SCALING OF HIGH-QUANTILE ESTIMATORS

Size: px
Start display at page:

Download "SCALING OF HIGH-QUANTILE ESTIMATORS"

Transcription

1 SCALING OF HIGH-QUANTILE ESTIMATORS MATTHIAS DEGEN AND PAUL EMBRECHTS, Department of Mathematics, ETH Zurich Abstract Enhanced by the global financial crisis, the discussion about an accurate estimation of regulatory (risk) capital a financial institution needs to hold in order to safeguard against unexpected losses has become highly relevant again. The presence of heavy tails in combination with small sample sizes turns estimation at such extreme quantile levels into an inherently difficult statistical issue. We discuss some of the problems and pitfalls that may arise. In particular, based on the framework of second-order extended regular variation, we compare different high-quantile estimators and propose methods for the improvement of standard methods by focussing on the concept of penultimate approximations. Keywords: Extreme Value Theory; Peaks Over Threshold; Penultimate Approximation; Power Normalization; Second-Order Extended Regular Variation AMS 2000 Subject Classification: Primary 60G70 Secondary 62G32 1. Introduction It is fair to say that the global financial system is going through a deep crisis. Whereas for some time a regulatory framework was put into place to avoid systemic risk, the current problems highlight the total insufficiency of this (so-called) Basel framework. Warnings for this were voiced early on; see for instance Daníelsson et al. [6]. Also the weaknesses of Value-at- Risk (VaR), the risk measure required by the Basel framework, were discussed over and over Postal address: Department of Mathematics, Raemistrasse 101, CH-8092 Zurich, Switzerland 1

2 2 M. DEGEN AND P. EMBRECHTS again; see for instance Nešlehová et al. [17] and references therein. Nevertheless, it has turned out to be extremely difficult to convince regulators to think again. As a consequence, and mainly spurred on by the subprime crisis, statisticians are increasingly called upon to single out research themes with considerable practical usefulness. A key example of this is the long-term joint project between the Office of the Comptroller of the Currency (OCC) and the National Institute of Statistical Sciences (NISS) on the topic of "Financial Risk Modeling and Banking Regulation". The current paper is motivated by this research program. Our starting point is the discussion about the estimation of regulatory (risk) capital a financial institution needs to hold in order to safeguard against unexpected losses. Without going into a full description of financial data be it Market Risk (MR), Credit Risk (CR) or Operational Risk (OR) it suffices to know that, according to the current regulatory standards in the banking industry (Basel II framework), risk capital has to be calculated (statistically estimated) using the concept of VaR at very high levels of confidence (for MR usually 99% at a 10-day horizon, for CR and OR 99.9%, for economic capital even 99.97%, all three of them at a 1-year horizon). The credit crisis prompted the introduction of an extra 99.9%, 1-year capital charge for MR, the so-called Incremental Risk Charge; see Basel Committee [20]. Because of the extreme quantile levels required, early on extreme value theory (EVT) was recognized as a potentially useful tool. However, and this often from practice, critical voices have been raised against an imprudent use of standard EVT. In the context of quantitative risk management (QRM), the use of EVT-based high-quantile estimators may indeed be a delicate issue and warrants careful further study. The aim of our paper is twofold. In a first and more theoretical part, we analyze different choices of normalization and their influence on the rate of convergence in certain limit laws underlying EVT. More precisely, we compare linear and power norming for high-risk scenarios and quantiles which leads to techniques that are not part of the standard EVT toolkit. In particular we propose the use of so-called penultimate approximations to estimate extreme quantiles. The idea of penultimate approximations goes back to Fisher and Tippett [9], its

3 Scaling of high-quantile estimators 3 potential for practical applications however seems to have received little attention so far; see Degen and Embrechts [7] for some references. In a second part, concrete applications of the methodology developed in the first part are discussed. We compare the performance of different high-quantile estimators. One method increasingly championed in practice estimates quantiles at a lower level (e.g. 99%) and then scales up to the desired higher level (e.g. 99.9%) according to some scaling procedure to be specified. In this context, the usefulness of penultimate approximations in situations of very heavy tails together with small sample sizes (typical for OR) is highlighted. 2. Univariate EVT We assume the reader to be familiar with univariate EVT, as presented for instance in Embrechts et al. [8] or in de Haan and Ferreira [12]. Throughout we assume that our loss data X > 0 are modeled by a continuous distribution function (df) F with upper end-point x F and standardly write F = 1 F. The corresponding tail quantile function is denoted by U(t) = F (1 1/t), where F denotes the (generalized) inverse of F. To avoid confusion we will where necessary denote the df and the tail quantile function of a random variable (rv) X by F X and U X, respectively. As our focus is on the application of EVT-based methods to quantitative risk management, we prefer to work within the framework of exceedances (Peaks Over Threshold (POT) method) rather than within the classical framework of block-maxima. The two concepts however are closely linked as the next result shows; see de Haan and Ferreira [12], Theorem Proposition 2.1. For ξ R the following are equivalent. i) There exist constants a n > 0 and b n R such that { lim F n (a n x + b n ) = H ξ (x) = exp (1 + ξx) 1/ξ}, (1) n for all x with 1 + ξx > 0.

4 4 M. DEGEN AND P. EMBRECHTS ii) There exists a measurable function a(.) > 0 such that for x > 0, U(tx) U(t) lim t a(t) iii) There exists a measurable function f(.) > 0 such that for all x for which 1 + ξx > 0. = D ξ (x) = xξ 1. (2) ξ F (t + xf(t)) lim = (1 + ξx) 1/ξ, (3) t x F F (t) Moreover, (1) holds with b n = U(n) and a n = a(n). Also, (3) holds with f(t) = a ( 1/F(t) ). Definition 2.1. A df F satisfying (1) is said to belong to the linear maximum (l-max) domain of attraction of the extreme value distribution H ξ and we write F Dl max (H ξ ). For necessary and sufficient conditions for distributions F to belong to Dl max (H ξ ) we refer to de Haan and Ferreira [12], Chapter 1. Domain of attraction conditions have been formulated directly in terms of regular variation of F at x F for the cases ξ > 0 and ξ < 0, but not for the case ξ = 0; see Gnedenko [10]. The novelty of Proposition 2.1 (originally due to de Haan [11]) is that it treats the domain of attraction conditions for the three cases in a unified way by making use of the more general concept of extended regular variation (ERV) for U. Recall that a function U is said to be of extended regular variation with index ξ R and with auxiliary function a(.) if it satisfies (2); see de Haan and Ferreira [12], Appendix B.2. In that case we write U ERV ξ (a). Remark 2.1. Even within the unified framework of ERV, the case ξ = 0 is still somewhat special. Acting as limiting cases, the right hand sides in (2) and (3) are interpreted as log x and e x respectively. In that case, U and 1/F are said to be of Π-variation and Γ-variation, respectively, and we write U Π(a) (or U ERV 0 ) and 1/F Γ(f). From a theoretical point of view, this full generality of the framework of extended regular variation is certainly to be appreciated. For applications to QRM however, a framework treating ξ 0 but not ξ < 0 in an as simple as possible way is to be preferred. This is done below basically by working with log U instead of U.

5 Scaling of high-quantile estimators 5 3. Asymptotic properties of normalized high-risk scenarios and quantiles For a positive rv X F we introduce the notation of X t, which is defined as the rv X, conditioned to exceed the threshold t > 0. Within QRM, X t is often referred to as a high-risk scenario; see also Balkema and Embrechts [1] for this terminology. With this notation, Proposition 2.1 iii) states that high-risk scenarios, linearly normalized, converge weakly to a non-degenerate limit, i.e. for ξ R and x > 0, P ( X t t f(t) ) > x F(t + xf(t)) = logh ξ (x) = (1 + ξx) 1/ξ, F(t) t x F, (4) for some measurable function f(.) > 0. In that case we shall say that F belongs to the linear POT (l-pot) domain of attraction of H ξ and write F D POT l (H ξ ). While the limit behavior of random variables (exceedances as well as block-maxima) under linear normalizations is well understood and frequently used in applications, the theory under non-linear normalizations has been studied less. Pantcheva [18] and Mohan and Ravi [15] developed a theory of power norming within the block-maxima framework. We shall adopt this idea of non-linear norming and study the limit behavior of power normalized high-risk scenarios. Inspired by Barakat et al. [2], who compare the convergence rates under linear and power normalization within the block-maxima setting, we study the firstand second-order asymptotic behavior of power-normalized high-risk scenarios and quantiles. Definition 3.1. We say that a df F belongs to the power POT (p-pot) domain of attraction of some non-degenerate df K and write F Dp POT (K), if there exists a measurable function g(.) > 0 such that the (power) normalized high-risk scenario (X t /t) 1/g(t) converges weakly to K, in the sense that ( (X P t /t ) ) 1/g(t) > x K(x), t x F, (5) for every continuity point x > 0 of K. Introducing logarithms proves useful at this point, as it provides a link between the two concepts of linear and power norming for high-risk scenarios. In particular we have the following result

6 6 M. DEGEN AND P. EMBRECHTS about the relation between the respective domains of attraction D POT l and D POT p. Proposition 3.1. For X > 0 with df F X and for ξ R the following holds: i) F log X D POT l (H ξ ) F X D POT p (K ξ ), ii) F X D POT l (H ξ ) = F X D POT p (K ξ ), where K ξ (x) = logh ξ (log x) for x > 0 and ξ = ξ 0. Proof. i) Let ξ R and x > 0. Setting Y = log X, the corresponding high-risk scenario satisfies Y s = log (X t ) for s = log t and thus it immediately follows that ( Y s ) s lim P > x = log H ξ (x) lim P s x F f(s) t x F where f(s) = g(t) and with s = log t. ( (X ) t 1/g(t) > x) = K ξ (x), t ii) Let x > 0 and assume F D POT l (H ξ ), i.e. for some f(.) > 0 and with x > 0, P ( X t t f(t) ) > x (1 + ξx) 1/ξ, t x F. We make use of the fact that the convergence above is uniformly in t. Moreover, define λ t (x) = tx g(t) t f(t) and observe that if lim t x F λ t (x) =: λ (x) exists, we have for every x > 0, ( (X ) t 1/g(t) P > x) t = F(txg(t) ) F(t) = F (t + λ t(x)f(t)) F(t) (1 + ξλ (x)) 1/ξ, t x F, Now, set g(t) = f(t)/t so that λ t (x) = xf(t)/t 1 f(t)/t for x > 0. ξ > 0: In this case g(t) ξ, as t x F ; see de Haan and Ferreira, Theorem Therefore, the limit λ exists, is finite and we have lim t x F λ t (x) = (x ξ 1)/ξ. ξ < 0: Note first that x F <. Moreover we have f(t)/(x F t) ξ as t x F (see de Haan and Ferreira [12], Theorem ) and hence g(t) 0 for t x F. Therefore we obtain lim t x F λ t (x) = log x. ξ = 0: For ξ = 0, the right endpoint x F may be finite or infinite. Moreover, f(.) is asymptotically equivalent to a function f(.), whose derivative vanishes at x F. For the

