1 Location In-Pit Lowwall Dump Design and Stability at Mt Owen Mine Wayne Bartlett Senior Engineering Geologist Mt Owen Complex Overview In the past Mt Owen Mine lowwall dumps have failed. Lowwall dumps are integral to the mining process at Mt Owen. Important considerations in the management of lowwall dumps include; ~ dump design, ~ monitoring of slope movement and ~ management of the risk to personnel. Mining Method Mine Layout 1

2 Lowwall Orientation Lowwall Orientation Lowwall Orientation Lowwall Orientation Lowwall Orientation B7 Lowwall 2

3 Folding and Faulting Coal Seams Product Coal is thermal and semi-soft coking coal for supply to the export markets. Up to 11 coal seams are mined in Mt Owen. Some seams consist of up to 6 splits, splits greater than 0.4m and partings less than 0.4m are mined. The mined seams at Mt Owen include; ~ Lemington Seams, ~ Pikes Gully Seams, ~ Arties Seams, ~ Upper Liddell Seams, ~ Middle Liddell Seams, ~ Lower Liddell Seams, ~ Barrett Seams, ~ Upper Hebden Seams and ~ Lower Hebden Seams. 400mm Splits March 2008 June 2008 September

4 December 2008 March 2009 June 2009 September 2009 December 2009 March

5 June 2010 September 2010 December 2010 March 2011 June 2011 September

6 December 2011 March 2012 June 2012 September 2012 Lowwall Stability In-Pit Lowwall Dump Design and Stability at Mt Owen Mine Lowwall dumping is necessary to minimise truck hauls and make use of available dump space. Due to the mine turning a corner there is limited dump space available. Dumping on a lowwall with a dip of up to 22 degrees. 6

7 Factor of Safety Factors Influencing Stability Stability analysis is an assessment of the factors driving failure and the factors that resist failure. Stability of a slope is referred to as a Factor of Safety (FoS). FoS = Factors Resisting Failure Factors Driving Failure Material Properties; ~ Cohesion, the strength required to shear rock and soil, ~ Angle of friction, the angle at which material will shear causing failure, and ~ Weight of material. Rock mass characteristics, discontinuities, faults Water and piezometric level Geometry of the slope Slope Stability Analysis Slope Stability Analysis Slope Stability Analysis Factors Decreasing Stability GALEA Version 5.01 Upper XW Rock & Soil Fr Rock normal Spoil Cat.2U Spoil Cat.2S Clay Band LHB Residual Fr Coal Analysis: 4 Single Stability Analysis Method: Sarma Surface: on-circular Over steepening of slope. ~ Removal of material at the toe. Mining deeper. ~ Loading at the crest. Dumping material at the crest of the slope. Change in water level Results Factor of Safety: 1.26 Critical Acceleration (Kc): Project: LOM - Revision June 08 - Section 4, Mined to RL-120 and Fill B6 buttress to RL-30, dump RL185 and RL218 Dump Stability File: X:\14 Geotech\StabilityCelcs\LOM Analyses\Revised LOM \LOM0803_0806d_dump04.gmf Licensed to: Thiess - Mt Owen Mine 7

8 Slope Monitoring Monitoring is installed so that we can monitor deformation to better understand the and predict failure. Automated Prism Monitoring Monitors prism movement. Measures prisms 2 or 3 times a day. Triggers alarms when thresholds are exceeded. Slope Stability Radar B6 Lowwall TARP Measures sub millimetre deformation of a slope. Scans a slope approximately every 2 to 8 minutes. Triggers alarms when thresholds are exceeded. Close to real-time alerts when movement exceeds thresholds. Low wall Conditions: L1 Green Existence of minor long term cracks. AD/OR Low wall monitoring is showing <10mm/day or 0.4mm/hr convergence. AD/OR Deceleration path in low wall monitoring over two weeks. L2 Yellow Opening of existing long term and development of new tensional cracks around low wall crest. AD/OR Development of isolated floor heave. AD/OR Low wall monitoring showing >10mm/day and < 180mm/day or 7.5mm/hour over a 12 hour period. AD/OR L3 Orange Rapid opening and slumping of cracks around low wall crest or toe. AD/OR Rapid onset of floor heave. AD/OR Isolated movement of low wall material. AD/OR Low wall monitoring showing > 7.5mm/hour and < 15mm/ hour over a 12 hour period. L4 Red Failure of low wall. AD/OR Imminent failure of low wall indicated by Rapid opening of cracks, floor heave, constant movement of spoil material. AD/OR Low wall monitoring showing > 15mm/hour increase in rate over a 12-hour period. Consistent acceleration path in low wall monitoring showing over 1 week. Rapid acceleration path in low wall monitoring showing over 1 week B4 Lowwall Failure 2005 B4 Lowwall Failure 8

