Fiducials for BM1 Std. Vac. Chamber

Size: px
Start display at page:

Download "Fiducials for BM1 Std. Vac. Chamber"

Transcription

1 Fiducials for BM1 Std. Vac. Chamber Date: Chamber: Operator(s): 4\18\02 F. Gaudreault L. Griffin Notes: Z on Exit port not measured. Single support on final check measurements. IN in cm Y (UP) e- X Z Z º º TB0 OUT TB9 Fiducial Coordinates for BM1 Standard Vacuum Chamber: (inches) Fiducial Z X Y Nominal Deltas For H Absorber () Z X Y TB9 (V4) TB0 (V4) inches inches inches Source V4 Step Fid. vals based on internal chamber datum. Source="V4 Step" indicates final data. Page 1 of 10

2 Fiducialization Step: (Traveler Step # 1380) Slot Calibration Ideal Meas Delta SLOT SURFACE ABOUT y=0 (inches) Ave. Min. Max. Line A Line B Line C Z POSITION (Inches) Step 1: Fiducial Coordinates for BM1 Std. Vac. Chamber Fiducial Z X Y inches inches inches Fiducial values based on internal chamber datum. Page 2 of 10

3 End Surface Attitudes for BM1 Std. Vac. Chamber Upstream Face yaw pitch Measured Nominal Difference mrad mrad US Face Upstream Checks Downstream Port yaw pitch Measured Nominal Downstream Checks Difference Downstream Support yaw pitch Difference Measured Nominal DS Port DS Support DS Flange Downstream Flange yaw pitch Measured Nominal Difference mrad mrad Orientation of the upstream and downstream surfaces compared to nominal values. Tol +/- 3 mrads Datum Verification DS Support DS Flange x x Measured Measured Nominal Nominal Diff Diff inches inches The x-distance from the center-line to the projection of the measured DS inside curve point on either of the DS surfaces. Tolerance values +/ in. Page 3 of 10

4 BM1 Chamber Lengths Status Length Nominal Length Tangent Line: inches without SMR OK Length Nominal Length Orbit Line: inches without SMR OK Both lengths are to the faces of the weld flanges. Length tolerance +/ in. Tangent Line in ( cm) IN Y(UP) X Z Z OUT Orbit Line in ( cm) Page 4 of 10

5 V4 Step A: V4 Step A: Survey and Check of BM1 Standard Vacuum Chamber Fiducials Before Attaching V4 and the Exit Port: Step A-1: Remeasurement of Fiducial Coordinates for BM1 Std. Vac. Chamber Fiducial Z X Y del Z del X del Y inches inches inches Compared to Step 1 Fiducial Coords. DS Port Level Check Level Status: OK OK? Yes (YES or NO) US Flange Roll Check Roll Status: UPDATE OK? No (YES or NO) Fid. vals based on internal chamber datum. IN Y(UP) XX Z DS Port OUT TB0 e- TB9 Page 5 of 10

6 V4 Step A: Check of US Flange Prior to V4 Installation Step A-2: Pre-Installation Check of UpStream Flange Postion US PIN US Inner Chamber US Bottom Inner Chamber Line US PIN Z X Y Measured Nominal Difference (inches) US Inner Chamber Z X Y Measured Nominal Difference (inches) US Bottom Inner Chamber Line ROLL (FINAL) Measured Nominal Roll Status Difference (mrads) OK Measured vs. nominal values for US flange expressed in the PART coordinate system. Fiducial values are updated (using those from Step A-1) if ROLL delta is not within1mrad. Page 6 of 10

7 V4 Fiducialization Step: V4 Fiducialization Step: Survey of Fiducial Coordinates for BM1 Standard Vacuum Chamber with V4 and the Exit Port Attached: Step Fid-1: Position of Added Tooling Balls TB9 and TB0 Fiducial Z X Y TB9 (V4) TB0 (V4) inches inches inches Fid. vals after V4 and exit port attached. IN Y (UP) e- X Z OUT Exit Port TB0 TB9 V4 Page 7 of 10

8 V4 Fiducialization Step: V4 Flange Step Fid-2: Set Position of V4 Flange Position V4 Top PIN V4 Inner Chamber V4 Bottom PIN V4 Top PIN Z X Y Measured Nominal Difference (inches) V4 Bottom PIN Z X Y Measured Nominal Difference (inches) V4 Inner Chamber Z X Y Measured Nominal Difference (inches) V4 Downstream Z Value Z Measured Nominal Difference (inches) Measured vs. nominal values for V4 flange expressed in the V4 coordinate system. Tol +/- 10mils except for the V4 Z-value. Values in BOLD or RED are most critical. Page 8 of 10

9 V4 Fiducialization Step: Exit Port Step Fid-3: Post-Installation Check of Exit Port Flange Position Metrology Dept: Measurements taken with single support on downstream end. Exit Port PIN US Inner Chamber Exit Port Inner Chamber Bottom Exit Port PIN Z X Y Measured Nominal Difference (inches) Exit Port Inner Chamber Side Z X Y Measured Nominal Difference (inches) Exit Port Inner Chamber Bottom Z X Y Measured Nominal Difference (inches) Exit Port DS Z Value (PART Frame) Z Measured Nominal Difference (inches) Metrology Dept: Did not measure flange face. Measured vs. nominal values for Exit Port flange expressed in the EXIT PORT coordinate system. Tol +/- 10mils except for the V4 Z-value. Values in BOLD or RED are most critical. Page 9 of 10

