL PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE ORAL PAPER PROCEEDINGS Design and Construction of Bored Tunnels for Mumbai Metro Line 3 S.K. Gupta

More information

Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN

Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN ATS11-02113 ABSTRACT Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN Mahdi Zolfaghari, Ehsan Mokhtari, Massoud Morsali Sahel consultant engineers,

More information

Rock Mechanical Aspects of Roadheader Excavation

Rock Mechanical Aspects of Roadheader Excavation Rock Mechanical Aspects of Roadheader Excavation Uwe Restner Sandvik Mining and Construction G.m.b.H., Hard Rock Continuous Mining, Zeltweg, Austria Ralf J. Plinninger Dr. Plinninger Geotechnik, Bernried,

More information

Three-Dimensional simulation for the rock fragmentation induced by TBM with GFEM

Three-Dimensional simulation for the rock fragmentation induced by TBM with GFEM Recent Advances in Rock Engineering (RARE 2016) Three-Dimensional simulation for the rock fragmentation induced by TBM with GFEM XY Xu, XH Tang and QS Liu School of Civil Engineering, Wuhan University,

More information

Simulation of the cutting action of a single PDC cutter using DEM

Simulation of the cutting action of a single PDC cutter using DEM Petroleum and Mineral Resources 143 Simulation of the cutting action of a single PDC cutter using DEM B. Joodi, M. Sarmadivaleh, V. Rasouli & A. Nabipour Department of Petroleum Engineering, Curtin University,

More information

Waterview Connection Tunnels

Waterview Connection Tunnels Stuart Cartwright Waterview Connection Tunnels Engineering Geology Assessment of East Coast Bays Formation from Investigation through to Construction S. Cartwright, D. Koumoutsakos, B. Hill, and C. Morrison

More information

Experimental Assessment of Rock Cutting Characteristics by Strength-Driven Mechanism. H Munoz, A Taheri & E Chanda

Experimental Assessment of Rock Cutting Characteristics by Strength-Driven Mechanism. H Munoz, A Taheri & E Chanda Experimental Assessment of Rock Cutting Characteristics by Strength-Driven Mechanism H Munoz, A Taheri & E Chanda AusIMM Africa Australia Technical Mining Conference, Jun 11-12 215 Adelaide, Australia

More information

7. Foundation and Slope Stability

7. Foundation and Slope Stability The Asian Nuclear Safety Network 7. Foundation and Slope Stability (SER 2.5.4 & 2.5.5) Taek-Mo SHIM k147stm@kins.re.kr Korea Institute of Nuclear Safety Structural Systems and Site Evaluation Department

More information

Quantitative Classification of Rock Mass

Quantitative Classification of Rock Mass Quantitative Classification of Rock Mass Description of Joints: Orientation, Persistence, Roughness, Wall Strength, Aperture, Filling, Seepage, Number of sets, Block size, spacing. ISRM commission s i

More information

Structurally controlled instability in tunnels

Structurally controlled instability in tunnels Structurally controlled instability in tunnels Introduction In tunnels excavated in jointed rock masses at relatively shallow depth, the most common types of failure are those involving wedges falling

More information

Use of the underground in Norway

Use of the underground in Norway Lecture at Nanyang Technical University 13th January 2015 Use of the underground in Norway Professor emeritus Einar Broch NTNU; Norwegian University of Science and Technology Trondheim, Norway 1 Geology

More information

AF SERIES AWEA MECHANTRONIC CO., LTD. High Performance Vertical Machining Center AGENT ISO 9001 ISO 14001

AF SERIES AWEA MECHANTRONIC CO., LTD. High Performance Vertical Machining Center AGENT ISO 9001 ISO 14001 AWEA MECHANTRONIC CO., LTD. HEADQUARTERS 629, Suezhetou Section, Kwanpu Rd., Wenshan Li, Hsinpu, Hsinchu, Taiwan TEL : +886-3-88-191 FAX : +886-3-88-19 Website : www.awea.com CENTRAL TAIWAN SCIENCE PARK

More information

Soil abrasiveness for TBM along Tabriz metro tunnel line 2, Iran

Soil abrasiveness for TBM along Tabriz metro tunnel line 2, Iran 3 r d International Conference on New Developments in Soil Mechanics and Geotechnical Engineering, Soil abrasiveness for TBM along Tabriz metro tunnel line 2, Iran Ebrahim Asghari Kaljahi Assistant Professor,