9 Monitoring Result of Failure B4 Failure Date 9

10 Back Analysis of Failure GALEA Version Failure along weak seam within the Lower Hebden. 300 Back analysis of failure allows calculation of material properties of the Lower Hebden; ~ Cohesion 0kPa and 200 ~ Phi of 12.5 degrees Analysis: 2 Single Stability Analysis Method: Sarma Surface: on-circular -100 Results Factor of Safety: 1.00 Critical Acceleration (Kc): Project: 215KB B3 Switchback Failure Main Section Postfailure Backanalysis Check - Case 2 File: kp_b3_analysis2.gmf Sherwood Geotechnical & Research Services Information Obtained Back analysis of the failure provided properties of failed materials. Current B6 Lowwall Movement Increased understandings of critical velocities and accelerations was derived from the analysis of slope movements. 10

11 Current B6 Lowwall Movement Current B6 Lowwall Movement Current B6 Lowwall Movement Current B6 Lowwall Movement B6 and B4 Comparison Radar Monitoring Monitoring Station Comparison with B4 Failure B4 Total Displacement (mm) B6 Total Displacement (mm) B6 Total Displacement (mm) Days 11

12 Radar Monitoring Lowwall Buttressing Lowwall Buttressing Lowwall Buttressing Lowwall Buttressing Buttress Construction RL-120 Barrett Box Cut 12

13 Buttress Construction RL-90 Buttress Buttress Construction RL-60 Buttress Buttress Construction Current Rate Movement RL-60 Ramp B6 Displacement from SSR and Prisms B6 RL57 DP01 B5 RL65 DP01 B6 BH02 DP01 Crib P06 Lookout Displacement (mm) Crib P05 Crib Hut B6 Slope B6 Upper Slope B6 Mid Slope Buttress complete to RL- 50.5mm of rain in hours Begin Construction of Buttress 61mm of rain in 24 hours Rainfall (mm) Date Daily Rainfall Date Conclusion Trigger Action Response Plan s (TARP s) are implemented to manage risk to personnel. Automated monitoring make it possible to analyse slope movement regularly and update the TARP level. Slope stability assessments, buttress and dump design are constantly updated to maintain stability as mining proceeds. 13

Mt Owen Mine barrier pillar

Mt Owen Mine barrier pillar Slope Stability 2013 P.M. Dight (ed) 2013 Australian Centre for Geomechanics, Perth, ISBN 978 0 9870937 5 2 https://papers.acg.uwa.edu.au/p/1308_64_bartlett/ W.D. Bartlett Thiess Pty Ltd, Australia I.H.

More information

TITLE: Burton Highwall Challenge. OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess. AUTHOR: Thiess Burton Geotechnical Team

TITLE: Burton Highwall Challenge. OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess. AUTHOR: Thiess Burton Geotechnical Team TITLE: Burton Highwall Challenge OPERATION: Burton Coal Mine, owned by Peabody and operated by Thiess AUTHOR: Thiess Burton Geotechnical Team ABSTRACT The Burton Coal Project mining operations currently

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY CONTROLLING FACTORS Dr. J C. JHANWAR Sr. Principal Scientist CSIR-Central Institute of Mining & Fuel Research Regional Centre, Nagpur

More information

MONITORING AND MANAGEMENT OF A LARGE OPEN PIT FAILURE

MONITORING AND MANAGEMENT OF A LARGE OPEN PIT FAILURE MONITORING AND MANAGEMENT OF A LARGE OPEN PIT FAILURE Stephanus David Naude Wessels A research report submitted to the Faculty of Engineering and the Built Environment, University of Witwatersrand, Johannesburg,

More information

I. Hulls E. Woods A. Creighton

I. Hulls E. Woods A. Creighton Slope Stability 2013 P.M. Dight (ed) 2013 Australian Centre for Geomechanics, Perth, ISBN 978-0-9870937-5-2 https://papers.acg.uwa.edu.au/p/1308_40_wines/ D.R. Wines Itasca Australia Pty Ltd, Australia

More information

MANAGEMENT OF A MAJOR SLOPE FAILURE AT NCHANGA OPEN PIT, CHINGOLA, ZAMBIA.