7 Scaling of high-quantile estimators 7 case x F = we thus have f(t) f(t 0 ) = 1 t t t t 0 f (s)ds 0, t. Therefore f(t)/t 0 as t x F (and hence also g(t) 0), which in turn implies lim t x F λ t (x) = log x. In the case x F <, f(t) 0 as t xf (and hence also g(t) 0); see de Haan and Ferreira [12], Theorem Therefore we obtain lim t x F λ t (x) = log x. Altogether, F D POT l (H ξ ) with ξ R implies that for every x > 0 and as t x F, x ( (X ) t 1/g(t) (1 + ξλ (x)) P > x) 1, ξ > 0, 1/ξ = t (1 + ξ log x) 1/ξ, ξ < 0, e λ (x) = x 1, ξ = 0, i.e. F Dp POT (K ξ ), where ξ = ξ 0. This finishes the proof. For later purposes we shall reformulate Proposition 3.1 in terms of quantiles. Due to the convergence properties of inverse functions (see Resnick [19], Proposition 0.1) this is immediate and we have the following result. Corollary 3.1. For X > 0 with tail quantile function U X and ξ R the following holds: i) U log X ERV ξ (a) log U X ERV ξ (a), ii) U X ERV ξ (a) = log U X ERV ξ (b), where ξ = ξ 0 and b(t) = a(t)/u(t) for some measurable function a(.) > 0. Remarks ) According to Assertion ii) of Corollary 3.1, convergence of linearly normalized quantiles U(tx), i.e. U(tx) U(t) a(t) D ξ (x) = xξ 1, t, (6) ξ for some x > 0, implies convergence of power normalized quantiles, i.e. ( ) 1/b(t) U(tx) exp { D } ξ (x), t. (7) U(t)

8 8 M. DEGEN AND P. EMBRECHTS In the case of main interest for QRM applications, i.e. for ξ 0, this rewrites as U ERV ξ (a) log U Π(b). 2) The respective converse implications in ii) of Proposition 3.1 and Corollary 3.1 do not hold; D POT p attracts in fact more distributions than D POT l. Consider for example F X (x) = (log x) 1 with x > e, hence F X / D POT l but F X D POT p. Note that for F D POT p (K), the possible limit laws K are unique up to what we might call p- types (in the POT setting), where we call two dfs K 1 and K 2 of the same p-type if K 1 (x) = K 2 (x p ) for some p > 0. Proposition 3.2. (Convergence to p-types.) Let X F be a positive rv and assume K 1 and K 2 are two non-degenerate distribution functions. i) If there exist measurable functions g 1 (.) > 0 and g 2 (.) > 0, such that for x > 0 F ( tx g1(t)) K 1 (x), F(t) F ( tx g2(t)) K 2 (x), t x F, (8) F(t) then g 2 (t) lim t x F g 1 (t) = p > 0 (9) and K 2 (x) = K 1 (x p ). (10) ii) If (9) holds, then either of the two relations in (8) implies the other and (10) holds. Proof. ii) Assume that (9) holds and that F ( tx g1(t)) /F(t) K 1 (x) as t x F. From the theory of ERV it clear that the existence of a non-degenerate limit K implies that necessarily K(x) = 1 (1 + ξ log x) 1/ξ. Since the limit laws K are continuous, uniform convergence holds and we obtain F ( tx g2(t)) = F(t) F (t ( x g2(t)/g1(t)) ) g 1(t) F(t) K 1 (x p ), t x F. i) Assume that the two relations in (8) hold and set V (t) = F (1 t) and W i (t) = K i (1 t) for 0 < t < 1 and i = 1, 2. As K 1 and K 2 are non-degenerate, we may find points x 1, x 2 such

9 Scaling of high-quantile estimators 9 that W 1 (x 1 ) > W 1 (x 2 ) and W 2 (x 1 ) > W 2 (x 2 ). Due to the convergence properties of generalized inverse functions, we have lim t x F Taking logarithms we find From this we obtain which finishes the proof. ( V ( F(t)xi ) t ) 1/gj(t) = W j (x i ), i, j {1, 2}. 1 g j (t) log V ( ) F(t)x1 V ( ) log W j(x 1 ) F(t)x 2 W j (x 2 ) > 0, t x F, j {1, 2}. g 2 (t) lim t x F g 1 (t) = log W 1(x 1 ) / log W 2(x 1 ) =: p > 0, W 1 (x 2 ) W 2 (x 2 ) In order to appreciate the approximations under linear and power norming, (6) and (7) respectively, we need to quantify and compare the goodness of these approximations. More precisely, we are interested in a comparison of the convergence rates for normalized quantiles in (6) and (7) or equivalently of the rates for corresponding normalized high-risk scenarios in (4) and (5). It turns out that a judicious choice of the power normalization b(.), respectively g(.), may improve the convergence rate over linear norming. This may be important for applications, as we might hope to improve the accuracy of standard EVT-based high-quantile estimators when using power norming Second-order asymptotics of normalized quantiles In the sequel we prefer to work with quantiles U rather than distribution tails F. However, any statement formulated in the U framework may equivalently be expressed in the F framework. Moreover, while we worked in full generality (i.e. ξ R) so far, we shall henceforth restrict ourselves to the case ξ 0, most of interest for QRM applications. Similar results for the case ξ < 0 may be worked out. In order to avoid unnecessary technicalities and to exclude pathological cases we shall

10 10 M. DEGEN AND P. EMBRECHTS throughout assume sufficient smoothness for U. For our purposes, the following representation for U turns out to be convenient to work with: U(t) = e ϕ(log t), ϕ(t) = e t 1 ds u(s) + c, where u(s) = U(s)/U (s) and c = log U(1). Furthermore we shall assume that (A1) the von Mises condition holds, i.e. tu (t)/u (t) ξ 1, for some ξ 0; see de Haan and Ferreira [12] for details. Assumption (A1) is equivalent to assuming ϕ ξ 0 together with ϕ /ϕ 0. It reflects the fact that the log-log plot ϕ of U is assumed to behave "nicely" in the sense of being ultimately linear, i.e. with converging slope ϕ and vanishing convexity ϕ. Moreover, (A1) is sufficient to guarantee U ERV ξ (a), i.e. for x > 0 U(tx) U(t) a(t) D ξ (x) = xξ 1, t, (11) ξ for some measurable function a(.) > 0. Note that from the theory of extended regular variation it is clear that a(t)/u(t) ξ 0. By Corollary 3.1, this in turn implies log U Π(b) and hence where b(t) = a(t)/u(t) > 0 and such that b(t) ξ. ( ) 1/b(t) U(tx) x, t, (12) U(t) Our interest is in second-order results for (11) and (12), i.e. we want to consider functions A and B with lim t A(t) = lim t B(t) = 0, which for ξ 0 and x > 0 satisfy U(tx) U(t) a(t) A(t) D ξ (x) S(x), t, (13) and ( ( ) ) 1/b(t) D U(tx) ξ U(t) D ξ (x) B(t) T(x), t, (14) with b(t) = a(t)/u(t) and for some non-trivial limits S(.) and T(.). Again, the limiting case D 0 (.) is interpreted as log(.).

11 Scaling of high-quantile estimators 11 Clearly, the precise conditions for (13) and (14) to hold will depend on the choice of the normalization a(.), respectively b(.). Different choices of normalization may lead to different asymptotics in the respective second-order relations. We discuss the following three cases. Case I: b 1 (t) ξ for ξ > 0 For this choice of power normalization, the limit relations (13) and (14) coincide and we have the following second-order asymptotics. Proposition 3.3. Suppose U(t) = e ϕ(log t) is twice differentiable and let A 1 (t) = ta (t)/a(t) ξ with a(t) = ξu(t) for some ξ > 0. Assume that (A1) holds, that ϕ is ultimately monotone, and that (A2) lim t ϕ (t)/(ϕ (t) ξ) = ρ, for some ρ 0. Then, for x > 0, U(tx) U(t) lim xξ t A 1 (t) = H ξ,ρ (x) = x ξ D ρ (x), where D ρ (x) = xρ 1 ρ. Proof. See Degen and Embrechts [7], Theorem 3.1. Case II: b 2 (t) = tu (t)/u(t) for ξ 0 An intuitive reasoning behind this choice of normalization may be given by noting that b(t) = tu (t)/u(t) = ϕ (log t) is the slope of the log-log plot ϕ of U. In the sequel we will therefore refer to b(t) = ϕ (log t) as the local slope (or local tail index) of the log-log plot of U at points t (as opposed to the ultimate slope ξ = ϕ ( ) typically considered in standard EVT); see also Degen and Embrechts [7]. We obtain the following second-order asymptotics for linear and power normalized quantiles. Proposition 3.4. Suppose U(t) = e ϕ(log t) is twice differentiable and let A 2 (t) = ta (t)/a(t) ξ with a(t) = tu (t). Assume that (A1) holds for some ξ 0, that ϕ is ultimately monotone, and

12 12 M. DEGEN AND P. EMBRECHTS that A 2 RV ρ, for some ρ 0. Then, for x > 0, lim t U(tx) U(t) a(t) A 2 (t) D ξ (x) = S ξ,ρ (x), where S ξ,ρ (x) = x 1 ρ s (D ξ+ρ(x) D ξ (x)), ρ < 0, s ξ 1 y ρ 1 ( dyds = x ξ log x D ξ (x) ), ρ = 0, ξ > 0, Proof. See de Haan and Ferreira [12], Theorem ξ (log x) 2 2, ρ = ξ = 0. Proposition 3.5. Suppose U(t) = e ϕ(log t) is three times differentiable and let B 2 (t) = tb (t)/b(t) with b(t) = tu (t)/u(t). Assume that (A1) holds for some ξ 0, that ϕ is ultimately monotone, and that (A3) lim t ϕ (t)/ϕ (t) = ρ, for some ρ 0. Then, for x > 0, lim t ( (U(tx) ) ) 1/b(t) D ξ U(t) D ξ (x) B 2 (t) = T ξ,ρ (x), where Proof. We rewrite (14) for t as ( (U(tx) ) ) 1/b(t) D ξ U(t) D ξ (x) x ξ ρ T ξ,ρ (x) = (D ρ(x) log x), ρ < 0, x ξ (log x) 2 2, ρ = 0. B(t) ξ log U(tx) log U(t) b(t)log x x b(t)b(t) x = x ξ b(ts) b(t) 1 b(t)b(t) s ds. For the above integral to converge to a non-trivial limit, it is sufficient to require b ERV ρ for some ρ 0 and with auxiliary function b(t)b(t). In that case, it is clear from the theory of extended regular variation that, in the case ρ < 0, we may take the auxiliary function to satisfy b(t)b(t) = tb (t), if b is ultimately monotone. 1

