1 Instrument Science Report ACS Best Gyroscope Usage To Maximize the HST Mission Lifetime Roeland P. van der Marel January 21, 2004 Abstract Without SM4, gyroscope survival is a critical factor for the HST Mission lifetime. I present a simple Monte-Carlo model to calculate the survival probabilities for various scenarios. I calibrate the model to reproduce and update more accurate, but somewhat outdated, calculations by Aerospace Corporation. Continued three-gyroscope guiding will become impossible by late January Subsequent two-gyroscope guiding will further extend the mission to late May 2007 (if no other hardware fails). I discuss the importance of alternative strategies. We can extend the HST Mission if we switch to two-gyroscope guiding sooner; this extends the lifetime of the gyroscope that is powered off. Starting two-gyroscope guiding by January 2005 could extend the HST Mission by another 10 months, to April Any 6-month implementation delay beyond January 2005 decreases the mission by 3 months. The 1-σ uncertainty in all the aforementioned 50% probability (median) dates ranges between months. To achieve maximum lifetime it is important to guide with the gyroscopes that have the lowest failure probabilities. This strategy is important during three-gyroscope guiding as well. I recommend that: (a) More detailed gyroscope survival models should be calculated to validate these results; (b) With knowledge of the individual gyroscope failure probabilities, an effort should be made guide with the gyroscopes for which these probabilities are lowest; (c) Implementation and testing of the two-gyroscope guiding capability should be expedited as much as possible; (d) A study should be undertaken of the (net) trade-off between 13 months of three-gyroscope observations and 23 months of two-gyroscope observations; (e) any remote possibility of one-gyroscope guiding should be actively investigated, since it is expected that one functional gyroscope will be available into 2009 or beyond. 1 Copyright c 2003 The Association of Universities for Research in Astronomy, Inc. All Rights Reserved.

2 2 1. Introduction The Hubble Space Telescope (HST) has six gyroscopes on board, three of which are required for scientific operations. Each gyroscope contains a spinning wheel inside a sealed cylinder. The gyroscopes provide a frame of reference for Hubble to determine where it is pointing and how that pointing changes as the telescope moves across the sky. After many years of extended use, gyroscopes ultimately fail. The possibility of being left with fewer than 3 functional gyroscopes has been one of the primary risks jeopardizing the continued operation of the observatory. For example, on November 13, 1999 the telescope entered a situation in which only two functional gyroscopes were left. The telescope was then unable to observe for the remaining 6 weeks until Servicing Mission SM3a in December All 6 gyroscopes were replaced during SM3a. Subsequently, Gyroscopes 3, 4, 5 and 6 were used for telescope control, either in a four-gyroscope configuration, or in a three-gyroscope configuration with one of the gyroscopes in shadow mode. The latter prevents the telescope from going into safe mode during a gyroscope failure. In March 2001 it was decided that it was more desirable to have the telescope go into safe mode rather than to accrue wear on one of the gyroscopes, and since that time only three gyroscopes have normally been in use. Gyroscope 5 failed in April 2001, after which Gyroscope 2 was brought into the control loop. No gyroscopes were replaced during Servicing Mission SM3b in March This choice was made to allow sufficient time during the mission to revive the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) through the installation of a cryocooler. Gyroscope 3 failed in April 2003, after which Gyroscope 1 was brought into the control loop. No gyroscope failures have occurred since. So HST currently has four functional gyroscopes, of which three are actually being used (Gyroscopes 1, 2, and 4) and one is a backup (Gyroscope 6). Gyroscope 6 suffers from anomalous bias performance, but a software workaround has been developed to allow its use even if this bias performance further degrades with time. After the tragic loss of the Space Shuttle Columbia on February 1, 2003, it was realized that the next HST Servicing Mission SM4 might be delayed considerably. As a result, it became a possibility that the observatory would be left with less than three functional gyroscopes before it could be serviced again. An effort was therefore started to rework telescope commanding to allow scientific operations with only two functional gyroscopes. This mode will use the HST magnetometers for added control information. The possibility of pursuing this two-gyroscope guiding capability had become possible due to increases in on-board computing power. In SM3A the original DF224 spacecraft computer was replaced by a 486 upgrade. On-orbit tests of the two-gyroscope guiding capability are currently planned for April, June and October 2004, with an operational readiness review scheduled for January 2005 (Myers 2004). Full operation is not currently planned any earlier than the

3 3 spring of 2005 (Reinhart, priv. comm). On January 16, 2004, NASA announced the cancelation of SM4. This implies that HST will not be serviced again, and that HST will have to do with its current complement of gyroscopes for the remainder of its lifetime. Predictions for the expected lifetime are detailed in the document Expected HST Science Lifetime after SM4, which was presented by the HST Program Office to the HST-JWST Transition Review Panel ( The Bahcall Committee ) in July These predictions are based on calculations for the situation as it existed on July 1, The likelihood for HST to have less than three functional gyroscopes drops monotonically with time, and in these calculations it fell below 50% at the predicted date of December 1, After this, the telescope would have to switch to two-gyroscope guiding. This provides for another expected 15 months of operations before only 1 functional gyroscope would be left (Beckwith 2003). So as of July 1, 2003, the prediction was that on average one would not expect HST to have enough functional gyroscopes for operation beyond approximately March 1, In the development and planning of a two-gyroscope guiding mode the assumption has been that this mode would only be used after three-gyroscope guiding had become impossible. However, in light of recent developments it now seems worthwhile to reassess this assumption. An alternative approach is to start two-gyroscope guiding as soon as possible. The advantage would be that instead of using three gyroscopes until approximately December 1, 2005, we would be using two. This would have two advantages. First, it would decrease the overall probability of a gyroscope failure in this period by a factor 2/3. So the average predicted number of functional gyroscopes late in the mission would increase. Second, any gyroscope that is still functional late in the mission would on average have been used for a smaller period of time. Since the failure probability increases with past usage (due to wear) this implies that the probability of loosing a gyroscope at a fixed time late in the mission is smaller. As a result, the time at which HST would be expected to have only one functional gyroscope left out of the total complement of six would be pushed further into the future. Thus: the overall expected lifetime of HST can be increased by switching to two-gyroscope guiding as soon as possible. Given the drastic impact of the cancelled SM4, this might be very important for the HST mission as a whole. There are several down-sides to two-gyroscope guiding, apart from the fact that its functionality remains to be demonstrated. The main impact on data quality is that it degrades the quality of the HST Point Spread Function (PSF). The lack of a third gyroscope will generate increased jitter in one direction, yielding an elongated PSF. The jitter magnitude and direction will depend on which gyroscopes are alive, and the direction of elongation will change across the sky. The expected worst case jitter is mas

4 4 (Beckwith 2003). This will degrade the quality of science at the highest resolution, e.g., with the High Resolution Channel (HRC) of the Advanced Camera for Surveys (ACS), including coronagraphic work. However, such work makes up only 5% of the HST science program. Spectroscopy with the Space Telescope Imaging Spectrograph (STIS) and its smallest slits would also be affected. By contrast, science with the ACS Wide Field Channel (WFC) or with NICMOS would not be much affected. These modes comprise 70% of the HST science program. Observations of point sources would need to integrate slightly longer to achieve the same signal-to-noise ratio (S/N). For the WFC this would be a factor 1.3 for 25 mas jitter. On the other hand, not all observations observe point sources, and not all programs have limiting S/N as their primary constraint. Other disadvantages of two-gyroscope guiding are that operational aspects are less desirable than with three-gyroscope guiding. Two-gyroscope guiding will be more restrictive as to what targets are visible at any given time; orbit-to-orbit pointing registration will likely not be as good; moving targets will not be supported (at least in the initial implementation); scheduling efficiency in terms of orbits per week will be lower; adjacent visits may not schedule as close together in time; and orbits in which the South-Atlantic Anomaly leads to loss of normal visibility time are likely to be less usable. Advantages of extending the lifetime of HST by switching to two-gyroscope guiding as soon as possible would be: (i) to allow more HST orbits to be used; (ii) to provide a general purpose UV/optical/near-IR space facility to the worldwide astronomical community for a longer period of time; (iii) to provide more opportunity for target-of-opportunity observations late in the decade (the next supernova in the Milky Way...?); and (iv) to provide extended opportunity for follow-up studies based on new results from SIRTF or other observatories. And also, even if one chooses to do two-gyroscope guiding at an early stage, it might still be possible to perform selected high resolution studies with three gyroscopes in a campaign mode. The advantages of an extended mission will need to be weighed carefully against the disadvantages of using two-gyroscope guiding during a period in which three-gyroscope guiding had been possible. Also, there is a little point in extending the gyroscope lifetime if there is an expectation that other critical hardware components on HST will fail first. The batteries on the telescope are a prime candidate for this, although their actual lifetime is not entirely clear at the present time. Either way, the primary number of relevance for any trade-off study is the amount of time by which the HST lifetime can actually be extended by switching to two-gyroscope guiding before this is operationally imperative. The present ISR discusses simple models that provide an answer to this question. It also addresses the question which individual gyroscopes should be used at any given time so as to maximize the overall lifetime of the mission.

