1 REDUCING COAL DAMAGE AND LOSS WITH A NEW BLASTING TECHNOLOGY Tapan Goswami 1, Geoff Brent 2, and Lloyd Hain 3 1 Tapan Goswami, Principal Mining Consultant, Orica Mining Services, PO Box 196, Kurri Kurri, NSW 2327, Australia. 2 Geoff Brent, Research Associate, Orica Mining Services, PO Box 196, Kurri Kurri, NSW 2327, Australia. 3 Lloyd Hain, Drill & Blast Engineer, Ensham Mine, PO Box 1565, Emerald, Queensland 4720, Australia. ABSTRACT For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have proved very challenging. In the past various blasting techniques were applied in attempts to improve coal recovery. One approach was to use a shallow throw (cast) blast followed by a separate post-strip blast underneath. Another method was the introduction of the practice known as baby decking with the addition of a large buffer of material in front of the coal. However, despite increasing mining costs, none of these techniques adequately reduced coal edge loss and damage. This paper describes how the new mining technology of Stratablast TM has been implemented at Ensham Mine to improve coal recovery and productivity. This technology employs electronic initiation systems and complex modelling to combine what were traditionally separate blast events, such as a throw blast and a stand-up blast, into a single blast event. Several layers are drilled, loaded and fired in one cycle, with a unique blast design assigned to each layer. Within each layer the blasts have different powder factors, inter-hole delays and directions of initiation. Additionally, delays of several seconds may be used between the various layers. This technology has been used routinely in Ramp 24 at Ensham since August Several aspects of the process have been highlighted during implementation, namely; the vital importance of explosives column location, managing issues associated with the presence of large amounts of water, dealing with varying geology and ensuring blast implementation exactly followed design. All these aspects had to be well understood and rigorously controlled; on occasions when this control was inadequate some coal damage did occur. The introduction of this technology has seen coal recovery levels increase dramatically along with providing good productivity without increasing the number of drill and blast cycles. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 1 of 16

2 INTRODUCTION Ensham Coal Mine is situated in Central Queensland, Australia. It is a large operation in the region producing around 9 Mtpa of coal. The mine removes 115 million bcm (150 million bcy) of overburden per year using four draglines and a truck and excavator fleet. While throw blasting is employed in the overburden, powder factors are relatively low. Despite this, coal loss has been a major recurring problem at the mine. In particular, Ramp 24 at Ensham has been very prone to blast-induced coal damage and loss. Whenever throw (cast) blasting was attempted the coal edge moved. This edge movement also resulted in trenches being formed in the coal. In Australia the extent of coal loss from mining operations varies between about 5 to 25 per cent of insitu coal. Much of this loss occurs during blasting. Coal edge movement, ultimately into spoil, as well as blast damage to the roof of the seam and dilution with the overlying rock are frequently observed. It has been estimated that an increase in coal recovery of 1% would increase revenue by about one to three million dollars per year for most Australian mining operations (ACARP, 1995). Operations that are margin-driven are often more committed to reducing coal loss and damage as compared to mining houses which may be more volume driven and committed to high production rates. However, where both high productivity and reduced coal loss can be achieved simultaneously, the cumulative benefit is substantial to any operation. Orica (the supplier) has developed a new mining technology that has been described previously (Goswami and Brent, 2006). It is essentially a technique of implementing multiple different blast types within a single drill, blast and excavation cycle. The method combines a throw blast with one or more stand-up blasts in a single event. The throw portions of the blasts are fired before the stand-up portions, with a separation in time in the range of 500 to 10,000 ms. This inter-blast delay is dictated by rock properties and the time required for the throw blast layer to fall in place. These separate sub-blasts in several layers are each loaded to a particular powder factor, separated by a column of stemming and fired on quite different initiation sequences and inter-hole delays from each other. Figure 1 shows a schematic view involving a throw blast followed several seconds later by a stand-up blast below. This is the type of blast implemented in this work to provide protection of the coal. Usually, all movement from the throw blast has ceased well before the stand-up blasts commence. This provides a large layer of static material over the stand-up blasts to minimise any movement from these later blast portions. The technology is particularly effective at limiting coal loss, since the stand-up blasts above the coal are restricted from moving. Furthermore, the throw blasts occur in complete isolation from the coal seam, ensuring that good throw can be obtained while not allowing any coal movement. Theoretically, it would seem impossible for any coal loss to occur with this method, and in practice when designs have been well implemented no coal loss in fact results. Unfortunately however, operational realities do not always equate to idealised designs! This paper discusses experiences with this technology in Ramp 24 at Ensham. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 2 of 16

3 Previous Approaches Various attempts have been made in the past to improve recovery of the coal from Ramp 24. Some of these are described here. Stand-up Blasts In order to focus on coal recovery, the mine attempted dispensing with throw blasting in favour of a more conservative approach, namely blasting only in a stand-up mode. Naturally, this resulted in extra material handling for the dragline and hence a higher cost of mining. It also adversely slowed the coal exposure rate at a critical time when market demands were high. Unfortunately, despite the productivity sacrifices, the stand-up blasts did not result in reductions in coal damage/loss. Two-pass Overburden Removal Another approach was to adopt a two-pass mining method for the overburden in Ramp 24. This method implemented a throw blast in the upper 80% of the overburden (35 m or 115 ft). After excavation of the throw blast a completely separate, so-called post-strip blast (10-15 m or ft) was subsequently drilled and fired in the remaining overburden layer. Coal is not usually blasted in the areas considered here. The need for this second blast in the overburden once again brought about considerable increases in mining costs. Excavation of the second layer was done with a shovel and truck fleet at a considerably higher cost than could be achieved with a dragline. Figure 2 shows the blast arrangement and excavation. Furthermore, a second campaign of blasthole surveying and mark-out, drilling, loading and blasting was required for the additional blast layer. A complete additional mining cycle of drilling, blasting and excavation had been introduced. Coal exposure rates thus also decreased. Baby Decking and Buffering So-called baby-decking is a well-known technique that has been trialled with mixed success at a number of sites around Australia for many years. It is described by Kanchibotla, Laing and Grouhel (2006) amongst others. The baby-deck is a small deck of explosive just above the coal that fires on a separate delay, conventionally ms, after the main column of explosive in the throw blast. In addition to baby-decking, a large buffer of material was constructed in front of the coal to protect it from movement during the blast. This is shown in Figure 3. Modelling Studies Blast models were used to compare the percentage thrown into final spoil for three different blasting methods in Ramp 24. The models, MBM and SoH, are described elsewhere (Minchinton and Lynch, 1996; Minchinton and Dare-Bryan, 2005). The blasts modelled were a baby-deck throw blast, a babydeck throw blast with a large buffer and the new blasting method. All models were constructed keeping the bench geometry, burden, spacing and throw blast powder factor and inter-hole timing the same. Both the baby deck blasts had the same explosive loading and timing, with the bottom baby deck firing 100 ms after the top main deck of each hole. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 3 of 16

