1 Math. Program., Ser. A (2007) 110: DOI /s FULL LENGTH PAPER On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems Yunpeng Pan Leyuan Shi Received: 4 April 2005 / Accepted: 12 May 2006 / Published online: 14 July 2006 Springer-Verlag 2006 Abstract New observations are made about two lower bound schemes for single-machine min-sum scheduling problems. We find that the strongest bound of those provided by transportation problem relaxations can be computed by solving a linear program. We show the equivalence of this strongest bound and the bound provided by the LP relaxation of the time-indexed integer programming formulation. These observations lead to a new lower bound scheme that yields fast approximation of the time-indexed bound. Several techniques are developed to facilitate the effective use of the new lower bound in branch-andbound. Numerical experiments are conducted on 375 benchmark problems of the total weighted tardiness problem from OR-Library. Results obtained with our new method are spectacular; we are able to solve all 125 open problems to optimality. Keywords Scheduling Combinatorial optimization Time-indexing 1 Introduction The application of linear programming (LP)-based lower bounds has fundamentally changed the landscapes of many areas of discrete optimization. Y. Pan (B) TomoTherapy Inc., 1240 Deming Way, Madison, WI , USA ypan@tomotherapy.com L. Shi ISyE Department, University of Wisconsin-Madison, Madison, WI 53706, USA leyuan@engr.wisc.edu

2 544 Y. Pan, L. Shi However, machine scheduling is one of the remaining strongholds where LPbased methods have not been able to compete with specialized algorithms. It is our hope that the results to be presented here would tip the balance of power to the favor of LP-based methods. First, let us describe the problem. Jobs 1,..., n need to be processed on a machine that can only process one job at a time without interruption. Job j takes time p j to complete; upon its completion at time t j, it incurs cost f j (t j ), which is an arbitrary function. The objective is to find a processing sequence such that the total cost, n j=1 f j (t j ), is minimized. Even for the most common cost functions, the problem may be intractable. The optimal solution of the problem hence entails clever enumeration, which in turn requires a tight lower bound. The classical scheduling approach assumes specific cost functions and develops lower bounds, typically without using LP. An apparent drawback is that specialized schemes become invalid with generalization of the problem. Within the mathematical programming community, there are two main schools of thought regarding how to formulate the problem. Integer programming (IP) formulations using continuous completion (or start) time variables along with binary variables have been proposed. Early work along this line includes that of Balas [6, 7]. The LP relaxations of these formulations are not very strong, despite various efforts to strengthen them using valid inequalities [4, 7] (see [18] for a comprehensive survey). On the other hand, time-indexed IP formulations have been studied. Dyer and Wolsey [12] show that a particular time-indexed formulation gives the strongest bound among several formulations, ranging from combinatorial lower bounds to LP-based ones. Polyhedral results are also proposed to further strengthen the LP relaxation of the timeindexed formulation [2, 21]. Despite its superior quality, one criticism of the time-indexed formulation is that time-indexing can result in a possibly huge number of time periods, as the number of time periods is not bounded by a polynomial function in the number of jobs. Therefore, model accuracy sometimes may have to be sacrificed with a coarse discretization of time, in an effort to curb the formulation size. A clear advantage of time-indexing is that the cost functions f j ( ) can be arbitrary, including nonlinear functions, as long as f j ( ) can be evaluated at each point. The biggest disadvantage of time-indexing, however, is that it involves a large number of variables and constraints, so much so that even the LP relaxation can be difficult to solve. To address this problem, Van den Akker et al. [3] exploit the sparsity in the LP solution through column generation. While column generation can speed up the solution of the LP relaxation as seen in [3], it has not overcome the breaking point where the large majority of instances with more than 30 jobs can be solved. More recent work includes [8] on the time-indexed formulation and column generation, and [5] on the time-indexed formulation and the Lagrangian relaxation. In this paper, the time-indexed formulation should be interpreted as the particular one studied in [2, 21]. The time-indexed lower bound refers to the bound provided by the LP relaxation of the time-indexed formulation. We report a somewhat unexpected result. It turns out that the time-indexed lower bound

3 Equivalence of max-min transportation bound and time-indexed bound 545 can be obtained in a completely different light. Specifically, we point out that the strongest bound from the family of lower bounds provided by transportation problem relaxations of the problem can be determined by solving a single linear program. Furthermore, this bound is shown to be equal to the time-indexed lower bound. We propose methods that offer a more cost-effective way to leverage the quality of the time-indexed lower bound in branch-and-bound. Although the initial work at the root node is no less than that required by the time-indexed lower bound, we are able to extract some crucial structural information that can be re-used at subsequent nodes. Computing lower bounds for nodes other than the root then amounts to solving transportation problems. The paper is organized as follows. Section 2 introduces the new lower bound and presents the equivalence proof. Section 3 addresses a number of issues regarding how to use the lower bound effectively in branch-and-bound. Section 4 reports on our computational experience in using the lower bound in branch-and-bound algorithms for solving the total weighted tardiness scheduling problem. Section 5 presents some concluding remarks. 2 Max-min transportation lower bound 2.1 General lower bound scheme The transportation problem relaxation of scheduling problems with min-sum objectives and general cost functions was first introduced by Lawler [14] in his 1964 seminal paper. Let us assume that jobs 1,..., n are to be processed during time window [0, T]. To discretize the time window, we refer to the time interval [t, t + 1) as period t; hence, t = 0,..., T 1. The following transportation problem can be constructed: (P(c)) min s.t. T 1 c jt x jt j=1 T 1 x jt = p j, j = 1,..., n, (1) x jt 1, t = 0,..., T 1, (2) j=1 x jt 0, j = 1,..., n; t = 0,..., T 1, (3) where x jt = 1ifjobj is assigned to period t, and x jt = 0 otherwise; c jt is the transportation cost. Lawler [14] gives the following sufficient condition under which (P(c)) will provide a lower bound for the scheduling problem:

4 546 Y. Pan, L. Shi Proposition 1 ([14]) A sufficient condition for (P(c)) to provide a lower bound for the scheduling problem is t+p j 1 s=t c js = f j (t + p j ), j = 1,..., n; t = 0,..., T p j. (4) A less stringent condition is obtained by changing = to in(4): Proposition 2 A sufficient condition for (P(c)) to provide a lower bound for the scheduling problem is t+p j 1 s=t c js f j (t + p j ), j = 1,..., n; t = 0,..., T p j. (5) The sufficiency of these conditions is obvious. Both (4) and (5) require that if all the p j units of processing are assigned to consecutive periods, the total transportation cost for this job cannot exceed the cost of job completion after the last of these periods. Since in (P(c)) jobs do not have to be assigned to consecutive periods, the minimum value of (P(c)) is therefore a lower bound. Further, we have found many examples indicating that the bounds produced by (5) are often strictly stronger than those produced by (4). Regardless of which of these conditions is adopted, it leaves an infinite number of choices for cost vector c. Lawler [14] seems to have left this question open. All previous work along this line focuses on particular job cost functions, and heuristically chooses cost structures that are plausible for their respective job cost functions; e.g., [12,19] using (4) and [9,13] using (5). We propose to determine an optimal cost structure that yields the strongest transportation problem relaxation. Our approach is fundamentally different than previous work in two respects. First, no assumption of a particular job cost function is made. Second, the bound provided by this strongest transportation problem relaxation has superior quality. In contrast, previous relaxations are viewed to have rather poor quality. The stark difference in bound quality is due to the fact that our optimal cost structure takes into account interactions among competing jobs, whereas previous heuristic cost structures have not been able to capture such interactions. 2.2 Optimal choice of c Let LB(c) denote the optimal objective value of the transportation problem (P(c)). Then, we define the max-min transportation lower bound as LB = max{lb(c) c satisfies (5)}. LB(c) is a concave function of c, and subgradient optimization may thus be used. However, it is important to note that the choice of c is constrained by (5). Although constrained subgradient optimization via projection can be applied, it makes the already slow convergence of subgradient

5 Equivalence of max-min transportation bound and time-indexed bound 547 optimization even slower. To resolve the difficulty of this max-min problem, we consider the LP dual problem of (P(c)) instead: LB(c) = max j=1 T 1 p j u j + v t (DP(c)) s.t. u j + v t c jt, j = 1,..., n; t = 0,..., T 1, u j free, j = 1,..., n and v t 0, t = 0,..., T 1, where (u, v) are the dual variables associated with (1) (2). Hence, the original two-stage problem reduces to a linear program with variables (u, v, c): LB = max j=1 T 1 p j u j + v t (P1) s.t. (5), u j + v t c jt 0, j = 1,..., n; t = 0,..., T 1, (6) u j free, j = 1,..., n and v t 0, t = 0,..., T 1, (7) 2.3 Equivalence of LB and the time-indexed lower bound The max-min transportation lower bound LB, by definition, is the strongest lower bound from the family of lower bounds provided by transportation problem relaxations of the scheduling problem. For a particular c that satisfies (4), Dyer and Wolsey [12] prove that LB(c) is dominated by the time-indexed lower bound. Other than this result, LB seemingly has nothing to do with the timeindexed lower bound. However, in our preliminary experiments, we compared these two bounds, and to our great surprise, they were equal on all test problems. A closer examination revealed that it was no coincidence that the two bounds matched on those test problems. We recall the LP relaxation of the time-indexed IP formulation: (TI) min s.t. j=1 T p j T p j f j (t + p j )y jt y jt = 1, j = 1,..., n, (8) t j=1 s=t p j +1 y jt 1, t = 0,..., T 1, (9) y jt 0, j = 1,..., n; t = 0,..., T p j, where variables y jt = 1ifjobj is to start in period t, and y jt = 0 otherwise.