5 5 Fig. 1. Probability calculated by Aerospace Corporation of having three or more functional gyroscopes as function of time, based on the assumption that there are four functional gyroscopes on July 1, These predictions are now outdated. 2. A Simple Model for Predicting Gyroscope Survival Gyroscope failure probabilities can be calculated with fair accuracy. Performance histories are known, both from ground-testing and in-flight operation, across many programs, for over 90 gyroscopes similar to those in HST. Aerospace Corporation made a detailed calculation of the probability for having three or more functional gyroscopes on board HST, assuming that there are 4 functional gyroscopes on July 1, The results, taken from the HST Program Office Expected Lifetime Document (2003), are shown in Figure 1. For a detailed assessment of the questions posed in this ISR it will be necessary to redo the calculations in Figure 1, using up to date information and complete knowledge of the nature and failure modes of the individual gyroscopes. However, in the absence of such a calculation it is useful to construct a simple model that reproduces the main characteristics of the more detailed calculations that have been performed in the past. This simple model

6 6 then provides an efficient means to quickly explore the full parameter space of the problem, and to serve as a basis for more detailed investigation. The probability that a gyroscope fails at any given time is not a deterministic process. For example, there is no consumable (e.g., fuel or cryogen) in a gyroscope that gets used up at a known rate. In such a case one would be able to calculate with fair accuracy when exactly the consumable will be used up. However, a gyroscope can fail at any given time due to any number of potential random or wear-related failures. In this sense, gyroscope failure is a statistical Poisson process. A useful analogy is to think of lifetime predictions for humans, as used by the life insurance industry. To calculate probabilities for the future availability of functional gyroscopes I adopt a Monte-Carlo approach to simulate the Poisson process. With a simple FORTRAN program I calculate a simulated future M times. Each simulation i (for i = 1,..., M) starts with a known (or hypothetical) situation at a starting month m = m 0. Throughout this ISR I adopt a time-system in which month l in year 200X is represented by the number 12X + l. So January 1, 2004 corresponds to m = 49. The gyroscopes were installed on the telescope at m 0. It is assumed that in each month of the simulation, a gyroscope that is used for operations has a probability p of loosing its functionality. Whether or not a given gyroscope actually looses its functionality depends on whether a randomly chosen number between 0 and 1 has value p. Once a gyroscope looses its functionality, it is ignored for the remainder of the simulation. If there is a remaining functional gyroscope that isn t already in the control loop, it can be added at that time (depending on what approach one wants to simulate). This procedure is repeated month after month, until some month far in the future. For each simulation i, and for each month m, it is recorded what the total number n i (m) of functional gyroscopes on the telescope was at the end of the month. It is also recorded for each number N = 0, 1, 2,... what the first month m = µ i (N) is in which n i (m) < N. After the M futures have been simulated, several statistics are calculated. The quantity M µ (N) = (1/M) µ i (N) (1) i=1 is the average (expectation value) of the month in which the number of functional gyroscopes will for the first time fall below N. The dispersion in this number is given by [ 1/2 M σ µ (N) = {(1/M) µ 2 i (N)} µ (N)] 2. (2) i=1 The function Prob(N; m) = (1/M) M i=1 { 1 ni (m) = N, 0 n i (m) N, (3)

7 7 measures the probability at month m that there are still N functional gyros. The function Prob( N; m) = Prob(j; m) (4) measures the probability at month m that there are still N or more functional gyros. So the curve plotted in Figure 1 corresponds to Prob( 3; m m 0 ). The value m = µ med (N) is the month for which Prob( N; m) = 50%; so µ med (N) is the median expected month in which the number of functional gyroscopes will for the first time fall below k. In the calculations performed in the context of this ISR it was always found that µ (N) and µ med (N) differed by no more than 1 2 months, which is of order 10% of the statistical dispersion σ µ (N). In the remainder I therefore present only µ med (N) for the various models that are discussed. The expectation value of the number of functional gyroscopes at month m is given by j N n (m) = j 0 j Prob(j; m), (5) where the sum runs from zero to the maximum possible number of functional gyroscopes. The dispersion in the number of functional gyroscopes at month m is given by σ n (m) { j 2 Prob(j; m)} n 2 (m) j 0 1/2. (6) To fit the model to reality one needs to choose the probability p. The simplest assumption is to assume that p is a constant. This corresponds to unpredictable random failure with a given probability. While certainly part of the story, it doesn t reflect the fact that gyroscopes are more likely to fail after they have been used longer. Therefore, one should choose a probability p that increase with time. A simple functional form is p(u) = max{ p 0, [p 4 (u/48) b ] }. (7) Here u is the number of months during which a gyroscope has been used. The per-month probability of failure for a brand-new gyroscope (u = 0) is p 0. The power b determines how fast the failure probability increases with time due to wear. After four years of usage, the probability has increased to p 4. Several important simplifying assumptions are made here. First, it is assumed that the failure probability and its relation to usage is the same for all gyroscopes. This is not expected to be true in practice, due to known differences in the properties of the individual gyroscopes. Second, it is assumed that other factors than usage do not affect the probability. This is an oversimplification, because in reality other issues will almost certainly contribute as well, e.g., aging while not in use, and the number of times that a gyroscope was cycled on or off. This should be kept in mind when assessing

8 8 the predictions of the model. In particular, statements about the ensemble of gyroscopes are more accurate than those about any individual one, and the general trends predicted by the models are more accurate than the specific details. With some experimentation it was found that the Aerospace Corporation results in Figure 1 can be well approximated using parameters p 0 = 0.5%, p 4 = 3.13% and b = 2.5. The calculations in Figure 1 apply to the situation on July 1, 2003 (m 0 = 43). For this same value of m 0, the simple model presented here yields the probabilities Prob( N; m m 0 ) that are shown in the bottom panel of Figure 2 for N = 4, 3, 2, 1 (left to right). The top panel shows the probabilities Prob(N; m m 0 ) of having exactly N functional gyroscopes at any given time. The calculations assume that the usage for the gyroscopes at the start of the simulations is u 1 = 3, u 2 = 26, u 4 = 42, and u 6 = 14. These numbers are based on the HST Gyroscope Configuration Log (maintained by the HST project at OTA Hardware/RGA/RGA main.htm); see also the gyroscope usage history outlined in Section 1. Operation in shadow mode is counted as usage, because the gyroscope is turned on, even though its information is not used to control the telescope. Any usage in testing while still on the ground was ignored. The calculations in Figure 2 assume that three-gyroscope guiding is used as long as there are at least three functional gyroscopes, and that Gyroscope 6 is not used until one of the other ones breaks. The predicted function Prob( 3; m m 0 ) can be compared directly to the probabilities shown in Figure 1, and matches well. The median value µ med (3) m 0 in the calculations is 29.0 months, in agreement with the results quoted in the HST Program Office Expected Lifetime Document (2003). This is no surprise, because the adopted parameters in equation (7) were chosen to fit the curve in Figure 1. However, the predicted lifetime that can be achieved with two-gyroscope guiding was not considered. This quantity can therefore be used as an independent test of the predictions of the simple model. Indeed, the model does well. It gives µ med (2) µ med (3) = 16.1 months, which can be compared to the value of 15 months that has been quoted on the basis of Aerospace Corporation calculations (Beckwith 2003). 3. Comparison of Scenarios Now that there is a simple model that predicts the fate of the gyroscopes on HST in a statistical sense, it can be used to calculate and compare a variety of scenarios. The first order of business is to update the Aerospace Corporation predictions in Figure 1. Those predicted that HST would have a 50% probability of having less than 3 functional gyroscopes by December 1, However, this did not take into account the knowledge