10 V4 Final Step: Re-Survey of all Ten Fiducials Fiducial Z X Y del Z del X del Y TB9 (V4) TB0 (V4) inches inches inches Final survey of BM1 standard vacuum chamber. (With V4 and exit port attached.) Note that all comparisons are relative to the most current fiducial values. (I.e. deltas are computed using values from Steps A-1 and Fid-1) IN Y (UP) X e- ZZ OUT Exit Port TB0 TB9 V4 Page 10 of 10

Fiducials for BM1 Std. Vac. Chamber

Fiducials for BM1 Std. Vac. Chamber Fiducials for BM1 Std. Vac. Chamber Date: Chamber: Operator(s): 4/30/02 C. Banuelos M. Gaydosh Notes: IN 49.002 in 124.465 cm Y (UP) e- X Z Z 2.2500º 10.5882º TB0 OUT TB9 Fiducial Coordinates for BM1 Standard

More information

SPEAR3 Alignment Chapter For Nuclear Instrumentation and Methods in Physics Research, Section A June 25, 2004

SPEAR3 Alignment Chapter For Nuclear Instrumentation and Methods in Physics Research, Section A June 25, 2004 SPEAR3 Alignment Chapter For Nuclear Instrumentation and Methods in Physics Research, Section A June 25, 2004 Catherine Le Cocq, Brian Fuss Stanford Linear Accelerator Center, Stanford, CA, USA 1. INTRODUCTION

More information

Lattice Cell/Girder Assembly

Lattice Cell/Girder Assembly SPEAR3 Magnets Jack Tanabe, Nanyang Li, Ann Trautwein, Domenico Dell Orco, Dave Ernst, Zach Wolf (SLAC Magnet Measurements), Catherine L Coq (SLAC Alignment), Jeff Corbett, Bob Hettel (SPEAR3 Physics)

More information

BEPCII Pre-alignment and Hold Level Adjustment. Accelerator Center of IHEP Xiaolong Wang

BEPCII Pre-alignment and Hold Level Adjustment. Accelerator Center of IHEP Xiaolong Wang BEPCII Pre-alignment and Hold Level Adjustment Accelerator Center of IHEP Xiaolong Wang 2008.2.3 Contents Introduction of BEPCII pre-alignment Fiducialization of magnets Hold Level Adjustment Introduction

More information

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets Babatunde O Sheg Oshinowo, Ph.D, ARICS Survey, Alignment and Geodesy Fermi National Accelerator Laboratory Batavia, IL 60510

More information

VISA Undulator Fiducialization and Alignment

VISA Undulator Fiducialization and Alignment SLAC-PUB-8270 December 1999 VISA Undulator Fiducialization and Alignment R. Ruland et al. Presented at VI International Workshop on Accelerator Alignment at ESRF Laboratory, 10/18/1999 10/22/99, Grenoble,

More information

First Alignment Geometry of LHCb (Survey and First Data)

First Alignment Geometry of LHCb (Survey and First Data) First Alignment Geometry of LHCb (Survey and First Data) Steven Blusk Syracuse University On behalf of the LHCb Collaboration LHC Detector Alignment Workshop, June 25-26, 2007 LHCb Detector/Tracking LHCb

More information

Vacuum Chambers. Type DK /DK /DK

Vacuum Chambers. Type DK /DK /DK Vacuum Chambers Type DK 020.010/DK 070.010/DK 050.010 Tel: (609) 924-3011 Fax (609) 924-3018 www.princetonscientific.com Email: info@princetonscientific.com Vacuum Chambers Application: Vacuum chambers

More information

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU IWAA2004, CERN, Geneva, 4-7 October 2004 A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU D. P. Sanderson, NSCL-MSU, 1 Cyclotron Lab, East Lansing, MI 48824, USA 1. INTRODUCTION The Rare Isotope Accelerator

More information

X-LRT-EC Series: High-load, closed-loop stages with built-in stepper motors, motor encoders, controllers, and dust covers

X-LRT-EC Series: High-load, closed-loop stages with built-in stepper motors, motor encoders, controllers, and dust covers X-LRT-EC Series: High-load, closed-loop stages with built-in stepper motors, motor encoders, controllers, and dust covers 100, 250, 500, 750, 1000, 1500 mm travel 500 kg load capacity High cantilever stiffness

More information

Survey and Alignment of the Fermilab Electron Cooling System

Survey and Alignment of the Fermilab Electron Cooling System Survey and Alignment of the Fermilab Electron Cooling System Babatunde O Sheg Oshinowo Jerry Leibfritz Fermi National Accelerator Laboratory Batavia, IL 60510 The goal of achieving the Tevatron luminosity

More information

r/lt.i Ml s." ifcr ' W ATI II. The fnncrnl.icniccs of Mr*. John We mil uppn our tcpiiblicnn rcprc Died.

r/lt.i Ml s. ifcr ' W ATI II. The fnncrnl.icniccs of Mr*. John We mil uppn our tcpiiblicnn rcprc Died. $ / / - (\ \ - ) # -/ ( - ( [ & - - - - \ - - ( - - - - & - ( ( / - ( \) Q & - - { Q ( - & - ( & q \ ( - ) Q - - # & - - - & - - - $ - 6 - & # - - - & -- - - - & 9 & q - / \ / - - - -)- - ( - - 9 - - -