6 548 Y. Pan, L. Shi Theorem 1 The max-min transportation lower bound and the time-indexed lower bound are equivalent. Proof Consider problem (P1). We first project the polyhedron represented by constraints (5) (7) from (u, v, c)-space to (u, v)-space. This is straightforward since c variables are free and their coefficients in the objective function of (P1) are all zeros. Hence, (P1) is reduced to (P1 ): LB = max j=1 (P1 ) s.t. p j u j + T 1 p j u j + t+p j 1 s=t v t v s f j (t+p j ), j=1,..., n;,..., T p j, (10) u j free, j = 1,..., n and v t 0, t = 0,..., T 1. (11) If (u, v, c) satisfies (5) (7), then (u, v) satisfies (10) (11). Conversely, if (u, v) satisfies (10) (11), we define (u, v, c) where c jt = u j + v t for all j, t; such a (u, v, c) satisfies (5) (7). If we replace p j u j with a new variable u j, and v t with v t in (P1 ), it is not difficult to verify that (P1 ) is the LP dual problem of (TI). Hence, their optimal values are equal. Note that the variables u j = p ju j, j = 1,..., n and v t = v t, t = 0,..., T 1 (12) are the dual variables associated with constraints (8) (9) in (TI). 3 Using the new lower bound in branch-and-bound The time-indexed lower bound is known to be strong, typically, with an initial gap of less than 1 2% in our experience as well as those of others (see, e.g., [2]). As mentioned before, the computational expense of the bound is unfortunately too high for even moderate sized problems. In this section, we discuss how to use the proposed max-min transportation lower bound in branch-and-bound, which can be done much more efficiently due to the structure of transportation problems. The original contribution of our proposed method is that it eliminates the need to compute time-indexed lower bounds at all nodes except the root. Since the root and other nodes in the search tree are handled differently, we proceed to explain the treatment of each node type separately. 3.1 Root node The main task to be accomplished at the root is to compute the optimal transportation costs for later use at other nodes. While it suffices to solve (P1), it

7 Equivalence of max-min transportation bound and time-indexed bound 549 is not a particularly efficient way, since this LP has (n + T + nt) columns and (2nT +n P) rows, where P = n j=1 p j is the sum of job processing times. Alternatively, we propose a method that first solves the projected problem (P1 )to determine optimal (u, v) values, and then computes an optimal c value for the fixed (u, v) values. Solution of problem (P1 ). In comparison with (P1), (P1 ) is a lot smaller in size, with only (n+t) columns and (nt +n P) rows. Furthermore, we find that it is conducive to transpose the coefficient matrix so that there are fewer rows than columns; then, fewer logical/slack variables would need to be added by an LP solver. We therefore solve, instead, the LP dual problem of (P1 ), which is (TI). After (TI) is solved, we extract the dual variable values associated with its constraints and use (12) to obtain (u, v) values. It is important to note that this is the only time when (TI) needs to be solved. A sparse reformulation of (TI). Although (TI) has fewer columns and rows than (P1), the size of (TI) remains the most serious challenge that we must face when trying to solve the LP. In fact, the size of (TI) as measured by the number of nonzeros in its coefficient matrix, roughly quadruples as the processing time range doubles. For example, with a processing time range of [1, 100], our 2.8 GHz PC equipped with 1 GB of memory would barely be able to solve the LP for n = 50; for n = 100, the initial loading of the LP data would activate virtual memory in addition to the 1 GB physical memory, thereby reducing solver execution to a crawl. To deal with this size issue, we introduce a simple, but useful sparse reformulation of (TI) whose size grows linearly with the expansion of the processing time range. As a result, an LP solver now can run faster and can solve problems that previously were too large to load into the memory. Let job 0 denote a dummy job with unit processing time, i.e., p 0 = 1. We expand the variable set of (TI) by adding variables y 0t (t = 0,..., T 1). When job 0 is started in period t, i.e., y 0t = 1, it indicates the idling of the machine in this period at cost f 0 (t + p 0 ) 0. In addition, job 0 is not subject to constraints (8), and can be started more than once. Hence, we have the following reformulation: min j=1 (TI ) s.t. (8), T p j j=0 s=t p j +1 f j (t + p j )y jt t y jt = 1, t = 0,..., T 1, (13) y jt 0, j = 0,..., n; t = 0,..., T p j, where the y 0t variables can also be viewed as slack variables. Furthermore, the constraints in (13) form an interval matrix, in which 1 s appear consecutively in each column [2, 15]. Hence, we can apply the following row

8 550 Y. Pan, L. Shi transformations to these constraints: The equation for t = 0 is left unchanged; for t = 1,..., T 1, we multiply both sides of the equation for t 1by 1 and then add it to the equation for t. This gives us a sparse reformulation: min j=1 T p j f j (t + p j )y jt (TIS) s.t. (8), y j0 = 1, (14) j=0 (y jt y j(t pj )) = 0, t = 1,..., T 1, (15) j=0 y jt 0, j = 0,..., n; t = 0,..., T p j. Note that the number of nonzeros in each equation of (15) does not exceed 2(n + 1), independent of processing time range. Now suppose that we have solved problem (TIS) to obtain an optimal primal solution y jt (j = 0,..., n; t = 0,..., T p j ) along with dual variable values u j (j = 1,..., n), v 0, and v t (t = 1,..., T 1) associated with constraints (8), (14), and (15), respectively. The restriction of the primal solution to index set (j = 1,..., n; t = 0,..., T p j ) is of course optimal to (TI). The dual variable values associated with constraints of (TI) are not explicit, but can be reconstituted as follows. Recall that (TI ) results from the addition of slack variables to (TI); thus, the dual variable values associated with the constraints are the same. Let A =[B; N] be the coefficient matrix of (TI ), where B is an (n + T) (n + T) matrix consisting of the basic columns associated with the optimal LP solution, and N consists of nonbasic columns. Also, let f =[..., f j (t + p j ),...] T be the vector of the objective function coefficients. From linear programming theory, we have at optimality, [u T, v T ]B = f T. (16) The row transformation involving consecutive periods t 1 and t can be written in matrix notation as L t = I I 2 (t + n)th row, (t n)th row, (17) where submatrices I 1 and I 2 are identity matrices. Similar to (16), the following also holds when optimality is attained for (TIS): [u T, v T ]L 1 L T 1 B = f T. (18)

9 Equivalence of max-min transportation bound and time-indexed bound 551 By comparing (16) and (18), we obtain [u T, v T ]=[u T, v T ]L 1 L T 1. (19) Using (12), (17), and (19), the original dual variable values can be computed as u j = u j /p j = u j /p j, j = 1,..., n, and (20) { v t = v v t = t v, t = 0,..., T 2, t+1 v t, t = T 1. (21) This sparse reformulation is actually quite effective. For a processing time range of [1, 100], we are now able to solve problems with n = 40/50 within a few minutes and problems with n = 100 in less than an hour. Solving for optimal transportation costs c jt. Now suppose that optimal u and v values have been computed, taking into account (20) and (21). With u j and v t fixed, constraints (6) of (P1) reduce to lower bound constraints on the c jt variables. Any feasible vector c that satisfies (5) and the lower bound constraints, together with u and v, would optimally solve problem (P1). Hence, the task on hand is a trivial feasibility problem; e.g., one solution would be c jt u j + v t for all j, t. Moreover, we note that the interaction among jobs through the constraints are gone. Thus, we propose a further decomposition by job; this allows us to solve no more than n small feasibility problems instead of a very large one. Specifically, for each fixed j = 1,..., n, we consider a system of linear inequalities defined by t+p j 1 s=t c js f j (t + p j ), t = 0,..., T p j, (22) c jt u j + v t, t = 0,..., T 1. (23) Fixing of variables. Further savings can be achieved by noting that some of constraints (10) in problem (P1 ) hold at equality; i.e., for some t 0, p j u j + t 0 +p j 1 s=t 0 v s = f j (t 0 + p j ), which implies fixing of variables: c js u j + v s for all s = t 0,..., t 0 + p j 1. We can then drop the inequality in (22) that corresponds to t = t 0. Moreover, we show that at least one such t 0 exists. Consider variables y jt (t = 0,..., T p j ) of (TI), which are the dual variables associated with constraints (22). Since at least one of these variables takes on a nonzero value, the existence of t 0 follows from complementarity. Ironically, this is perhaps one of the few occasions when