13 Scaling of high-quantile estimators 13 For the special case ρ = 0 note that, when b is ultimately monotone, b RV 1 if and only if b Π(c). In this case one may choose c(t) = tb (t). This follows from the Monotone Density Theorem for Π Variation; see Bingham et al. [4], Theorem Altogether, (A3) being equivalent to tb (t)/b (t) ρ 1, together with the assumption of ϕ (i.e. b ) being ultimately monotone ensures that b ERV ρ (c) for some ρ 0 and such that we may choose c(t) = tb (t). By the Uniform Convergence Theorem for ERV(see Bingham et al. [4], Theorem 3.1.7a), the convergence b(ts) b(t) lim t tb = (t) x ρ 1 ρ, ρ < 0, log x, ρ = 0. holds locally uniformly on (0, ) which finishes the proof. Case III: b 3 (t) = log U(t) 1/t t t 0 log U(s)ds for some t 0 > 0 and for ξ 0 Compared with the previous two cases, this choice of b(.) does not seem to be very intuitive. We shall therefore briefly give a heuristic argument about its raison d être in the literature. Recall from Case II that in smooth cases we may choose b(.) as the local slope of the log-log plot of U, i.e. b(t) = ϕ (log t). However, if one does not want to a priori assume differentiabilty, ϕ need not exist. In that case, by Karamata s Theorem, ϕ(log t) is of the same order as its average ϕ(log t) := 1 t t t 0 ϕ(log s)ds, for some 0 < t 0 < t, i.e. ϕ(log t)/ϕ(log t) 1 as t. However, unlike ϕ, ϕ is always differentiable and hence similar to the (smooth) Case II one may choose b(t) = ϕ (log t) = ϕ(log t) 1 t t t 0 ϕ(log s)ds with 0 < t 0 < t. Following the terminology in Case II, we might refer to ϕ as a kind of local pseudo slope of ϕ (or local pseudo tail index). Proposition 3.6. Suppose U(t) = e ϕ(log t) is twice differentiable and let B 3 (t) = tb (t)/b(t) with b(t) = log U(t) 1/t t t 0 log U(s)ds for some t 0 > 0. Assume that (A1) holds for some ξ 0, that b is ultimately monotone, and that (A4) lim t ϕ (log t)/ (ϕ (log t) b(t)) 1 = τ, for some τ 0.

14 14 M. DEGEN AND P. EMBRECHTS Then, for x > 0, lim t ( (U(tx) ) ) 1/b(t) D ξ U(t) D ξ (x) B 3 (t) = T ξ,τ (x) = x ξ ( D τ (x) + S ξ,τ(x) ). Proof. Assumption (A4) rewrites as tb (t)/b (t) τ 1, as t, and, together with b being ultimately monotone, ensures that b ERV τ (c) with c(t) = tb (t). For b(t) = log U(t) 1 t t t 0 log U(s)ds and for some x > t 0 we obtain by partial integration so that x b(t) t 0 t dt = = 1 x x log U(t) dt t 0 t x x t t 0 log U(s) t 0 t 2 dsdt t 0 log U(s)ds = log U(x) b(x), x b(t) log U(x) = b(x) + dt. t 0 t Therefore, by the Uniform Convergence Theorem for ERV (see Bingham et al. [4], Theorem 3.1.7a), we obtain for t, ( ( ) ) 1/b(t) D U(tx) ξ U(t) D ξ (x) B 3 (t) ξ log U(tx) log U(t) b(t)log x x b(t)b 3 (t) ( b(tx) b(t) x = x ξ b(ts) b(t) tb + (t) 1 tb (t) ( x x ξ τ ) 1 + S ξ,τ(x), τ ) 1 s ds where S ξ,τ is as in Proposition 3.4. Concerning a second-order result under linear norming in the Case III, we draw on the work of Vanroelen [22]. The author relates different second-order relations for cases where the normalization a(.) is replaced by ã(.) with a(t) ã(t), as t. We have the following result. Proposition 3.7. Suppose that the assumptions of Proposition 3.4 hold, as well as (A3) for ( some ρ 0 and (A4) with τ 1. Define ã(t) = U(t) log U(t) 1/t ) t t 0 log U(s)ds for some t 0 > 0. Then, for x > 0, U(tx) U(t) ea(t) D ξ (x) lim = S ξ,ρ,τ (x), t A 3 (t)

15 Scaling of high-quantile estimators 15 where A 3 (.) = A 2 (.) and A 2 (.) is as in Proposition 3.4 and with ρ (D ξ+ρ(x) (1 + ρτ) D ξ (x)), ρ < 0, ( S ξ,ρ,τ (x) = x ξ log x + (1 + ξτ) D ξ (x) ), ρ = 0, ξ > 0, 1 1 ξ (log x) 2 2 τ log x, ρ = ξ = 0. Proof. In terms of ϕ and its derivatives we have B 2 (t) = ϕ (r)/ϕ (r) and A 2 (t) = B 2 (t) + A 1 (t) = ϕ (r)/ϕ (r)+ϕ (r) ξ, where r = log t and with A i and B i as defined above. Moreover, B 3 (t) = ϕ (log t)/b 3 (t) 1, so that Assumption (A4) may be rewritten as B 2 (t)/b 3 (t) 1 τ for t and with τ 0. The proof now follows from Proposition of Vanroelen [22] by remarking that Assumption (A4) with τ 1 implies Condition (1.17) of Vanroelen [22]. Indeed, with a(t) = tu (t) as in Proposition 3.4, we have lim t for some λ R (λ = 0 in the case ρ = 0). (ã(t) ) 1 A 2 (t) a(t) 1 B 3 (t) = lim = λ, (15) t A 2 (t) 3.2. Comparison of the converence rates under linear and power norming It is not surprising that in the case of a constant power normalization (Case I), no improvement may be achieved when using power norming for quantiles U(tx) instead of linear norming. This however need not be the case for non-constant power normalizations. Indeed, a comparison of the respective second-order limit relations in the Cases II and III shows that there are situations in which the convergence rate for power normalized quantiles is faster than when a linear normalization is applied. Case II: b 2 (t) = tu (t)/u(t) Recall from the proof of Proposition 3.7 that we have B 2 (t)/a 2 (t) = 1 A 1 (t)/a 2 (t) and A 2 (t)/a 1 (t) = ϕ (r) ϕ (r)(ϕ (r) ξ) + 1, with r = log t and A i and B i as defined above. ξ > 0: In this case, A 2 (t)/a 1 (t) ρ/ξ + 1 as t and, consequently, the rates under linear

16 16 M. DEGEN AND P. EMBRECHTS and power norming, A 2 (t) and B 2 (t) respectively, are both of the same order O (A 1 (t)), t, as long as ρ < 0. For ρ = 0 however, B 2 (t) = o(a 2 (t)), t, i.e the convergence rate is (asymptotically) faster when using power norming instead of linear norming. ξ = 0: Assumption (A3) implies ϕ /ϕ ρ 0, so that under (A1) a non-degenerate secondorder relation (14) is only possible for ρ = 0. In this case, ϕ /(ϕ ) 2 0 (by l Hôpital s rule) and thus the convergence rate B 2 (.) for power normalized quantiles is (asymptotically) improved over the rate for linearly normalized quantiles. Moreover, note that for ρ = 0 (and ξ > 0) the rate under a non-constant power normalization b 2 (t) = ϕ (log t) (local slope) is also faster than with a constant normalization b(t) ξ = ϕ ( ) (ultimate slope). This in particular motivates the consideration of so-called penultimate approximations and their application to QRM. Remark 3.2. (penultimate approximation.) From an asymptotic point of view, in the case ξ = 0 it matters whether we consider U(tx)/U(t) together with a power normalization 1/b 2 (t) = 1/ϕ (log t) and convergence to a constant limit x as in relation (12), or convergence of U(tx)/U(t) to the non-constant, threshold-dependent limit x b2(t). While in the former case the convergence rate is ϕ /ϕ (see Propsition 3.5), the rate in the latter case is ϕ ; see Degen and Embrechts [7], Theorem 3.2 (which also holds for ξ = 0 as one easily verifies). Clearly this difference is merely of theoretical interest, since, with QRM applications in mind, both procedures give rise to the same penultimate approximation U(tx) x b2(t) U(t) for x > 1 and t large. For an introduction to the concept of local slopes and penultimate approximations as well as references for the latter, see Degen and Embrechs [7]. Case III: b 3 (t) = log U(t) 1/t t t 0 log U(s)ds Assumption (A4) may be rewritten as B 2 (t)/b 3 (t) 1 τ 0 for t ; see proof of Proposition 3.7. For τ 1, this implies that Condition (15) holds, i.e. B 3 (t)/a 3 (t) λ for some λ R. For the special case τ = 1 which may lead to λ = in (15), we refer to Vanroelen [22] for further reading. As a consequence, for τ 1 and due to the second-order

17 Scaling of high-quantile estimators 17 asymptotics in Case II, B 3 (.) and A 3 (.) are of the same order if and only if the second-order parameter satisfies ρ < 0. Similar to Case II, for ρ = 0, the rate under power norming may be improved over the rate under linear norming, i.e B 3 (t) = o(a 3 (t)), t. Also, the rate under a non-constant normalization b 3 (.) ist faster than with constant norming b(t) ξ (for ξ > 0). With applications in mind, this motivates the consideration of a penultimate approximation given by U(tx) x b3(t) U(t) for x > 1 and t large. From the above we may draw the following conclusions about an EVT-based approximation of high quantiles under linear and power normalization. There are indeed situations where the convergence rate for quantiles with non-constant power normalization improves both the rates for linear normalization as well as constant power normalization. This in particular necessitates the second-order parameter ρ associated with the underlying model to satisfy ρ = 0 which pertains to many loss models important for QRM-practice. Hence we may hope for an improvement of the accuracy of classical EVT-based high-quantile estimators by the use of penultimate approximations. In cases where the rate may be improved under power norming, the improvement does not seem to be spectacular at first glance as the improved rate is again slowly varying and hence may still be arbitrarily slow. However, the above second-order statements are about the asymptotic behavior of quantiles F (α) only, i.e. as the confidence level α tends to 1. Of greater interest for QRM practice is the local behavior as one usually considers a fixed level α = 99.9%, say. Having said that, slow convergence (i.e. ρ = 0) does not at all need to be an impediment. In ranges relevant for practice the improvement in the estimation of high quantiles may well be considerable; see Degen and Embrechts [7], Figure Implications for quantitative risk management We discuss the relevance of power norming, or more precisely of the corresponding penultimate approximations, for practical applications to QRM. In particular we study the EVT-based estimation of high quantiles together with possible fallacies it may bring with it. We hope that