More information

PREX Simulation Update

PREX Simulation Update PREX Simulation Update Rakitha Beminiwattha Syracuse University rakithab@jlab.org 1 Outline PREX-II Collimator Plastic Shielding for Neutrons PREX-II Background Radiation Effects of Septum Magnet Fringe

More information

Measurements and Calibration of the stripline BPM for the ELI-NP facility with the stretched wire method

Measurements and Calibration of the stripline BPM for the ELI-NP facility with the stretched wire method ACDIV-2015-13 September, 2015 Measurements and Calibration of the stripline BPM for the ELI-NP facility with the stretched wire method A. A. Nosych, U. Iriso, A. Olmos, A. Crisol, C. Colldelram, ALBA-CELLS,

More information

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error User Workshop ESRIN 2005 Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4 error Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4

More information

THE SPEAR3 UPGRADE PROJECT AT SLAC *

THE SPEAR3 UPGRADE PROJECT AT SLAC * IWAA2004, CERN, Geneva, 4-7 October 2004 THE SPEAR3 UPGRADE PROJECT AT SLAC * Catherine Le Cocq, Brian Fuss, Michael Gaydosh Stanford Linear Accelerator Center, Stanford, CA, USA 1. INTRODUCTION The Stanford

More information

X-LSM-SV1 Series: Low vacuum miniature motorized linear stages with built-in controllers

X-LSM-SV1 Series: Low vacuum miniature motorized linear stages with built-in controllers X-LSM-SV1 Series: Low vacuum miniature motorized linear stages with built-in controllers Vacuum compatible to 10-3 Torr 25, 50, 100, 150, 200 mm travel 10 kg load capacity Up to 100 mm/s speed and up to

More information

ACCREDITED LABORATORY. INSPECTION MEASUREMENT COMPANY Wyoming, MI

ACCREDITED LABORATORY. INSPECTION MEASUREMENT COMPANY Wyoming, MI THE AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATION ACCREDITED LABORATORY A2LA has accredited INSPECTION MEASUREMENT COMPANY Wyoming, MI for technical competence in the field of Calibration The accreditation

More information

REVIEW OF ALIGNMENT ACTIVITIES AT JEFFERSON LAB

REVIEW OF ALIGNMENT ACTIVITIES AT JEFFERSON LAB REVIEW OF ALIGNMENT ACTIVITIES AT JEFFERSON LAB C. J. Curtis Thomas Jefferson National Accelerator Facility, Virginia, U.S.A. 1. INTRODUCTION The Thomas Jefferson National Accelerator Facility (Jefferson

More information

' Liberty and Umou Ono and Inseparablo "

' Liberty and Umou Ono and Inseparablo 3 5? #< q 8 2 / / ) 9 ) 2 ) > < _ / ] > ) 2 ) ) 5 > x > [ < > < ) > _ ] ]? <

More information

Addis Ababa University Addis Ababa Institute of Technology School Of Mechanical and Industrial Engineering Extension Division` Assignment 1

Addis Ababa University Addis Ababa Institute of Technology School Of Mechanical and Industrial Engineering Extension Division` Assignment 1 Assignment 1 1. Vehicle B is stopped at a traffic light, as shown in the figure. At the instant that the light turns green, vehicle B starts to accelerate at 0.9144m/s 2. At this time vehicle A is 91.44m

More information

Air Force Research Laboratory

Air Force Research Laboratory Air Force Research Laboratory Lidar Wind Sensing for Improved Precision Airdrop and Gunship Wind Sensing 27 Jun 2016 Integrity Service Excellence Wesley Jones InfoSciTex AFRL RQQD 1 AFRL PAD FCC and MS&A

More information

V-Cone Flowmeter DATASHEET

V-Cone Flowmeter DATASHEET V-Cone Flowmeter ATASHEET JUNHO 013 IntraCone Cone Flow Meter Type: ICM etail: Cone-Element Technical Information 05/011 FLOW THE SPECIALIST IN LEVEL AN FLOW Cone Flow Meter Technical Information Intra-Automation

More information

Experimental Facilities Division, Advanced Photon Source, Argonne National Laboratoty, Argonne, Illinois 60439

Experimental Facilities Division, Advanced Photon Source, Argonne National Laboratoty, Argonne, Illinois 60439 I/ Alignment and commissioning of the APS beamline front ends D Shu, J Barraza, M Ramanathan, J Chang, and TM Kuzay e =JC"FIVE Experimental Facilities Division, Advanced Photon Source, Argonne National

More information

X-LSM-E Series: Miniature motorized linear stages with built-in motor encoder and controllers

X-LSM-E Series: Miniature motorized linear stages with built-in motor encoder and controllers X-LSM-E Series: Miniature motorized linear stages with built-in motor encoder and controllers 25, 50, 100, 150, 200 mm travel 10 kg load capacity Up to 104 mm/s speed and up to 55 N thrust Built-in controller;

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. GREENSLADE & CO., INC Wenneca Avenue Fort Worth, TX Larry Borowski Phone:

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. GREENSLADE & CO., INC Wenneca Avenue Fort Worth, TX Larry Borowski Phone: SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 GREENSLADE & CO., INC. 2234 Wenneca Avenue Fort Worth, TX 76102 Larry Borowski Phone: 800 435 2657 CALIBRATION Valid To: October 31, 2018 Certificate Number:

More information

PanHomc'r I'rui;* :".>r '.a'' W"»' I'fltolt. 'j'l :. r... Jnfii<on. Kslaiaaac. <.T i.. %.. 1 >

PanHomc'r I'rui;* :.>r '.a'' W»' I'fltolt. 'j'l :. r... Jnfii<on. Kslaiaaac. <.T i.. %.. 1 > 5 28 (x / &» )»(»»» Q ( 3 Q» (» ( (3 5» ( q 2 5 q 2 5 5 8) 5 2 2 ) ~ ( / x {» /»»»»» (»»» ( 3 ) / & Q ) X ] Q & X X X x» 8 ( &» 2 & % X ) 8 x & X ( #»»q 3 ( ) & X 3 / Q X»»» %» ( z 22 (»» 2» }» / & 2 X

More information

MANY BILLS OF CONCERN TO PUBLIC

MANY BILLS OF CONCERN TO PUBLIC - 6 8 9-6 8 9 6 9 XXX 4 > -? - 8 9 x 4 z ) - -! x - x - - X - - - - - x 00 - - - - - x z - - - x x - x - - - - - ) x - - - - - - 0 > - 000-90 - - 4 0 x 00 - -? z 8 & x - - 8? > 9 - - - - 64 49 9 x - -

More information

FLUVIA NAUTIC DATASET (16 March 2007) Description of the sensor logs

FLUVIA NAUTIC DATASET (16 March 2007) Description of the sensor logs FLUVIA NAUTIC DATASET (16 March 2007) Description of the sensor logs David Ribas, PhD Student. Underwater Robotics Lab, Computer Vision and Robotics Group, University of Girona Doppler Velocity Log (Argonaut

More information

CLIPPER SCREEN SIZES - DECEMBER 28, 2005

CLIPPER SCREEN SIZES - DECEMBER 28, 2005 PERFORATED METAL ROUND HOLE FRACTIONS HOLE SIZE HOLE SIZE IN HOLE SIZE TOLERANCE STANDARD OR ( INCH ) IN 64TH THOUSANDS IN MM THOUSAND ADD ON PRICE 1/25 2.56.040 1.01 + 0 -.003 STANDARD 1/24 2.67.041 1.05

More information

Hilti North America Installation Technical Manual Technical Data MI System Version

Hilti North America Installation Technical Manual Technical Data MI System Version MIC-S10-AH-L 179517-1 Hilti North America Installation Technical Manual Technical Data MI System Version 1. 08.017 Terms of common cooperation / Legal disclaimer The product technical data published in

More information

PLUME MODELING AND APPLICATION TO MARS 2001 ODYSSEY AEROBRAKING

PLUME MODELING AND APPLICATION TO MARS 2001 ODYSSEY AEROBRAKING PLUME MODELING AND APPLICATION TO MARS ODYSSEY AEROBRAKING Zachary Q. Chavis Joint Institute for Advancement of Flight Sciences The George Washington University NASA Langley Research Center Hampton, VA

More information

Lecture Module 5: Introduction to Attitude Stabilization and Control

Lecture Module 5: Introduction to Attitude Stabilization and Control 1 Lecture Module 5: Introduction to Attitude Stabilization and Control Lectures 1-3 Stability is referred to as a system s behaviour to external/internal disturbances (small) in/from equilibrium states.

More information

LCLS Undulators Present Status and Future Upgrades

LCLS Undulators Present Status and Future Upgrades LCLS Undulators Present Status and Future Upgrades Heinz-Dieter Nuhn LCLS Undulator Group Leader 1 1 Heinz-Dieter Nuhn Linac Coherent Light Source INJECTOR LINAC BEAM TRANSPORT UNDULATOR HALL 2 2 Heinz-Dieter

More information

Magnetic Measurements

Magnetic Measurements Magnetic Measurements Neil Marks, DLS/CCLRC, Daresbury Laboratory, Warrington WA4 4AD, U.K. Tel: (44) (0)1925 603191 Fax: (44) (0)1925 603192 Philosophy To cover the possible methods of measuring flux

More information

TECHNIQUES USED IN THE ALIGNMENT OF TJNAF S ACCELERATORS AND EXPERIMENTAL HALLS*

TECHNIQUES USED IN THE ALIGNMENT OF TJNAF S ACCELERATORS AND EXPERIMENTAL HALLS* TECHNIQUES USED IN THE ALIGNMENT OF TJNAF S ACCELERATORS AND EXPERIMENTAL HALLS* C. J. Curtis, J. C. Dahlberg, W. A. Oren, K. J. Tremblay Thomas Jefferson National Accelerator Facility, Virginia, U.S.A.