10 552 Y. Pan, L. Shi we would wish that more of the decision variables y jt take on fractional values, thereby allowing more constraints to be dropped and more costs c jt to be fixed. Secondary considerations for choosing c jt. The u and v that we have computed, together with any c satisfying (22) (23), would attain the time-indexed bound. Therefore, the choice of c among all qualified choices does not change the lower bound for the root. However, this choice will affect bound quality at other nodes, since c is not re-optimized. This motivates secondary considerations in choosing c. The intuition behind our secondary criterion is to make the transportation costs as large as possible. It is then reasonable to require the following property be satisfied by a criterion: Property 1 No c jt1 can be increased without some other c jt2 being decreased. Here we propose a criterion that minimizes the total difference between the two sides of constraints (22), which clearly satisfies Property 1. More precisely, we minimize [ T p j f j (t + p j ) ] t+p j 1 s=t c js subject to (22) (23). 3.2 Subsequent nodes When a lower bound needs to be evaluated at a node other than the root, we solve a transportation problem of the form (P(c)) with the optimal cost structure found at the root. The transportation problem is solved using an algorithm proposed in [19], which is a specialized O(n 2 T) adaptation of the Hungarian method [15]. We refer to [19] for issues regarding warm start and early termination of the algorithm. The optimal transportation costs for the root are not necessarily optimal for the other nodes, but rather are an approximation. The other nodes represent subproblems of which schedules are partially determined. On the other hand, the transportation costs can still be used to compute valid lower bounds. Moreover, such lower bounds are most likely to be fairly good approximations of the time-indexed bounds when the subproblems do not deviate too much from the original problem. In other words, lower bounds should be tight for nodes that are not very deep in the tree, where effective pruning has the greatest impact. Although we do not re-optimize the transportation costs, some simple improvements can be carried out. Let J = {1,..., n} be the original set of jobs to be scheduled. Suppose that some jobs are already scheduled at a node other than the root and that the set of unscheduled jobs is J J. Also, suppose that for each j J, the feasible processing window is now narrowed to [a j, b j ] [0, T].Forjobj J, (5) is satisfied over time window [0, T]; therefore, (5) is obviously satisfied over time window [a j, b j ]. This ensures the validity of the lower bound. However, Property 1 may not hold with respect to the narrower time window. We give a heuristic for the adjustment of c jt (t [a j, b j ]) so that Property 1 is restored. The heuristic increases c jt for each j J and for each period t = b j 1,..., a j in a greedy fashion.

11 Equivalence of max-min transportation bound and time-indexed bound Effect of node depth on bound quality Normally, the quality of the lower bound improves as branch-and-bound explores deep into the tree. Our lower bound behaves somewhat differently. At a node other than the root, it approximates the time-indexed bound. As the search goes deeper and deeper into the tree, the transportation costs c jt deviate further and further from the optimal costs for the individual nodes. Therefore, the quality of this approximation deteriorates and may reach a point where the tree size is noticeably enlarged. We further illustrate this phenomenon using two numerical examples of 40-job total weighted tardiness problems (denoted by 1 w j T j in the scheduling literature). In the two examples, we assume that positional branching is used; therefore, the depth of a node is measured by the number of jobs fixed. In Fig. 1a, b the horizontal axis indicates a certain depth of the tree, and the vertical axis shows the node count at this depth (the number of nodes that cannot be fathomed). To eliminate the influence of the upper bound, we initially set it to the known optimal value. In the legend, TI and MMT refer to the curves for the time-indexed bound and for our max-min transportation bound, respectively. In both Fig. 1a and b, it can be seen that our bound approximates the time-indexed bound fairly well until around 20 jobs are fixed. After that, our bound deviates noticeably from the time-indexed bound, as indicated by the larger node counts. All the node counts eventually come down when nearly all jobs are fixed. There is also an important distinction between (a) and (b). The degradation of the transportation lower bound and its effect seen in (a) are reasonable; the node count curve for MMT follows an up-and-down pattern similar to that for TI. In comparison, the situation in (b) indicates poor approximation of the timeindexed bound by our bound when roughly n > 20. We develop two methods for alleviating such pathological occurrences. First, we may recompute c jt from time to time as the search progresses. But, recomputation cannot be too frequent, since that would conflict with our initial intention to approximate the hard LP by the easy transportation problem. A second method is to employ one or more combinatorial lower bounds in conjunction with our lower bound, provided that such bounds can be derived. The running time of a combinatorial lower bound is typically negligible, while No. nodes at depth Fig (a) TI MMT MMT/DPD No. jobs fixed (depth) No. nodes at depth No. jobs fixed (depth) (b) Comparison of max-min transportation bound and time-indexed bound TI MMT MMT/DPD

12 554 Y. Pan, L. Shi the quality may not be satisfactory. However, it seems that some combinatorial lower bounds can complement our lower bound. For example, we have observed that the pathological behavior occurs mostly on instances of 1 w j T j that are considered to be easy for a combinatorial lower bound in [17]. Further, we note that the pathological behavior tends to occur when initial lower bounds are poor, but nodes can be fathomed effectively using problem-specific dominance rules or general-purpose dynamic programming dominance techniques. The curves (MMT/DPD) in Fig. 1a, b show the effectiveness of a partial dynamic programming (PDP) dominance technique [16] in helping tame the erratic tree growth when it is used alongside MMT. The solution time is relatively small for this type of instance. In our experiments, we encountered few occasions when timeconsuming measures like recomputing the transportation costs are justified. 4 Branch-and-bound algorithms for 1 w j T j We incorporate the max-min transportation lower bound in a branch-andbound algorithm to solve the problem 1 w j T j, which is unary NP-hard. Now the job cost function takes the form f j (t j ) = w j max{0, t j d j }, where d j is a given due date. 4.1 Algorithms Our proposed lower bound (MMT) and three previous bounds are wrapped in a branch-and-bound framework presented in [1] and then compared computationally. The three existing bounds are the time-indexed LP bound (TI), Potts and Van Wassenhove s combinatorial bound (PVW) [17], and Lawler s transportation lower bound (LT) with the costs c jt determined in accordance with (4) and the free variable values defined as c jt = 0, t = 0,..., p 2; c jt = c j(t pj ) + f j (t + 1) f j (t), t = p 1,..., T 1 (for all j). By varying the configuration of branch-and-bound, we obtain a number of different algorithms that are meant to reveal various characteristics of the lower bounds. All the algorithms use a standard positional node representation and branching scheme. The strategy for selecting a node to branch on is a new variation of the depth-first strategy: When more than one node have the same lower bound, select the node whose most recently fixed job has a due date that is closest to the due date of the job occupying the same position in the incumbent solution. In addition to the upper bound heuristics discussed in [1], we also compute the best-α schedule [10] and improve upon it using the standard adjacent pairwise interchange heuristic. The algorithms were coded in C++ and tested on a Pentium IV 2.8 GHz Linux PC with 1 GB RAM. LPs are solved with QSopt. 4.2 Experimental design We consider four sets of instances. Let us begin with the last set, which is taken from OR-Library. There are three control parameters in the process of

13 Equivalence of max-min transportation bound and time-indexed bound 555 generating these instances: n {40, 50, 100}, RDD {0.2, 0.4, 0.6, 0.8, 1.0}, and TF {0.2, 0.4, 0.6, 0.8, 1.0}. There are five instances for each combination of the values. All the 40/50-job instances can be solved optimally using the algorithm in [1] that employs PVW [17]. According to [11], there were no attempts to solve the 100-job instances, since CPU times were expected to be prohibitively large. We derived the other three sets of instances from the above instances through time scaling. Let SF be a scaling factor. For each of the 375 instances with p j U[1, 100] for all j, we modify the instance by setting p j p j /SF and d j d j /SF. The other input of an instance stays unchanged. The above set of instances corresponds to the case where SF = 1. Via this scheme, three more sets of instances were obtained with SF = 10, 5, 2. Thus, the processing time ranges, [1, p max ], p max = 10, 20, 50, 100, are all represented. 4.3 Results Our initial set of experiments was designed to evaluate the relative strength of MMT in relation to the other bounds. Let z be the optimal value and let z LB be a lower bound. Then, the percentage gap is defined as g LB = (z z LB )/z 100 if z > 0. Instances with z = 0 are trivial; in that event, we define g LB = 0. g avg LB and glb max stand for the average and maximum values. We first compare the quality of PVW, LT, and MMT at the root. TI and MMT are equal at the root. The fourth test set (p max = 100) is used in this experiment. For the same combination (n, TF) we report g avg LB and gmax LB computed over 25 instances. TF is the dominant factor governing the difficulty of instances of the same n. In Table 1, g avg MMT never exceeds 2%. Large gmax MMT values are observed for TF = 0.4 across all n. Nevertheless, the instances with TF = 0.4 are actually easy, despite large initial gaps. Table 1 Lower bound quality at root node (p max = 100) n TF g avg PVW g max PVW g avg LT g max LT g avg MMT g max MMT