18 18 M. DEGEN AND P. EMBRECHTS for the EVT-community, our discussion will lead to further relevant research especially for the important case ρ = 0. Recall the Basel II regulatory guidelines for CR and OR according to which risk capital has to be calculated using VaR (i.e. quantiles) at the high level of 99.9%. While this is standard for CR, where a variety of by now well-established models has been tried and tested, it is not so for OR. The latter has only been incorporated in the Basel II framework relatively recently, so that the resulting lack of historical data makes the estimation of a 99.9% quantile a daunting and inherently difficult task. Estimation methods include for instance the use of empirical quantiles as well as the fitting of some specific parametric loss models. For the latter method one is usually left with a reasonably good fit in the body but not in the tails of the data. Due to the nature of the problem, the use of EVT has emerged naturally; see for instance Moscadelli [16], where the application of the popular Peaks Over Threshold (POT) method to OR is discussed. Having an extreme quantile level in mind, level scaling inherent to standard EVT (estimate at lower levels, 99% say, and then scale up to the desired higher levels such as 99.9%) provides a potential alternative. In either case however, accurate estimation of the tail index ξ is challenging, so that, in the end some constructive scepticism concerning the wiseness to base risk capital on high-level quantiles of some (profit and) loss df, even when using standard EVT methods, is still called for; see for instance Daníelsson et al. [6] and Nešlehová et al. [17]. The second-order results on power norming suggest that moving away from the tail index ξ the indicator of the ultimate heavy-tailedness of the loss model and focusing instead on the local tail index b(t) = ϕ (log t), or on its pseudo equivalent b(t) = ϕ (log t), might prove useful at this point. In particular it motivates the consideration and comparison of estimation methods for high quantiles based on i) standard EVT, and ii) "advanced" EVT. As for i), we incorporate two methods belonging to the standard EVT toolkit. Recall from the asymptotics for quantiles under linear norming (see relation (11)) that we may consider

19 Scaling of high-quantile estimators 19 U(tx) U(t) + a(t) xξ 1 ξ and, due to regular variation of U, also U(tx) x ξ U(t) for x > 1 and large values of t. This suggests the following scaling properties of high-quantile estimators. For some quantile levels α, α (0, 1) with α < α, and similarly VaR α = VaR eα + â(t) xbξ 1, (16) ξ VaR α = x b ξ VaR eα, (17) with x = (1 α)/(1 α) > 1 and some estimates of ξ, a(t) and VaR eα at the lower level α. Relation (16) is better known as the POT-estimator of VaR α. Indeed, setting u = VaR eα, and using Proposition 2.1, we arrive at a natural estimator VaR α = u + f(u) ( Nu for some estimates ξ and f(u) of ξ and of f(u). Here Nu n ξ n(1 α))b 1, (18) ξ is an estimate of F(u), where N u denotes the number of exceedances over the threshold u (set by the user) of a total number of n data points; see for instance Embrechts et al. [8], Chapter 6.5. In the simulation study below, (18) and (17) are referred to as the Standard EVT I and II methods, respectively. The tail index ξ and (threshold-dependent) scale parameter f(u) are estimated using the POT-MLE method with an ad-hoc threshold choice of 10% of the upper order statistics. Compared to the POT-MLE, the performance of other implemented tail index estimators such as the Hill, the method of moments, and the exponential regression model (see for instance Beirlant et al. [3]) did not show significant differences. Method ii) makes use of penultimate approximations. Based on relation (12), with a nonconstant power normalization b(.), we suggest the following scaling procedure for high-quantile estimators. For quantile levels α, α (0, 1) with α < α, VaR α = x d b(t) VaR eα, (19) with t = 1/(1 α), x = (1 α)/(1 α) > 1 and some estimates of b(t) and VaR eα. For the simulation study, we incorporate the two choices b(t) = ϕ (log t), the local slope, as well as

20 20 M. DEGEN AND P. EMBRECHTS b(t) = ϕ (log t), the local pseudo slope, and will refer to these methods as the Advanced EVT I and II methods, respectively. The advanced EVT methods, are included in the simulation study in order to outline the potential of penultimate approximations for practical applications. For the aim of this paper, we do not elaborate on the respective estimation procedures for ϕ and ϕ. In both cases, the estimates are based on a prior local regression procedure for the log-data. This is done with the locfit function (with a tricube weight function and smoothing parameter of 3/4) provided in S- Plus (see Loader [14], Chapter 3 and Section 6.1). The integral appearing in ϕ is approximated by a composite trapezoidal rule. Finally, the (lower) quantile VaR eα for (17) and (19) is estimated by the empirical quantile. Remark 4.1. (Local tail index.) The two scaling procedures (17) and (19) use the idea of a linear extrapolation of the log-log plot ϕ of U, but with slopes ϕ at different quantile levels. While the penultimate approximation (19) requires the estimation of the local tail index ϕ (log t) (or of ϕ (log t)) at a specified levels t, the ultimate approximation (17) in theory makes use of estimates of the ultimate tail index ϕ ( ) = ξ. In practice, given a sample of size a thousand, say, one will use a number of largest order statistics (above a certain threshold t 0 ) to estimate ξ in (17). It is clear that this yields an estimate of ϕ (log u) at some (unknown) level u > t 0 rather than of ξ = ϕ ( ). One of the differences between (17) and (19) thus is, that in the former case the level u is random (u depends on the underlying data), while the latter case uses estimates of the slope ϕ (log t) at predefined levels t = 1/(1 α), set by the user Simulation study The simulation study is based on sample data from six frequently used OR loss models, such as the loggamma, the lognormal, the g-and-h, the Pareto, the Burr and the generalized Beta distribution of the second kind (GB2). For convenience we recall the definition of a g-and-h rv

21 Scaling of high-quantile estimators 21 X which is obtained from a standard normal rv Z through X = a + b egz 1 e hz2 /2, g with parameters a, g, h R and b 0. Note that in the case h = 0 one obtains a (shifted) lognormal rv. For the Pareto df we use the parameterization F(x) = (x/x 0 ) 1/ξ, for x > x 0 > 0 and some ξ > 0. The GB2 is parameterized as in Kleiber and Kotz [13], p. 184, while the remaining three loss models are as in Embrechts et al. [8], p. 35. For Table 1 we simulate 200 samples of 1000 observations from each of the six loss models. For each of the 200 data sets we compare bias and the standardized root mean square error (SRMSE) of the four above-mentioned EVT-based estimation methods for VaR at level 99.9%. Several simulations with different choices of (for risk management practice relevant) parameter values were performed, all of them showing a similar pattern concerning the performance of the different estimation methods; see Table 1. Table 1: Bias and SRMSE (in %) of four EVT-based estimators for VaR at the 99.9% level based on based on 200 datasets of 1000 observations of six different loss models. Bias SRMSE Bias SRMSE Bias SRMSE Loss model Loggamma Lognormal g-and-h (a = b = 3, (α = 1.75, β = 2) (µ = 3.5, σ = 1.25) g = 0.8, h = 0.4) Std. EVT I (POT) Std. EVT II (eα = 0.99) Adv. EVT I (eα = 0.99) Adv. EVT II (eα = 0.99) Pareto Burr GB2 (a = b = 2, (x 0 = 1.2, ξ = 0.75) (α = 1, κ = 2, τ = 1.5) p = 1.5, q = 0.75) Std. EVT I (POT) Std. EVT II (eα = 0.99) Adv. EVT I (eα = 0.99) Adv. EVT II (eα = 0.99)

22 22 M. DEGEN AND P. EMBRECHTS Remark 4.2. Despite its inconsistency with the well-known stylized facts of OR data (powertail, i.e. ξ > 0), the lognormal distribution (semi heavy-tailed, i.e. ξ = 0) is widely used in OR practice as a loss severity model. We include it in our simulation study primarily to question its omnipresence by highlighting some of the problems its use may bring with it. As mentioned above, estimation at very high quantile levels by means of fitting a parametric loss model may be hard to justify. For illustrative purposes we nevertheless perform a simulation for the six resulting parametric high-quantile estimators, based on the same data sample. An excerpt of these (expectedly) disappointing results is given in Table 2. Here, the model parameters are estimated using MLE, except for the g-and-h distribution, for which there is no agreed standard estimation method so far. For that case we adapt a method suggested by Tukey [21] based on log 2 n so-called letter values, where n is the sample size. Table 2: Bias and SRMSE (in %) of parametric estimators for VaR at the 99.9% level based on based on 200 datasets of 1000 observations of three different loss models. Bias SRMSE Bias SRMSE Bias SRMSE Loss model Lognormal Burr GB2 (a = b = 2, (µ = 3.5, σ = 1.25) (α = 1, κ = 2, τ = 1.5) p = 1.5, q = 0.75) Loggamma Lognormal g-and-h Pareto 1.04e e e e e e+11 Burr GB A comparison of the results in the Tables 1 and 2 clearly shows that the estimation of high quantiles based on fitting parametric models may indeed be problematic. The model uncertainty involved may be considerable (large fluctuation of the estimation errors). Moreover, from a QRM regulatory point of view, a large negative bias (i.e. underestimation of risk capital) is to be avoided. Not surprisingly, the lognormal parametric model underestimates risk capital charges

23 Scaling of high-quantile estimators 23 considerably. While intolerable from a sound regulatory perspective this at the same time may explain the attractiveness of its use for a financial institution. On the other hand, given the high level of 99.9%, the performance of all four EVT-based methods is promising; see Table 1. A comparison within the EVT-based methods does not yield a clear ranking. However, the advanced EVT methods seem to work at least as well as the standard EVT methods, in particular exhibiting smaller SRMSE. This finding is not by accident. Recall that the estimation of ϕ and ϕ in the advanced EVT I and II methods is based on a local regression procedure (i.e. smoothing) of the log-data. As a consequence, the estimates are more robust, which leads to smaller SRMSE-values. For smaller sample sizes we expect this behavior to become even more pronounced. To confirm the above findings on EVT-based high-quantile estimators, we perform a second, similar study and estimate quantiles at the even more extreme level of 99.97%, relevant for the calculation of so-called economic capital; see for instance Crouhy et al. [5], Chapter 15. Owing to Remark 4.2 we leave out the lognormal data sample. We again simulate 200 samples of 1000, 500 and 250 observations of very heavy-tailed data in Table 3. From Table 3 we may draw the following conclusions. Most importantly, the potential of an advanced EVT approach to estimate extreme quantiles in the presence of very heavy tails and small sample sizes is clearly revealed. The performance of the advanced EVT I and II methods is by far superior compared to that of the two standard EVT approaches. This confirms that the idea of using penultimate approximations instead of ultimate approximations may indeed be promising in certain situations relevant for practice (and not only from a secondorder asymptotic viewpoint). While the estimation errors of the two advanced EVT methods remain comparably moderate even for small sample sizes, standard EVT-based methods hit the wall. The estimation errors explode for decreasing sample sizes so that the usefulness of these methods seems questionable in such situations. From a QRM perspective this means that relying on high-quantile estimates based on these conventional methods may be questionable.