More information

X-LRQ-SV2 Series: High vacuum motorized linear stages with built-in controllers

X-LRQ-SV2 Series: High vacuum motorized linear stages with built-in controllers X-LRQ-SV2 Series: High vacuum motorized linear stages with built-in controllers Vacuum compatible to 10-6 torr 75, 150, 300, 450, 600 mm travel 100 kg load capacity Up to 205 mm/s speed and up to 100 N

More information

Improving Yield for High Pin Count Wafer Probing Applications

Improving Yield for High Pin Count Wafer Probing Applications John R. Goulding Martin Elzingre Larry Hendler Technical Marketing Manager 200mm Product Manager Consultant Electroglas, Inc. Electroglas, Inc. Electroglas, Inc. South West Test Workshop June 11-14 th

More information

CONNECTION DESIGN. Connections must be designed at the strength limit state

CONNECTION DESIGN. Connections must be designed at the strength limit state CONNECTION DESIGN Connections must be designed at the strength limit state Average of the factored force effect at the connection and the force effect in the member at the same point At least 75% of the

More information

LCLS Gun Solenoid Design Considerations * John Schmerge

LCLS Gun Solenoid Design Considerations * John Schmerge LCLS-TN-05-14 June 2005 LCLS Gun Solenoid Design Considerations * John Schmerge Abstract The LCLS photocathode rf gun requires a solenoid immediately downstream for proper emittance compensation. Such

More information

MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER

MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER Centre for Basic, Thermal and Length Metrology National Physical Laboratory MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER A Watts Precision Clinometer fitted with a circular glass scale

More information

DS 300. Electronic Pressure Switch. with IO-Link interface. Stainless Steel Sensor. accuracy according to IEC 60770: 0.35 % FSO.

DS 300. Electronic Pressure Switch. with IO-Link interface. Stainless Steel Sensor. accuracy according to IEC 60770: 0.35 % FSO. DS 00 Electronic Pressure Switch with IO-Link interface Stainless Steel Sensor accuracy according to IEC 60770: 0.5 % FSO Nominal pressure from 0... 00 mbar up to 0... 600 bar Digital output signal IO-Link

More information

Upgrade of 5m-Bench System for Traceable Measurements of Tapes and Rules at SASO-NMCC Dimensional Laboratory

Upgrade of 5m-Bench System for Traceable Measurements of Tapes and Rules at SASO-NMCC Dimensional Laboratory Upgrade of 5m-Bench System for Traceable Measurements of Tapes and Rules at SASO-NMCC Dimensional Laboratory Bülent ÖZGÜR 1,*, Okhan GANİOĞLU 1, Nasser Al-Qahtani 2, Faisal Al-Qahtani 2 1 TÜBİTAK, National

More information

Product Quality README file for GOME Level 1b version 5.1 dataset

Product Quality README file for GOME Level 1b version 5.1 dataset Product Quality README file for GOME Level 1b version 5.1 dataset Field Content Document Title Product Quality Readme file: GOME Level 1b version 5.1 dataset Reference ESA-EOPG-MOM-TN-13, issue 1.0, 15/06/2018

More information

Polar Coordinates; Vectors

Polar Coordinates; Vectors 10.5 The Dot Product 1. v i, w i+ (a) v w 1(1) + ( 1)(1) 1 1 0 (b) cos v w 0 1 + ( 1) 1 + 1 0 0 0 90º (c) The vectors are orthogonal.. v i +, w i+ (a) v w 1( 1) +1(1) 1 + 1 0 (b) cos v w 0 1 +1 ( 1) +

More information

Series 7500 Formed Metal Bellows Catalog 974C

Series 7500 Formed Metal Bellows Catalog 974C Series 00 Formed Metal Bellows Catalog C Innovators of the industry Bellows assemblies for safety valves, control valves, and regulators. When you look for a formed bellows which is reliable, has a long

More information

Miniball Flexible Frame

Miniball Flexible Frame Miniball Flexible Frame Author: Nigel Warr Date: 6 th March 2015. Contents 1 Overview 2 2 Modifications 3 2.1 Modifications to the height..................................... 3 2.2 Modifications to the

More information

DATA SHEET Metal Element Current Sensing Chip Resistor (Jumper) CLS Series

DATA SHEET Metal Element Current Sensing Chip Resistor (Jumper) CLS Series DATA SHEET Metal Element Current Sensing Chip Resistor (Jumper) 5% SIZE: 0805,1206 & 2512 RoHs Compliant January 19, 2017 V.5 DS-ENG-009 Page: 2 of 14 1. SCOPE 1.1 This specification is applicable to lead

More information

ALIGNMENT OF INSERTION UNITS IN NSRL RING

ALIGNMENT OF INSERTION UNITS IN NSRL RING I/62 ALIGNMENT OF INSERTION UNITS IN NSRL RING Xiaoye He National Synchrotron Radiation Laboratory University of Science and Technology of China Hefei, Anhui 230029, P. R. China ABSTRACT The general alignment

More information

The basic dynamic load rating C is a statistical number and it is based on 90% of the bearings surviving 50 km of travel carrying the full load.

The basic dynamic load rating C is a statistical number and it is based on 90% of the bearings surviving 50 km of travel carrying the full load. Technical data Load Rating & Life Under normal conditions, the linear rail system can be damaged by metal fatigue as the result of repeated stress. The repeated stress causes flaking of the raceways and

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z540-1-1994 TRI-STATE INSTRUMENT SERVICE, INC. 3024 Wayne Trace Ft. Wayne, IN 46806 Lynn A. Stroble Phone: 260 456 4545 CALIBRATION Valid To: September

More information

Survey and Alignment at the Advanced Light Source

Survey and Alignment at the Advanced Light Source I/140 Survey and Alignment at the Advanced Light Source Gary F. Krebs, Ted Lauritzen, and William Thur Lawrence Berkeley Laboratory Introduction This paper describes survey and alignment at the Lawrence

More information

2.6 Electron transport lines

2.6 Electron transport lines 2.6 Electron transport lines 2.6 Electron transport lines Overview The electron transport lines consist of all of the electron beamline segments that are neither part of the Linacs nor part of the injector.