14 556 Y. Pan, L. Shi Next, we examine the quality of LT, MMT, and TI as search progresses. We take the tree size generated by each lower bound as an indicator of bound strength. In this experiment, each lower bound was used independently, and all pruning devices were turned off except trivial ones. The initial upper bound was set to the optimal value. The set of instances with (n = 40, p max = 10) is used since it is impractical for TI to deal with larger problems. Also, results for PVW were omitted because its tree size is orders of magnitude larger. In Table 2, n avg LB and nmax LB denote the average and maximum numbers of nodes in the tree for lower bound LB. We can see that MMT generates markedly fewer nodes than LT. The extent of reduction is most spectacular in the parameter range 0.6 RDD 1, 0.6 TF 1. Within the same range, MMT generates 2 4 times more nodes than TI. This is a strong indication that on average MMT is a fairly good approximation of TI. The results thus far indicate that the max-min transportation lower bound can be effectively used in branch-and-bound in a stand-alone manner. The idea of re-using optimal transportation cost structure found at the root node is indeed viable computationally. Now we present a specialized algorithm that employs the best combination of MMT and other existing techniques. Results on the fourth (and the most difficult) set of instances are reported. In Table 3, the CPU times in seconds Table 2 Tree sizes of using a single lower bound (n = 40, p max = 10) RDD TF n avg LT n max LT n avg MMT n max MMT n avg TI n max TI ,369 5, ,483 1, ,142 10, ,418 2, ,718 10, ,087 34, ,455 10, ,863 46, ,721 15, ,752 47, ,347 1,082, , , ,326 7,

15 Equivalence of max-min transportation bound and time-indexed bound 557 Table 3 CPU time and node counts of specialized algorithm (p max = 100) n TF NO t avg t max t avg 2 t max 2 n avg n max required by the algorithm are denoted by t avg and t max, and further broken down into t avg 2 and t2 max after the root node times have been subtracted. n avg and n max are the node counts. NO shows the numbers of instances (out of 25) solved optimally. Within the 4-hour per instance time limit, our algorithm solved to optimality all but one of the 125 open instances with 100 jobs. The remaining instance (#44) was also solved optimally after 9 hours of computation. It turns out that for all these instances, their best known upper bounds are in fact optimal. Additionally, in our other experiments, we found that the proposed bound demonstrates good scalability with increase of n and p max. 5 Conclusion We presented new results as to finding the strongest bound from the family of lower bounds provided by transportation problem relaxations of the singlemachine scheduling problem. As an application of the theory, we proposed a new scheme to approximate the time-indexed bound during branch-and-bound. The theory behind our results should bring due attention to the study of the LP dual problem (P1 ) associated with (TI) the LP relaxation of the time-indexed formulation. (P1 ) is related to the transportation problem (P(c)) via (P1). An immediate impact of recognizing these relations has been unambiguously illustrated through our computational results. The proposed lower bound is based on the family of transportation problem relaxations. Interestingly, an alternative assignment problem relaxation has been suggested in [20], where constraints (1) of (P(c)) are replaced by (T s)/p j k=0 x j(s+kpj ) = 1, j = 1,..., n; s = 0,..., p j 1. This relaxation is at least as strong as (P(c)) because the above constraints imply (1). Our lower bound idea can again be applied while condition (5) is imposed as before. We

16 558 Y. Pan, L. Shi find that it is counter-intuitive, but nevertheless true, that the resulting bound is also equal to the time-indexed lower bound. Some issues are yet to be fully explored. First, we should be able to speed up the root node computation. A second issue aries from the fact that more than one set of optimal (u, v, c) can attain the same lower bound at the root. This issue has been partially addressed, but needs to be further examined. In parallel with our work, there are other efforts to leverage the bound quality of the time-indexed formulation while reducing its computational expense. For example, Bigras et al. [8] suggest temporal decomposition for the column generation algorithm for (TI). On a similar computer, they were able to solve 89 of the 125 open instances within a 12-h time limit per instance. We are looking into incorporating the idea in our method. Acknowledgements The authors would like to thank Professor Nemhauser for an insightful discussion, Professor Jünger for pointing out the alternative assignment formulation, the associated editor for the encouraging comments, and two anonymous referees for their helpful suggestions. This research was supported in part by NSF (DMI , DMI , and DMI ), by AFOSR (FA ), and by John Deere Horicon Works. References 1. Abdul-Razaq, T.S., Potts, C.N., van Wassenhove, L.N.: (1990) A survey of algorithms for the single machine total weighted tardiness scheduling problem. Discrete Appl. Math. 26, van den Akker, J.M., van Hoesel, C.P.M., Savelsbergh, M.W.P.: (1999) A polyhedral approach to single-machine scheduling problems. Math. Program. 85, van den Akker, J.M., Hurkens, C.A.J., Savelsbergh, M.W.P.: (2000) Time-indexed formulations for machine scheduling problems: Column generation. INFORMS J. Comput. 12(2), Applegate, D., Cook, W.: (1991) A computational study of the job-shop scheduling problem. ORSA J. Comput. 3, Avella, P., Boccia, M., D Auria, B.: (2005) Near-optimal solutions of large-scale single-machine scheduling problems. INFORMS J. Comput. 17(2), Balas, E.: (1969) Machine sequencing via disjunctive graphs: an implicit enumeration algorithm. Oper. Res. 17, Balas, E.: (1979) Disjunctive programming. Ann. Discrete Math. 5, Bigras, L., Gamache, M., Savard, G.: (2005) Time-indexed formulations and the total weighted tardiness problem. G , Les Cahiers du GERAD 9. Bülbül, K., Kaminsky, P., Yano, C.: (2005) Preemption in single machine earliness/tardiness scheduling. J. Sched. Forthcoming 10. Chekuri, C., Motwani, R., Natarajan, B., Stein, C.: (2001) Approximation techniques for average completion time scheduling. SIAM J. Comput. 31, Congram, R.K., Potts, C.N., van de Velde, S.L.: (2002) An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem. INFORMS J. Comput. 13(1), Dyer, M.E., Wolsey, L.A.: (1990) Formulating the single machine sequencing problem with release dates as a mixed integer program. Discrete Appl. Math. 26, Gelders, L., Kleindorfer, P.R.: (1974) Coordinnating aggregate and detailed scheduling in the one-machine job shop: Part I. Theory. Oper. Res. 22, Lawler, E.L.: (1964) On scheduling problems with deferral costs. Management Sci. 11(2), Nemhauser, G.L., Wolsey, L.A.: (1988) Integer and Combinatorial Optimization. John Wiley, NY 16. Pan, Y.: (2003) An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time. Oper. Res. Lett. 31(6),

17 Equivalence of max-min transportation bound and time-indexed bound Potts, C.N., van Wassenhove, L.N.: (1985) A branch and bound algorithm for the total weighted tardiness problem. Oper. Res. 33(2), Queyranne, M., Schulz, A.S.: (1985) Polyhedral approaches to machine scheduling. Preprint 408/1994, Math. Dept., Tech. Univ. Berlin. Revised June Sourd, F., Kedad-Sidhoum, S.: (2003) The one-machine problem with earliness and tardiness penalties. J. Sched. 6, Sousa, J.P.: (1989) Time indexed formulations of non-preemptive single-machine scheduling problems. Ph.D. thesis, Faculté des Sciences Appliquées, Université Catholique de Louvain, Louvain-la-Neuve, Belgium 21. Sousa, J.P., Wolsey, L.A.: (1992) A time indexed formulation of non-preemptive single machine scheduling problems. Math. Program. 54,

On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems

On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems Mathematical Programming manuscript No. (will be inserted by the editor) Yunpeng Pan Leyuan Shi On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine

More information

Finding the best root node strategy for the approximation of the time-indexed bound in min-sum scheduling

Finding the best root node strategy for the approximation of the time-indexed bound in min-sum scheduling 1 Finding the best root node strategy for the approximation of the time-indexed bound in min-sum scheduling Yunpeng Pan and Leyuan Shi Abstract We identify the best root node strategy for the approximation

More information

A combinatorial auctions perspective on min-sum scheduling problems

A combinatorial auctions perspective on min-sum scheduling problems Yunpeng Pan A combinatorial auctions perspective on min-sum scheduling problems Abstract In combinatorial auctions, prospective buyers bid on bundles of items for sale, including but not limited to singleton

More information

A new lower bound for one-machine earliness-tardiness scheduling

A new lower bound for one-machine earliness-tardiness scheduling A new lower bound for one-machine earliness-tardiness scheduling Francis Sourd Université Pierre et Marie Curie CNRS LIP6 laboratory, Paris, France e-mail: Francis.Sourd@lip6.fr Abstract In one-machine

More information

Single Machine Scheduling: Comparison of MIP Formulations and Heuristics for. Interfering Job Sets. Ketan Khowala

Single Machine Scheduling: Comparison of MIP Formulations and Heuristics for. Interfering Job Sets. Ketan Khowala Single Machine Scheduling: Comparison of MIP Formulations and Heuristics for Interfering Job Sets by Ketan Khowala A Dissertation Presented in Partial Fulfillment of the Requirements for the Degree Doctor