24 24 M. DEGEN AND P. EMBRECHTS Table 3: Bias and SRMSE (in %) of four EVT-based estimators for VaR at the 99.97% level based on 200 datasets of 1000, 500 and 250 observations. n = 1000, eα = 0.99 n = 500, eα = 0.98 n = 250, eα = 0.96 Bias SRMSE Bias SRMSE Bias SRMSE Loggamma (α = 1.25, β = 1.25) Std. EVT I (POT) Std. EVT II Adv. EVT I Adv. EVT II g-and-h (a = b = 1.5, g = 0.8, h = 0.6) Std. EVT I (POT) Std. EVT II Adv. EVT I Adv. EVT II Pareto (x 0 = 1, ξ = 0.85) Std. EVT I (POT) Std. EVT II Adv. EVT I Adv. EVT II Burr (α = 1, κ = 1.5, τ = 1.25) Std. EVT I (POT) Std. EVT II Adv. EVT I Adv. EVT II GB2 (a = 1, b = 2, p = 1.5, q = 1.25) Std. EVT I (POT) Std. EVT II Adv. EVT I Adv. EVT II Conclusion In this paper we consider EVT-based high-quantile estimators and discuss scaling properties and their influence on the estimation accuracy at very high quantile levels. The scarcity of data

25 Scaling of high-quantile estimators 25 together with the heavy-tailedness present in the data (especially for OR), turns high-quantile estimation into an inherently difficult statistical task. The nature of the problem calls for EVT in some or other form. The application of methods from the standard EVT toolkit in such applied situations is however not without problems. Our main results are as follows. First, from a methodological perspective, it is de Haan s framework of Π-variation that is most useful for our purposes, as it allows for a unified treatment of the for QRM important cases ξ > 0 and ξ = 0. Inherent to Π-variation is the notion of power norming (as opposed to the standardly used linear norming) of quantiles and high-risk scenarios. The use of different normalizations leads to different second-order asymptotics. It turns out that, in certain cases relevant for practice, judicious choices of a (non-constant) power normalization instead of a linear or a constant power normalization may improve the rate of convergence in the respective limit results. Second, the theory of second-order extended regular variation provides a methodological basis for the derivation of new high-quantile estimators. The application of different normalizations in the respective second-order relations translates into different scaling properties of the resulting high-quantile estimators. Our findings motivate the derivation of new estimation procedures for high quantiles by means of penultimate approximations. In particular we propose two advanced EVT methods which are based on the estimation of the local (pseudo) slope ϕ (and ϕ ) of the log-log plot ϕ of the underlying loss model U(t) = e ϕ(log t). The methods proposed are intended to complement, rather than to replace, methods from the standard EVT toolkit. Their applications may be useful in situations in which the reliability of standard methods seems questionable. Third, by means of a simulation study we show that, in the presence of heavy tails together with data scarcity, reliable estimation at very high quantile levels, such as the 99.9% or 99.97%, is a tough call. While our study highlights the limitations of standard EVT approaches in such cases, at the same time it reveals the potential of more advanced EVT methods. Further statistical research on advanced EVT approaches to estimate high quantiles, to-

26 26 M. DEGEN AND P. EMBRECHTS gether with a more in-depth study of their benefits as well as limitations for practical applications would be desirable. 6. Acknowledgements The authors would like to thank Guus Balkema for useful discussions related to the paper. References [1] Balkema, G. and Embrechts, P. (2007). High Risk Scenarios and Extremes - A geometric approach. EMS Publishing House, Zürich. [2] Barakat, H. M., Nigm, E. M. and El-Adll, M. E. (2008). Comparison between the rates of convergence of extremes under linear and under power normalization. Statistical Papers, Springer. DOI: /s [3] Beirlant, J., Goegebeur, Y., Segers, J. and Teugels, J. (2004). Statistics of Extremes. Wiley, Chichester. [4] Bingham, N. H., Goldie, C. M. and Teugels, J. L. (1987). Regular Variation. Cambridge University Press, Cambridge. [5] Crouhy, M., Galai, D. and Mark, R. (2006). The Essentials of Risk Management. McGraw-Hill, New York. [6] Daníelsson, J., Embrechts, P., Goodhart, C., Keating, C., Muennich, F., Renault, O. and Song Shin, H. (2001). An academic response to Basel II. Financial Markets Group, London School of Economics. [7] Degen, M. and Embrechts, P. (2008). EVT-based estimation of risk capital and convergence of high quantiles. Advances in Applied Probability 40,

27 Scaling of high-quantile estimators 27 [8] Embrechts, P., Klüppelberg, C. and Mikosch, T. (1997). Modelling Extremal Events for Insurance and Finance. Springer, Berlin. [9] Fisher, R. A. and Tippett, L. H. T. (1928). Limiting forms of the frequency distribution of the largest or smallest member of a sample. Proc. Camb. Phil. Soc. 24, [10] Gnedenko, B. (1943). Sur la distribution limite du terme maximum d une série aléatoire. Annals of Mathematics 44, [11] de Haan, L. (1970). On regular variation and its applications to the weak convergence of sample extremes. CWI Tract 32, Amsterdam. [12] de Haan, L. and Ferreira, A. (2006). Extreme Value Theory - An Introduction. Springer, New York. [13] Kleiber, C. and Kotz, S. (2003). Statistical Size Distributions in Economics and Actuarial Sciences. Wiley, Hoboken. [14] Loader, C. (1999). Local Regression and Likelihood. Springer, New York. [15] Mohan, N. R. and Ravi, S. (1991). Max domains of attraction of univariate and multivariate p-max stable laws. Theory Probab. Appl. 37, [16] Moscadelli, M. (2004). The modelling of operational risk: experiences with the analysis of the data collected by the Basel Committee. Bank of Italy, Working Paper No 517. [17] Nešlehová, J., Embrechts, P. and Chavez-Demoulin, V. (2006). Infinite mean models and the LDA for operational risk. Journal of Operational Risk 1, [18] Pantcheva, E. (1985). Limit theorems for extreme order statistics under nonlinear normalization. Lecture Notes in Mathematics, No. 1155, Springer, Berlin. [19] Resnick, S. I. (1987). Extreme Values, Regular Variation and Point Processes. Springer, New York.

28 28 M. DEGEN AND P. EMBRECHTS [20] Basel Committee on Banking Supervision (2008). Guidelines for Computing Capital for Incremental Risk in the Trading Book. Basel: Bank for International Settlements. [21] Tukey, J. W. (1977). Exploratory Data Analysis. Addison-Wesley, Reading. [22] Vanroelen, G. (2003). The effect of transformations on second-order regular variation. Ph.D. Thesis, Katholieke Universiteit Leuven.

Quantitative Modeling of Operational Risk: Between g-and-h and EVT

Quantitative Modeling of Operational Risk: Between g-and-h and EVT : Between g-and-h and EVT Paul Embrechts Matthias Degen Dominik Lambrigger ETH Zurich (www.math.ethz.ch/ embrechts) Outline Basel II LDA g-and-h Aggregation Conclusion and References What is Basel II?

More information

A NOTE ON SECOND ORDER CONDITIONS IN EXTREME VALUE THEORY: LINKING GENERAL AND HEAVY TAIL CONDITIONS

A NOTE ON SECOND ORDER CONDITIONS IN EXTREME VALUE THEORY: LINKING GENERAL AND HEAVY TAIL CONDITIONS REVSTAT Statistical Journal Volume 5, Number 3, November 2007, 285 304 A NOTE ON SECOND ORDER CONDITIONS IN EXTREME VALUE THEORY: LINKING GENERAL AND HEAVY TAIL CONDITIONS Authors: M. Isabel Fraga Alves

More information

Introduction to Algorithmic Trading Strategies Lecture 10

Introduction to Algorithmic Trading Strategies Lecture 10 Introduction to Algorithmic Trading Strategies Lecture 10 Risk Management Haksun Li haksun.li@numericalmethod.com www.numericalmethod.com Outline Value at Risk (VaR) Extreme Value Theory (EVT) References

More information

Extreme Value Theory and Applications

Extreme Value Theory and Applications Extreme Value Theory and Deauville - 04/10/2013 Extreme Value Theory and Introduction Asymptotic behavior of the Sum Extreme (from Latin exter, exterus, being on the outside) : Exceeding the ordinary,

More information

A Note on Tail Behaviour of Distributions. the max domain of attraction of the Frechét / Weibull law under power normalization

A Note on Tail Behaviour of Distributions. the max domain of attraction of the Frechét / Weibull law under power normalization ProbStat Forum, Volume 03, January 2010, Pages 01-10 ISSN 0974-3235 A Note on Tail Behaviour of Distributions in the Max Domain of Attraction of the Frechét/ Weibull Law under Power Normalization S.Ravi

More information

A Closer Look at the Hill Estimator: Edgeworth Expansions and Confidence Intervals

A Closer Look at the Hill Estimator: Edgeworth Expansions and Confidence Intervals A Closer Look at the Hill Estimator: Edgeworth Expansions and Confidence Intervals Erich HAEUSLER University of Giessen http://www.uni-giessen.de Johan SEGERS Tilburg University http://www.center.nl EVA

More information

Overview of Extreme Value Theory. Dr. Sawsan Hilal space

Overview of Extreme Value Theory. Dr. Sawsan Hilal space Overview of Extreme Value Theory Dr. Sawsan Hilal space Maths Department - University of Bahrain space November 2010 Outline Part-1: Univariate Extremes Motivation Threshold Exceedances Part-2: Bivariate

More information

AN ASYMPTOTICALLY UNBIASED MOMENT ESTIMATOR OF A NEGATIVE EXTREME VALUE INDEX. Departamento de Matemática. Abstract

AN ASYMPTOTICALLY UNBIASED MOMENT ESTIMATOR OF A NEGATIVE EXTREME VALUE INDEX. Departamento de Matemática. Abstract AN ASYMPTOTICALLY UNBIASED ENT ESTIMATOR OF A NEGATIVE EXTREME VALUE INDEX Frederico Caeiro Departamento de Matemática Faculdade de Ciências e Tecnologia Universidade Nova de Lisboa 2829 516 Caparica,

More information

EXTREMAL QUANTILES OF MAXIMUMS FOR STATIONARY SEQUENCES WITH PSEUDO-STATIONARY TREND WITH APPLICATIONS IN ELECTRICITY CONSUMPTION ALEXANDR V.