4 Despite the limitations of two-dimensional models, the results compared very well to actual muckpile profiles and percentages of material thrown to final spoil. Table 1 shows the calculated percentage cast to final spoil for the three designs. From Table 1 it can be seen that the baby-decked blast (without the buffer) generates the greatest throw to final spoil, which is to be expected as the relatively short delay time for the baby deck ensures that the small bottom deck actively contributes to the throw. Conversely, with the new technology the bottom stand-up blast occurs completely separately to the throw blast with a different timing regime and hence does not contribute to throw. For the buffered baby deck blast, although the overall muckpile profile appeared to show a lot of material in the void, when the preexisting buffer material was subtracted the actual thrown material from the blast was the least of the three blast practices modelled. Additionally of course, this material originally had to be brought into the void by the truck and shovel fleet, adding a large extra volume to the total excavation volume and making this by far the least productive option. The model showed that for the conventional cases the coal edge moved while for the new technology it did not. Table 1. Cast to final spoil as modelled for three blast types Blast practice Percentage cast to final spoil (%) New Technology 20 Baby deck (no buffer) 24 Buffered baby deck 17 While the exact science of coal damage and movement is not yet well understood, some general observations suggest that the following factors contribute to, or are associated with, coal damage and loss. Geological disturbances such as faults, folds and intrusions. These are commonplace at Ensham. Coal damage usually results when the material layers overlying or underlying the coal seam are weaker than the coal seam. One of the worst situations appears to be when the layers comprise saturated clay, shale or mudstone. The location of the control (leading) row for the throw blast. Generally the coal edge moves along the control rows, which is followed by trenches. For example, if a row-by-row throw blast timing is used parallel to the strike, the coal edge moves and trenches are formed parallel to strike. Likewise, if a V timing design is used then trenches are often formed at an angle to the strike direction following the orientation of the V. Blast blocks containing considerable amounts of water. It appears that energy can be transmitted between the explosive decks due to the presence of water, thereby losing control on energy release. Coal damage and movement from decks firing out-of-sequence can occur. It is also speculated that water can lubricate the coal seam by reducing cohesion between the coal and overburden. Coal damage has been observed to be more pronounced where coal seams are saturated by water as compared to dry sections of blasts. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 4 of 16

5 Improperly designed or inaccurately implemented stand-off distances from the coal. This is a crucial factor as explosive placed too close to the coal inevitably damages the coal. Control is made more difficult by variations in the coal or overburden as well as by blasthole fall-back and water ingress. Insufficient knowledge of the exact location of the top of the seam in each and every blasthole exacerbates this problem. Blast timing. Certain timing designs have been observed to result in increased coal movement. Primer location and explosive type may have an impact on the extent of damage. While these effects can be modelled, definitive field experiments have not been done in this regard. Application in Ramp 24 The new technology was introduced into Ramp 24 at Ensham in August The first blast implemented was about 1.8 Mbcm (2.4 M cu yd) in volume and comprised over 500 blastholes of 229 mm (9 inch) diameter on a nominal 7.5 m x 10 m (25 ft x 33 ft) staggered pattern. The upper throw blast layer was about 35 m (115 ft) thick while the second, stand-up layer was around 8 m (26 ft) thick. Figure 6 shows the blast face and void. An earlier paper describes the initial blast and the highly successful outcomes (Goswami, Brent and Rutledge, 2006). The mine has since changed to 270 mm (10 5 / 8 inch) drill holes and patterns have also now been modified. After the success of the first blast, this technology was routinely implemented. By September 2007, sixteen large blasts using this technology had been fired in Ramp 24. In the majority of cases, as anticipated, the blasts produced absolutely no coal edge loss or damage, while providing productivity benefits. However, in three out of sixteen cases the operational realities conspired to ensure that theoretical perfection was not always achieved! Localised occurrences of coal damage arose in a couple of blasts where factors such as unusual or unnoticed geological formations, wet and saturated blast blocks and localised concentrations of explosives occurred, normally in combination with each other. Typically, the bottom deck charge varies according to the design standoff distance between the bottom of the blasthole and the top of coal, as well as the rock formation (e.g. hard, soft, wet or dry) above and below the coal seam. Furthermore, each layer is blasted with a unique timing design to achieve its targeted blast result, which is different from that of the other layers. Designs in each layer differ in explosive type and deck position, powder factor, standoff distances to other layers, inter-hole and inter row delays and direction of initiation or blast progression. Also, in order to match localised conditions and to increase or decrease blast throw, the blasthole spacing is varied in certain sections. These complexities made design and implementation challenging. It may be noted that to date no two blasts have been the same at Ensham; each has been designed to be loaded and timed differently. In some cases the presence of a major fault dislocated and shifted the coal seam, causing the blast depth to increase to over 70 m (230 ft). The spacing in these areas had to be reduced by 30% to provide extra energy to adequately blast this particular section of the block. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 5 of 16

6 The Process The general process begins by collecting relevant information on geology, in particular the coal seam, rock layers and the presence of faults, the blast blocks, pattern, powder factors, dig rates, blast performance requirements and any environmental issues. The supplier then analyses the data and appraises the current practice, and, if required, recommendations for improvement within the general blast design are made. For example, alternative products (bulk and initiation) and delay initiation sequences (including firing direction) may well form the basis of such recommendations. The design process then commences. Key Performance Indicators (KPIS) Prior to designing a blast, the KPIs are usually agreed between the supplier and the mine. Generally they include the following in order of priority. No safety or environmental incidents - vibration and over pressure levels must be within the allowable limits at particular locations. No coal loss or damage. Provision of a muckpile shape that maximises equipment productivity e.g. forming a ramp for dragline access and achieving sufficient blast throw to maximise machine productivity. Maintenance of the dragline s budget dig rates of 2011 bcm/hr (2630 bcy/hr) for the strip. Production of a safe high wall and minimisation of material clinging to the wall for the dragline to clean. For Ensham mine, Safety is always the number one priority. Blast Modelling The supplier s proprietary mechanistic blast models, MBM and SoH, are used to generate simulations on potential coal damage and on the movement of material within a blast for different blast designs. This allows the analysis of the effect of various different blast designs. The modelling can be used to determine the effects of incremental changes in blast designs and bench geometry or more profound changes in the operation to reveal potentially more productive or costeffective means of blasting and excavating material. Such radical changes may include changes to strip width, combinations of layers such as pre-strip with overburden or changes to wall and blasthole angles. The models generate results showing particle displacement, velocity of all particles as a function of time and final muckpile profiles as a function of time. The latter is important in optimising timing design, in particular the delay required between various blast layers. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 6 of 16