9 9 Fig. 2. Predictions of the simple model described in this ISR, as function of the number of months after July 1, Top panel: probability of having N functional gyroscopes. Bottom panel: probability of having N or more functional gyroscopes. Curves are shown for N = 4 (solid), N = 3 (heavy), N = 2 (heavy dashed), N = 1 (long dashed), and N = 0 (dotted). The predictions are based on the assumption of having four functional gyroscopes on July 1, 2003, similar to the assumption underlying Figure 1. These predictions are therefore outdated. The model parameters were chosen so that the heavy curve in the bottom panel reproduces the more detailed calculations shown in Figure 1. that there are still four functional gyroscopes in January 2004; it only assumed there were four in July The fact that we have had no failure in the past 6 months pushes forward

10 10 the time at which HST is expected to have less than 3 functional gyroscopes. The reason for this is that the predictions in July 2003 included the possibility of failure in the subsequent six months, which has not happened. This possibility had a negative effect on the predicted lifetimes as of last July. Lifetime predictions for humans again form a useful analogy. The life expectancy (age at which 50% probability of having died is reached) for someone age 50, is to live to age 80. However, someone who is currently at age 75 will statistically be expected to live to an age of 86. So the expected lifetime increases by merely managing to continue living, even though the probability of expiring at any time continues to rise. To address this quantitatively for the HST gyroscopes, I repeated the calculations of Figure 2, but now starting with four functional gyroscopes at m 0 = 49 (January 1, 2004). The usage for the gyroscopes at the start of the simulations is u 1 = 9, u 2 = 32, u 4 = 48, and u 6 = 14. This yields the results in Figure 3. As function of m m 0, the curves have shifted to the left as compared to Figure 2. This is because the probabilities for gyroscope failure have increased due to aging. However, the shift is less than the 6 months that have elapsed between July 2003 and January So in a net sense, dates have shifted into the future, as expected. The predictions give µ med (3) m 0 = So the month in which the probability is 50% for having less than 3 functional gyroscopes is now late January The 1-σ uncertainty in this date is σ µ (3) = 11.0 months. Also, µ med (2) m 0 = 40.9, with a difference µ med (2) µ med (3) = 16.2 months. So in late May 2007 the probability of being able to do two-gyroscope guiding drops below 50%. The 1-σ uncertainty in this date is σ µ (2) = 12.9 months. These are the up-to-date predictions if we stick with our plans to do three-gyroscope guiding as long as we can, use Gyroscope 6 only when we have to, and switch to two-gyroscope guiding only when we have to. I will henceforth refer to this as the standard approach. Instead of using Gyroscopes 1, 2 and 4 for the time being, we could switch to another combination. In the model presented here, the probability for gyroscope failure increases with use. So if we want to optimize the time µ med (3) m 0 for which we can continue to do three-gyroscope guiding, then the best approach is to stop using Gyroscope 4, which has the most current usage (u 4 = 48), and to start using Gyroscope 6 instead. With this approach, it is predicted that µ med (3) m 0 can be pushed forward to 29.8, which is 5.1 months more than in the standard approach. We would then expect to be able to continue three-gyroscope guiding until late June However, the time µ med (2) m 0 at which we would expect two-gyroscope guiding to become impossible would only increase by 0.1 month as compared to the standard approach. The method that would maximize µ med (2) m 0 is actually to stop using Gyroscope 2. This predicts µ med (3) m 0 = 28.3 (early May 2006) and µ med (2) m 0 = 41.4 (mid June 2007). These results are illustrated in Figure 4. It shows the expectation value n of the number of functional gyroscopes as function of time. The

11 11 Fig. 3. Predictions as in Figure 2, but now taking into account the fact that we still have four functional gyroscopes as of January 1, 2004 (and not just as of July 1, 2003). These curves are the up-to-date predictions if we stick with our plans to do three-gyroscope guiding as long as we can, use Gyroscope 6 only when we have to, and switch to two-gyroscope guiding only when we have to (the standard approach ). The abscissa is the number of years that have passed since January 1, historically available number of gyroscopes, from their installation to the current epoch, is shown as well. In this representation, the expected time at which three-gyroscope guiding becomes impossible is when the curves drop below n = 2.5. The expected time at which two-gyroscope guiding becomes impossible, and when the HST Mission will presumably end,

12 12 Fig. 4. Number of functional gyroscopes as a function of time. The heavy solid histogram shows the known past behavior. The curves show the predicted expectation value n for cases in which we keep using three-gyroscope guiding as long as possible. The curves differ in which gyroscope is not used as long as there are four functional ones. The standard approach doesn t use Gyroscope 6 (heavy solid curve). The cases of not using Gyroscope 4 (short-dashed curve) and not using Gyroscope 2 (long-dashed curve) are shown as well. The error bars show the statistical uncertainty σ n on the predictions. is when the curves drop below n = 1.5. The heavy solid curve shows the expectation value for the standard approach. The short-dashed curve corresponds to the situation in which we stop using Gyroscope 4, and the long-dashed curve corresponds to situation in which we stop using Gyroscope 2. The dispersion (uncertainty) in the predicted number of functional gyroscopes is considerable, and ranges from σ n = in the period Now let s consider the situation in which we voluntarily switch to two-gyroscope guiding before we actually have to. Although two-gyroscope guiding is currently not planned any earlier than spring 2005, let s assume that with some effort we could make this step already on January 1, To make a specific prediction one needs to specify which gyroscopes will be used in each stage of the future of HST. To restrict the number of models to study, I assume that we can switch gyroscopes at the start of the simulation, that one gyroscope gets turned of on January 1, 2005, and that any other changes are made only when a gyroscope fails. I then performed calculations for all possible permutations of allowed choices, and selected the one that maximizes the HST lifetime µ med (2). The best strategy is the one in which: (a) we use Gyroscopes 1, 2 and 6 until January 1, 2005; (b) we turn off Gyroscope

13 13 Fig. 5. Predictions as in Figure 3, but now assuming that we use three-gyroscope guiding until January 2005, and then switch to two-gyroscope guiding. The break in the curves is due to this change in strategy. Whenever a change is made in the gyroscope complement used for telescope control, the best strategy is to give control to the gyroscopes with the smallest probability for failure (i.e., in the model these are the gyroscopes with the lowest past usage). This approach is expected to extend the lifetime of the HST mission by 10 months, as compared to the standard approach in which we continue to use three-gyroscope guiding for as long as we can (Figure 3). 2 on January 1, 2005; (c) we turn on Gyroscope 2 before Gyroscope 4 whenever there is a gyroscopes failure. In other words, this strategy uses at each stage those gyroscopes that

14 14 have the least usage, and hence the smallest probability for failure. With this strategy one obtains the predictions in Figure 5. They give µ med (3) m 0 = 41.6 and µ med (2) m 0 = The 1-σ uncertainties are σ µ (3) = 16.4 months and σ µ (3) = 16.0 months. So we would expect to have at least three functional gyroscopes until mid-june 2007, and at least two functional gyroscopes until approximately early-april These dates are, respectively, 16.9 and 10.2 months further into the future compared to the standard approach. So with prudent use of the gyroscopes we could potentially add some 10 months to the lifetime of HST. Figure 6 compares the predictions of this model (short-dashed curve) to the standard approach (heavy solid curve), by showing the expectation value for the number of functional gyroscopes (similar to Figure 4). The dispersion (uncertainty) in the predicted number of functional gyroscopes ranges from σ n = in the period The long-dashed curve shows another model that switches to two-gyroscope guiding on January 1, 2005, but which doesn t optimize the order in which the gyroscopes are used. This approach is based on the current and past priority setting used for telescope control: Gyroscope 6 is not used until we have to, and when a gyroscope is removed from the control loop we choose the one that was added most recently. This strategy still extends the HST mission by 5 months. So in the optimum model (which extends the mission by 10 months), half the gain comes from switching to two-gyroscope guiding on January 1, 2005, and the other half comes from adopting the best order for using the gyroscopes. The calculations were repeated for other dates of switching to two-gyroscope guiding. The results show that for every six-month delay beyond January 1, 2005 in starting the use of two-gyroscope guiding, the mission lifetime decreases by 3 months. It is therefore important that the development of the capability for doing two-gyroscope guiding be expedited as much as possible. 4. Discussion and Conclusions In the absence of a servicing mission SM4 it is of vital importance to extend the HST Mission for as long as possible with the presently available hardware and software. The longevity of the gyroscopes on HST provides probably the most critical factor, although certainly not the only one, that determines the amount of time for which we can realistically expect to operate HST. In this ISR I have presented a simple Monte-Carlo model that yields predictions for the future survival of the gyroscopes. The model is used to generate predictions for a variety of possible approaches of operating the observatory in the years to come. The results provide important insight that will aid decisions on what the best course of action will be.