More information

An Exact Algorithm for the Single-Machine Earliness Tardiness Scheduling Problem

An Exact Algorithm for the Single-Machine Earliness Tardiness Scheduling Problem Chapter 2 An Exact Algorithm for the Single-Machine Earliness Tardiness Scheduling Problem Shunji Tanaka Abstract This paper introduces our exact algorithm for the single-machine total weighted earliness

More information

On the Approximate Linear Programming Approach for Network Revenue Management Problems

On the Approximate Linear Programming Approach for Network Revenue Management Problems On the Approximate Linear Programming Approach for Network Revenue Management Problems Chaoxu Tong School of Operations Research and Information Engineering, Cornell University, Ithaca, New York 14853,

More information

On the Polyhedral Structure of a Multi Item Production Planning Model with Setup Times

On the Polyhedral Structure of a Multi Item Production Planning Model with Setup Times CORE DISCUSSION PAPER 2000/52 On the Polyhedral Structure of a Multi Item Production Planning Model with Setup Times Andrew J. Miller 1, George L. Nemhauser 2, and Martin W.P. Savelsbergh 2 November 2000

More information

Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs

Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs G. Diepen J.M. van den Akker J.A. Hoogeveen institute of information and computing sciences, utrecht university

More information

Integer Programming ISE 418. Lecture 8. Dr. Ted Ralphs

Integer Programming ISE 418. Lecture 8. Dr. Ted Ralphs Integer Programming ISE 418 Lecture 8 Dr. Ted Ralphs ISE 418 Lecture 8 1 Reading for This Lecture Wolsey Chapter 2 Nemhauser and Wolsey Sections II.3.1, II.3.6, II.4.1, II.4.2, II.5.4 Duality for Mixed-Integer

More information

Marjan van den Akker. Han Hoogeveen Jules van Kempen

Marjan van den Akker. Han Hoogeveen Jules van Kempen Parallel machine scheduling through column generation: minimax objective functions, release dates, deadlines, and/or generalized precedence constraints Marjan van den Akker Han Hoogeveen Jules van Kempen

More information

Combinatorial Algorithms for Minimizing the Weighted Sum of Completion Times on a Single Machine

Combinatorial Algorithms for Minimizing the Weighted Sum of Completion Times on a Single Machine Combinatorial Algorithms for Minimizing the Weighted Sum of Completion Times on a Single Machine James M. Davis 1, Rajiv Gandhi, and Vijay Kothari 1 Department of Computer Science, Rutgers University-Camden,

More information

A big bucket time indexed formulation for nonpreemptive single machine scheduling problems

A big bucket time indexed formulation for nonpreemptive single machine scheduling problems A big bucket time indexed formulation for nonpreemptive single machine scheduling problems Natashia Boland Riley Clement Hamish Waterer Centre for Optimal Planning and Operations University of Newcastle

More information

Column Generation for Extended Formulations

Column Generation for Extended Formulations 1 / 28 Column Generation for Extended Formulations Ruslan Sadykov 1 François Vanderbeck 2,1 1 INRIA Bordeaux Sud-Ouest, France 2 University Bordeaux I, France ISMP 2012 Berlin, August 23 2 / 28 Contents

More information

A dynamic programming algorithm for single machine scheduling with ready times

A dynamic programming algorithm for single machine scheduling with ready times Annals of Operations Research 69(1997)135 156 135 A dynamic programming algorithm for single machine scheduling with ready times Sylvie Gélinas and François Soumis GERAD and École Polytechnique de Montréal,

More information

An Integrated Column Generation and Lagrangian Relaxation for Flowshop Scheduling Problems

An Integrated Column Generation and Lagrangian Relaxation for Flowshop Scheduling Problems Proceedings of the 2009 IEEE International Conference on Systems, Man, and Cybernetics San Antonio, TX, USA - October 2009 An Integrated Column Generation and Lagrangian Relaxation for Flowshop Scheduling

More information

Using column generation to solve parallel machine scheduling problems with minmax objective functions

Using column generation to solve parallel machine scheduling problems with minmax objective functions Using column generation to solve parallel machine scheduling problems with minmax objective functions J.M. van den Akker J.A. Hoogeveen Department of Information and Computing Sciences Utrecht University

More information

Fixed-charge transportation problems on trees

Fixed-charge transportation problems on trees Fixed-charge transportation problems on trees Gustavo Angulo * Mathieu Van Vyve * gustavo.angulo@uclouvain.be mathieu.vanvyve@uclouvain.be November 23, 2015 Abstract We consider a class of fixed-charge

More information

An Adaptive Partition-based Approach for Solving Two-stage Stochastic Programs with Fixed Recourse

An Adaptive Partition-based Approach for Solving Two-stage Stochastic Programs with Fixed Recourse An Adaptive Partition-based Approach for Solving Two-stage Stochastic Programs with Fixed Recourse Yongjia Song, James Luedtke Virginia Commonwealth University, Richmond, VA, ysong3@vcu.edu University

More information

Using column generation to solve parallel machine scheduling problems with minmax objective functions

Using column generation to solve parallel machine scheduling problems with minmax objective functions J Sched (2012) 15:801 810 DOI 10.1007/s10951-010-0191-z Using column generation to solve parallel machine scheduling problems with minmax objective functions J.M. van den Akker J.A. Hoogeveen J.W. van

More information

Fundamental Domains for Integer Programs with Symmetries

Fundamental Domains for Integer Programs with Symmetries Fundamental Domains for Integer Programs with Symmetries Eric J. Friedman Cornell University, Ithaca, NY 14850, ejf27@cornell.edu, WWW home page: http://www.people.cornell.edu/pages/ejf27/ Abstract. We

More information

Monoidal Cut Strengthening and Generalized Mixed-Integer Rounding for Disjunctions and Complementarity Constraints

Monoidal Cut Strengthening and Generalized Mixed-Integer Rounding for Disjunctions and Complementarity Constraints Monoidal Cut Strengthening and Generalized Mixed-Integer Rounding for Disjunctions and Complementarity Constraints Tobias Fischer and Marc E. Pfetsch Department of Mathematics, TU Darmstadt, Germany {tfischer,pfetsch}@opt.tu-darmstadt.de

More information

A Branch-and-Bound Procedure to Minimize Total Tardiness on One Machine with Arbitrary Release Dates

A Branch-and-Bound Procedure to Minimize Total Tardiness on One Machine with Arbitrary Release Dates A Branch-and-Bound Procedure to Minimize Total Tardiness on One Machine with Arbitrary Release Dates Philippe Baptiste 1,2, Jacques Carlier 2 and Antoine Jouglet 2 Abstract In this paper, we present a

More information

A Global Constraint for Total Weighted Completion Time for Unary Resources

A Global Constraint for Total Weighted Completion Time for Unary Resources A Global Constraint for Total Weighted Completion Time for Unary Resources András Kovács Computer and Automation Research Institute Hungarian Academy of Sciences akovacs@sztaki.hu J. Christopher Beck Department

More information

Practical Tips for Modelling Lot-Sizing and Scheduling Problems. Waldemar Kaczmarczyk

Practical Tips for Modelling Lot-Sizing and Scheduling Problems. Waldemar Kaczmarczyk Decision Making in Manufacturing and Services Vol. 3 2009 No. 1 2 pp. 37 48 Practical Tips for Modelling Lot-Sizing and Scheduling Problems Waldemar Kaczmarczyk Abstract. This paper presents some important

More information

3.10 Lagrangian relaxation

3.10 Lagrangian relaxation 3.10 Lagrangian relaxation Consider a generic ILP problem min {c t x : Ax b, Dx d, x Z n } with integer coefficients. Suppose Dx d are the complicating constraints. Often the linear relaxation and the

More information

- Well-characterized problems, min-max relations, approximate certificates. - LP problems in the standard form, primal and dual linear programs

- Well-characterized problems, min-max relations, approximate certificates. - LP problems in the standard form, primal and dual linear programs LP-Duality ( Approximation Algorithms by V. Vazirani, Chapter 12) - Well-characterized problems, min-max relations, approximate certificates - LP problems in the standard form, primal and dual linear programs

More information

arxiv: v1 [cs.cc] 5 Dec 2018

arxiv: v1 [cs.cc] 5 Dec 2018 Consistency for 0 1 Programming Danial Davarnia 1 and J. N. Hooker 2 1 Iowa state University davarnia@iastate.edu 2 Carnegie Mellon University jh38@andrew.cmu.edu arxiv:1812.02215v1 [cs.cc] 5 Dec 2018

More information

An exact approach to early/tardy scheduling with release dates

An exact approach to early/tardy scheduling with release dates Computers & Operations Research 32 (2005) 2905 2917 www.elsevier.com/locate/dsw An exact approach to early/tardy scheduling with release dates Jorge M.S. Valente, Rui A.F.S. Alves Faculdade de Economia,

More information

Lagrangian Domain Reductions for the Single Machine Earliness-Tardiness Problem with Release Dates