7 Block Definition All the free faces, bench surfaces and voids need to be surveyed. This information is necessary to create various surfaces used in the blast design process. The mine surveyors usually provide all details such as crest lines, the top of the coal seams visible in the exposed highwalls, voids, low wall, and relevant information of current and previous strips within the strip. The supplier s proprietary SHOTPlus-i TM program is then used to recommend blasthole locations with appropriate burden, spacing and hole depths. Strata Logging Once the block is drilled, Gamma logging is carried out in a defined sequence to accurately determine rock strata changes throughout the blast block. This key process identifies material layers overlying and underlying the coal seams as well as the exact location of the top and bottom of the coal seams. Approximately 20 holes per 100 m (330 ft) of block length are logged. This information is crucial for success as it affects all design parameters. Loading Design A detailed design specifying each explosive and stemming deck is then generated. The various positions of each deck in the blastholes and their column lengths, explosive masses and primer locations are provided to the shotfirer. This design is then implemented, as accurately as field conditions allow, by the experienced mine and explosives teams. Initiation Design Information gathered from the modelling analysis, the actual as-loaded explosive and stemming deck locations, any environmental restrictions and the required muckpile shapes are then considered in developing the timing design. These complex blasts cannot be performed using signal tube systems as the system flexibility of the electronic i-kon TM initiation system is required. This includes the provision of very long and accurate delays. Accuracy and controlled timing energy release are important in achieving the desired blast results. Also, the multiple delay sequences used in the various layers can only be achieved with electronic detonators. A key consideration in the timing design of the throw blast part of the blasts is that of environmental constraints. Environmental Issues Initially, airblast and vibration were not considered to be high risk factors in the design of the first blast in August 2005, as the monitoring locations were more than 5 km (3 miles) away. While ensuring no coal loss was the major blast objective, the throw blast initiation design was aimed at achieving good throw outcomes. This design used short inter-hole delays along the control row, providing timing of about 0.6 to 0.7 ms/m ( ms/yd) along most of the 650 m (710 yd) long face. This blast recorded high overpressure levels, in excess of the allowable limits at the mine s monitoring station. The blast 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 7 of 16

8 video showed some evidence of face bursting and stemming ejection, however, subsequent analysis of the airblast trace indicated that these were not dominant contributors to the peak level. The supplier has since developed a new model for prediction of airblast based on the effect of blast face movement. This model is based on the blast face moving the air in front, resulting in overpressure (Blair, 2004). The overall face motion is dependent on the delays and spacing used between face holes as well as the explosive column height, rock and burden in each hole. Since its development this model has been used for all the subsequent such blasts fired at Ensham and none have exceeded allowable limits again. It was also established that the use of two face sections initiating in opposite directions in throw section could actually increase airblast levels at the monitoring station. Field Implementation The importance of the design steps has been emphasised, however the actual implementation of the designs in the field is equally crucial. The quality of the outcome can only be as good as the quality of implementation. The coal and rock will move according to the actual explosive charge placement, not the theoretical design! Utmost care and attention to detail is required to implement the design successfully in the field. Control of charge masses and column lengths, air/stemming deck locations and lengths and actual stand off distances are necessary to avoid any coal damage or loss. Accurate (calibrated) stemming delivery is a key requirement. Results Coal Loss and Damage One of the important benefits that this technology has brought to Ensham mine is the significant reduction of coal edge loss and the resultant trenches. In almost all the blasts with the new technology the results have been very good. An example of the ability to recover coal with localised variations is shown in Figures 7 and 8. Figure 7 shows a pre-blast model of the coal surface and Figure 8 shows the same coal surface after it was exposed by the dragline. A localised fold in the coal is visible in both figures. Figure 9 shows the general quality of coal surfaces with this technology. Table 2 shows the comparison of recovery of the complete coal seam against the in-situ coal model for the last three strips at Ensham. The increased recovery was due to the reduced coal loss/damage as a result of this technology. This far exceeds what can be expected from conventional blasting, where 5-25% loss of coal is often experienced in Australian coalmines. Table 2. Coal seam recovery for three strips with the new technology Strip Expected coal as per mine model including t t t % dilution/loss allowed by Ensham Actual recovery t t t % Recovery 101.3% 104.5% 100.7% 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 8 of 16

9 When Things Go Wrong Of sixteen such blasts fired so far in Ramp 24 south and north, one blast did however result in significant coal edge movement and damage. Various factors were believed to have led to this situation, including the unnoticed presence of a geological change, misinterpretation or insufficient logging data and excessive water which transmitted energy, displacing the coal seam horizontally into the low-wall. There were two other cases of some localised coal damage, again due to unusual field conditions or inaccurate implementation of design. It is extremely important to locate any coal and geological variations, identifying locations of hard or soft layers immediately above or below the coal seam as well as the amount of water in each hole. It has been observed from video records that the overburden appears to rupture along fault lines, which can lead to disruptions in the stand-up portion of blasts and damage to the coal. This venting of energy is also believed to have caused insufficient breakage giving rise to hard digging in these regions. When things did go wrong it was due to a combination of field circumstances. These included geological abnormalities, excessive water, restrictions on firing direction due to the presence of a nearby residence, fall back of drill cuttings, short holes, inaccurate backfilling and last minute changes to the firing direction due to operational requirements. Muckpile Shape Typical designs in Ramp 24 aim to throw the top 35 m (115 ft) of overburden to achieve maximum displacement into the void. However, due to restricted blast geometry (35 m (115 ft) instead of the full bench height of 45 m (150 ft)) the throw is usually limited to about 25%. However, the designs are done in such a way as to achieve forward displacement of the muckpile centre of mass, which helps in the initial phase of excavation; namely dozer push. Dozer push of the upper layers of the muckpile into the void can be cheaper than dragline excavation. The dozer also prepares the pad for the dragline. Figure 10 shows a muckpile during dozer push operations. Dragline Dig Rates One of the key performance measures for the Marion 8050 dragline (40 bcm (52 bcy) per swing capacity) is to achieve more than the mine s budgeted dig rate, which is 2011 bcm/hr (2630 bcy/hr). Any improvement on this dig rate is directly proportional to extra dragline days made available for the mine to utilise. Extra dragline days translate into the coal exposure rate, which is taken as the best measure of productivity. The coal exposure rate is a function of both the volume to be excavated by the dragline and the actual dragline excavation rate. It has been estimated that the opportunity-cost of lower coal exposure rates in the current market conditions, taking account of the operating and capital costs for the Marion 8050 dragline, equates to about A$11,000/hr of dragline time. This translates into a very significant opportunity-cost of approximately A$250,000/day. In strips 25, 26 and 27 the number of days saved was estimated to be 16. The total savings due to the dragline productivity alone was thus worth A$4 million just for these three 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 9 of 16