15 15 Fig. 6. Number of functional gyroscopes as a function of time, as in Figure 4. The heavy solid curve is the standard approach, and keeps using three-gyroscope guiding as long as possible. By contrast, the dashed curves assume that we switch to two-gyroscope guiding on January 1, The short-dashed curve is for the model shown in Figure 5. Whenever a change is made in the gyroscope complement used for telescope control, this model gives control to the gyroscopes with the smallest probability for failure. The long-dashed curve uses a strategy based on current priorities: Gyroscope 6 is not used until we have to, and when a gyroscope is removed from the control loop we choose the one that was added most recently. These strategies extend the HST mission by 10 and 5 months, respectively. The error bars show the statistical uncertainty σ n on the predictions. The model is calibrated to reproduce the results of more detailed calculations by Aerospace Corporation performed 6 months ago. The calibrated model is then applied to the present day situation to yield the following updated predictions. If we continue to use three-gyroscope guiding for as long as we can, and do not start using Gyroscope 6 until we have to, then in late January 2006 the probability is 50% that this will become infeasible because of an insufficient number of functional gyroscopes. Assuming that the capability to guide using two gyroscopes is successfully implemented, the probability is 50% that this will extend the HST Mission to late May I have argued, and demonstrated quantitatively, that the HST Mission can be extended beyond these predicted dates if we switch to two-gyroscope guiding as soon as possible, rather than to wait until we only have two functional gyroscopes left. If we do this on January 1, 2005, about 1 year from now, then we could potentially extend the HST Mission

16 16 by 10 months, until early April 2008 (50% probability). In this case the net trade-off is between doing 13 months of observations with three gyroscopes or 23 months of observations with two gyroscopes. Two-gyroscope guiding does have disadvantages, so the scientific pros and cons of this choice will need to be weighed carefully, as discussed in Section 1. Either way, it is important that the development of the capability for doing two-gyroscope guiding be expedited as much as possible. For every six-month delay beyond January 1, 2005 in starting the use of two-gyroscope guiding, the mission lifetime decreases by 3 months. Only half of the 10 month gain in the optimum approach is due to the switch to two-gyroscope guiding on January 1, The other half is due to adopting the best order for using the available gyroscopes. Even if we stick with the approach of doing three-gyroscope guiding for as long as we can, adopting the best order for using the available gyroscopes is still important. While with that approach it will not significantly extend the HST mission, it may be able to extend the period during which three-gyroscope guiding is possible by 5 months, i.e., until late June The best order is always characterized by the fact that the gyroscopes with the lowest probability for failure are used first. The reason for this is that it minimizes the probability of being left with one gyroscope at the end of the mission that still has a lot of life in it. The optimum situation is to be left with one gyroscope at the end of the mission that is almost ready to fail. In my models the gyroscopes with the lowest probability for failure are the ones with the lowest past usage, namely Gyroscopes 1 and 6. This is an oversimplification because other factors are important as well. In particular, Gyroscopes 1 was constructed with an older mechanism for filling the gyroscope cavity with fluid, using oxygen-pressurized air. The corrosive properties of oxygen increase the failure probability for the flex leads in the gyroscope, as compared to the newer gyroscopes that were filled using nitrogen. Gyroscope 6 suffers from anomalous bias performance, which has not been seen in any other previous gyroscope. It is therefore unknown whether this anomaly increases the probability for gyroscope failure. So even though Gyroscopes 2 and 4 currently have the higher past usage, it is not a priori clear whether they have the highest present-day failure probability. If they don t, then some of the potential gains reported in this ISR will not be achievable. The solid and long-dashed curves in Figure 6 would then be the best that we can do. Even so, switching to two-gyroscope guiding on January 1, 2005 would still extend the HST mission by 5 months. Either way, the important point is that the failure probabilities of all four gyroscopes should be calculated or estimated as well as possible. The ones with the lowest failure probabilities should then be used for telescope control. The gyroscope complement put in use for guiding directly after SM3a was chosen because it gave the lowest telescope jitter. There is no reason that this combination would also give the longest HST Mission lifetime. In the present circumstances, the latter is likely to be the more important

17 17 consideration to base gyroscope usage on. The assumption at present is that the observatory cannot be used when only one functional gyroscope remains. However, it seems worthwhile to investigate whether some form of (crude) pointing and guiding may not be possible anyway. As shown by Figures 5 and 6, this would be expected to extend the mission well into Of course, all this assumes that failure of other hardware components does not terminate the mission before lack of gyroscopes does. This is an optimistic assumption, especially as far into the future as 2009 (see the HST Program Office Expected HST Lifetime Document, 2003). Based on the calculations presented here I recommend the following actions: (a) The gyroscope survival rates should be recalculated with more detailed models (e.g., by Aerospace Corporation) for the same approaches discussed here, to validate the results obtained with my simpler model; (b) With knowledge of the individual gyroscope failure probabilities, an effort should be made to use only the gyroscopes with the lowest failure probabilities to control the telescope; (c) The implementation and testing of the two-gyroscope guiding capability should be expedited as much as possible; (d) A scientific trade-off study should be undertaken to weigh the value of an extended HST mission against the disadvantages of having a longer period of guiding with only two gyroscopes; and (e) Even a remote possibility of some form of one-gyroscope guiding should be actively investigated, since it has the potential to extend the mission into 2009 or beyond. I am grateful to Merle Reinhart and Ron Gilliland for proofreading early drafts of this ISR, and for providing information and thoughts on the workings of the HST gyroscopes and the potential scientific trade-offs to be considered for switching to two-gyroscope guiding. References Beckwith, S. 2003, Hubble Science Without Servicing (presentation to the NASA/OSS Origins Subcommittee; October 23, 2003) [spacescience.nasa.gov/admin/divisions/sz/seus0310/beckwith Extension.pdf] HST Program Office (NASA/GSFC) 2003, Expected HST Science Lifetime after SM4 (presentation to the HST-JWST Transition Review Panel; July 21, 2003) [hst-jwst-transition.hq.nasa.gov/hst-jwst/hstexpectedlifetime.pdf] Myers, C. 2004, Two-Gyro Science (TGS) Mode Status (internal STScI Mission Status Review presentation; Jan 13, 2004) [ MSRs/2004/January/5 Two Gyro.pdf]

Hubble Space Telescope: NASA s Plans for a Servicing Mission

Hubble Space Telescope: NASA s Plans for a Servicing Mission Order Code RS21767 Updated May 23, 2008 Hubble Space Telescope: NASA s Plans for a Servicing Mission Summary Daniel Morgan Analyst in Science and Technology Policy Resources, Science, and Industry Division

More information

HST & Servicing Mission 4

HST & Servicing Mission 4 HST & Servicing Mission 4 This briefing will provide an overview of the present condition of the Hubble observatory and describe the upcoming servicing mission Ambitious mission with three major objectives

More information

The Effective Spectral Resolution of the WFC and HRC Grism

The Effective Spectral Resolution of the WFC and HRC Grism The Effective Spectral Resolution of the WFC and HRC Grism A. Pasquali, N. Pirzkal, J.R. Walsh, R.N. Hook, W. Freudling, R. Albrecht, R.A.E. Fosbury March 7, 2001 ABSTRACT We present SLIM simulations of

More information

NICMOS Status and Plans

NICMOS Status and Plans 1997 HST Calibration Workshop Space Telescope Science Institute, 1997 S. Casertano, et al., eds. NICMOS Status and Plans Rodger I. Thompson Steward Observatory, University of Arizona, Tucson, AZ 85721

More information

Improvement of Hubble Space Telescope subsystems through data mining

Improvement of Hubble Space Telescope subsystems through data mining Improvement of Hubble Space Telescope subsystems through data mining S. Skias, M. Darrah & M. Webb Institute for Scientific Research Inc., USA Abstract The Hubble Space Telescope continues to increase

More information

HST AND BEYOND EXPLORATION AND THE SEARCH FOR ORIGINS: A VISION FOR ULTRAVIOLET- OPTICAL-INFRARED SPACE ASTRONOMY

HST AND BEYOND EXPLORATION AND THE SEARCH FOR ORIGINS: A VISION FOR ULTRAVIOLET- OPTICAL-INFRARED SPACE ASTRONOMY Chapter Ten HST AND BEYOND EXPLORATION AND THE SEARCH FOR ORIGINS: A VISION FOR ULTRAVIOLET- OPTICAL-INFRARED SPACE ASTRONOMY Bibliographic Information: Dressler, Alan, ed., HST and Beyond Exploration

More information

Thank you for your interest in the Support Resistance Strength Analyzer!