MANAGEMENT OF A MAJOR SLOPE FAILURE AT NCHANGA OPEN PIT, CHINGOLA, ZAMBIA. MANAGEMENT OF A MAJOR SLOPE FAILURE AT NCHANGA OPEN PIT, CHINGOLA, ZAMBIA. Synopsis: SDN Wessels, Head of Rock Mechanics, NOP WA Naismith, Principal Consultant, SRK On 16 July 2004, at 07:10 a collapse

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE

ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE ANALYSIS OF A SLOPE FAILURE IN AN OPEN PIT MINE USING TSLOPE 1. Background In 1996 a slope failure occurred at the Round Hill open pit mine, operated by Macraes Mining Company Ltd. The failure as shown

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Rock Slope Analysis Small and Large Scale Failures Mode of Failure Marklands Test To establish the possibility of wedge failure. Plane failure is a special case of wedge failure. Sliding along

More information

Slope Stability Model of the Questa Rock Pile Phase 2

Slope Stability Model of the Questa Rock Pile Phase 2 2 Proceedings Tailings and Mine Waste 2011 Slope Stability Model of the Questa Rock Pile Phase 2 Murray Fredlund SoilVision Systems Ltd., Saskatoon, Canada Haihua Lu SoilVision Systems Ltd., Saskatoon,

More information

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay 19 Module 5: Lecture -1 on Stability of Slopes Contents Stability analysis of a slope and finding critical slip surface; Sudden Draw down condition, effective stress and total stress analysis; Seismic

More information

Deformation And Stability Analysis Of A Cut Slope

Deformation And Stability Analysis Of A Cut Slope Deformation And Stability Analysis Of A Cut Slope Masyitah Binti Md Nujid 1 1 Faculty of Civil Engineering, University of Technology MARA (Perlis), 02600 Arau PERLIS e-mail:masyitahmn@perlis.uitm.edu.my

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY

More information

Exploration for Results: Moura Coal Mine

Exploration for Results: Moura Coal Mine University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2004 Exploration for Results: Moura Coal Mine J. Hoelle Moura Coal Mine Publication Details

More information

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum Curriculum Document Curriculum Code Curriculum Title 311701-008 Mining Technician: Strata Control Practitioner (Surface) TABLE OF CONTENTS SECTION 1: CURRICULUM OVERVIEW 1 Occupational Information 1 Associated

More information

Slope failure process recognition based on mass-movement induced structures

Slope failure process recognition based on mass-movement induced structures 2nd Conference on 6-11 September, 2011 SLOPE TECTONICS Vienna, Austria Slope failure process recognition based on mass-movement induced structures R. Poisel, A. Preh, R. Hofmann (1) Institute for Geotechnics,

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

GEOHART CONSULTANTS Geotechnical (Mining & Civil)

GEOHART CONSULTANTS Geotechnical (Mining & Civil) Wouter Hartman Principal Geotechnical Engineer / Director Geotechnical Engineering in Brown Coal 21 st April 2014 Outline Setting the Scene Geo-Technical Mechanism of Failure Historical Failures Known

More information

Rock slope failure along non persistent joints insights from fracture mechanics approach

Rock slope failure along non persistent joints insights from fracture mechanics approach Rock slope failure along non persistent joints insights from fracture mechanics approach Louis N.Y. Wong PhD(MIT), BSc(HKU) Assistant Professor and Assistant Chair (Academic) Nanyang Technological University,

More information

1.8 Unconfined Compression Test

1.8 Unconfined Compression Test 1-49 1.8 Unconfined Compression Test - It gives a quick and simple measurement of the undrained strength of cohesive, undisturbed soil specimens. 1) Testing method i) Trimming a sample. Length-diameter

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure)

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure) Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure) Liew, S. S., Gue, S. S., Liong, C. H. Director, Gue &

More information

Geog 1000 Lecture 17: Chapter 10

Geog 1000 Lecture 17: Chapter 10 Geog 1000 Lecture 17: Chapter 10 Landslides and Mass Movements Link to lectures: http://scholar.ulethbridge.ca/chasmer/classes/ Today s Lecture 1. Assignment 2 Due Pick up Assignment 1 if you don t have

More information

IMPLEMENTATION OF REAL TIME GEOTECHNICAL MONITORING AT AN OPEN PIT MOUNTAIN COAL MINE IN WESTERN CANADA

IMPLEMENTATION OF REAL TIME GEOTECHNICAL MONITORING AT AN OPEN PIT MOUNTAIN COAL MINE IN WESTERN CANADA IMPLEMENTATION OF REAL TIME GEOTECHNICAL MONITORING AT AN OPEN PIT MOUNTAIN COAL MINE IN WESTERN CANADA Brian Klappstein, M.Sc., PGeo., Manager of Long Range Planning, Grande Cache Coal LP, AB, Canada