Lagrangian Domain Reductions for the Single Machine Earliness-Tardiness Problem with Release Dates Lagrangian Domain Reductions for the Single Machine Earliness-Tardiness Problem with Release Dates Boris Detienne a, Éric Pinsonb and David Rivreau b a École Nationale Supérieure des Mines de Saint-Étienne,

More information

Section Notes 9. IP: Cutting Planes. Applied Math 121. Week of April 12, 2010

Section Notes 9. IP: Cutting Planes. Applied Math 121. Week of April 12, 2010 Section Notes 9 IP: Cutting Planes Applied Math 121 Week of April 12, 2010 Goals for the week understand what a strong formulations is. be familiar with the cutting planes algorithm and the types of cuts

More information

A lower bound on deterministic online algorithms for scheduling on related machines without preemption

A lower bound on deterministic online algorithms for scheduling on related machines without preemption Theory of Computing Systems manuscript No. (will be inserted by the editor) A lower bound on deterministic online algorithms for scheduling on related machines without preemption Tomáš Ebenlendr Jiří Sgall

More information

Office of Naval Research contract no. N K-0377 (9) FINAL TECHNICAL REPORT

Office of Naval Research contract no. N K-0377 (9) FINAL TECHNICAL REPORT Office of Naval Research contract no. N00014-88-K-0377 (9) The Concept of Best Probability in the Analysis of Approximation Algorithms 0) - Dorit S. Hochbaum, Principal Investigator oom FINAL TECHNICAL

More information

Preemption in Single Machine Earliness/Tardiness Scheduling

Preemption in Single Machine Earliness/Tardiness Scheduling Preemption in Single Machine Earliness/Tardiness Scheduling Kerem Bülbül Philip Kaminsky Candace Yano Industrial Engineering and Operations Research University of California, Berkeley, CA October 001 Abstract

More information

Lifting for conic mixed-integer programming

Lifting for conic mixed-integer programming Math. Program., Ser. A DOI 1.17/s117-9-282-9 FULL LENGTH PAPER Lifting for conic mixed-integer programming Alper Atamtürk Vishnu Narayanan Received: 13 March 28 / Accepted: 28 January 29 The Author(s)

More information

IE418 Integer Programming

IE418 Integer Programming IE418: Integer Programming Department of Industrial and Systems Engineering Lehigh University 2nd February 2005 Boring Stuff Extra Linux Class: 8AM 11AM, Wednesday February 9. Room??? Accounts and Passwords

More information

A note on : A Superior Representation Method for Piecewise Linear Functions

A note on : A Superior Representation Method for Piecewise Linear Functions A note on : A Superior Representation Method for Piecewise Linear Functions Juan Pablo Vielma Business Analytics and Mathematical Sciences Department, IBM T. J. Watson Research Center, Yorktown Heights,

More information

Stabilized Branch-and-cut-and-price for the Generalized Assignment Problem

Stabilized Branch-and-cut-and-price for the Generalized Assignment Problem Stabilized Branch-and-cut-and-price for the Generalized Assignment Problem Alexandre Pigatti, Marcus Poggi de Aragão Departamento de Informática, PUC do Rio de Janeiro {apigatti, poggi}@inf.puc-rio.br

More information

The Modified Integer Round-Up Property of the One-Dimensional Cutting Stock Problem

The Modified Integer Round-Up Property of the One-Dimensional Cutting Stock Problem EJOR 84 (1995) 562 571 The Modified Integer Round-Up Property of the One-Dimensional Cutting Stock Problem Guntram Scheithauer and Johannes Terno Institute of Numerical Mathematics, Dresden University

More information

Exact algorithm over an arc-time-indexed formulation for parallel machine scheduling problems

Exact algorithm over an arc-time-indexed formulation for parallel machine scheduling problems Math. Prog. Comp. (2010) 2:259 290 DOI 10.1007/s12532-010-0019-z FULL LENGTH PAPER Exact algorithm over an arc-time-indexed formulation for parallel machine scheduling problems Artur Pessoa Eduardo Uchoa

More information

Parallel PIPS-SBB Multi-level parallelism for 2-stage SMIPS. Lluís-Miquel Munguia, Geoffrey M. Oxberry, Deepak Rajan, Yuji Shinano

Parallel PIPS-SBB Multi-level parallelism for 2-stage SMIPS. Lluís-Miquel Munguia, Geoffrey M. Oxberry, Deepak Rajan, Yuji Shinano Parallel PIPS-SBB Multi-level parallelism for 2-stage SMIPS Lluís-Miquel Munguia, Geoffrey M. Oxberry, Deepak Rajan, Yuji Shinano ... Our contribution PIPS-PSBB*: Multi-level parallelism for Stochastic

More information

CMSC 722, AI Planning. Planning and Scheduling

CMSC 722, AI Planning. Planning and Scheduling CMSC 722, AI Planning Planning and Scheduling Dana S. Nau University of Maryland 1:26 PM April 24, 2012 1 Scheduling Given: actions to perform set of resources to use time constraints» e.g., the ones computed

More information

Lift-and-Project Inequalities

Lift-and-Project Inequalities Lift-and-Project Inequalities Q. Louveaux Abstract The lift-and-project technique is a systematic way to generate valid inequalities for a mixed binary program. The technique is interesting both on the

More information

An Integer Cutting-Plane Procedure for the Dantzig-Wolfe Decomposition: Theory

An Integer Cutting-Plane Procedure for the Dantzig-Wolfe Decomposition: Theory An Integer Cutting-Plane Procedure for the Dantzig-Wolfe Decomposition: Theory by Troels Martin Range Discussion Papers on Business and Economics No. 10/2006 FURTHER INFORMATION Department of Business

More information

Exponential neighborhood search for a parallel machine scheduling problem

Exponential neighborhood search for a parallel machine scheduling problem xponential neighborhood search for a parallel machine scheduling problem Y.A. Rios Solis and F. Sourd LIP6 - Université Pierre et Marie Curie 4 Place Jussieu, 75252 Paris Cedex 05, France Abstract We consider

More information

CS6999 Probabilistic Methods in Integer Programming Randomized Rounding Andrew D. Smith April 2003

CS6999 Probabilistic Methods in Integer Programming Randomized Rounding Andrew D. Smith April 2003 CS6999 Probabilistic Methods in Integer Programming Randomized Rounding April 2003 Overview 2 Background Randomized Rounding Handling Feasibility Derandomization Advanced Techniques Integer Programming

More information

Inference of A Minimum Size Boolean Function by Using A New Efficient Branch-and-Bound Approach From Examples

Inference of A Minimum Size Boolean Function by Using A New Efficient Branch-and-Bound Approach From Examples Published in: Journal of Global Optimization, 5, pp. 69-9, 199. Inference of A Minimum Size Boolean Function by Using A New Efficient Branch-and-Bound Approach From Examples Evangelos Triantaphyllou Assistant

More information

MINIMIZING TOTAL TARDINESS FOR SINGLE MACHINE SEQUENCING

MINIMIZING TOTAL TARDINESS FOR SINGLE MACHINE SEQUENCING Journal of the Operations Research Society of Japan Vol. 39, No. 3, September 1996 1996 The Operations Research Society of Japan MINIMIZING TOTAL TARDINESS FOR SINGLE MACHINE SEQUENCING Tsung-Chyan Lai

More information

Time Aggregation for Network Design to Meet Time-Constrained Demand

Time Aggregation for Network Design to Meet Time-Constrained Demand 20th International Congress on Modelling and Simulation, Adelaide, Australia, 1 6 December 2013 www.mssanz.org.au/modsim2013 Time Aggregation for Network Design to Meet Time-Constrained Demand N. Boland

More information

An Exact Extended Formulation for the Unrelated Parallel Machine Total Weighted Completion Time Problem

An Exact Extended Formulation for the Unrelated Parallel Machine Total Weighted Completion Time Problem SABANCI UNIVERSITY Orhanlı-Tuzla, 34956 Istanbul, Turkey Phone:+9 216) 483-95 Fax:+9 216) 483-955 http://www.sabanciuniv.edu March 9, 16 Abstract: An Exact Extended Formulation for the Unrelated Parallel

More information

Linear Programming: Simplex

Linear Programming: Simplex Linear Programming: Simplex Stephen J. Wright 1 2 Computer Sciences Department, University of Wisconsin-Madison. IMA, August 2016 Stephen Wright (UW-Madison) Linear Programming: Simplex IMA, August 2016

More information

A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint

A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint Joachim Breit Department of Information and Technology Management, Saarland University,

More information

SOME RESOURCE ALLOCATION PROBLEMS

SOME RESOURCE ALLOCATION PROBLEMS SOME RESOURCE ALLOCATION PROBLEMS A Dissertation Presented to the Faculty of the Graduate School of Cornell University in Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy

More information

Santa Claus Schedules Jobs on Unrelated Machines

Santa Claus Schedules Jobs on Unrelated Machines Santa Claus Schedules Jobs on Unrelated Machines Ola Svensson (osven@kth.se) Royal Institute of Technology - KTH Stockholm, Sweden March 22, 2011 arxiv:1011.1168v2 [cs.ds] 21 Mar 2011 Abstract One of the