EXTREMAL QUANTILES OF MAXIMUMS FOR STATIONARY SEQUENCES WITH PSEUDO-STATIONARY TREND WITH APPLICATIONS IN ELECTRICITY CONSUMPTION ALEXANDR V. MONTENEGRIN STATIONARY JOURNAL TREND WITH OF ECONOMICS, APPLICATIONS Vol. IN 9, ELECTRICITY No. 4 (December CONSUMPTION 2013), 53-63 53 EXTREMAL QUANTILES OF MAXIMUMS FOR STATIONARY SEQUENCES WITH PSEUDO-STATIONARY

More information

Extreme value theory and high quantile convergence

Extreme value theory and high quantile convergence Journal of Operational Risk 51 57) Volume 1/Number 2, Summer 2006 Extreme value theory and high quantile convergence Mikhail Makarov EVMTech AG, Baarerstrasse 2, 6300 Zug, Switzerland In this paper we

More information

THIRD ORDER EXTENDED REGULAR VARIATION. Isabel Fraga Alves, Laurens de Haan, and Tao Lin

THIRD ORDER EXTENDED REGULAR VARIATION. Isabel Fraga Alves, Laurens de Haan, and Tao Lin PUBLICATIONS DE L INSTITUT MATHÉMATIQUE Nouvelle série, tome 8094) 2006), 09 20 DOI:02298/PIM069409F THIRD ORDER EXTENDED REGULAR VARIATION Isabel Fraga Alves, Laurens de Haan, and Tao Lin Abstract A theory

More information

Challenges in implementing worst-case analysis

Challenges in implementing worst-case analysis Challenges in implementing worst-case analysis Jon Danielsson Systemic Risk Centre, lse,houghton Street, London WC2A 2AE, UK Lerby M. Ergun Systemic Risk Centre, lse,houghton Street, London WC2A 2AE, UK

More information

On Backtesting Risk Measurement Models

On Backtesting Risk Measurement Models On Backtesting Risk Measurement Models Hideatsu Tsukahara Department of Economics, Seijo University e-mail address: tsukahar@seijo.ac.jp 1 Introduction In general, the purpose of backtesting is twofold:

More information

Extreme Value Analysis and Spatial Extremes

Extreme Value Analysis and Spatial Extremes Extreme Value Analysis and Department of Statistics Purdue University 11/07/2013 Outline Motivation 1 Motivation 2 Extreme Value Theorem and 3 Bayesian Hierarchical Models Copula Models Max-stable Models

More information

MFM Practitioner Module: Quantitiative Risk Management. John Dodson. October 14, 2015

MFM Practitioner Module: Quantitiative Risk Management. John Dodson. October 14, 2015 MFM Practitioner Module: Quantitiative Risk Management October 14, 2015 The n-block maxima 1 is a random variable defined as M n max (X 1,..., X n ) for i.i.d. random variables X i with distribution function

More information

Department of Econometrics and Business Statistics

Department of Econometrics and Business Statistics Australia Department of Econometrics and Business Statistics http://www.buseco.monash.edu.au/depts/ebs/pubs/wpapers/ Minimum Variance Unbiased Maximum Lielihood Estimation of the Extreme Value Index Roger

More information

Chapter 2 Asymptotics

Chapter 2 Asymptotics Chapter Asymptotics.1 Asymptotic Behavior of Student s Pdf Proposition.1 For each x R d,asν, f ν,,a x g a, x..1 Proof Let a = 0. Using the well-known formula that Ɣz = π z e z z z 1 + O 1, as z,. z we

More information

Ruin, Operational Risk and How Fast Stochastic Processes Mix

Ruin, Operational Risk and How Fast Stochastic Processes Mix Ruin, Operational Risk and How Fast Stochastic Processes Mix Paul Embrechts ETH Zürich Based on joint work with: - Roger Kaufmann (ETH Zürich) - Gennady Samorodnitsky (Cornell University) Basel Committee

More information

Statistics and Quantitative Risk Management

Statistics and Quantitative Risk Management Statistics and Quantitative Risk Management ( including computational probability) Paul Embrechts Department of Mathematics and RiskLab ETH Zurich, Switzerland www.math.ethz.ch/ embrechts Paul Embrechts

More information

Shape of the return probability density function and extreme value statistics

Shape of the return probability density function and extreme value statistics Shape of the return probability density function and extreme value statistics 13/09/03 Int. Workshop on Risk and Regulation, Budapest Overview I aim to elucidate a relation between one field of research

More information

Multivariate generalized Pareto distributions

Multivariate generalized Pareto distributions Multivariate generalized Pareto distributions Holger Rootzén and Nader Tajvidi Abstract Statistical inference for extremes has been a subject of intensive research during the past couple of decades. One

More information

A class of probability distributions for application to non-negative annual maxima

A class of probability distributions for application to non-negative annual maxima Hydrol. Earth Syst. Sci. Discuss., doi:.94/hess-7-98, 7 A class of probability distributions for application to non-negative annual maxima Earl Bardsley School of Science, University of Waikato, Hamilton

More information

Does k-th Moment Exist?

Does k-th Moment Exist? Does k-th Moment Exist? Hitomi, K. 1 and Y. Nishiyama 2 1 Kyoto Institute of Technology, Japan 2 Institute of Economic Research, Kyoto University, Japan Email: hitomi@kit.ac.jp Keywords: Existence of moments,

More information

Operational risk modeled analytically II: the consequences of classification invariance. Vivien BRUNEL

Operational risk modeled analytically II: the consequences of classification invariance. Vivien BRUNEL Operational risk modeled analytically II: the consequences of classification invariance Vivien BRUNEL Head of Risk and Capital Modeling, Société Générale and Professor of Finance, Léonard de Vinci Pôle

More information

Discussion on Human life is unlimited but short by Holger Rootzén and Dmitrii Zholud

Discussion on Human life is unlimited but short by Holger Rootzén and Dmitrii Zholud Extremes (2018) 21:405 410 https://doi.org/10.1007/s10687-018-0322-z Discussion on Human life is unlimited but short by Holger Rootzén and Dmitrii Zholud Chen Zhou 1 Received: 17 April 2018 / Accepted:

More information

ESTIMATING BIVARIATE TAIL

ESTIMATING BIVARIATE TAIL Elena DI BERNARDINO b joint work with Clémentine PRIEUR a and Véronique MAUME-DESCHAMPS b a LJK, Université Joseph Fourier, Grenoble 1 b Laboratoire SAF, ISFA, Université Lyon 1 Framework Goal: estimating

More information

The Modelling of Rare Events: from methodology to practice and back. Paul Embrechts

The Modelling of Rare Events: from methodology to practice and back. Paul Embrechts The Modelling of Rare Events: from methodology to practice and back Paul Embrechts Department of Mathematics RiskLab, ETH Zurich www.math.ethz.ch/~embrechts The menu (8 take-homes): Some EVT history Risk

More information

Research Article Strong Convergence Bound of the Pareto Index Estimator under Right Censoring

Research Article Strong Convergence Bound of the Pareto Index Estimator under Right Censoring Hindawi Publishing Corporation Journal of Inequalities and Applications Volume 200, Article ID 20956, 8 pages doi:0.55/200/20956 Research Article Strong Convergence Bound of the Pareto Index Estimator

More information

PREPRINT 2005:38. Multivariate Generalized Pareto Distributions HOLGER ROOTZÉN NADER TAJVIDI

PREPRINT 2005:38. Multivariate Generalized Pareto Distributions HOLGER ROOTZÉN NADER TAJVIDI PREPRINT 2005:38 Multivariate Generalized Pareto Distributions HOLGER ROOTZÉN NADER TAJVIDI Department of Mathematical Sciences Division of Mathematical Statistics CHALMERS UNIVERSITY OF TECHNOLOGY GÖTEBORG

More information

Analysis of the ruin probability using Laplace transforms and Karamata Tauberian theorems

Analysis of the ruin probability using Laplace transforms and Karamata Tauberian theorems Analysis of the ruin probability using Laplace transforms and Karamata Tauberian theorems Corina Constantinescu and Enrique Thomann Abstract The classical result of Cramer-Lundberg states that if the rate

More information

Asymptotic distribution of the sample average value-at-risk

Asymptotic distribution of the sample average value-at-risk Asymptotic distribution of the sample average value-at-risk Stoyan V. Stoyanov Svetlozar T. Rachev September 3, 7 Abstract In this paper, we prove a result for the asymptotic distribution of the sample

More information

Efficient Estimation of Distributional Tail Shape and the Extremal Index with Applications to Risk Management

Efficient Estimation of Distributional Tail Shape and the Extremal Index with Applications to Risk Management Journal of Mathematical Finance, 2016, 6, 626-659 http://www.scirp.org/journal/jmf ISSN Online: 2162-2442 ISSN Print: 2162-2434 Efficient Estimation of Distributional Tail Shape and the Extremal Index

More information

Estimation de mesures de risques à partir des L p -quantiles

Estimation de mesures de risques à partir des L p -quantiles 1/ 42 Estimation de mesures de risques à partir des L p -quantiles extrêmes Stéphane GIRARD (Inria Grenoble Rhône-Alpes) collaboration avec Abdelaati DAOUIA (Toulouse School of Economics), & Gilles STUPFLER

More information

Risk Aggregation. Paul Embrechts. Department of Mathematics, ETH Zurich Senior SFI Professor.

Risk Aggregation. Paul Embrechts. Department of Mathematics, ETH Zurich Senior SFI Professor. Risk Aggregation Paul Embrechts Department of Mathematics, ETH Zurich Senior SFI Professor www.math.ethz.ch/~embrechts/ Joint work with P. Arbenz and G. Puccetti 1 / 33 The background Query by practitioner

More information

X

X Correlation: Pitfalls and Alternatives Paul Embrechts, Alexander McNeil & Daniel Straumann Departement Mathematik, ETH Zentrum, CH-8092 Zürich Tel: +41 1 632 61 62, Fax: +41 1 632 15 23 embrechts/mcneil/strauman@math.ethz.ch

More information

Frontier estimation based on extreme risk measures

Frontier estimation based on extreme risk measures Frontier estimation based on extreme risk measures by Jonathan EL METHNI in collaboration with Ste phane GIRARD & Laurent GARDES CMStatistics 2016 University of Seville December 2016 1 Risk measures 2

More information

Characterizations on Heavy-tailed Distributions by Means of Hazard Rate

Characterizations on Heavy-tailed Distributions by Means of Hazard Rate Acta Mathematicae Applicatae Sinica, English Series Vol. 19, No. 1 (23) 135 142 Characterizations on Heavy-tailed Distributions by Means of Hazard Rate Chun Su 1, Qi-he Tang 2 1 Department of Statistics

More information

Risk Aggregation and Model Uncertainty

Risk Aggregation and Model Uncertainty Risk Aggregation and Model Uncertainty Paul Embrechts RiskLab, Department of Mathematics, ETH Zurich Senior SFI Professor www.math.ethz.ch/ embrechts/ Joint work with A. Beleraj, G. Puccetti and L. Rüschendorf

More information

Reduced-load equivalence for queues with Gaussian input

Reduced-load equivalence for queues with Gaussian input Reduced-load equivalence for queues with Gaussian input A. B. Dieker CWI P.O. Box 94079 1090 GB Amsterdam, the Netherlands and University of Twente Faculty of Mathematical Sciences P.O. Box 17 7500 AE