More information

Forces on piles preventing debris slope slips

Forces on piles preventing debris slope slips Risk Analysis VII PI-637 Forces on piles preventing debris slope slips J. Vacek & S. Hrachová Czech Technical University, Klokner Institute, Czech Republic Abstract Failure of rock mass is not a static

More information

GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE ANALYSIS AND DESIGN OF RETAINING STRUCTURES

GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE ANALYSIS AND DESIGN OF RETAINING STRUCTURES GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 07 3.0 ANALYSIS AND DESIGN OF RETAINING STRUCTURES LEARNING OUTCOMES Learning outcomes: At the end of this lecture/week the students would be able to: Understand

More information

CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA

CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA Jun Sugawara 1 and Takao Aizawa 2 1 WorleyParsons, Australia 2 Suncoh Consultants, Japan ABSTRACT This paper presents results of detailed

More information

INTRODUCTION TO STATIC ANALYSIS PDPI 2013

INTRODUCTION TO STATIC ANALYSIS PDPI 2013 INTRODUCTION TO STATIC ANALYSIS PDPI 2013 What is Pile Capacity? When we load a pile until IT Fails what is IT Strength Considerations Two Failure Modes 1. Pile structural failure controlled by allowable

More information

Ch 4a Stress, Strain and Shearing

Ch 4a Stress, Strain and Shearing Ch. 4a - Stress, Strain, Shearing Page 1 Ch 4a Stress, Strain and Shearing Reading Assignment Ch. 4a Lecture Notes Sections 4.1-4.3 (Salgado) Other Materials Handout 4 Homework Assignment 3 Problems 4-13,

More information

Analysis of soil failure modes using flume tests

Analysis of soil failure modes using flume tests Analysis of soil failure modes using flume tests A. Spickermann & J.-P. Malet Institute of Earth Physics, CNRS UMR 751, University of Strasbourg, Strasbourg, France Th.W.J. van Asch, M.C.G. van Maarseveen,

More information

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Landslide and other ground failures posting substantial damage and loss of life In U.S., average 25 50 deaths; damage more than $3.5 billion

More information

Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR. Thanachot Harnpa* Dr.Schradh Saenton**

Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR. Thanachot Harnpa* Dr.Schradh Saenton** IPMO3-1 Stability Analysis of Hongsa Coal Mine s Pit Walls, Xaignabouli Province, Laos PDR Thanachot Harnpa* Dr.Schradh Saenton** ABSTRACT The slope stability analysis is an important requirement for routine

More information

(Refer Slide Time: 01:15)

(Refer Slide Time: 01:15) Soil Mechanics Prof. B.V.S. Viswanathan Department of Civil Engineering Indian Institute of Technology, Bombay Lecture 56 Stability analysis of slopes II Welcome to lecture two on stability analysis of

More information

Slope Stability. loader

Slope Stability. loader Slope Stability Slope Stability loader Lower San Fernando Dam Failure, 1971 Outlines Introduction Definition of key terms Some types of slope failure Some causes of slope failure Shear Strength of Soils

More information

2D Embankment and Slope Analysis (Numerical)

2D Embankment and Slope Analysis (Numerical) 2D Embankment and Slope Analysis (Numerical) Page 1 2D Embankment and Slope Analysis (Numerical) Sunday, August 14, 2011 Reading Assignment Lecture Notes Other Materials FLAC Manual 1. 2. Homework Assignment

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

Earthquake-induced landslide distribution and hazard mapping. Megh Raj Dhital Central Department of Geology, Tribhuvan University

Earthquake-induced landslide distribution and hazard mapping. Megh Raj Dhital Central Department of Geology, Tribhuvan University Earthquake-induced landslide distribution and hazard mapping Megh Raj Dhital Central Department of Geology, Tribhuvan University Contents Geological setting of Gorkha earthquake Peak ground acceleration

More information

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM Martin WIELAND 1 And Sujan MALLA 2 SUMMARY A horizontal crack first appeared along the downstream wall of

More information

Analysis of Blocky Rock Slopes with Finite Element Shear Strength Reduction Analysis

Analysis of Blocky Rock Slopes with Finite Element Shear Strength Reduction Analysis Analysis of Blocky Rock Slopes with Finite Element Shear Strength Reduction Analysis R.E. Hammah, T. Yacoub, B. Corkum & F. Wibowo Rocscience Inc., Toronto, Canada J.H. Curran Department of Civil Engineering

More information

SLOPE FAILURE SLOPES. Landslides, Mudflows, Earthflows, and other Mass Wasting Processes