More information

On Counting Lattice Points and Chvátal-Gomory Cutting Planes

On Counting Lattice Points and Chvátal-Gomory Cutting Planes On Counting Lattice Points and Chvátal-Gomory Cutting Planes Andrea Lodi 1, Gilles Pesant 2, and Louis-Martin Rousseau 2 1 DEIS, Università di Bologna - andrea.lodi@unibo.it 2 CIRRELT, École Polytechnique

More information

Outline. Relaxation. Outline DMP204 SCHEDULING, TIMETABLING AND ROUTING. 1. Lagrangian Relaxation. Lecture 12 Single Machine Models, Column Generation

Outline. Relaxation. Outline DMP204 SCHEDULING, TIMETABLING AND ROUTING. 1. Lagrangian Relaxation. Lecture 12 Single Machine Models, Column Generation Outline DMP204 SCHEDULING, TIMETABLING AND ROUTING 1. Lagrangian Relaxation Lecture 12 Single Machine Models, Column Generation 2. Dantzig-Wolfe Decomposition Dantzig-Wolfe Decomposition Delayed Column

More information

Integer Programming Formulations for the Minimum Weighted Maximal Matching Problem

Integer Programming Formulations for the Minimum Weighted Maximal Matching Problem Optimization Letters manuscript No. (will be inserted by the editor) Integer Programming Formulations for the Minimum Weighted Maximal Matching Problem Z. Caner Taşkın Tınaz Ekim Received: date / Accepted:

More information

A BRANCH&BOUND ALGORITHM FOR SOLVING ONE-DIMENSIONAL CUTTING STOCK PROBLEMS EXACTLY

A BRANCH&BOUND ALGORITHM FOR SOLVING ONE-DIMENSIONAL CUTTING STOCK PROBLEMS EXACTLY APPLICATIONES MATHEMATICAE 23,2 (1995), pp. 151 167 G. SCHEITHAUER and J. TERNO (Dresden) A BRANCH&BOUND ALGORITHM FOR SOLVING ONE-DIMENSIONAL CUTTING STOCK PROBLEMS EXACTLY Abstract. Many numerical computations

More information

SMO vs PDCO for SVM: Sequential Minimal Optimization vs Primal-Dual interior method for Convex Objectives for Support Vector Machines

SMO vs PDCO for SVM: Sequential Minimal Optimization vs Primal-Dual interior method for Convex Objectives for Support Vector Machines vs for SVM: Sequential Minimal Optimization vs Primal-Dual interior method for Convex Objectives for Support Vector Machines Ding Ma Michael Saunders Working paper, January 5 Introduction In machine learning,

More information

Section Notes 8. Integer Programming II. Applied Math 121. Week of April 5, expand your knowledge of big M s and logical constraints.

Section Notes 8. Integer Programming II. Applied Math 121. Week of April 5, expand your knowledge of big M s and logical constraints. Section Notes 8 Integer Programming II Applied Math 121 Week of April 5, 2010 Goals for the week understand IP relaxations be able to determine the relative strength of formulations understand the branch

More information

4 Sequencing problem with heads and tails

4 Sequencing problem with heads and tails 4 Sequencing problem with heads and tails In what follows, we take a step towards multiple stage problems Therefore, we consider a single stage where a scheduling sequence has to be determined but each

More information

Strengthened Benders Cuts for Stochastic Integer Programs with Continuous Recourse

Strengthened Benders Cuts for Stochastic Integer Programs with Continuous Recourse Strengthened Benders Cuts for Stochastic Integer Programs with Continuous Recourse Merve Bodur 1, Sanjeeb Dash 2, Otay Günlü 2, and James Luedte 3 1 Department of Mechanical and Industrial Engineering,

More information

is called an integer programming (IP) problem. model is called a mixed integer programming (MIP)

is called an integer programming (IP) problem. model is called a mixed integer programming (MIP) INTEGER PROGRAMMING Integer Programming g In many problems the decision variables must have integer values. Example: assign people, machines, and vehicles to activities in integer quantities. If this is

More information

Integer Programming Part II

Integer Programming Part II Be the first in your neighborhood to master this delightful little algorithm. Integer Programming Part II The Branch and Bound Algorithm learn about fathoming, bounding, branching, pruning, and much more!

More information

Lecture 9: Dantzig-Wolfe Decomposition

Lecture 9: Dantzig-Wolfe Decomposition Lecture 9: Dantzig-Wolfe Decomposition (3 units) Outline Dantzig-Wolfe decomposition Column generation algorithm Relation to Lagrangian dual Branch-and-price method Generated assignment problem and multi-commodity

More information

SEQUENCING A SINGLE MACHINE WITH DUE DATES AND DEADLINES: AN ILP-BASED APPROACH TO SOLVE VERY LARGE INSTANCES

SEQUENCING A SINGLE MACHINE WITH DUE DATES AND DEADLINES: AN ILP-BASED APPROACH TO SOLVE VERY LARGE INSTANCES SEQUENCING A SINGLE MACHINE WITH DUE DATES AND DEADLINES: AN ILP-BASED APPROACH TO SOLVE VERY LARGE INSTANCES PH. BAPTISTE, F. DELLA CROCE, A. GROSSO, AND V. T KINDT Abstract. We consider the problem of

More information

Introduction to integer programming II

Introduction to integer programming II Introduction to integer programming II Martin Branda Charles University in Prague Faculty of Mathematics and Physics Department of Probability and Mathematical Statistics Computational Aspects of Optimization

More information

A Mixed-Integer Linear Program for the Traveling Salesman Problem with Structured Time Windows

A Mixed-Integer Linear Program for the Traveling Salesman Problem with Structured Time Windows A Mixed-Integer Linear Program for the Traveling Salesman Problem with Structured Time Windows Philipp Hungerländer Christian Truden 5th January 2017 Abstract In this extended abstract we introduce the

More information

Extended Formulations, Lagrangian Relaxation, & Column Generation: tackling large scale applications

Extended Formulations, Lagrangian Relaxation, & Column Generation: tackling large scale applications Extended Formulations, Lagrangian Relaxation, & Column Generation: tackling large scale applications François Vanderbeck University of Bordeaux INRIA Bordeaux-Sud-Ouest part : Defining Extended Formulations

More information

1 Review Session. 1.1 Lecture 2

1 Review Session. 1.1 Lecture 2 1 Review Session Note: The following lists give an overview of the material that was covered in the lectures and sections. Your TF will go through these lists. If anything is unclear or you have questions

More information

Computer Sciences Department

Computer Sciences Department Computer Sciences Department Solving Large Steiner Triple Covering Problems Jim Ostrowski Jeff Linderoth Fabrizio Rossi Stefano Smriglio Technical Report #1663 September 2009 Solving Large Steiner Triple

More information

A Generalized Uncertainty Principle and Sparse Representation in Pairs of Bases

A Generalized Uncertainty Principle and Sparse Representation in Pairs of Bases 2558 IEEE TRANSACTIONS ON INFORMATION THEORY, VOL 48, NO 9, SEPTEMBER 2002 A Generalized Uncertainty Principle Sparse Representation in Pairs of Bases Michael Elad Alfred M Bruckstein Abstract An elementary

More information

Linear Programming Redux

Linear Programming Redux Linear Programming Redux Jim Bremer May 12, 2008 The purpose of these notes is to review the basics of linear programming and the simplex method in a clear, concise, and comprehensive way. The book contains

More information

Notes on Dantzig-Wolfe decomposition and column generation

Notes on Dantzig-Wolfe decomposition and column generation Notes on Dantzig-Wolfe decomposition and column generation Mette Gamst November 11, 2010 1 Introduction This note introduces an exact solution method for mathematical programming problems. The method is

More information

Column Generation in Integer Programming with Applications in Multicriteria Optimization

Column Generation in Integer Programming with Applications in Multicriteria Optimization Column Generation in Integer Programming with Applications in Multicriteria Optimization Matthias Ehrgott Department of Engineering Science The University of Auckland, New Zealand email: m.ehrgott@auckland.ac.nz

More information

arxiv: v1 [cs.ds] 26 Feb 2016

arxiv: v1 [cs.ds] 26 Feb 2016 On the computational complexity of minimum-concave-cost flow in a two-dimensional grid Shabbir Ahmed, Qie He, Shi Li, George L. Nemhauser arxiv:1602.08515v1 [cs.ds] 26 Feb 2016 Abstract We study the minimum-concave-cost

More information

A Faster Strongly Polynomial Time Algorithm for Submodular Function Minimization

A Faster Strongly Polynomial Time Algorithm for Submodular Function Minimization A Faster Strongly Polynomial Time Algorithm for Submodular Function Minimization James B. Orlin Sloan School of Management, MIT Cambridge, MA 02139 jorlin@mit.edu Abstract. We consider the problem of minimizing