More information

CONTAGION VERSUS FLIGHT TO QUALITY IN FINANCIAL MARKETS

CONTAGION VERSUS FLIGHT TO QUALITY IN FINANCIAL MARKETS EVA IV, CONTAGION VERSUS FLIGHT TO QUALITY IN FINANCIAL MARKETS Jose Olmo Department of Economics City University, London (joint work with Jesús Gonzalo, Universidad Carlos III de Madrid) 4th Conference

More information

The Goodness-of-fit Test for Gumbel Distribution: A Comparative Study

The Goodness-of-fit Test for Gumbel Distribution: A Comparative Study MATEMATIKA, 2012, Volume 28, Number 1, 35 48 c Department of Mathematics, UTM. The Goodness-of-fit Test for Gumbel Distribution: A Comparative Study 1 Nahdiya Zainal Abidin, 2 Mohd Bakri Adam and 3 Habshah

More information

Finite-time Ruin Probability of Renewal Model with Risky Investment and Subexponential Claims

Finite-time Ruin Probability of Renewal Model with Risky Investment and Subexponential Claims Proceedings of the World Congress on Engineering 29 Vol II WCE 29, July 1-3, 29, London, U.K. Finite-time Ruin Probability of Renewal Model with Risky Investment and Subexponential Claims Tao Jiang Abstract

More information

Losses Given Default in the Presence of Extreme Risks

Losses Given Default in the Presence of Extreme Risks Losses Given Default in the Presence of Extreme Risks Qihe Tang [a] and Zhongyi Yuan [b] [a] Department of Statistics and Actuarial Science University of Iowa [b] Smeal College of Business Pennsylvania

More information

Asymptotic Tail Probabilities of Sums of Dependent Subexponential Random Variables

Asymptotic Tail Probabilities of Sums of Dependent Subexponential Random Variables Asymptotic Tail Probabilities of Sums of Dependent Subexponential Random Variables Jaap Geluk 1 and Qihe Tang 2 1 Department of Mathematics The Petroleum Institute P.O. Box 2533, Abu Dhabi, United Arab

More information

Analysis methods of heavy-tailed data

Analysis methods of heavy-tailed data Institute of Control Sciences Russian Academy of Sciences, Moscow, Russia February, 13-18, 2006, Bamberg, Germany June, 19-23, 2006, Brest, France May, 14-19, 2007, Trondheim, Norway PhD course Chapter

More information

WEIGHTED SUMS OF SUBEXPONENTIAL RANDOM VARIABLES AND THEIR MAXIMA

WEIGHTED SUMS OF SUBEXPONENTIAL RANDOM VARIABLES AND THEIR MAXIMA Adv. Appl. Prob. 37, 510 522 2005 Printed in Northern Ireland Applied Probability Trust 2005 WEIGHTED SUMS OF SUBEXPONENTIAL RANDOM VARIABLES AND THEIR MAXIMA YIQING CHEN, Guangdong University of Technology

More information

Modeling Extremal Events Is Not Easy: Why the Extreme Value Theorem Cannot Be As General As the Central Limit Theorem

Modeling Extremal Events Is Not Easy: Why the Extreme Value Theorem Cannot Be As General As the Central Limit Theorem University of Texas at El Paso DigitalCommons@UTEP Departmental Technical Reports (CS) Department of Computer Science 5-2015 Modeling Extremal Events Is Not Easy: Why the Extreme Value Theorem Cannot Be

More information

Expected Shortfall is not elicitable so what?

Expected Shortfall is not elicitable so what? Expected Shortfall is not elicitable so what? Dirk Tasche Bank of England Prudential Regulation Authority 1 dirk.tasche@gmx.net Modern Risk Management of Insurance Firms Hannover, January 23, 2014 1 The

More information

Comparing downside risk measures for heavy tailed distributions

Comparing downside risk measures for heavy tailed distributions Comparing downside risk measures for heavy tailed distributions Jon Danielsson Bjorn N. Jorgensen Mandira Sarma Casper G. de Vries March 6, 2005 Abstract In this paper we study some prominent downside

More information

arxiv:cond-mat/ v1 23 Jul 2002

arxiv:cond-mat/ v1 23 Jul 2002 Remarks on the monotonicity of default probabilities Dirk Tasche arxiv:cond-mat/0207555v1 23 Jul 2002 July 23, 2002 Abstract The consultative papers for the Basel II Accord require rating systems to provide

More information

Bias-corrected goodness-of-fit tests for Pareto-type behavior

Bias-corrected goodness-of-fit tests for Pareto-type behavior Bias-corrected goodness-of-fit tests for Pareto-type behavior Yuri Goegebeur University of Southern Denmark, Department of Statistics JB Winsløws Ve 9B DK5000 Odense C, Denmark E-mail: yurigoegebeur@statsdudk

More information

Abstract: In this short note, I comment on the research of Pisarenko et al. (2014) regarding the

Abstract: In this short note, I comment on the research of Pisarenko et al. (2014) regarding the Comment on Pisarenko et al. Characterization of the Tail of the Distribution of Earthquake Magnitudes by Combining the GEV and GPD Descriptions of Extreme Value Theory Mathias Raschke Institution: freelancer

More information

Estimation of Quantiles

Estimation of Quantiles 9 Estimation of Quantiles The notion of quantiles was introduced in Section 3.2: recall that a quantile x α for an r.v. X is a constant such that P(X x α )=1 α. (9.1) In this chapter we examine quantiles

More information

Regular Variation and Extreme Events for Stochastic Processes

Regular Variation and Extreme Events for Stochastic Processes 1 Regular Variation and Extreme Events for Stochastic Processes FILIP LINDSKOG Royal Institute of Technology, Stockholm 2005 based on joint work with Henrik Hult www.math.kth.se/ lindskog 2 Extremes for

More information

Chapter 1. Root Finding Methods. 1.1 Bisection method

Chapter 1. Root Finding Methods. 1.1 Bisection method Chapter 1 Root Finding Methods We begin by considering numerical solutions to the problem f(x) = 0 (1.1) Although the problem above is simple to state it is not always easy to solve analytically. This

More information

Operational Risk and Pareto Lévy Copulas

Operational Risk and Pareto Lévy Copulas Operational Risk and Pareto Lévy Copulas Claudia Klüppelberg Technische Universität München email: cklu@ma.tum.de http://www-m4.ma.tum.de References: - Böcker, K. and Klüppelberg, C. (25) Operational VaR

More information

Regularly Varying Asymptotics for Tail Risk

Regularly Varying Asymptotics for Tail Risk Regularly Varying Asymptotics for Tail Risk Haijun Li Department of Mathematics Washington State University Humboldt Univ-Berlin Haijun Li Regularly Varying Asymptotics for Tail Risk Humboldt Univ-Berlin

More information

Gaussian processes. Chuong B. Do (updated by Honglak Lee) November 22, 2008

Gaussian processes. Chuong B. Do (updated by Honglak Lee) November 22, 2008 Gaussian processes Chuong B Do (updated by Honglak Lee) November 22, 2008 Many of the classical machine learning algorithms that we talked about during the first half of this course fit the following pattern:

More information

Expected Shortfall is not elicitable so what?

Expected Shortfall is not elicitable so what? Expected Shortfall is not elicitable so what? Dirk Tasche Bank of England Prudential Regulation Authority 1 dirk.tasche@gmx.net Finance & Stochastics seminar Imperial College, November 20, 2013 1 The opinions

More information

Linear-Quadratic Optimal Control: Full-State Feedback

Linear-Quadratic Optimal Control: Full-State Feedback Chapter 4 Linear-Quadratic Optimal Control: Full-State Feedback 1 Linear quadratic optimization is a basic method for designing controllers for linear (and often nonlinear) dynamical systems and is actually

More information

Generalized quantiles as risk measures

Generalized quantiles as risk measures Generalized quantiles as risk measures Bellini, Klar, Muller, Rosazza Gianin December 1, 2014 Vorisek Jan Introduction Quantiles q α of a random variable X can be defined as the minimizers of a piecewise

More information

Randomly Weighted Sums of Conditionnally Dependent Random Variables

Randomly Weighted Sums of Conditionnally Dependent Random Variables Gen. Math. Notes, Vol. 25, No. 1, November 2014, pp.43-49 ISSN 2219-7184; Copyright c ICSRS Publication, 2014 www.i-csrs.org Available free online at http://www.geman.in Randomly Weighted Sums of Conditionnally

More information

Precise Large Deviations for Sums of Negatively Dependent Random Variables with Common Long-Tailed Distributions

Precise Large Deviations for Sums of Negatively Dependent Random Variables with Common Long-Tailed Distributions This article was downloaded by: [University of Aegean] On: 19 May 2013, At: 11:54 Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer

More information

Math 576: Quantitative Risk Management

Math 576: Quantitative Risk Management Math 576: Quantitative Risk Management Haijun Li lih@math.wsu.edu Department of Mathematics Washington State University Week 11 Haijun Li Math 576: Quantitative Risk Management Week 11 1 / 21 Outline 1

More information

Estimation of risk measures for extreme pluviometrical measurements

Estimation of risk measures for extreme pluviometrical measurements Estimation of risk measures for extreme pluviometrical measurements by Jonathan EL METHNI in collaboration with Laurent GARDES & Stéphane GIRARD 26th Annual Conference of The International Environmetrics

More information

Modelação de valores extremos e sua importância na

Modelação de valores extremos e sua importância na Modelação de valores extremos e sua importância na segurança e saúde Margarida Brito Departamento de Matemática FCUP (FCUP) Valores Extremos - DemSSO 1 / 12 Motivation Consider the following events Occurance

More information

Estimation of Truncated Data Samples in Operational Risk Modeling

Estimation of Truncated Data Samples in Operational Risk Modeling 2015 The Journal of Risk and Insurance. Vol. 83, No. 3, 613 640 2016). DOI: 10.1111/jori.12062 Estimation of Truncated Data Samples in Operational Risk Modeling Bakhodir Ergashev Konstantin Pavlikov Stan

More information

Extreme Value Theory as a Theoretical Background for Power Law Behavior

Extreme Value Theory as a Theoretical Background for Power Law Behavior Extreme Value Theory as a Theoretical Background for Power Law Behavior Simone Alfarano 1 and Thomas Lux 2 1 Department of Economics, University of Kiel, alfarano@bwl.uni-kiel.de 2 Department of Economics,

More information

Parametric Techniques Lecture 3

Parametric Techniques Lecture 3 Parametric Techniques Lecture 3 Jason Corso SUNY at Buffalo 22 January 2009 J. Corso (SUNY at Buffalo) Parametric Techniques Lecture 3 22 January 2009 1 / 39 Introduction In Lecture 2, we learned how to

More information

Semi-parametric tail inference through Probability-Weighted Moments

Semi-parametric tail inference through Probability-Weighted Moments Semi-parametric tail inference through Probability-Weighted Moments Frederico Caeiro New University of Lisbon and CMA fac@fct.unl.pt and M. Ivette Gomes University of Lisbon, DEIO, CEAUL and FCUL ivette.gomes@fc.ul.pt

More information

Minimization of the root of a quadratic functional under a system of affine equality constraints with application in portfolio management

Minimization of the root of a quadratic functional under a system of affine equality constraints with application in portfolio management Minimization of the root of a quadratic functional under a system of affine equality constraints with application in portfolio management Zinoviy Landsman Department of Statistics, University of Haifa.