SLOPE FAILURE SLOPES. Landslides, Mudflows, Earthflows, and other Mass Wasting Processes GEOL g406 Environmental Geology SLOPE FAILURE Landslides, Mudflows, Earthflows, and other Mass Wasting Processes Read Chapter 5 in your textbook (Keller, 2000) Gros Ventre landslide, Wyoming S. Hughes,

More information

2017 Soil Mechanics II and Exercises Final Exam. 2017/7/26 (Wed) 10:00-12:00 Kyotsu 4 Lecture room

2017 Soil Mechanics II and Exercises Final Exam. 2017/7/26 (Wed) 10:00-12:00 Kyotsu 4 Lecture room 2017 Soil Mechanics II and Exercises Final Exam 2017/7/26 (Wed) 10:00-12:00 Kyotsu 4 Lecture room Attention: The exam consists of five questions for which you are provided with five answer sheets. Write

More information

Analysis of soil failure modes using flume tests

Analysis of soil failure modes using flume tests Analysis of soil failure modes using flume tests A. Spickermann & J.-P. Malet CNRS UMR 7516, School and Observatory of Earth Sciences, University of Strasbourg, Strasbourg, France Th.W.J. van Asch, M.C.G.

More information

Improving slope stability at Kışladağ Gold Mine

Improving slope stability at Kışladağ Gold Mine Improving slope stability at Kışladağ Gold Mine S. Ergun, E. Gungor & B. Ozdemir Eldorado Gold Corporation / Tuprag, Usak, Turkey S. Esen Drill and Blast Consultant, Sydney, Australia ABSTRACT: This paper

More information

GEO The Åknes rock slope. Content. Dr. Vidar Kveldsvik NGI

GEO The Åknes rock slope. Content. Dr. Vidar Kveldsvik NGI GEO 4180 The Åknes rock slope Dr. Vidar Kveldsvik NGI Content Background on large rock slides Triggers Stability analysis Risk mitigation (risk reduction) The Åknes rock slope 1 Background Landslides due

More information

Back Analysis of the Lower San Fernando Dam Slide Using a Multi-block Model

Back Analysis of the Lower San Fernando Dam Slide Using a Multi-block Model Proceedings Geohazards Engineering Conferences International Year 2006 Back Analysis of the Lower San Fernando Dam Slide Using a Multi-block Model C. A. Stamatopoulos P. Petridis Stamatopoulos and Associates

More information

Haulage Drift Stability Analysis- A Sensitivity Approach

Haulage Drift Stability Analysis- A Sensitivity Approach Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level

More information

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT

TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT 4 th International Conference on Earthquake Geotechnical Engineering June 25-28, 2007 Paper No. 1637 TWO DIMENSIONAL MODELING AND STABILITY ANALYSIS OF SLOPES OVERLAYING TO SHAHID RAGAEE POWER PLANT Mohammad

More information

LECTURE 28. Module 8 : Rock slope stability 8.3 WEDGE FAILURE

LECTURE 28. Module 8 : Rock slope stability 8.3 WEDGE FAILURE LECTURE 28 8.3 WEDGE FAILURE When two or more weak planes in the slope intersect to from a wedge, the slope may fail as wedge failure. The basic condition at which wedge mode of slope failure happens are

More information

THE USE OF CUSUMS AS A TOOL TO AID IN THE INTERPRETATION OF SLOPE MONITORING DATA WITH SPECIFIC EXAMPLES FROM AN OPERATING OPEN PIT MINE

THE USE OF CUSUMS AS A TOOL TO AID IN THE INTERPRETATION OF SLOPE MONITORING DATA WITH SPECIFIC EXAMPLES FROM AN OPERATING OPEN PIT MINE THE USE OF CUSUMS AS A TOOL TO AID IN THE INTERPRETATION OF SLOPE MONITORING DATA WITH SPECIFIC EXAMPLES FROM AN OPERATING OPEN PIT MINE W.Sarunic 1 and P.A.Lilly 2 1 Snowden Mining Industry Consultants,

More information

Effects of Slope Stability Evaluation on Highway Bridge Design

Effects of Slope Stability Evaluation on Highway Bridge Design Effects of Slope Stability Evaluation on Highway Bridge Design Shanzhi Shu, PhD PE KCI Technologies INC Les C. Banas, PE Kiewit Infrastructure Engineers Samuel D. Palmer, PE Terracon Consultants Inc. Introduction