10 strips. In the most recent blast in strip 28, four days of dragline operation was saved after only digging half of the muckpile. Highwall Quality It was established at Ensham that the resulting highwalls were generally good in northern parts of the ramp where the major joints were parallel to the strike direction. However, in the southern parts of the ramp the face orientation was turned, changing the direction of major joints to an angle of about 30 0 to the strike. Less clean highwalls, with material clinging on to the wall, started to result in the south. This made the dragline less efficient. The problem has since been addressed by increasing the explosive energy in the last row adjacent to the presplit line and modifying the timing in the back three rows. Concluding Remarks To date over 24M bcm (31 M bcy), producing over 3 M t of coal, have been blasted in Ramp 24 with this technology. It is now a routine mining method at Ensham. Careful design and field implementation are always required to ensure success, since changes in geology or actual explosive loading can lead to coal damage or loss. The supplier and the mine continue to work together with this mining method, which has proven itself in reducing coal losses while maintaining high productivity in all aspects of mining in Ramp 24 at Ensham mine. Acknowledgements The authors thank and acknowledge many people from the mine and from Orica Australia Limited for their assistance during this work. In particular, Ensham Resources are acknowledged for their cooperation and permission to publish. Particular thanks go to Simon Wedgwood and Malcolm Christie from Ensham mine. Dane Blair and Peter Dare-Bryan are thanked for their modelling and Keith Gimbert, Dirk Smith, Trevor Byers, Alex Steciuk, Stephen Mansfield, Clive Leeds and others in the Orica Ensham team are thanked for their immense efforts in blast implementation and success. References Australian Coal Association Research Programme (ACARP), Final Report, The Assessment and Control of Coal Damage and Loss (C3017). Blair, D.P., Analysis and Modelling of Airblast and Ground Vibration, Proc. EXPLO 2004, Perth, WA, Australia. Kanchibotla, S., Laing, T. and Grouhel. P., Reducing Coal Loss During Cast Blasting at Rix s Creek Mine, Proc. International Society of Explosives Engineers, Dallas, USA. Goswami, T., Brent, G.F. and Rutledge, C., Stratablast TM in action, Proc. 32 nd Int. Conf. on Expl. and Blasting Technique, Dallas, USA. ISEE. Goswami, T. and Brent, G.F., Stratablast TM - A New Mining Method, Proc. 32 nd Int. Conf. on Expl. and Blasting Technique, Dallas, USA. ISEE. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 10 of 16

11 Minchinton, A. and Lynch, P., Fragmentation and heave modelling using a coupled discrete element gas flow code, Proc. 5 th International Symposium on Rock Fragmentation by Blasting- Fragblast 5 (Ed: B Mohanty), pp (Balkema: Rotterdam). Minchinton, A. and Dare-Bryan, P., On the application of computer modelling for blasting and flow in sublevel caving operations, Proc. 9 th Underground Operators Conference, Perth, WA 7-9 March 2005 (AusIMM). 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 11 of 16

12 Figure 1. Schematic view of the new blast technology for reducing coal loss, showing a throw blast with subsequent stand-up blast. Figure 2. Two-pass blasting with dragline and truck and shovel excavation. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 12 of 16

13 Figure 3. A cast blast with baby deck and buffer to restrict coal edge movement. Despite best efforts, once again these methods did not eliminate coal edge loss. With the edge movement, trench-like damage occurred in the coal, as shown in Figures 4 and 5. Figure 4. Edge movement into spoil and trenches in the coal with conventional blasting. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 13 of 16

14 Figure 5. An example of formation of deep trenches in the coal. The trenches are filled with water in this picture. This was result of a conventional cast blast. Figure 6. The blast face and void for the first blast with the new technology in Ramp G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 14 of 16

15 Figure 7. A pre-blast model of the coal surface showing a fold in the coal. Figure 8. The post-blast surface after the dragline exposed the coal, showing the recovered fold in the coal. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 15 of 16

16 Figure 9. Post-blast coal surfaces after dragline exposure. Figure 10. Dozer push in preparation for dragline excavation. 2008G Volume 1 - Reducing Coal Damage and Loss with a New Blasting Technology 16 of 16

A new mining method T. GOSWAMI G.F. BRENT

A new mining method T. GOSWAMI G.F. BRENT A new mining method T. GOSWAMI G.F. BRENT 02 A new mining method List of headings T. GOSWAMI Principal Blasting Engineer Orica Australia PO Box 196 Kurri Kurri NSW 2327 T 61 2 4939 5138 E tapan.goswami@orica.com

More information

Blast design parameters and their impact on rock fragmentation

Blast design parameters and their impact on rock fragmentation Blast design parameters and their impact on rock fragmentation By Pradeep K Singh, Chief Scientist & Professor, Academy of Scientific & Innovative Research CSIR Central Institute of Mining and Fuel Research,

More information

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

Selection of inter-hole and inter-row timing for surface blasting - an approach based on burden relief analysis

Selection of inter-hole and inter-row timing for surface blasting - an approach based on burden relief analysis Selection of inter-hole and inter-row timing for surface blasting - an approach based on burden relief analysis I.Onederra & S.Esen Julius Kruttschnitt Mineral Research Centre -The University of Queensland,