Thank you for your interest in the Support Resistance Strength Analyzer! This user manual refer to FXCM s Trading Station version of the indicator Support Resistance Strength Analyzer Thank you for your interest in the Support Resistance Strength Analyzer! This unique indicator

More information

Dark Rate of the STIS NUV Detector

Dark Rate of the STIS NUV Detector SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Instrument Science Report STIS 2011-03 Dark Rate of the STIS NUV Detector Wei Zheng 1, Charles Proffitt 2, and David Sahnow 1 1 Department of

More information

Briefing to STUC. David Leckrone HST Senior Project Scientist October 19, 2007

Briefing to STUC. David Leckrone HST Senior Project Scientist October 19, 2007 Briefing to STUC David Leckrone HST Senior Project Scientist October 19, 2007 Topics SM4 Manifest and Priorities COS Gratings WFC3 Status SM4 Early Release Observations Establishing SM4 Content and Priorities

More information

Princeton Astrophysics Community Meeting

Princeton Astrophysics Community Meeting Princeton Astrophysics Community Meeting Michael Moore Program Executive Astrophysics Division Science Mission Directorate September 4, 2012 Timeline 2011 2012 10 January: Identification of hardware availability

More information

What do we do with the image?

What do we do with the image? Astro 150 Spring 2018: Lecture 7 page 1 Reading: Chapter 6, Sect. 6.4; Chapter 14 + assignment posted on Astro 150 website Homework: questions on special reading - answers due in lecture Thursday Exam

More information

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL PROBA 1 F. Teston ESA/ESTEC D/TEC-EL Frederic.Teston@esa.int PROBA 1 launch PROBA 1 has been launched on 21 October 2001 Orbital parameters: Altitude: 681-561 km Near polar (inclination of 97.9 ) Sun-synchronous

More information

Breathing, Position Drift, and PSF Variations on the UVIS Detector

Breathing, Position Drift, and PSF Variations on the UVIS Detector SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Instrument Science Report WFC3 1-1 Breathing, Position Drift, and PSF Variations on the UVIS Detector L. Dressel July 13, 1 ABSTRACT This study

More information

Predicting AGI: What can we say when we know so little?

Predicting AGI: What can we say when we know so little? Predicting AGI: What can we say when we know so little? Fallenstein, Benja Mennen, Alex December 2, 2013 (Working Paper) 1 Time to taxi Our situation now looks fairly similar to our situation 20 years

More information

Discovering Exoplanets Transiting Bright and Unusual Stars with K2

Discovering Exoplanets Transiting Bright and Unusual Stars with K2 Discovering Exoplanets Transiting Bright and Unusual Stars with K2 PhD Thesis Proposal, Department of Astronomy, Harvard University Andrew Vanderburg Advised by David Latham April 18, 2015 After four years

More information

TIPS-JIM Meeting 13 October 2005, 10am, Auditorium

TIPS-JIM Meeting 13 October 2005, 10am, Auditorium TIPS-JIM Meeting 13 October 2005, 10am, Auditorium 1. The Mid-Infrared Instrument (MIRI) Martyn Wells Medium Resolution Spectrometer for JWST 2. Temperature changes for ACS CCDs: Marco Sirianni Initial

More information

Future HST Observations of Europa and its Plumes: Findings and Recommendations

Future HST Observations of Europa and its Plumes: Findings and Recommendations Future HST Observations of Europa and its Plumes: Findings and Recommendations John T Clarke / Boston University Amanda Hendrix / Planetary Science Institute John Spencer / Southwest Research Institute

More information

Time Dependence of ACS WFC CTE Corrections for Photometry and Future Predictions

Time Dependence of ACS WFC CTE Corrections for Photometry and Future Predictions Time Dependence of ACS WFC CTE Corrections for Photometry and Future Predictions Adam Riess, Jennifer Mack May 5, 2004 ABSTRACT We present measurements of photometric losses due to imperfect parallel and

More information

The Stratospheric Observatory for Infrared Astronomy (SOFIA)

The Stratospheric Observatory for Infrared Astronomy (SOFIA) The Stratospheric Observatory for Infrared Astronomy (SOFIA) a and E. E. Becklin b a University of Minnesota b Universities Space Research Association This talk is at: http://www.sofia.usra.edu/science/speakers/index.html

More information

Asteroid Redirect Mission: Candidate Targets. Paul Chodas, NEO Program Office, JPL

Asteroid Redirect Mission: Candidate Targets. Paul Chodas, NEO Program Office, JPL Asteroid Redirect Mission: Candidate Targets Paul Chodas, NEO Program Office, JPL Small Bodies Assessment Group Meeting #12, January 7, 2015 NEA Discovery Rates Are Increasing Overall discovery rate of

More information

Evaluation of a temperaturebased

Evaluation of a temperaturebased Instrument Science Report TEL 2011-01 Evaluation of a temperaturebased HST Focus Model Colin Cox and Sami-Matias Niemi. March 22, 2011 ABSTRACT A study of the history of the HST focus measurements compared

More information

MIRI The Mid-InfraRed Instrument for JWST The James Webb Space Telescope

MIRI The Mid-InfraRed Instrument for JWST The James Webb Space Telescope MIRI The Mid-InfraRed Instrument for JWST The James Webb Space Telescope Prof. Gillian Wright, MBE Science and Technology Facilities Council UK-Astronomy Technology Centre JWST MIRI European PI Talk Overview

More information

Study of the evolution of the ACS/WFC sensitivity loss

Study of the evolution of the ACS/WFC sensitivity loss Instrument Science Report ACS 2013 01 Study of the evolution of the ACS/WFC sensitivity loss Leonardo Úbeda and Jay Anderson Space Telescope Science Institute January 28, 2013 ABSTRACT We present a study

More information

SMD in Brief -- Status and Program Highlights Presentation to Space Studies Board November 8, 2013

SMD in Brief -- Status and Program Highlights Presentation to Space Studies Board November 8, 2013 SMD in Brief -- Status and Program Highlights Presentation to Space Studies Board November 8, 2013 Science Mission Highlights 97 missions 122 spacecraft Lunar Atmosphere and Dust Environment Explorer Objective:

More information

Announcement of Opportunity AKARI (ASTRO-F)

Announcement of Opportunity AKARI (ASTRO-F) Announcement of Opportunity AKARI (ASTRO-F) CALL FOR OBSERVING PROPOSALS for the AKARI Post-Helium (phase 3) mission 2 nd year of Operations (October 2009 October 2010) Policies and procedures 27 May 2009

More information

Predicted Countrates for the UV WFC3 Calibration Subsystem using Deuterium Lamps

Predicted Countrates for the UV WFC3 Calibration Subsystem using Deuterium Lamps Predicted Countrates for the UV WFC3 Calibration Subsystem using Deuterium Lamps S.Baggett, J. Sullivan, and M. Quijada May 17,24 ABSTRACT Predicted WFC3 calibration subsystem countrates have been computed

More information

Opportunities with the James Webb Space Telescope

Opportunities with the James Webb Space Telescope Opportunities with the James Webb Space Telescope Nancy A. Levenson Space Telescope Science Institute image credit: J.Dore JWST NASA, ESA, and CSA 6.5m mirror cooled instruments cover nearthrough mid-infrared

More information

CHAPTER 10 Techniques for Background Measurement and Mosaicing

CHAPTER 10 Techniques for Background Measurement and Mosaicing CHAPTER 10 Techniques for Background Measurement and Mosaicing In This Chapter... Introduction / 139 Chopping and Dithering Strategies / 141 Chopping and Dithering Patterns / 143 Examples / 147 Orienting

More information

COS FUV Dispersion Solution Verification at the New Lifetime Position

COS FUV Dispersion Solution Verification at the New Lifetime Position SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Instrument Science Report COS 2013-06(v1) COS FUV Dispersion Solution Verification at the New Lifetime Position Paule Sonnentrucker 1, Julia

More information

Challenging Decisions from a Career in Aerospace. AIAA Huntsville Section Michael D. Griffin 8 August 2017