More information

Landslide FE Stability Analysis

Landslide FE Stability Analysis Landslide FE Stability Analysis L. Kellezi Dept. of Geotechnical Engineering, GEO-Danish Geotechnical Institute, Denmark S. Allkja Altea & Geostudio 2000, Albania P. B. Hansen Dept. of Geotechnical Engineering,

More information

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) MINISTRY OF ENERGY AND MINES Mines and Mineral Resources REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-203 General Manager: Company:

More information

Deep Foundations 2. Load Capacity of a Single Pile

Deep Foundations 2. Load Capacity of a Single Pile Deep Foundations 2 Load Capacity of a Single Pile All calculations of pile capacity are approximate because it is almost impossible to account for the variability of soil types and the differences in the

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Internal C Unit Dilatanc y

Internal C Unit Dilatanc y 2 Grimsby Sub was not at any time definitively established. The preliminary analysis provided by Thurber Engineering Ltd indicates the slope should be stable with a factor of safety of 1.23 for a deep

More information

GEOL151 Fall 2016: Lab for Week #4 Gooseneck Bend Slump

GEOL151 Fall 2016: Lab for Week #4 Gooseneck Bend Slump GEOL151 Fall 2016: Lab for Week #4 Gooseneck Bend Slump Overview This week, we will investigate a recent example of dynamic hillslope processes: a slump (Figs. 1 and 2) that has caused damage to a road

More information

Underground Excavation Design Classification

Underground Excavation Design Classification Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index

More information

Southern Cape Landslip, Mossel Bay

Southern Cape Landslip, Mossel Bay Geotechnical Engineering Southern Cape Landslip, Mossel Bay Patrick Beales Pr Eng Senior Geotechnical Engineer Kantey & Templer Consulting Engineers pbeales@ct.kanteys.co.za This case study highlights

More information

Large scale three-dimensional pit slope stability analysis of the structurally controlled mechanism in Mae Moh coal mine

Large scale three-dimensional pit slope stability analysis of the structurally controlled mechanism in Mae Moh coal mine APSSIM 2016 PM Dight (ed.) 2016 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-5-6 https://papers.acg.uwa.edu.au/p/1604_40_chaiwan/ Large scale three-dimensional pit slope stability analysis

More information

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling Yvette

More information

PLANES OF WEAKNESS IN ROCKS, ROCK FRCTURES AND FRACTURED ROCK. Contents

PLANES OF WEAKNESS IN ROCKS, ROCK FRCTURES AND FRACTURED ROCK. Contents PLANES OF WEAKNESS IN ROCKS, ROCK FRCTURES AND FRACTURED ROCK Contents 7.1 Introduction 7.2 Studies On Jointed Rock Mass 7.2.1 Joint Intensity 7.2.2 Orientation Of Joints 7.2.3 Joint Roughness/Joint Strength

More information

Mechanics of Rib Deformation at Moranbah North Mine - A Case Study

Mechanics of Rib Deformation at Moranbah North Mine - A Case Study University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Mechanics of Rib Deformation at Moranbah North Mine - A Case Study Yvette Heritage

More information

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. Title Pore-water pressure characteristics of two instrumented residual soil slopes( Main article ) Author(s)

More information

Development of Risk Management Guide Lines for Slope Stability Problem at Nchanga Open Pit (Nop) Mine, Zambia

Development of Risk Management Guide Lines for Slope Stability Problem at Nchanga Open Pit (Nop) Mine, Zambia Development of Risk Management Guide Lines for Slope Stability Problem at Nchanga Open Pit (Nop) Mine, Zambia 1 Krishna, R., 1 Besa, B. and 2 Ahmed, A.H. 1 Department of Mining Engineering, 2 Department

More information

Design of RC Retaining Walls

Design of RC Retaining Walls Lecture - 09 Design of RC Retaining Walls By: Prof Dr. Qaisar Ali Civil Engineering Department UET Peshawar www.drqaisarali.com 1 Topics Retaining Walls Terms Related to Retaining Walls Types of Retaining

More information

The Mine Geostress Testing Methods and Design

The Mine Geostress Testing Methods and Design Open Journal of Geology, 2014, 4, 622-626 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojg http://dx.doi.org/10.4236/ojg.2014.412046 The Mine Geostress Testing Methods and Design

More information

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Cubzac-les-Ponts Experimental Embankments on Soft Clay Cubzac-les-Ponts Experimental Embankments on Soft Clay 1 Introduction In the 197 s, a series of test embankments were constructed on soft clay at Cubzac-les-Ponts in France. These full-scale field tests

More information

Effects of the slope toe evolution on the behaviour of a slow-moving large landslide