More information

Managing Muckpile Fragmentation. Scott G. Giltner

Managing Muckpile Fragmentation. Scott G. Giltner Managing Muckpile Fragmentation Scott G. Giltner Topics to be Covered The purpose of drilling & blasting in producing crushed stone Relative cost of drilling & blasting vs other quarrying activities Cost/production

More information

Blast Fragmentation Modelling of the Codelco-Andina Open Pit Expansion

Blast Fragmentation Modelling of the Codelco-Andina Open Pit Expansion Blast Fragmentation Modelling of the Codelco-Andina Open Pit Expansion F. Mardones GeoBlast S. A., Chile C. Scherpenisse GeoBlast S. A., Chile I. Onederra The University of Queensland, Sustainable Minerals

More information

Ring Blasting Design Modeling and Optimization

Ring Blasting Design Modeling and Optimization Ring Blasting Design Modeling and Optimization María Rocha, Rocha Blast Engineers, Spain & Roberto Laredo, Real Miners Consulting S.L., Spain Benjamín Cebrián, Blast-Consult S.L., Spain Abstract Ring blasting

More information

TITLE: Burton Highwall Challenge. OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess. AUTHOR: Thiess Burton Geotechnical Team

TITLE: Burton Highwall Challenge. OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess. AUTHOR: Thiess Burton Geotechnical Team TITLE: Burton Highwall Challenge OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess AUTHOR: Thiess Burton Geotechnical Team ABSTRACT The Burton Coal Project mining operations currently

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

Exploration for Results: Moura Coal Mine

Exploration for Results: Moura Coal Mine University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2004 Exploration for Results: Moura Coal Mine J. Hoelle Moura Coal Mine Publication Details

More information

Mathias Jern nitroconsult.se)

Mathias Jern nitroconsult.se) Blast management- Environmental impact Blast management Environmental impact Mathias Jern (mathias.jern @ nitroconsult.se) Blasting Management Environmental - impact Vibrations Airblast Fly rock Blasting

More information

List of Abstracts. Automation and Introduction of New Technologies in Blasting Operations (9)

List of Abstracts. Automation and Introduction of New Technologies in Blasting Operations (9) List of Abstracts Automation and Introduction of New Technologies in Blasting Operations (9) A review of dam foundation excavation techniques in China Building Accurate and Inexpensive Accelerometer-Based

More information

Fragmentation Management for the Downstream Value Chain. Scott G. Giltner

Fragmentation Management for the Downstream Value Chain. Scott G. Giltner Fragmentation Management for the Downstream Value Chain Scott G. Giltner Topics to be Covered The purpose of drilling & blasting in producing crushed stone Relative cost of drilling & blasting vs. other

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Wall Control by Blasting Optimization at Las Cruces Open Pit Copper Mine (Spain)

Wall Control by Blasting Optimization at Las Cruces Open Pit Copper Mine (Spain) Wall Control by Blasting Optimization at Las Cruces Open Pit Copper Mine (Spain) M. Rocha Mining Engineer I. Carrasco Mine Planning Manager. Cobre Las Cruces, S.A., Seville, Spain J. Castilla Universidad

More information

The use of seismic methods for the detection of dykes

The use of seismic methods for the detection of dykes University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 1998 The use of seismic methods for the detection of dykes B. J. Evans Curtin University

More information

UNDERGROUND BLASTING. There are two reasons to go underground and excavate:

UNDERGROUND BLASTING. There are two reasons to go underground and excavate: UNDERGROUND BLASTING TUNNELING There are two reasons to go underground and excavate: i. to use the excavated space, e.g. for storage, transport etc. ii. to use the excavated material, e.g. mining and quarrying

More information

Methods of Interpreting Ground Stress Based on Underground Stress Measurements and Numerical Modelling

Methods of Interpreting Ground Stress Based on Underground Stress Measurements and Numerical Modelling University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2006 Methods of Interpreting Ground Stress Based on Underground Stress Measurements and

More information

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling Yvette

More information

Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project

Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project Presentation by: C.G. Goncalves DetNet South Africa (Pty) Ltd Paper by: C.G. Goncalves DetNet South Africa (Pty) Ltd S.J.

More information

Structurally controlled instability in tunnels

Structurally controlled instability in tunnels Structurally controlled instability in tunnels Introduction In tunnels excavated in jointed rock masses at relatively shallow depth, the most common types of failure are those involving wedges falling

More information

Large scale three-dimensional pit slope stability analysis of the structurally controlled mechanism in Mae Moh coal mine

Large scale three-dimensional pit slope stability analysis of the structurally controlled mechanism in Mae Moh coal mine APSSIM 2016 PM Dight (ed.) 2016 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-5-6 https://papers.acg.uwa.edu.au/p/1604_40_chaiwan/ Large scale three-dimensional pit slope stability analysis

More information

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants Introduction to Coal Mining History of Coal in the United States Coal was one of man s earliest sources of heat and light Coal was first

More information

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting By Pradeep K Singh Chief Scientist & Professor, Academy of Scientific & Innovative Research CSIR Central Institute of Mining

More information

Understanding the Causes of Roof Control Problems on A Longwall Face from Shield Monitoring Data - a Case Study

Understanding the Causes of Roof Control Problems on A Longwall Face from Shield Monitoring Data - a Case Study University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2011 Understanding the Causes of Roof Control Problems on A Longwall Face from Shield

More information

Prediction of subsoil subsidence caused by opencast mining

Prediction of subsoil subsidence caused by opencast mining Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). IAHS Publ. no. 234, 1995. 167 Prediction of subsoil subsidence caused by opencast mining

More information

Strong Weighting Events in Shallow Multi-seam Longwall Mining

Strong Weighting Events in Shallow Multi-seam Longwall Mining University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Strong Weighting Events in Shallow Multi-seam Longwall Mining Weibing Zhu China

More information

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining Coal Mining Methods Underground Mining Longwall & Room and Pillar Mining Longwall mining and room-and-pillar mining are the two basic methods of mining coal underground, with room-and-pillar being the

More information

5. Crater Rim Uplift and Crater Wall Collapse

5. Crater Rim Uplift and Crater Wall Collapse 5. Crater Rim Uplift and Crater Wall Collapse The basic processes involved in crater rim uplift are understood, but there is a lot of evidence at the crater that has not been fully explored and may eventually

More information

Optimising slew torque on a mining dragline via a four degree of freedom dynamic model