Challenging Decisions from a Career in Aerospace. AIAA Huntsville Section Michael D. Griffin 8 August 2017 Challenging Decisions from a Career in Aerospace AIAA Huntsville Section Michael D. Griffin 8 August 2017 Delta 183/Delta Star DoD/SDIO mission to capture phenomenology of rocket plumes on Soviet launch

More information

PACS Wavelength Switching AOT release note

PACS Wavelength Switching AOT release note PACS Wavelength Switching AOT release note 1 Prepared by the PACS ICC 20 January 2010 Wavelength switching release note version of 03-dec-2009 updated with full dynamic range saturation limits. Differences

More information

Extraction of Point Source Spectra from STIS Long Slit Data

Extraction of Point Source Spectra from STIS Long Slit Data 1997 HST Calibration Workshop Space Telescope Science Institute, 1997 S. Casertano, et al., eds. Extraction of Point Source Spectra from STIS Long Slit Data J. R. Walsh Spect Telescope European Coordinating

More information

ACS PSF variations with temperatures

ACS PSF variations with temperatures Instrument Science Report ACS 07-12 ACS PSF variations with temperatures Kailash C. Sahu, Matt Lallo, Russ Makidon September 18, 2007 ABSTRACT We have used the HST ACS/WFC observations of a Galactic bulge

More information

J. G. Miller (The MITRE Corporation), W. G. Schick (ITT Industries, Systems Division)

J. G. Miller (The MITRE Corporation), W. G. Schick (ITT Industries, Systems Division) Contributions of the GEODSS System to Catalog Maintenance J. G. Miller (The MITRE Corporation), W. G. Schick (ITT Industries, Systems Division) The Electronic Systems Center completed the Ground-based

More information

LESSONS LEARNED FROM THREE RECENT SAMPLE RETURN MISSIONS Mike Zolensky and Scott Sandford

LESSONS LEARNED FROM THREE RECENT SAMPLE RETURN MISSIONS Mike Zolensky and Scott Sandford LESSONS LEARNED FROM THREE RECENT SAMPLE RETURN MISSIONS Mike Zolensky and Scott Sandford LESSONS LEARNED FROM THREE RECENT SAMPLE RETURN MISSIONS Mike Zolensky and Scott Sandford Introduction We share

More information

GEMINI 8-M Telescopes Project

GEMINI 8-M Telescopes Project GEMINI 8-M Telescopes Project RPT-I-G0057 Principles Behind the Gemini Instrumentation Program M. Mountain, F. Gillett, D. Robertson, D. Simons GEMINI PROJECT OFFICE 950 N. Cherry Ave. Tucson, Arizona

More information

James Webb Space Telescope Cycle 1 Call for Proposals

James Webb Space Telescope Cycle 1 Call for Proposals James Webb Space Telescope Cycle 1 Call for Proposals Stefanie Milam JWST Deputy Project Scientist for Planetary John Stansberry Solar System Lead, STScI Bryan Holler Solar System Scientist, STScI Getting

More information

WFC3 IR Blobs, IR Sky Flats and the measured IR background levels

WFC3 IR Blobs, IR Sky Flats and the measured IR background levels The 2010 STScI Calibration Workshop Space Telescope Science Institute, 2010 Susana Deustua and Cristina Oliveira, eds. WFC3 IR Blobs, IR Sky Flats and the measured IR background levels N. Pirzkal 1 Space

More information

Science Policy. Neill Reid SMO. STUC: 20 October

Science Policy. Neill Reid SMO. STUC: 20 October Science Policy Neill Reid SMO 1 Outline Observing Venus with Hubble Large joint Hubble-Chandra proposals TAC demographics Summary 2 Venus & HST 3 Background Hubble is generally restricted from observing

More information

Scattered Light from the Earth Limb Measured with the STIS CCD

Scattered Light from the Earth Limb Measured with the STIS CCD Instrument Science Report STIS 98 21 Scattered Light from the Earth Limb Measured with the STIS CCD Dick Shaw, Merle Reinhart, and Jennifer Wilson 17 June 1998 ABSTRACT We describe a recent program to

More information

NCS. New Control System for the 30m Telescope. TBD. 2005

NCS. New Control System for the 30m Telescope. TBD. 2005 Title: NCS. New Control System for the 30m Telescope. TBD. 2005 Identifier - Master URL: http://www.iram.es/irames/documents/ncs30mtbdsummer2005 Revision: ncs30mtbdsummer2005, v1.5 Date: 2005-10-06 Expiration

More information

DOWNLOAD OR READ : SPACE TELESCOPES AND INSTRUMENTS V MARCH 1998 KONA HAWAII ILLUSTRATED EDITION PDF EBOOK EPUB MOBI

DOWNLOAD OR READ : SPACE TELESCOPES AND INSTRUMENTS V MARCH 1998 KONA HAWAII ILLUSTRATED EDITION PDF EBOOK EPUB MOBI DOWNLOAD OR READ : SPACE TELESCOPES AND INSTRUMENTS V 25 28 MARCH 1998 KONA HAWAII ILLUSTRATED EDITION PDF EBOOK EPUB MOBI Page 1 Page 2 space telescopes and instruments v 25 28 march 1998 kona hawaii

More information

Random Bit Generation

Random Bit Generation .. Random Bit Generation Theory and Practice Joshua E. Hill Department of Mathematics, University of California, Irvine Math 235B January 11, 2013 http://bit.ly/xwdbtv v. 1 / 47 Talk Outline 1 Introduction

More information

Newsletter of the INTEGRAL Science Operations Centre

Newsletter of the INTEGRAL Science Operations Centre Newsletter of the INTEGRAL Science Operations Centre No. 4 January 2002 Foreword Christoph Winkler - Project Scientist Status of spacecraft and payload Astrid Orr - Operations Scientist During the past

More information

The Making of the Hubble Ultra Deep Field

The Making of the Hubble Ultra Deep Field The Making of the Hubble Ultra Deep Field Hubble Science Briefing October 4, 2012 Massimo Stiavelli Space Telescope Science Institute Bold methods and new technology - What happens if you point the most

More information

SOLVING THE INTERNATIONAL SPACE STATION (ISS) MOTION CONTROL LONG-TERM PLANNING PROBLEM

SOLVING THE INTERNATIONAL SPACE STATION (ISS) MOTION CONTROL LONG-TERM PLANNING PROBLEM SOLVING THE INTERNATIONAL SPACE STATION (ISS) MOTION CONTROL LONG-TERM PLANNING PROBLEM V. N. Zhukov, Dr. E. K. Melnikov, A. I. Smirnov Mission Control Center, Central Research Institute of Machine Building,

More information

Anomaly Trends for Missions to Mars: Mars Global Surveyor and Mars Odyssey

Anomaly Trends for Missions to Mars: Mars Global Surveyor and Mars Odyssey Anomaly Trends for Missions to Mars: Mars Global Surveyor and Mars Odyssey Nelson W. Green and Alan R. Hoffman Jet Propulsion Laboratory, California Institute of Technology, Pasadena, California, 91109

More information

Cancellation of the Fifth (SM-4) Hubble Servicing Mission

Cancellation of the Fifth (SM-4) Hubble Servicing Mission Cancellation of the Fifth (SM-4) Hubble Servicing Mission Executive Summary The Hubble Space Telescope (HST) was originally launched aboard the Space Shuttle in 1990, with an as designed mission lifetime

More information

Space-Based Visible End of Life Experiments

Space-Based Visible End of Life Experiments Space-Based Visible End of Life Experiments Joseph Scott Stuart MIT Lincoln Laboratory Andrew J. Wiseman MIT Lincoln Laboratory Jayant Sharma MIT Lincoln Laboratory ABSTRACT The Space-Based Visible (SBV)

More information

Impacts of focus on aspects of STIS UV Spectroscopy

Impacts of focus on aspects of STIS UV Spectroscopy Instrument Science Report STIS 2018-06 Impacts of focus on aspects of STIS UV Spectroscopy Allyssa Riley 1, TalaWanda Monroe 1, & Sean Lockwood 1 1 Space Telescope Science Institute, Baltimore, MD November

More information

Cycle 20 COS Calibration Plan. Jerry Kriss & COS/STIS Team 9/13/2012

Cycle 20 COS Calibration Plan. Jerry Kriss & COS/STIS Team 9/13/2012 Cycle 20 COS Calibration Plan Jerry Kriss & COS/STIS Team 9/13/2012 COS Cycle 20 Usage Statistics Based on Phase II Submissions COS orbits comprise of 24.1% all prime exposure time (2832 GO orbits) in