More information

New hydro-mechanical tunnel excavation method using an abrasive waterjet system

New hydro-mechanical tunnel excavation method using an abrasive waterjet system Japanese Geotechnical Society Special Publication The 6th Japan-Korea Geotechnical Workshop New hydro-mechanical tunnel excavation method using an abrasive waterjet system Gye-Chun Cho i), Gun-Wook Joo

More information

II Engineering & hydrogeologic characteriskcs of rocks: general trends

II Engineering & hydrogeologic characteriskcs of rocks: general trends ENGINEERING & HYDROGEOLOGIC CHARACTERISTICS OF ROCKS (03) I Main Topics A Engineering & hydrogeologic characteriskcs of rocks B Engineering uses of rocks: RecogniKon of potenkal uses C Main rock types

More information

STONE. What is Dimension Stone? 3/23/17

STONE. What is Dimension Stone? 3/23/17 3/23/17 What is Dimension Stone? STONE A rock material that has been harvested from its in-situ position in the earth and cut, machined, and finished to a specified size & shape with alteration of the

More information

Notes Week 1 Engineering Geology Problems

Notes Week 1 Engineering Geology Problems Notes Week 1 Engineering Geology Problems The Big Three of Engineering Geology 1. Will the ground bear the weight? (i.e. Subsurface materials? Rock or soft soil and sediment? Differential settlement?)

More information

Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine

Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine Volume 5, Number 2, April 2009, pp.63-68 [TECHNICAL NOTES] Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine Budi SULISTIANTO *, M. Safrudin SULAIMAN **, Ridho Kresna

More information

Rock slope rock wedge stability

Rock slope rock wedge stability Engineering manual No. 28 Updated: 02/2018 Rock slope rock wedge stability Program: Rock stability File: Demo_manual_28.gsk The aim of the chapter of this engineering manual is to explain a rock slope

More information

ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION SIMULATION

ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION SIMULATION Oil Shale, 2018, Vol. 35, No. 4, pp. 356 364 ISSN 0208-189X doi: https://doi.org/10.3176/oil.2018.4.05 2018 Estonian Academy Publishers ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION

More information

Using EMDS for CLs Mapping and Assessment: SE Demo Project. Keith Reynolds, USDA Forest Service Tim Sullivan, E&S Environmental Tim Lewis, U.S.

Using EMDS for CLs Mapping and Assessment: SE Demo Project. Keith Reynolds, USDA Forest Service Tim Sullivan, E&S Environmental Tim Lewis, U.S. Using EMDS for CLs Mapping and Assessment: SE Demo Project Partners: Keith Reynolds, USDA Forest Service Tim Sullivan, E&S Environmental Tim Lewis, U.S. EPA What is EMDS? The Ecosystem Management Decision

More information

Numerical simulation of rock cutting using 2D AUTODYN

Numerical simulation of rock cutting using 2D AUTODYN IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Numerical simulation of rock cutting using 2D AUTODYN To cite this article: D E Woldemichael et al 2015 IOP Conf. Ser.: Mater.

More information

EXAMINATION PAPER MEMORANDUM

EXAMINATION PAPER MEMORANDUM EXAMINATION PAPER MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 3.1 : HARD ROCK TABULAR EXAMINER: PJ LE ROUX SUBJECT CODE: COMRMC EXAMINATION DATE: MAY 2015 TIME: MODERATOR: WM BESTER TOTAL MARKS:

More information

Considering Creep Parameters of Rock Mass to Evaluate the Necessity Thrust for Excavation in Squeezing Ground

Considering Creep Parameters of Rock Mass to Evaluate the Necessity Thrust for Excavation in Squeezing Ground ORIGINAL ARTICLE Received 28 Apr. 2014 Accepted 06 May. 2014 Copyright 2014 Scienceline Publication Journal of Civil Engineering and Urbanism Volume 4, Issue 4: 370-377 (2014) ISSN-2252-0430 Considering

More information

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Blast-induced damaged zone can affect the affect stability and performance of tunnel. But, we

More information

Numerical study on Optimization of key parameters for better cutting performance of shield machine cutters

Numerical study on Optimization of key parameters for better cutting performance of shield machine cutters www.ijcsi.org https://doi.org/10.20943/01201605.135145 135 Numerical study on Optimization of key parameters for better cutting performance of shield machine cutters TAN Qing 1, 3, YI Nian-en 1, 2,*, XIA