More information

Saf-T-Graf Graphite Rupture Disks

Saf-T-Graf Graphite Rupture Disks Catalog # 77-8500 Catalog # 77-8500 Saf-T-Graf Graphite Rupture Disks BSBsystems.com BSB.ie Visit our website for the most complete, up-to-date information Saf-T-Graf TM Graphite Rupture Disks Introduction

More information

Therefore, the control volume in this case can be treated as a solid body, with a net force or thrust of. bm # V

Therefore, the control volume in this case can be treated as a solid body, with a net force or thrust of. bm # V When the mass m of the control volume remains nearly constant, the first term of the Eq. 6 8 simply becomes mass times acceleration since 39 CHAPTER 6 d(mv ) CV m dv CV CV (ma ) CV Therefore, the control

More information

DISTRIBUTION LIST. Others original copies Name amount. Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD

DISTRIBUTION LIST. Others original copies Name amount. Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD 2 of 15 DISTRIBUTION LIST Others original copies Name amount Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD Issue Date Total pages Pages affected Brief description of change

More information

Distance Determination between the MINOS Detectors for TOF Measurements. Dr. Virgil Bocean Alignment & Metrology Department Fermilab

Distance Determination between the MINOS Detectors for TOF Measurements. Dr. Virgil Bocean Alignment & Metrology Department Fermilab Distance Determination between the MINOS Detectors for TOF Measurements Dr. Virgil Bocean Alignment & Metrology Department Fermilab 1 1 Introduction Part of the neutrino research program at Fermilab is

More information

Educjatipnal. L a d ie s * COBNWALILI.S H IG H SCHOOL. I F O R G IR L S A n B k i n d e r g a r t e n.

Educjatipnal. L a d ie s * COBNWALILI.S H IG H SCHOOL. I F O R G IR L S A n B k i n d e r g a r t e n. - - - 0 x ] - ) ) -? - Q - - z 0 x 8 - #? ) 80 0 0 Q ) - 8-8 - ) x ) - ) -] ) Q x?- x - - / - - x - - - x / /- Q ] 8 Q x / / - 0-0 0 x 8 ] ) / - - /- - / /? x ) x x Q ) 8 x q q q )- 8-0 0? - Q - - x?-

More information

Charge readout and double phase

Charge readout and double phase Charge readout and double phase Vyacheslav Galymov IPN Lyon 1 st annual meeting AIDA-2020 Liquid argon double-phase TPC Concept of double-phase LAr TPC (Not to scale) Anode 0V 2 mm Collection field 5kV/cm

More information

Lab Section Date. ME4751 Air Flow Rate Measurement

Lab Section Date. ME4751 Air Flow Rate Measurement Name Lab Section Date ME4751 Air Flow Rate Measurement Objective The objective of this experiment is to determine the volumetric flow rate of air flowing through a pipe using a Pitot-static tube and a

More information

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS P.J.Bryant and G.Kantardjian CERN, Geneva, Switzerland Introduction and General Description

More information

Slot Region Radiation Environment Models

Slot Region Radiation Environment Models Slot Region Radiation Environment Models I. Sandberg, I.A. Daglis (IAASARS/NOA, Phys/UoA) D. Heynderickx (DHConsultancy) H. Evans, P. Nieminen (ESA/ESTEC) ESTEC/CONTRACT No.4000104839 (ESTEC/ITT AO/1 6700/11/NL/AT)

More information

ASTRA EVANGELISTA S.A.

ASTRA EVANGELISTA S.A. (1) STR EVNGELIST S.. PLNT CNNING COMPRESS Pressure Vessel Design Calculations Vessel No: Customer: FIUB Contract: Designer: HRI/SEG Date: lunes, agosto 09, 2004 1 / 33 Table Of Contents1) Table Of Contents

More information

Effect of Insertion Devices. Effect of IDs on beam dynamics

Effect of Insertion Devices. Effect of IDs on beam dynamics Effect of Insertion Devices The IDs are normally made of dipole magnets ith alternating dipole fields so that the orbit outside the device is un-altered. A simple planer undulator ith vertical sinusoidal

More information

Q SON,' (ESTABLISHED 1879L

Q SON,' (ESTABLISHED 1879L ( < 5(? Q 5 9 7 00 9 0 < 6 z 97 ( # ) $ x 6 < ( ) ( ( 6( ( ) ( $ z 0 z z 0 ) { ( % 69% ( ) x 7 97 z ) 7 ) ( ) 6 0 0 97 )( 0 x 7 97 5 6 ( ) 0 6 ) 5 ) 0 ) 9%5 z» 0 97 «6 6» 96? 0 96 5 0 ( ) ( ) 0 x 6 0

More information

1. Introduction. 2. Concept

1. Introduction. 2. Concept SLAC-PUB-11412 FINDING THE MAGNETIC CENTER OF A QUADRUPOLE TO HIGH RESOLUTION G. E. Fischer, J. K. Cobb, D. R. Jenson Stanford Linear Accelerator Center Stanford, CA. 1. Introduction In a companion proposal