More information

Relative Astrometry Within ACS Visits

Relative Astrometry Within ACS Visits Instrument Science Report ACS 2006-005 Relative Astrometry Within ACS Visits Richard L. White August 07, 2006 ABSTRACT The log files from APSIS, the ACS science team s image processing pipeline, have been

More information

Updates to the COS/NUV Dispersion Solution Zero-points

Updates to the COS/NUV Dispersion Solution Zero-points Instrument Science Report COS 017-0 Updates to the COS/NUV Dispersion Solution Zero-points Rachel Plesha 1, Paule Sonnentrucker 1,, Cristina Oliveira 1, Julia Roman-Duval 1 1 Space Telescope Science Institute,

More information

Spitzer Space Telescope Current Status and Future Plans

Spitzer Space Telescope Current Status and Future Plans Spitzer Space Telescope Current Status and Future Plans Great Observatories Workshop Pasadena, 22-24 May 2006 Current Status Instruments and Observatory are operating well Observing efficiency has continued

More information

WFC3 TV2 Testing: IR Channel Read Noise

WFC3 TV2 Testing: IR Channel Read Noise Instrument Science Report WFC3 2008-04 WFC3 TV2 Testing: IR Channel Read B. Hilbert 12 Feb 2008 ABSTRACT Using data taken during WFC3's Thermal Vacuum 2 (TV2) testing campaign, we have characterized the

More information

NICMOS Focus Field Variations (FFV) and Focus Centering

NICMOS Focus Field Variations (FFV) and Focus Centering Instrument Science Report NICMOS-98-005 NICMOS Focus Field Variations (FFV) and Focus Centering A.Suchkov & G.Galas March 16, 1998 ABSTRACT NICMOS foci are known to vary across detector s field of view.

More information

Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017

Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017 James Webb Space Telescope Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017 JWST Vital Stats General Observatory: 5 years required; 10 years goal Primary mirror:

More information

Improved Photometry for G750L

Improved Photometry for G750L SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Instrument Science Report STIS 2015-01(v1) Improved Photometry for G750L R.C. Bohlin 1, C.R. Proffitt 1 1 Space Telescope Science Institute,

More information

Outline HST HST. HST& JWST CARMA and ALMA SOFIA Chandra Blackbodies. Doppler Effect. Homework #5 was due today.

Outline HST HST. HST& JWST CARMA and ALMA SOFIA Chandra Blackbodies. Doppler Effect. Homework #5 was due today. Outline Homework #5 was due today. Next homework is #6 due next Friday at 11:50 am. There will be another make-up nighttime observing session in November. Stay tuned. I will be teaching Paul s class on

More information

Improving the Absolute Astrometry of HST Data with GSC-II

Improving the Absolute Astrometry of HST Data with GSC-II The 2005 HST Calibration Workshop Space Telescope Science Institute, 2005 A. M. Koekemoer, P. Goudfrooij, and L. L. Dressel, eds. Improving the Absolute Astrometry of HST Data with GSC-II A. M. Koekemoer,

More information

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites

Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites Predicting Long-Term Telemetry Behavior for Lunar Orbiting, Deep Space, Planetary and Earth Orbiting Satellites Item Type text; Proceedings Authors Losik, Len Publisher International Foundation for Telemetering

More information

CASE STUDY. Keeping the James Webb Space Telescope on Track

CASE STUDY. Keeping the James Webb Space Telescope on Track CASE STUDY Keeping the James Webb Space Telescope on Track In October 2018, NASA, the Canadian Space Agency (CSA), and the European Space Agency are set to launch the James Webb Space Telescope. Billed

More information

Sun Shield. Solar Paddle

Sun Shield. Solar Paddle The Institute of Space and Astronautical Science Report SP No.14, December 2000 Current Status of ASTRO-F By Hiroshi Murakami Λ (November 1, 2000) Abstract: The ASTRO-F is the second infrared astronomy

More information

Human Spaceflight Value Study Was the Shuttle a Good Deal?

Human Spaceflight Value Study Was the Shuttle a Good Deal? Human Spaceflight Value Study Was the Shuttle a Good Deal? Andy Prince Billy Carson MSFC Engineering Cost Office/CS50 20 October 2016 Purpose Examine the Space Shuttle Program Relative to its Goals and

More information

Russell B. Schweickart and Gary Mills

Russell B. Schweickart and Gary Mills ANALYSIS AND TEST VERIFICATION OF TRANSITIONAL FLOW IN A DEWAR VENT Russell B. Schweickart and Gary Mills Ball Aerospace & Technologies Corp. Boulder, CO 80301 USA ABSTRACT The pressure of the cryogen

More information

A First Look at Cosmic Rays on ACS

A First Look at Cosmic Rays on ACS A First Look at Cosmic Rays on ACS Adam Riess June 6, 2002 ABSTRACT We have made an initial study of the characteristics of cosmic ray impacts on the two ACS imaging cameras, HRC and WFC. The fraction

More information

Orbital Debris Mitigation

Orbital Debris Mitigation Orbital Debris Mitigation R. L. Kelley 1, D. R. Jarkey 2, G. Stansbery 3 1. Jacobs, NASA Johnson Space Center, Houston, TX 77058, USA 2. HX5 - Jacobs JETS Contract, NASA Johnson Space Center, Houston,

More information

Wavelength Calibration Accuracy for the STIS CCD and MAMA Modes

Wavelength Calibration Accuracy for the STIS CCD and MAMA Modes SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Instrument Science Report STIS 11-1(v1) Wavelength Calibration Accuracy for the STIS CCD and MAMA Modes Ilaria Pascucci 1, Phil Hodge 1, Charles

More information

Measuring Carbon Dioxide from the A-Train: The OCO-2 Mission

Measuring Carbon Dioxide from the A-Train: The OCO-2 Mission Measuring Carbon Dioxide from the A-Train: The OCO-2 Mission David Crisp, OCO-2 Science Team Leader for the OCO-2 Science Team Jet Propulsion Laboratory, California Institute of Technology March 2013 Copyright

More information

Procedure 4. The Use of Precision Statistics

Procedure 4. The Use of Precision Statistics Issue 3 9th March 04 Procedure 4 The Use of Precision Statistics. Scope.... Definitions... 3. CEC Precision Statistics... 3 4. Measurement of a Single Product... 4 5. Conformance with Specifications...

More information

Science with a Wide-Field Telescope in Space. NASA HQ Perspective. Richard Griffiths. Astrophysics Division Science Mission Directorate

Science with a Wide-Field Telescope in Space. NASA HQ Perspective. Richard Griffiths. Astrophysics Division Science Mission Directorate Science with a Wide-Field Telescope in Space NASA HQ Perspective Richard Griffiths Astrophysics Division Science Mission Directorate February 13, 2012 1 Mission Timeline Last updated: January 4, 2012 ORION

More information

Spitzer Space Telescope

Spitzer Space Telescope Spitzer Space Telescope (A.K.A. The Space Infrared Telescope Facility) The Infrared Imaging Chain 1/38 The infrared imaging chain Generally similar to the optical imaging chain... 1) Source (different

More information

Tibor Kremic, Glenn Research Center

Tibor Kremic, Glenn Research Center Balloon Based Planetary" Science Capability" Tibor Kremic, Glenn Research Center VEXAG Meeting #10 " Nov, 2012 Study Objectives 1) Confirm the science potential of a balloon based telescope deeper exploration

More information

Calibration Goals and Plans

Calibration Goals and Plans CHAPTER 13 Calibration Goals and Plans In This Chapter... Expected Calibration Accuracies / 195 Calibration Plans / 197 This chapter describes the expected accuracies which should be reached in the calibration

More information

November 3, 2014 Eric P. Smith JWST Program Office

November 3, 2014 Eric P. Smith JWST Program Office November 3, 014 Eric P. Smith JWST Program Office 1 SINCE LAST CAA MEETING... Completed of 3 recommended GAO schedule risk analyses for this year. Mutually agreed to drop 3 rd. Will perform cost-risk study

More information

Cross-Talk in the ACS WFC Detectors. I: Description of the Effect

Cross-Talk in the ACS WFC Detectors. I: Description of the Effect Cross-Talk in the ACS WFC Detectors. I: Description of the Effect Mauro Giavalisco August 10, 2004 ABSTRACT Images acquired with the Wide Field Channel (WFC) of the Advanced Camera for Surveys (ACS) are

More information

STScI at the AAS 231: January 2018, Washington, D.C.