Effects of the slope toe evolution on the behaviour of a slow-moving large landslide Effects of the slope toe evolution on the behaviour of a slow-moving large landslide A. Ferrari, A. Ledesma, J. Corominas MOUNTAIN RISKS - Topic Meeting WB1 Dynamic spatial modelling of landslide hazards

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information

Te Kuha Mining Operation Geotechnical Concept Study for Stevenson Mining

Te Kuha Mining Operation Geotechnical Concept Study for Stevenson Mining Te Kuha Mining Operation Geotechnical Concept Study for Stevenson Mining Prepared For Mike Coleman CEO for Stevenson Mining Prepared By Christian Mans BSc, PGD, AusIMM(CP), RPEQ, NZGS Geotechnical Engineer

More information

Application of a transversely isotropic brittle rock mass model in roof support design

Application of a transversely isotropic brittle rock mass model in roof support design University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Application of a transversely isotropic brittle rock mass model in roof support

More information

A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington

A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington By S. Debray and W.Z. Savage Open-File Report 01-0357 2001 This report is preliminary and has not been

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

Advantages of Variable Frequency Drive Technology for Face Conveyor and Plow Systems in Longwall Mining

Advantages of Variable Frequency Drive Technology for Face Conveyor and Plow Systems in Longwall Mining Advantages of Variable Frequency Drive Technology for Face Conveyor and Plow Systems in Longwall Mining Andreas Johannes Westphalen Caterpillar Global Mining Table of Contents Abstract Abstract... 3 Introduction...

More information

Rock slope rock wedge stability

Rock slope rock wedge stability Engineering manual No. 28 Updated: 02/2018 Rock slope rock wedge stability Program: Rock stability File: Demo_manual_28.gsk The aim of the chapter of this engineering manual is to explain a rock slope

More information

SUSTAINABILITY OF INNOVATIVE MANAGEMENT PRACTICES OF GEOTECHNICAL RISK AT DAMANG PIT CUT BACK (DPCB) A CASE STUDY AT GOLD FIELDS GHANA, DAMANG MINE

SUSTAINABILITY OF INNOVATIVE MANAGEMENT PRACTICES OF GEOTECHNICAL RISK AT DAMANG PIT CUT BACK (DPCB) A CASE STUDY AT GOLD FIELDS GHANA, DAMANG MINE SUSTAINABILITY OF INNOVATIVE MANAGEMENT PRACTICES OF GEOTECHNICAL RISK AT DAMANG PIT CUT BACK (DPCB) A CASE STUDY AT GOLD FIELDS GHANA, DAMANG MINE E. Dadzie, M. Abdulai, and A. Baku Gold Fields Ghana

More information

GG 454 March 19, EFFECTIVE STRESS AND MOHR-COULOMB FAILURE (26)

GG 454 March 19, EFFECTIVE STRESS AND MOHR-COULOMB FAILURE (26) GG 454 March 19, 2002 1 EFFECTIVE STRESS AND MOHR-COULOMB FAILURE (26) I Main Topics A Driving and resisting stresses at the base of an inclined block B Factor of safety C Effective stress D Mohr-Coulomb

More information

Roadway Support Technology with Sliding Cracking Surrounding Rock under Tectonic Stress

Roadway Support Technology with Sliding Cracking Surrounding Rock under Tectonic Stress International Journal of Mining Science (IJMS) Volume 3, Issue 1, 2017, PP 34-43 ISSN 2454-9460 (Online) DOI: http://dx.doi.org/10.20431/2454-9460.0301003 www.arcjournals.org Roadway Support Technology

More information

RESEARCH ON LOAD CARRYING CAPACITY OF BASE TERRAINS OF THE WASTE DUMPS IN JIU VALLEY

RESEARCH ON LOAD CARRYING CAPACITY OF BASE TERRAINS OF THE WASTE DUMPS IN JIU VALLEY RESEARCH ON LOAD CARRYING CAPACITY OF BASE TERRAINS OF THE WASTE DUMPS IN JIU VALLEY Maria LAZAR, Prof.Ph.D., University of Petrosani Adrian FLOREA, Assoc.Prof.Ph.D., University of Petrosani Florin FAUR,

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

Terramechanics MARYLAND. Overview of wheel-soil interactions Sources of rolling resistance on soil Rover propulsion analysis U N I V E R S I T Y O F

Terramechanics MARYLAND. Overview of wheel-soil interactions Sources of rolling resistance on soil Rover propulsion analysis U N I V E R S I T Y O F Overview of wheel-soil interactions Sources of rolling resistance on soil Rover propulsion analysis 2007 David L. Akin - All rights reserved http://spacecraft.ssl.umd.edu Soil Mechanics Wheel rolling over