Optimising slew torque on a mining dragline via a four degree of freedom dynamic model 5 th Australasian Congress on Applied Mechanics, ACAM 007 10-1 December 007, Brisbane, Australia Optimising slew torque on a mining dragline via a four degree of freedom dynamic model Charles H. McInnes

More information

ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION SIMULATION

ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION SIMULATION Oil Shale, 2018, Vol. 35, No. 4, pp. 356 364 ISSN 0208-189X doi: https://doi.org/10.3176/oil.2018.4.05 2018 Estonian Academy Publishers ANALYSIS OF FIELD TEST RESULTS FOR THE OIL SHALE MINE VENTILATION

More information

Geotechnical modelling based on geophysical logging data

Geotechnical modelling based on geophysical logging data University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 Geotechnical modelling based on geophysical logging data Peter Hatherly Coalbed

More information

The Application of Electronic Monitors to Understand Blast Movement Dynamics and Improve Blast Designs

The Application of Electronic Monitors to Understand Blast Movement Dynamics and Improve Blast Designs The Application of Electronic Monitors to Understand Blast Movement Dynamics and Improve Blast Designs D.M. Thornton Blast Movement Technologies, Brisbane, Queensland, Australia ABSTRACT: Blasting is a

More information

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY CONTROLLING FACTORS Dr. J C. JHANWAR Sr. Principal Scientist CSIR-Central Institute of Mining & Fuel Research Regional Centre, Nagpur

More information

Rock mechanics related to mining: challenges and opportunities

Rock mechanics related to mining: challenges and opportunities Rock mechanics related to mining: challenges and opportunities Zong-Xian Zhang April 26, 2018 Zhang ZX, University of Oulu 1 Two missions of rock mechanics in mining engineering Destroy rock efficiently

More information

EFFECTIVENESS AND SAFETY OF OPEN PIT HAUL ROADS, OPERATORS PERFORMANCE, HAUL ROAD DESIGN AND TOLERABLE METHODS

EFFECTIVENESS AND SAFETY OF OPEN PIT HAUL ROADS, OPERATORS PERFORMANCE, HAUL ROAD DESIGN AND TOLERABLE METHODS EFFECTIVENESS AND SAFETY OF OPEN PIT HAUL ROADS, OPERATORS PERFORMANCE, HAUL ROAD DESIGN AND TOLERABLE METHODS Saul Dev PG Scholar Department Of Mechanical Engineering Excel College Of Engineering & Technology

More information

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Correlation of Blast-hole Deviation and Area of Block with Fragment Size and Fragmentation Cost

Correlation of Blast-hole Deviation and Area of Block with Fragment Size and Fragmentation Cost Correlation of Blast-hole Deviation and of with Fragment and Fragmentation B. Adebayo 1,2 and B. Mutandwa 1 1Department of Mining and Metallurgical Engineering University of Namibia, Ongwediva, Namibia

More information

SEISMIC SURVEYS FOR IMAGING THE REGOLITH

SEISMIC SURVEYS FOR IMAGING THE REGOLITH SEISMIC SURVEYS FOR IMAGING THE REGOLITH Barry Drummond Geoscience Australia. PO Box 378, Canberra, ACT 2601. E-mail: barry.drummond@ga.gov.au 1. INTRODUCTION Seismic reflection and refraction imaging

More information

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE CEN Li, JIANG Cang-ru School of Civil Engineering & Architecture, Wuhan University of Technology, Wuhan 430070, P.R.China Email: myfqp@tom.com

More information

Innovative Techniques for Detection and Control of Underground Spontaneous Combustion of Coal

Innovative Techniques for Detection and Control of Underground Spontaneous Combustion of Coal University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2004 Innovative Techniques for Detection and Control of Underground Spontaneous Combustion

More information

For personal use only

For personal use only Quarterly Activities Report Quarter Ending 30 September 2018 (ASX Code: HE8) (Helios or Company) is pleased to report its activities for the quarter ended 30 September 2018. Oil Discovery in the Ojinaga

More information

Common Exploration Methods.

Common Exploration Methods. Common Exploration Methods. The following list contains the most common methods which a company with a mineral prospecting licence in Northern Ireland might use to carry out a mineral prospecting programme.

More information

How to Interpret Mining Company Drill Reports & Announcements

How to Interpret Mining Company Drill Reports & Announcements How to Interpret Mining Company Drill Reports & Announcements A Simple Guide amscot Stockbroking Pty Ltd A division of State One Stockbroking Ltd (AFSL 247 100) Disclaimer: All information in this document

More information

How NSW and Queensland Coalfields Differ - What We Need To Do Better

How NSW and Queensland Coalfields Differ - What We Need To Do Better University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2001 How NSW and Queensland Coalfields Differ - What We Need To Do Better B. Nicholls

More information

Rock Breakage by Explosives

Rock Breakage by Explosives Rock Breakage by Explosives Slavko Torbica, Ph.D. 1, Veljko Lapcevic M.Sc. 2* 1 Proffesor at Univeristy of Belgrade, Faculty of Mining and Geology, Djusina 7, 11000 Belgrade, Republic of Serbia Email:

More information

6. Crater Rim Uplift and Crater Wall Collapse

6. Crater Rim Uplift and Crater Wall Collapse 6. Crater Rim Uplift and Crater Wall Collapse The basic processes involved in crater rim uplift are understood, but there is a lot of evidence at the crater that has not been fully explored and may eventually

More information

A NEW ROCK BOLT CONCEPT FOR UNDERGROUND EXCAVATIONS UNDER HIGH STRESS CONDITIONS

A NEW ROCK BOLT CONCEPT FOR UNDERGROUND EXCAVATIONS UNDER HIGH STRESS CONDITIONS A NEW ROCK BOLT CONCEPT FOR UNDERGROUND EXCAVATIONS UNDER HIGH STRESS CONDITIONS François Charette 1 and Michel Plouffe 2 1 Atlas Copco MAI, 2 CANMET-MMSL, Natural Resources Canada Abstract This paper

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

Dilution and ore loss A short practical guide

Dilution and ore loss A short practical guide Dilution and ore loss A short practical guide Following are a few helpful pointers when dealing with dilution and ore loss. Please refer to the suggested reading list that is at the bottom of this paper