STScI at the AAS 231: January 2018, Washington, D.C. STScI at the AAS 231: January 2018, Washington, D.C. The Space Telescope Science Institute (STScI) will be at the 231st AAS meeting in Washington, D.C. with an exhibit booth and several associated events

More information

Goals of the meeting. Catch up with JWST news and developments: ERS and GO call for proposals are coming!!

Goals of the meeting. Catch up with JWST news and developments: ERS and GO call for proposals are coming!! Welcome Goals of the meeting Catch up with JWST news and developments: ERS and GO call for proposals are coming!! What is JWST capable of (focus on H 2 spectroscopy)? What do we need to do (models, lab)

More information

Traffic Modelling for Moving-Block Train Control System

Traffic Modelling for Moving-Block Train Control System Commun. Theor. Phys. (Beijing, China) 47 (2007) pp. 601 606 c International Academic Publishers Vol. 47, No. 4, April 15, 2007 Traffic Modelling for Moving-Block Train Control System TANG Tao and LI Ke-Ping

More information

SPITZER SPACE TELESCOPE

SPITZER SPACE TELESCOPE SPITZER SPACE TELESCOPE The Rationale for Infrared Astronomy reveal cool states of matter explore the hidden Universe provide access to many spectral features probe the early life of the cosmos WANT TO

More information

TECHNICAL REPORT. Doc #: Date: Rev: JWST-STScI , SM-12 August 31, Authors: Karl Gordon, Ralph Bohlin. Phone:

TECHNICAL REPORT. Doc #: Date: Rev: JWST-STScI , SM-12 August 31, Authors: Karl Gordon, Ralph Bohlin. Phone: When there is a discrepancy between the information in this technical report and information in JDox, assume JDox is correct. TECHNICAL REPORT Title: Title: JWST Absolute Flux Calibration II: Expanded

More information

Lecture 16: Announcements

Lecture 16: Announcements Lecture 16: Announcements Homework 2 due Mon Feb 28 Exam on Wed Mar 9 : Makes up 20% of total grade. See webpage for a description of the exam format http://www.as.utexas.edu/~sj/a301-sp05.html On Mon

More information

ASTRONOMY Merit Badge Requirements

ASTRONOMY Merit Badge Requirements ASTRONOMY Merit Badge Requirements 1) Do the following: A) Sketch the face of the moon, indicating on it the locations of at least five seas and five craters. B) Within a single week, sketch the position

More information

IRS-TR 05001: Detector Substrate Voltage and Focal Plane Temperature of the LH module

IRS-TR 05001: Detector Substrate Voltage and Focal Plane Temperature of the LH module Infrared Spectrograph Technical Report Series IRS-TR 05001: Detector Substrate Voltage and Focal Plane Temperature of the LH module Daniel Devost (1), Jeff van Cleve (2), G. C. Sloan (1), Lee Armus (3),

More information

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018 Operations Report Tag B. Short, Director South Region Operations Entergy Regional State Committee (ERSC) February 14, 2018 1 Winter Operations Highlights South Region Max Gen Event Regional Dispatch Transfer

More information

Astro 358/Spring 2006 (48915) Galaxies and the Universe

Astro 358/Spring 2006 (48915) Galaxies and the Universe Astro 358/Spring 2006 (48915) Galaxies and the Universe Instructor: Professor Shardha Jogee TA: Ben Holder Figures for Lecture 20+21 : Tu Apr 04 + Th Apr 6 Lecture 20 - Collecting area and angular resolution

More information

Reinforcement Learning and Control

Reinforcement Learning and Control CS9 Lecture notes Andrew Ng Part XIII Reinforcement Learning and Control We now begin our study of reinforcement learning and adaptive control. In supervised learning, we saw algorithms that tried to make

More information

By choosing to view this document, you agree to all provisions of the copyright laws protecting it.

By choosing to view this document, you agree to all provisions of the copyright laws protecting it. Copyright 2017 IEEE. Reprinted, with permission, from Sharon L. Honecker and Umur Yenal, Quantifying the Effect of a Potential Corrective Action on Product Life, 2017 Reliability and Maintainability Symposium,

More information

Astronomy Merit Badge Workbook

Astronomy Merit Badge Workbook Merit Badge Workbook This workbook can help you but you still need to read the merit badge pamphlet. This Workbook can help you organize your thoughts as you prepare to meet with your merit badge counselor.

More information

WFPC2 Dark Current vs. Time

WFPC2 Dark Current vs. Time WFPC2 Dark Current vs. Time J. Mack, J. Biretta, S. Baggett, C. Proffitt June 7, 2001 ABSTRACT On-going measurements of the dark current in the WFPC2 detectors indicate that the average level of dark current

More information

Overview. Hubble Pluto Satellite Search Team reporting the discovery to the New Horizons Science Team on November 2, 2005 at the Kennedy Space Center

Overview. Hubble Pluto Satellite Search Team reporting the discovery to the New Horizons Science Team on November 2, 2005 at the Kennedy Space Center The discovery of two new satellites of Pluto Overview Max Mutchler Space Telescope Science Institute mutchler@stsci.edu New Horizons Educator Workshop 16 January 2006 Hubble s Advanced Camera; Discovery

More information

Observer Anomaly(?): Recent Jitter and PSF Variations

Observer Anomaly(?): Recent Jitter and PSF Variations Instrument Science Report TEL 2005-01 Observer Anomaly(?): Recent Jitter and PSF Variations R. L. Gilliland gillil@stsci.edu February 2005 Abstract An anomaly in the HST Pointing Control System (PCS) has

More information

Defining Normal Weather for Energy and Peak Normalization

Defining Normal Weather for Energy and Peak Normalization Itron White Paper Energy Forecasting Defining Normal Weather for Energy and Peak Normalization J. Stuart McMenamin, Ph.D Managing Director, Itron Forecasting 2008, Itron Inc. All rights reserved. 1 Introduction

More information

Failure rate in the continuous sense. Figure. Exponential failure density functions [f(t)] 1

Failure rate in the continuous sense. Figure. Exponential failure density functions [f(t)] 1 Failure rate (Updated and Adapted from Notes by Dr. A.K. Nema) Part 1: Failure rate is the frequency with which an engineered system or component fails, expressed for example in failures per hour. It is

More information

Session-Based Queueing Systems

Session-Based Queueing Systems Session-Based Queueing Systems Modelling, Simulation, and Approximation Jeroen Horters Supervisor VU: Sandjai Bhulai Executive Summary Companies often offer services that require multiple steps on the

More information

Tracking Accuracy: An Essential Step to Improve Your Forecasting Process

Tracking Accuracy: An Essential Step to Improve Your Forecasting Process Tracking Accuracy: An Essential Step to Improve Your Forecasting Process Presented by Eric Stellwagen President & Co-founder Business Forecast Systems, Inc. estellwagen@forecastpro.com Business Forecast

More information

Time and Frequency Activities at the JHU Applied Physics Laboratory

Time and Frequency Activities at the JHU Applied Physics Laboratory Time and Frequency Activities at the JHU Applied Physics Laboratory Mihran Miranian, Gregory L. Weaver, Jeffrey F. Garstecki, and Richard A. Dragonette Johns Hopkins University Applied Physics Laboratory,

More information

Introduction to Engineering Reliability

Introduction to Engineering Reliability Introduction to Engineering Reliability Robert C. Patev North Atlantic Division Regional Technical Specialist (978) 318-8394 Topics Reliability Basic Principles of Reliability Analysis Non-Probabilistic

More information

FPA#64 and new substrate removed FPAs for WFC3-IR: a trade-off study

FPA#64 and new substrate removed FPAs for WFC3-IR: a trade-off study Instrument Science Report WFC3 2005-019 ` and new substrate removed FPAs for WFC3-IR: a trade-off study Massimo Robberto (ESA/STSI) Abstract Recent tests indicate that the flight detectors selected for

More information

Early Results from the NASA Orbiting Carbon Observatory-2 (OCO-2)

Early Results from the NASA Orbiting Carbon Observatory-2 (OCO-2) Early Results from the NASA Orbiting Carbon Observatory-2 (OCO-2) David Crisp, OCO-2 Science Team Leader for the OCO-2 Science Team California Institute of Technology, Jet Propulsion Laboratory 08 June

More information