More information

The Alignment of BEPCII RING

The Alignment of BEPCII RING The Alignment of BEPCII RING Li Bo Institute of High Energy Physics libo@ihep.ac.cn 2008.2.12 Brief introduction of BEPCII ring The survey of BEPCII ring The installment and alignment of BEPCII ring 2008-2-18

More information

MODULE F: SIMPLE CONNECTIONS

MODULE F: SIMPLE CONNECTIONS MODULE F: SIMPLE CONNECTIONS This module of CIE 428 covers the following subjects Connector characterization Failure modes of bolted shear connections Detailing of bolted connections Bolts: common and

More information

David Martin High Precision Beamline Alignment at the ESRF IWAA, Grenoble 3-7 October 2016

David Martin High Precision Beamline Alignment at the ESRF IWAA, Grenoble 3-7 October 2016 David Martin High Precision Beamline Alignment at the ESRF IWAA, Grenoble 3-7 October 2016 OVERVIEW The ESRF has just completed the Phase I Upgrade programme. The Phase I Upgrade programme was centered

More information

Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011

Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011 Experiment Design to Obtain Unsteady Force and Moment Data on a Yawing Submarine Model - Sept. 2011 Problem: This problem is to determine (1) the desired values of fixed parameters and (2) the required

More information

Designing Information Devices and Systems I Spring 2015 Note 3

Designing Information Devices and Systems I Spring 2015 Note 3 EECS 16A Designing Information Devices and Systems I Spring 2015 Note 3 Lecture notes by Christine Wang (01/27/2015) Introduction to Vectors Remark. Often, vectors are represented as letters in boldface(x),

More information

Rapid Averaging Probe (RAP)

Rapid Averaging Probe (RAP) () The probe (Rapid Averaging Probe) is designed for fast and accurate measurements of average velocity in ductwork. The probe averages the stagnation (impact) pressure across the duct allowing for the

More information

THE LASER TRACKER : A MAJOR TOOL FOR THE METROLOGY OF THE LHC

THE LASER TRACKER : A MAJOR TOOL FOR THE METROLOGY OF THE LHC IWAA2004, CERN, Geneva, 4-7 October 2004 THE LASER TRACKER : A MAJOR TOOL FOR THE METROLOGY OF THE LHC M. Dupont, D. Missiaen, P. Winkes, CERN*, 1211 Geneva 23, Switzerland 1. INTRODUCTION The Large Hadron

More information

3519 State Rte Corning Road. South New Berlin, Elmira, NY NY p p

3519 State Rte Corning Road. South New Berlin, Elmira, NY NY p p WINTER CATALOG SUPERIOR QUALITY. HEADQUARTERS PO Box 527 PENNSYLVANIA OSWEGO TOOL AND STEEL S. NEW BERLIN 3519 State Rte. 8 2420 Corning Road 102 Creek Road 5183 State Rte.104 South New Berlin, Elmira,

More information

Electrical Specifications WW, WWS, MWW. Power Rating Power Rating TCR 70ºC 0.1% 0.5% 1% 5% WW W 0.5 W 5-2K 3-2K

Electrical Specifications WW, WWS, MWW. Power Rating Power Rating TCR 70ºC 0.1% 0.5% 1% 5% WW W 0.5 W 5-2K 3-2K Features: WWS offers miniature size at higher power rating High performance for low cost High power to size ratio High temperature silicone coating MWW/NMWW completely molded construction with welded terminations

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 FRANK COX METROLOGY (Formerly CANADIAN CENTRAL GAUGE LABORATORY) 40 West Drive Brampton, Ontario, Canada L6T 3T6 Hilliard Cox Phone: 905 457 9190 CALIBRATION

More information

DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS

DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS Manfred Gottwald (1), Eckhart Krieg (1), Sander Slijkhuis (1), Christian von Savigny (2), Stefan Noël (2), Heinrich Bovensmann (2), Klaus Bramstedt

More information

Geometry Survey of the Time-of-Flight Neutron-Elastic Scattering (Antonella) Experiment

Geometry Survey of the Time-of-Flight Neutron-Elastic Scattering (Antonella) Experiment Geometry Survey of the Time-of-Flight Neutron-Elastic Scattering (Antonella) Experiment Babatunde O Sheg Oshinowo a and Federico Izraelevitch a, b a Fermi National Accelerator Laboratory (Fermilab), Batavia,

More information

ENAE483: Principles of Space System Design Power Propulsion Thermal System

ENAE483: Principles of Space System Design Power Propulsion Thermal System Power Propulsion Thermal System Team B4: Ben Abresch Jason Burr Kevin Lee Scott Wingate November 8th, 2012 Presentation Overview Mission Guidelines Project Specifications Initial Design Power Thermal Insulation

More information

1. Introduction. 1.1 Overview of Study:

1. Introduction. 1.1 Overview of Study: 1. Introduction 1.1 Overview of Study: Hot and cold fluid passing through long pipes causes thermal expansion and contraction in the piping system. The fluid passing through pipes also creates fluctuations

More information

Status and Challenges of CEPC Time Projection Chamber Detector. Huirong On behalf of CEPC Tracking Subgroup

Status and Challenges of CEPC Time Projection Chamber Detector. Huirong On behalf of CEPC Tracking Subgroup Status and Challenges of CEPC Time Projection Chamber Detector Huirong On behalf of CEPC Tracking Subgroup 015.01.1 Content Status of GEM and TPC Detector Requirements and Concept design Preliminary Simulation

More information

UNIT XX: DYNAMICS AND NEWTON S LAWS. DYNAMICS is the branch of mechanics concerned with the forces that cause motions of bodies

UNIT XX: DYNAMICS AND NEWTON S LAWS. DYNAMICS is the branch of mechanics concerned with the forces that cause motions of bodies I. Definition of FORCE UNIT XX: DYNAMICS AND NEWTON S LAWS DYNAMICS is the branch of mechanics concerned with the forces that cause motions of bodies FORCE is a quantitative interaction between two (or

More information

sensonic II modular version

sensonic II modular version sensonic II sensonic II modular version Combination with impeller contact water meters With these dry running meters with magnetic coupling, the roller-type counter is fully evacuated and can also be rotated.