More information

Critical Borehole Orientations Rock Mechanics Aspects

Critical Borehole Orientations Rock Mechanics Aspects Critical Borehole Orientations Rock Mechanics Aspects By R. BRAUN* Abstract This article discusses rock mechanics aspects of the relationship between borehole stability and borehole orientation. Two kinds

More information

Experimental Researches on Friction Coefficient for Disc Cutters

Experimental Researches on Friction Coefficient for Disc Cutters Experimental Researches on Friction Coefficient for Disc Cutters Guiju Zhang 1,, Caiyuan Xiao 1,* 1 Department of Mechanical and Energy Engineering Shaoyang University Shaoyang Hunan, China College of

More information

Extreme Excavation in Fault Zones and Squeezing Ground at the Kargi HEPP in Turkey

Extreme Excavation in Fault Zones and Squeezing Ground at the Kargi HEPP in Turkey Jim CLARK (*) SEE Tunnel : Promoting Tunneling in SEE Region ITAWTC 2015 Congress and 41 st General Assembly May 22-28, 2015, Lacroma Valamar Congress Center, Dubrovnik, Croatia Extreme Excavation in Fault

More information

Tunnel Boring Machines Hong Kong. Dr. Ian McFeat-Smith & Odd G. Askilsrud, PE

Tunnel Boring Machines Hong Kong. Dr. Ian McFeat-Smith & Odd G. Askilsrud, PE Chapter 25 Tunnel Boring Machines Hong Kong in Dr. Ian McFeat-Smith & Odd G. Askilsrud, PE Director, Charles Haswell & Partners (Far East) Ltd., Hong Kong Engineering Applications Manager, The Robbins

More information

Weak Rock - Controlling Ground Deformations

Weak Rock - Controlling Ground Deformations EOSC 547: Tunnelling & Underground Design Topic 7: Ground Characteristic & Support Reaction Curves 1 of 35 Tunnelling Grad Class (2014) Dr. Erik Eberhardt Weak Rock - Controlling Ground Deformations To

More information

Discrete/Finite Element Modelling of Rock Cutting with a TBM Disc Cutter

Discrete/Finite Element Modelling of Rock Cutting with a TBM Disc Cutter Manuscript Click here to download Manuscript RMRE_rev-v.pdf Rock Mechanics and Rock Engineering manuscript No. (will be inserted by the editor) Discrete/Finite Element Modelling of Rock Cutting with a

More information

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

Ground support modelling involving large ground deformation: Simulation of field observations Part 1 Ground Support 2016 E. Nordlund, T.H. Jones and A. Eitzenberger (eds) Ground support modelling involving large ground deformation: Simulation of field observations Part 1 D.Saiang, Luleå University of

More information

EXPERIENCES FROM THE GROUND PROBING IN THE GOTTHARD-BASE TUNNEL AND THEIR APPLICABILITY IN THE GIBRALTAR STRAIT CROSSING

EXPERIENCES FROM THE GROUND PROBING IN THE GOTTHARD-BASE TUNNEL AND THEIR APPLICABILITY IN THE GIBRALTAR STRAIT CROSSING IV UN-ITA Workshop Gibraltar Strait Crossing, Madrid January 20, 2005 Session 2: Mechanical Probing EXPERIENCES FROM THE GROUND PROBING IN THE GOTTHARD-BASE TUNNEL AND THEIR APPLICABILITY IN THE GIBRALTAR

More information

Moglicë HPP - Albania. Jorge Terron

Moglicë HPP - Albania. Jorge Terron Moglicë HPP - Albania Jorge Terron DEVOLL MOGLICË PROJECT Background Location Project Summary Sweco duties Plant overview Geology Cavern complex Layout Site investigations Rock mass characterization Geology

More information

Innovative Blast Free Mining Methods for Aggregate Quarries " Ramesh Bhatawdekar, Edy Tonnizam Mohamad, Firdaus Azlan Department of Geoteknik and Tran

Innovative Blast Free Mining Methods for Aggregate Quarries  Ramesh Bhatawdekar, Edy Tonnizam Mohamad, Firdaus Azlan Department of Geoteknik and Tran Innovative Blast Free Mining Methods for Aggregate Quarries " Ramesh Bhatawdekar, Edy Tonnizam Mohamad, Firdaus Azlan Department of Geoteknik and Transportation, Faculty of Civil Engineering, University

More information