More information

BUILDING 3D MODEL OF ROCK QUALITY DESIGNATION ASSISTED BY CO-OPERATIVE INVERSION OF SEISMIC AND BOREHOLE DATA

BUILDING 3D MODEL OF ROCK QUALITY DESIGNATION ASSISTED BY CO-OPERATIVE INVERSION OF SEISMIC AND BOREHOLE DATA BUILDING 3D MODEL OF ROCK QUALITY DESIGNATION ASSISTED BY CO-OPERATIVE INVERSION OF SEISMIC AND BOREHOLE DATA 1 st Duy Thong Kieu 2 nd Anton Kepic* Curtin University and DET CRC Curtin University and DET

More information

Analysis of Large-Scale Pit Slope Stability The Aitik Mine Revisited

Analysis of Large-Scale Pit Slope Stability The Aitik Mine Revisited The Spanish Mining Council is organising the 2018 International Symposium in Slope Stability in Open Pit Mining and Civil Engineering at the XIV International Congress for Energy and Resource Mining in

More information

Successful Use of a Stress Relief Roadway at Appin Colliery

Successful Use of a Stress Relief Roadway at Appin Colliery University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2004 Successful Use of a Stress Relief Roadway at Appin Colliery R. Doyle BHP Billiton

More information

Geotechnical roof classification for an underground coal mine from borehole data

Geotechnical roof classification for an underground coal mine from borehole data University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 Geotechnical roof classification for an underground coal mine from borehole data

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran

Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran

More information

For efficient blasting practice

For efficient blasting practice Investigation of Firing Patterns on Fragmentation in an Indian Opencast Limestone Mine For efficient blasting practice the parameters incorporated in a blast design can be categorized as: rock parameters,

More information

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING PREPARED BY: Strategy and Economics DATE: 18 January 2012 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Update on Acton Extension Application

Update on Acton Extension Application Update on Acton Extension Application Andrea Bourrie Property & Resource Manager, Dufferin Aggregates Dufferin Aggregates Acton Quarry Public Information Centre October 26, 2009 A division of Holcim (Canada)

More information

WE DELIVER THE USE OF RTK GPS IN BLAST OPTIMIZATION THE USE OF RTK GPS IN BLAST OPTIMIZATION THE CASE OF GOLD FIELDS GHANA LTD, TARKWA

WE DELIVER THE USE OF RTK GPS IN BLAST OPTIMIZATION THE USE OF RTK GPS IN BLAST OPTIMIZATION THE CASE OF GOLD FIELDS GHANA LTD, TARKWA THE USE OF RTK GPS IN BLAST OPTIMIZATION THE CASE OF GOLD FIELDS GHANA LTD, TARKWA BY FRANCIS MENSAH EILAT 2009, FIG WORKING WEEK PRESENTATION OUTLINE 2 BACKGROUND Tarkwa Gold Mine is owned by Gold Fields

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

Engineering Geophysical Application to Mine Subsidence Risk Assessment

Engineering Geophysical Application to Mine Subsidence Risk Assessment Engineering Geophysical Application to Mine Subsidence Risk Assessment By: Kanaan Hanna, Sr. Mining Engineer Steve Hodges, Sr. Geophysicist Jim Pfeiffer, Sr. Geophysicist Dr. Keith Heasley, Professor West

More information

Geotechnical Assessment of Polymeric Materials as Skin Reinforcement in Underground Mines

Geotechnical Assessment of Polymeric Materials as Skin Reinforcement in Underground Mines University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2009 Geotechnical Assessment of Polymeric Materials as Skin Reinforcement in Underground

More information

Assessing Acid Loads of Coal Mine Overburden as Related to Grain Size Distribution

Assessing Acid Loads of Coal Mine Overburden as Related to Grain Size Distribution Introduction Assessing Acid Loads of Coal Mine Overburden as Related to Grain Size Distribution by Frank Caruccio and Gwendelyn Geidel University of South Carolina Department of Geology Columbia, South

More information

Appendix D Rock Blasting Report

Appendix D Rock Blasting Report Appendix D Rock Blasting Report 02-2500-01 May 20, 2005 Frank Arciero Jr. Fallingstar Homes 27231 Burbank Foothill Ranch, California 92610 Subject: ANTICIPATED ROCK EXCAVATION FRAZIER PARK ESTATES DEVELOPMENT

More information

Pit Slope Optimization Based on Hydrogeologic Inputs

Pit Slope Optimization Based on Hydrogeologic Inputs Pit Slope Optimization Based on Hydrogeologic Inputs G. Evin, F. Henriquez, V. Ugorets SRK Consulting (U.S.), Inc., Lakewood, Colorado, USA ABSTRACT With the variability of commodity prices and the constant

More information

Blasting damage in rock

Blasting damage in rock Blasting damage in rock Introduction The development of rock mechanics as a practical engineering tool in both underground and surface mining has followed a rather erratic path. Only the most naively optimistic

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

Controlling Downstream Particle Segregation with a Twisted Standpipe

Controlling Downstream Particle Segregation with a Twisted Standpipe University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 2009 Controlling Downstream Particle Segregation with a Twisted Standpipe

More information

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures DL Electric Power Industry Standard of the People's Republic of China P DL I T 5389-- Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures DL/T 5389-

More information

Mechanics of Rib Deformation at Moranbah North Mine - A Case Study

Mechanics of Rib Deformation at Moranbah North Mine - A Case Study University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Mechanics of Rib Deformation at Moranbah North Mine - A Case Study Yvette Heritage

More information

A summary of the review s findings for the six areas, listed in Table 1, is given below.

A summary of the review s findings for the six areas, listed in Table 1, is given below. 11 February 2010 Company Announcements Office Australian Stock Exchange 20 Bridge Street SYDNEY NSW 2000 RESULTS OF COAL PROJECT REVIEW Pacific Enviromin Limited (PEV) is pleased to release the main findings

More information

Mt Owen Mine barrier pillar

Mt Owen Mine barrier pillar Slope Stability 2013 P.M. Dight (ed) 2013 Australian Centre for Geomechanics, Perth, ISBN 978 0 9870937 5 2 https://papers.acg.uwa.edu.au/p/1308_64_bartlett/ W.D. Bartlett Thiess Pty Ltd, Australia I.H.