More information

LOWELL WEEKLY JOURNAL.

LOWELL WEEKLY JOURNAL. Y $ Y Y 7 27 Y 2» x 7»» 2» q» ~ [ } q q $ $ 6 2 2 2 2 2 2 7 q > Y» Y >» / Y» ) Y» < Y»» _»» < Y > Y Y < )»» >» > ) >» >> >Y x x )»» > Y Y >>»» }> ) Y < >» /» Y x» > / x /»»»»» >» >» >»» > > >» < Y /~ >

More information

Lightweight, Low-Power Coarse Star Tracker

Lightweight, Low-Power Coarse Star Tracker Lightweight, Low-Power Coarse Star Tracker Ray Zenick AeroAstro Inc. 17th Annual AIAA/USU Conference on Small Satellites Paper Number SSC03-X-7 August 14, 2003 The LIST Concept Medium accuracy star tracker

More information

Lunar Reconnaissance Orbiter Project. Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface Control Document

Lunar Reconnaissance Orbiter Project. Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface Control Document Revision B DraftA Effective Date: July 17, 2006 Expiration Date: July 17, 2011 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface

More information

LEP-style counting in luminosity measurement at CepC

LEP-style counting in luminosity measurement at CepC LEP-style counting in luminosity measurement at CepC S. Luki Vin a institute of nuclear sciences, University of Belgrade Lumical meeting, online, Sep. 29, 2017 S. Luki, Lumical meeting, online, Sep. 29,

More information

Polarized muon decay asymmetry measurement: status and challenges

Polarized muon decay asymmetry measurement: status and challenges Polarized muon decay asymmetry measurement: status and challenges Glen Marshall, for the TWIST Collaboration Muon Physics in the LHC Era Symposium at the Institute of Nuclear Theory Seattle, October 008

More information

In order to optimize the shell and coil heat exchanger design using the model presented in Chapter

In order to optimize the shell and coil heat exchanger design using the model presented in Chapter 1 CHAPTER FOUR The Detailed Model In order to optimize the shell and coil heat exchanger design using the model presented in Chapter 3, one would have to build several heat exchanger prototypes, and then

More information

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010 Orbit Design Marcelo Suárez Orbit Design Requirements The following Science Requirements provided drivers for Orbit Design: Global Coverage: the entire extent (100%) of the ice-free ocean surface to at

More information

EUCLID SKY SCANNING TOOL

EUCLID SKY SCANNING TOOL EUCLID SKY SCANNING TOOL 5TH INTERNATIONAL CONFERENCE ON ASTRODYNAMICS TOOLS AND TECHNIQUES ESA/ESTEC, NOORDWIJK, THE NETHERLANDS 29 MAY 1 JUNE 2012 Francesco Cacciatore (1), Mariano Sánchez (2), Alberto

More information

HT75XX-2 100mA Low Power LDO

HT75XX-2 100mA Low Power LDO 100mA Low Power LDO Features Low power consumption Low voltage drop Low temperature coefficient High input voltage (up to 24V) High output current : 100mA Output voltage accuracy: tolerance 1% TO92 SOT89

More information

A Magnetic Measurement Plan For The Delta Undulator

A Magnetic Measurement Plan For The Delta Undulator LCLS-TN-3-4 A Magnetic Measurement Plan For The Delta Undulator Zachary Wolf SLAC March 28, 23 Abstract This note describes a magnetic measurement plan for the Delta undulator. The note starts by discussing

More information

The Expansibility Factor Equations in ISO and ISO : Do They Deliver What They Promise?

The Expansibility Factor Equations in ISO and ISO : Do They Deliver What They Promise? The Expansibility Factor Equations in ISO 567-2 and ISO 567-4: Do They Deliver What They Promise? Michael Reader-Harris, NEL INTRODUCTION The expansibility factor equations in ISO 567-2:2003 [] and ISO

More information

Power output: 6 750kW=4500kW Location: Top of Taikoyama, Kyoto prefecture, Japan. Terrain condition: Complex mountainous area

Power output: 6 750kW=4500kW Location: Top of Taikoyama, Kyoto prefecture, Japan. Terrain condition: Complex mountainous area Introduction Power output: 6 75kW=45kW Location: Top of Taikoyama, Kyoto prefecture, Japan 1 2 3 4 5 6 5m 45.94m Fracture section Terrain condition: Complex mountainous area m History: Nov, 21: Power generation

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017 FRANK COX METROLOGY (Formerly CANADIAN CENTRAL GAUGE LABORATORY) 40 West Drive Brampton, Ontario, Canada L6T 3T6 Hilliard Cox Phone: 905 457 9190 CALIBRATION

More information