More information

Introduction to optimization and operations research

Introduction to optimization and operations research Introduction to optimization and operations research David Pisinger, Fall 2002 1 Smoked ham (Chvatal 1.6, adapted from Greene et al. (1957)) A meat packing plant produces 480 hams, 400 pork bellies, and

More information

An Optimization-Based Heuristic for the Split Delivery Vehicle Routing Problem

An Optimization-Based Heuristic for the Split Delivery Vehicle Routing Problem An Optimization-Based Heuristic for the Split Delivery Vehicle Routing Problem Claudia Archetti (1) Martin W.P. Savelsbergh (2) M. Grazia Speranza (1) (1) University of Brescia, Department of Quantitative

More information

Notes on Complexity of the Simple Assembly Line Balancing Problem

Notes on Complexity of the Simple Assembly Line Balancing Problem Notes on Complexity of the Simple Assembly Line Balancing Problem Lazarev A.A., Gafarov E.R. Institute of Control Sciences of the Russian Academy of Sciences, Profsoyuznaya st. 65, 117997 Moscow, Russia

More information

Exploring the Numerics of Branch-and-Cut for Mixed Integer Linear Optimization

Exploring the Numerics of Branch-and-Cut for Mixed Integer Linear Optimization Zuse Institute Berlin Takustr. 7 14195 Berlin Germany MATTHIAS MILTENBERGER 1, TED RALPHS 2, DANIEL E. STEFFY 3 Exploring the Numerics of Branch-and-Cut for Mixed Integer Linear Optimization 1 Zuse Institute

More information

Solving LP and MIP Models with Piecewise Linear Objective Functions

Solving LP and MIP Models with Piecewise Linear Objective Functions Solving LP and MIP Models with Piecewise Linear Obective Functions Zonghao Gu Gurobi Optimization Inc. Columbus, July 23, 2014 Overview } Introduction } Piecewise linear (PWL) function Convex and convex

More information

Conic optimization under combinatorial sparsity constraints

Conic optimization under combinatorial sparsity constraints Conic optimization under combinatorial sparsity constraints Christoph Buchheim and Emiliano Traversi Abstract We present a heuristic approach for conic optimization problems containing sparsity constraints.

More information

Optimization under Ordinal Scales: When is a Greedy Solution Optimal?

Optimization under Ordinal Scales: When is a Greedy Solution Optimal? Optimization under Ordinal Scales: When is a Greedy Solution Optimal? Aleksandar Pekeč BRICS Department of Computer Science University of Aarhus DK-8000 Aarhus C, Denmark pekec@brics.dk Abstract Mathematical

More information

Bounds for the Permutation Flowshop Scheduling Problem with Exact Time Lags while Minimizing the Total Earliness and Tardiness

Bounds for the Permutation Flowshop Scheduling Problem with Exact Time Lags while Minimizing the Total Earliness and Tardiness Bounds for the Permutation Flowshop Scheduling Problem with Exact Time Lags while Minimizing the Total Earliness and Tardiness Imen Hamdi, Taïcir Loukil Abstract- We consider the problem of n-jobs scheduling

More information

Distributed Optimization. Song Chong EE, KAIST

Distributed Optimization. Song Chong EE, KAIST Distributed Optimization Song Chong EE, KAIST songchong@kaist.edu Dynamic Programming for Path Planning A path-planning problem consists of a weighted directed graph with a set of n nodes N, directed links

More information

The two-machine flowshop total completion time problem: A branch-and-bound based on network-flow formulation

The two-machine flowshop total completion time problem: A branch-and-bound based on network-flow formulation The two-machine flowshop total completion time problem: A branch-and-bound based on network-flow formulation Boris Detienne 1, Ruslan Sadykov 1, Shunji Tanaka 2 1 : Team Inria RealOpt, University of Bordeaux,

More information

Scenario Grouping and Decomposition Algorithms for Chance-constrained Programs

Scenario Grouping and Decomposition Algorithms for Chance-constrained Programs Scenario Grouping and Decomposition Algorithms for Chance-constrained Programs Siqian Shen Dept. of Industrial and Operations Engineering University of Michigan Joint work with Yan Deng (UMich, Google)

More information

Solving Dual Problems

Solving Dual Problems Lecture 20 Solving Dual Problems We consider a constrained problem where, in addition to the constraint set X, there are also inequality and linear equality constraints. Specifically the minimization problem

More information

Solution of the Train Platforming Problem

Solution of the Train Platforming Problem Solution of the Train Platforming Problem Alberto Caprara, Laura Galli, and Paolo Toth DEIS, University of Bologna Viale Risorgimento 2, 40136 Bologna, Italy {alberto.caprara,l.galli,paolo.toth}@unibo.it

More information

Integer Programming ISE 418. Lecture 16. Dr. Ted Ralphs

Integer Programming ISE 418. Lecture 16. Dr. Ted Ralphs Integer Programming ISE 418 Lecture 16 Dr. Ted Ralphs ISE 418 Lecture 16 1 Reading for This Lecture Wolsey, Chapters 10 and 11 Nemhauser and Wolsey Sections II.3.1, II.3.6, II.3.7, II.5.4 CCZ Chapter 8

More information

A Hub Location Problem with Fully Interconnected Backbone and Access Networks

A Hub Location Problem with Fully Interconnected Backbone and Access Networks A Hub Location Problem with Fully Interconnected Backbone and Access Networks Tommy Thomadsen Informatics and Mathematical Modelling Technical University of Denmark 2800 Kgs. Lyngby Denmark tt@imm.dtu.dk

More information

BCOL RESEARCH REPORT 07.04

BCOL RESEARCH REPORT 07.04 BCOL RESEARCH REPORT 07.04 Industrial Engineering & Operations Research University of California, Berkeley, CA 94720-1777 LIFTING FOR CONIC MIXED-INTEGER PROGRAMMING ALPER ATAMTÜRK AND VISHNU NARAYANAN

More information

Approximation Algorithms for Maximum. Coverage and Max Cut with Given Sizes of. Parts? A. A. Ageev and M. I. Sviridenko

Approximation Algorithms for Maximum. Coverage and Max Cut with Given Sizes of. Parts? A. A. Ageev and M. I. Sviridenko Approximation Algorithms for Maximum Coverage and Max Cut with Given Sizes of Parts? A. A. Ageev and M. I. Sviridenko Sobolev Institute of Mathematics pr. Koptyuga 4, 630090, Novosibirsk, Russia fageev,svirg@math.nsc.ru

More information

CAPACITATED LOT-SIZING PROBLEM WITH SETUP TIMES, STOCK AND DEMAND SHORTAGES

CAPACITATED LOT-SIZING PROBLEM WITH SETUP TIMES, STOCK AND DEMAND SHORTAGES CAPACITATED LOT-SIZING PROBLEM WITH SETUP TIMES, STOCK AND DEMAND SHORTAGES Nabil Absi,1 Safia Kedad-Sidhoum Laboratoire d Informatique d Avignon, 339 chemin des Meinajariès, 84911 Avignon Cedex 09, France

More information

Worst case analysis for a general class of on-line lot-sizing heuristics

Worst case analysis for a general class of on-line lot-sizing heuristics Worst case analysis for a general class of on-line lot-sizing heuristics Wilco van den Heuvel a, Albert P.M. Wagelmans a a Econometric Institute and Erasmus Research Institute of Management, Erasmus University

More information

Single Machine Scheduling with a Non-renewable Financial Resource

Single Machine Scheduling with a Non-renewable Financial Resource Single Machine Scheduling with a Non-renewable Financial Resource Evgeny R. Gafarov a, Alexander A. Lazarev b Institute of Control Sciences of the Russian Academy of Sciences, Profsoyuznaya st. 65, 117997

More information

On the Existence of Ideal Solutions in Multi-objective 0-1 Integer Programs

On the Existence of Ideal Solutions in Multi-objective 0-1 Integer Programs On the Existence of Ideal Solutions in Multi-objective -1 Integer Programs Natashia Boland a, Hadi Charkhgard b, and Martin Savelsbergh a a School of Industrial and Systems Engineering, Georgia Institute

More information

LOWER BOUNDS FOR THE UNCAPACITATED FACILITY LOCATION PROBLEM WITH USER PREFERENCES. 1 Introduction

LOWER BOUNDS FOR THE UNCAPACITATED FACILITY LOCATION PROBLEM WITH USER PREFERENCES. 1 Introduction LOWER BOUNDS FOR THE UNCAPACITATED FACILITY LOCATION PROBLEM WITH USER PREFERENCES PIERRE HANSEN, YURI KOCHETOV 2, NENAD MLADENOVIĆ,3 GERAD and Department of Quantitative Methods in Management, HEC Montréal,

More information

Discrete lot sizing and scheduling on parallel machines: description of a column generation approach

Discrete lot sizing and scheduling on parallel machines: description of a column generation approach 126 IO 2013 XVI Congresso da Associação Portuguesa de Investigação Operacional Discrete lot sizing and scheduling on parallel machines: description of a column generation approach António J.S.T. Duarte,

More information