More information

GROUND VIBRATIONS IN OPENCAST MINE BLAST ON STRUCTURES VIS-À-VIS A LOCAL ENVIRONMENTAL EFFECT AND ITS MITIGATION THROUGH MINING TECHNOLOGY

GROUND VIBRATIONS IN OPENCAST MINE BLAST ON STRUCTURES VIS-À-VIS A LOCAL ENVIRONMENTAL EFFECT AND ITS MITIGATION THROUGH MINING TECHNOLOGY GROUND VIBRATIONS IN OPENCAST MINE BLAST ON STRUCTURES VIS-À-VIS A LOCAL ENVIRONMENTAL EFFECT AND ITS MITIGATION THROUGH MINING TECHNOLOGY Prof. S. Jayanthu * and Mr. Ch. Naveen **, G V Rao***, B R V Susheel

More information

Demonstration of the Advanced Radio Imaging Method (RIM): Ground Truth Results for Three-Dimensional Imaging of Coal Seams

Demonstration of the Advanced Radio Imaging Method (RIM): Ground Truth Results for Three-Dimensional Imaging of Coal Seams Demonstration of the Advanced Radio Imaging Method (RIM): Ground Truth Results for Three-Dimensional Imaging of Coal Seams Joseph Duncan, RIM Geophysicist Larry G. Stolarczyk, President Stolar Horizon,

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT 15 Rheola Street WEST PERTH WA 6005 Telephone: +61 8 9213 4388 Facsimile: +61 8 9213 4399 ASX Code: ETE ASX RELEASE 29 July 2011 QUARTERLY ACTIVITIES REPORT Entek Energy Limited provides the following

More information

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI January 12, 2005 IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland and President John

More information

FINAL WALL STABILITY IN METAL OPEN PIT MINES USING PRESPLIT BLASTING. Stirling, United Kingdom (* Corresponding author:

FINAL WALL STABILITY IN METAL OPEN PIT MINES USING PRESPLIT BLASTING. Stirling, United Kingdom (* Corresponding author: FINAL WALL STABILITY IN METAL OPEN PIT MINES USING PRESPLIT BLASTING *Kazem Oraee 1,Ali Mozafari 2, Arash Goodazi 2, and Nikzad Oraee-Mirzamani 3 1 FK9 4LA, University of Stirling Stirling, United Kingdom

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Flyrocks Detection and Mitigation at Construction Site in Blasting Operation

Flyrocks Detection and Mitigation at Construction Site in Blasting Operation World Environment: 2011; 1(1): 1-5 DOI: 10.5923/j.env.20110101.01 Flyrocks Detection and Mitigation at Construction Site in Blasting Operation A. K. Mishra *, M.Rout Department of Mining Engineering, Indian

More information

The importance of both geological structures and mining induced stress fractures on the hangingwall stability in a deep level gold mine

The importance of both geological structures and mining induced stress fractures on the hangingwall stability in a deep level gold mine The importance of both geological structures and mining induced stress fractures on the hangingwall stability in a deep level gold mine by G.B. Quaye and G. Guler* Synopsis The deep level gold mining environment

More information

ITASCA Consulting Canada Inc.

ITASCA Consulting Canada Inc. Forward Thinking Engineering World leaders in geomechanics, hydrogeology and microseismicity. Solving problems for clients in the mining industry. Itasca offers advanced, first-hand knowledge of mining

More information

Environmental and Safety Accidents Related to Blasting Operation

Environmental and Safety Accidents Related to Blasting Operation American Journal of Environmental Science, 2012, 8 (4), 360-365 ISSN: 1553-345X 2012 Science Publication doi:10.3844/ajessp.2012.360.365 Published Online 8 (4) 2012 (http://www.thescipub.com/ajes.toc)

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

Landslide Granice in Zagreb (Croatia)

Landslide Granice in Zagreb (Croatia) Landslides and Engineered Slopes Chen et al. (eds) 28 Taylor & Francis Group, London, ISBN 978--415-41196-7 Landslide Granice in Zagreb (Croatia) Z. Mihalinec Civil Engineering Institute of Croatia, Zagreb,

More information

Location. Mt Owen Complex. Overview. Mine Layout. Mining Method. Mitsubishi Lecture. In-Pit Lowwall Dump Design and Stability at Mt Owen Mine

Location. Mt Owen Complex. Overview. Mine Layout. Mining Method. Mitsubishi Lecture. In-Pit Lowwall Dump Design and Stability at Mt Owen Mine Location In-Pit Lowwall Dump Design and Stability at Mt Owen Mine Wayne Bartlett Senior Engineering Geologist Mt Owen Complex Overview In the past Mt Owen Mine lowwall dumps have failed. Lowwall dumps

More information

Geotechnical Issues on Application of Highwall Mining System inindonesia

Geotechnical Issues on Application of Highwall Mining System inindonesia an ISRM specialized conference Geotechnical Issues on Application of Highwall Mining System inindonesia T. Sasaoka a *, H. Shimada a, A. Hamanaka a, B. Sulistianto b, M. Ichinose c and K. Matsui a a Kyushu

More information

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Key Issue: Growth opportunities for Southern Hinterland

More information

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository T. Son Nguyen Geoscience Specialist Brugg, Switzerland May 13, 2016 e-doc 4972224 nuclearsafety.gc.ca Content Ontario Power Generation

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information

CHAPTER VI. Deep Compaction Techniques

CHAPTER VI. Deep Compaction Techniques CHAPTER VI Deep Compaction Techniques Densification of deep soil deposits is achieved by the following techniques: a. Precompression b. Explosion c. Heavy tamping d. Vibration e. Compaction grouting 1

More information

Influence of the undercut height on the behaviour of pillars at the extraction level in block and panel caving operations

Influence of the undercut height on the behaviour of pillars at the extraction level in block and panel caving operations Caving 2018 Y Potvin and J Jakubec (eds) 2018 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-9-4 https://papers.acg.uwa.edu.au/p/1815_24_alvarez/ Influence of the undercut height on the

More information

Geological factors influencing the design of a narrow-reef autonomous gold miner

Geological factors influencing the design of a narrow-reef autonomous gold miner Geological factors influencing the design of a narrow-reef autonomous gold miner Dr George Henry and Dr. Jan Kuijpers Centre for Mining Innovation (CMI) 31 August 2011 Introduction CMI focus areas Real

More information

Monitoring longwall weighting at Austar Mine using microseismic systems and stressmeters

Monitoring longwall weighting at Austar Mine using microseismic systems and stressmeters University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 Monitoring longwall weighting at Austar Mine using microseismic systems and stressmeters

More information

Blasting damage in rock

Blasting damage in rock 16 Blasting damage in rock 16.1 Introduction The development of rock mechanics as a practical engineering tool in both underground and surface mining has followed a rather erratic path over the past few

More information