More information

Pareto approximation of the tail by local exponential modeling

Pareto approximation of the tail by local exponential modeling Pareto approximation of the tail by local exponential modeling Ion Grama Université de Bretagne Sud rue Yves Mainguy, Tohannic 56000 Vannes, France email: ion.grama@univ-ubs.fr Vladimir Spokoiny Weierstrass

More information

Sharp bounds on the VaR for sums of dependent risks

Sharp bounds on the VaR for sums of dependent risks Paul Embrechts Sharp bounds on the VaR for sums of dependent risks joint work with Giovanni Puccetti (university of Firenze, Italy) and Ludger Rüschendorf (university of Freiburg, Germany) Mathematical

More information

EXTREMAL MODELS AND ENVIRONMENTAL APPLICATIONS. Rick Katz

EXTREMAL MODELS AND ENVIRONMENTAL APPLICATIONS. Rick Katz 1 EXTREMAL MODELS AND ENVIRONMENTAL APPLICATIONS Rick Katz Institute for Study of Society and Environment National Center for Atmospheric Research Boulder, CO USA email: rwk@ucar.edu Home page: www.isse.ucar.edu/hp_rick/

More information

Operational Risk and Pareto Lévy Copulas

Operational Risk and Pareto Lévy Copulas Operational Risk and Pareto Lévy Copulas Claudia Klüppelberg Technische Universität München email: cklu@ma.tum.de http://www-m4.ma.tum.de References: - Böcker, K. and Klüppelberg, C. (25) Operational VaR

More information

Pitfalls in Using Weibull Tailed Distributions

Pitfalls in Using Weibull Tailed Distributions Pitfalls in Using Weibull Tailed Distributions Alexandru V. Asimit, Deyuan Li & Liang Peng First version: 18 December 2009 Research Report No. 27, 2009, Probability and Statistics Group School of Mathematics,

More information

Spatial and temporal extremes of wildfire sizes in Portugal ( )

Spatial and temporal extremes of wildfire sizes in Portugal ( ) International Journal of Wildland Fire 2009, 18, 983 991. doi:10.1071/wf07044_ac Accessory publication Spatial and temporal extremes of wildfire sizes in Portugal (1984 2004) P. de Zea Bermudez A, J. Mendes

More information

A Bayesian perspective on GMM and IV

A Bayesian perspective on GMM and IV A Bayesian perspective on GMM and IV Christopher A. Sims Princeton University sims@princeton.edu November 26, 2013 What is a Bayesian perspective? A Bayesian perspective on scientific reporting views all

More information

Bias Reduction in the Estimation of a Shape Second-order Parameter of a Heavy Right Tail Model

Bias Reduction in the Estimation of a Shape Second-order Parameter of a Heavy Right Tail Model Bias Reduction in the Estimation of a Shape Second-order Parameter of a Heavy Right Tail Model Frederico Caeiro Universidade Nova de Lisboa, FCT and CMA M. Ivette Gomes Universidade de Lisboa, DEIO, CEAUL

More information

A Partially Reduced-Bias Class of Value-at-Risk Estimators

A Partially Reduced-Bias Class of Value-at-Risk Estimators A Partially Reduced-Bias Class of Value-at-Risk Estimators M. Ivette Gomes CEAUL and DEIO, FCUL, Universidade de Lisboa, Portugal, e-mail: ivette.gomes@fc.ul.pt Frederico Caeiro CMA and DM, Universidade

More information

Parametric Techniques

Parametric Techniques Parametric Techniques Jason J. Corso SUNY at Buffalo J. Corso (SUNY at Buffalo) Parametric Techniques 1 / 39 Introduction When covering Bayesian Decision Theory, we assumed the full probabilistic structure

More information

Additivity properties for Value-at-Risk under Archimedean dependence and heavy-tailedness

Additivity properties for Value-at-Risk under Archimedean dependence and heavy-tailedness Additivity properties for Value-at-Risk under Archimedean dependence and heavy-tailedness Paul Embrechts, Johanna Nešlehová, Mario V. Wüthrich Abstract Mainly due to new capital adequacy standards for

More information

SOME INDICES FOR HEAVY-TAILED DISTRIBUTIONS

SOME INDICES FOR HEAVY-TAILED DISTRIBUTIONS SOME INDICES FOR HEAVY-TAILED DISTRIBUTIONS ROBERTO DARIS and LUCIO TORELLI Dipartimento di Matematica Applicata B. de Finetti Dipartimento di Scienze Matematiche Universitk degli Studi di Trieste P.le

More information

Generalized additive modelling of hydrological sample extremes

Generalized additive modelling of hydrological sample extremes Generalized additive modelling of hydrological sample extremes Valérie Chavez-Demoulin 1 Joint work with A.C. Davison (EPFL) and Marius Hofert (ETHZ) 1 Faculty of Business and Economics, University of

More information

September Math Course: First Order Derivative

September Math Course: First Order Derivative September Math Course: First Order Derivative Arina Nikandrova Functions Function y = f (x), where x is either be a scalar or a vector of several variables (x,..., x n ), can be thought of as a rule which

More information

Classical Extreme Value Theory - An Introduction

Classical Extreme Value Theory - An Introduction Chapter 1 Classical Extreme Value Theory - An Introduction 1.1 Introduction Asymptotic theory of functions of random variables plays a very important role in modern statistics. The objective of the asymptotic

More information

Multivariate generalized Pareto distributions

Multivariate generalized Pareto distributions Bernoulli 12(5), 2006, 917 930 Multivariate generalized Pareto distributions HOLGER ROOTZÉN 1 and NADER TAJVIDI 2 1 Chalmers University of Technology, S-412 96 Göteborg, Sweden. E-mail rootzen@math.chalmers.se

More information

NOTES ON PRODUCT SYSTEMS

NOTES ON PRODUCT SYSTEMS NOTES ON PRODUCT SYSTEMS WILLIAM ARVESON Abstract. We summarize the basic properties of continuous tensor product systems of Hilbert spaces and their role in non-commutative dynamics. These are lecture

More information

Bayesian Inference for Clustered Extremes

Bayesian Inference for Clustered Extremes Newcastle University, Newcastle-upon-Tyne, U.K. lee.fawcett@ncl.ac.uk 20th TIES Conference: Bologna, Italy, July 2009 Structure of this talk 1. Motivation and background 2. Review of existing methods Limitations/difficulties

More information

On the Application of the Generalized Pareto Distribution for Statistical Extrapolation in the Assessment of Dynamic Stability in Irregular Waves

On the Application of the Generalized Pareto Distribution for Statistical Extrapolation in the Assessment of Dynamic Stability in Irregular Waves On the Application of the Generalized Pareto Distribution for Statistical Extrapolation in the Assessment of Dynamic Stability in Irregular Waves Bradley Campbell 1, Vadim Belenky 1, Vladas Pipiras 2 1.

More information

On the Estimation and Application of Max-Stable Processes

On the Estimation and Application of Max-Stable Processes On the Estimation and Application of Max-Stable Processes Zhengjun Zhang Department of Statistics University of Wisconsin Madison, WI 53706, USA Co-author: Richard Smith EVA 2009, Fort Collins, CO Z. Zhang

More information

Multivariate Distributions

Multivariate Distributions IEOR E4602: Quantitative Risk Management Spring 2016 c 2016 by Martin Haugh Multivariate Distributions We will study multivariate distributions in these notes, focusing 1 in particular on multivariate

More information

Additive functionals of infinite-variance moving averages. Wei Biao Wu The University of Chicago TECHNICAL REPORT NO. 535

Additive functionals of infinite-variance moving averages. Wei Biao Wu The University of Chicago TECHNICAL REPORT NO. 535 Additive functionals of infinite-variance moving averages Wei Biao Wu The University of Chicago TECHNICAL REPORT NO. 535 Departments of Statistics The University of Chicago Chicago, Illinois 60637 June

More information

Estimation of Operational Risk Capital Charge under Parameter Uncertainty

Estimation of Operational Risk Capital Charge under Parameter Uncertainty Estimation of Operational Risk Capital Charge under Parameter Uncertainty Pavel V. Shevchenko Principal Research Scientist, CSIRO Mathematical and Information Sciences, Sydney, Locked Bag 17, North Ryde,

More information

Extreme L p quantiles as risk measures

Extreme L p quantiles as risk measures 1/ 27 Extreme L p quantiles as risk measures Stéphane GIRARD (Inria Grenoble Rhône-Alpes) joint work Abdelaati DAOUIA (Toulouse School of Economics), & Gilles STUPFLER (University of Nottingham) December

More information

Change Point Analysis of Extreme Values

Change Point Analysis of Extreme Values Change Point Analysis of Extreme Values TIES 2008 p. 1/? Change Point Analysis of Extreme Values Goedele Dierckx Economische Hogeschool Sint Aloysius, Brussels, Belgium e-mail: goedele.dierckx@hubrussel.be

More information

Variable inspection plans for continuous populations with unknown short tail distributions

Variable inspection plans for continuous populations with unknown short tail distributions Variable inspection plans for continuous populations with unknown short tail distributions Wolfgang Kössler Abstract The ordinary variable inspection plans are sensitive to deviations from the normality

More information

Semi-parametric predictive inference for bivariate data using copulas

Semi-parametric predictive inference for bivariate data using copulas Semi-parametric predictive inference for bivariate data using copulas Tahani Coolen-Maturi a, Frank P.A. Coolen b,, Noryanti Muhammad b a Durham University Business School, Durham University, Durham, DH1

More information

The Subexponential Product Convolution of Two Weibull-type Distributions

The Subexponential Product Convolution of Two Weibull-type Distributions The Subexponential Product Convolution of Two Weibull-type Distributions Yan Liu School of Mathematics and Statistics Wuhan University Wuhan, Hubei 4372, P.R. China E-mail: yanliu@whu.edu.cn Qihe Tang

More information

HIERARCHICAL MODELS IN EXTREME VALUE THEORY

HIERARCHICAL MODELS IN EXTREME VALUE THEORY HIERARCHICAL MODELS IN EXTREME VALUE THEORY Richard L. Smith Department of Statistics and Operations Research, University of North Carolina, Chapel Hill and Statistical and Applied Mathematical Sciences

More information