More information

vulcanhammer.net This document downloaded from

vulcanhammer.net This document downloaded from This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works

More information

Omaroro Lower Playing Field - Geotechnical Interpretive Report

Omaroro Lower Playing Field - Geotechnical Interpretive Report Report Omaroro Lower Playing Field - Geotechnical Interpretive Report Prepared for Wellington Water Limited Prepared by Beca Limited 1 December 2017 Omaroro Lower Playing Field - Geotechnical Interpretive

More information

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting Mass Wasting Movement of earth materials downslope, driven by Gravitational Forces. Landslides - general term for rock or soil movement. In U.S., on average, mass wasting causes 1 to 2 billion dollars

More information

Slope stability analysis limit equilibrium or the finite element method?

Slope stability analysis limit equilibrium or the finite element method? Slope stability analysis limit equilibrium or the finite element method? Carol Matthews and Zeena Farook, Arup; and Peter Helm, Newcastle University 1. Introduction Since the 193s, the limit equilibrium

More information

Geotechnical analysis of slopes and landslides: achievements and challenges

Geotechnical analysis of slopes and landslides: achievements and challenges University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 2010 Geotechnical analysis of slopes and landslides: achievements and

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

GEOLOGIC STRUCTURE MAPPING using digital photogrammetry

GEOLOGIC STRUCTURE MAPPING using digital photogrammetry Digital photogrammetry provides a cost effective remote means of documenting a mapped rock face while allowing structural mapping to be conducte d from the photographs. Digital photogrammetry allows structural

More information

RAMWALL DESIGN METHODOLOGY

RAMWALL DESIGN METHODOLOGY RAMWALL DESIGN METHODOLOGY Submitted by:. June 005 CONTENTS 1. INTRODUCTION 1 Page. REFERENCED DOCUMENTS & ABBREVIATIONS 1 3 DESIGN METHODOLOGY / THEORY 3.1 General 3. Internal Analysis 4 3.3 External

More information

Seismic Analysis of Concrete Dams Workshop Field investigations and foundation material properties USSD Annual Conference April 6-7, 2017

Seismic Analysis of Concrete Dams Workshop Field investigations and foundation material properties USSD Annual Conference April 6-7, 2017 Seismic Analysis of Concrete Dams Workshop Field investigations and foundation material properties Foundation deformation modulus For analysis purposes, approach used at Reclamation is to reduce the laboratory

More information

Stability Assessment of a Heavily Jointed Rock Slope using Limit Equilibrium and Finite Element Methods

Stability Assessment of a Heavily Jointed Rock Slope using Limit Equilibrium and Finite Element Methods Indian Geotechnical Conference 2017 GeoNEst 14-16 December 2017, IIT Guwahati, India Stability Assessment of a Heavily Jointed Rock Slope using Limit Equilibrium and Finite Element Methods Aswathi CK Amalesh

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

Mitigation measures: stabilization works

Mitigation measures: stabilization works Intensive Course in Quantitative Landslide Risk Assessment and Risk management Mitigation measures: stabilization works E.E. Alonso Department of Geotechnical Engineering and Geosciences UPC, Barcelona

More information

Evaluating the role of groundwater in the stability of slopes in an open pit coal mine with shallow dipping multi-seam stratigraphy.

Evaluating the role of groundwater in the stability of slopes in an open pit coal mine with shallow dipping multi-seam stratigraphy. Evaluating the role of groundwater in the stability of slopes in an open pit coal mine with shallow dipping multi-seam stratigraphy. W Harding, R Connelly L F Contreras (SRK (UK) Ltd) ABSTRACT The subject

More information

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California May 7, 2015 May 7, 2015 Project No. GT13-16 Prepared for: CEMEX 5180 Golden Foothills, Parkway El Dorado Hills, California 95762 7400 Shoreline Drive, Ste. 6 Stockton, California 95219 Tel: 209-472-1822

More information

Integrating weather and geotechnical monitoring data for assessing the stability of large scale surface mining operations

Integrating weather and geotechnical monitoring data for assessing the stability of large scale surface mining operations Open Geosci. 2016; 8:694 699 Research Article Open Access Chrysanthos Steiakakis, Zacharias Agioutantis*, Evangelia Apostolou, Georgia Papavgeri, and Achilles Tripolitsiotis Integrating weather and geotechnical

More information

Two Case Studies on Soil Nailed Slope Failures

Two Case Studies on Soil Nailed Slope Failures Two Case Studies on Soil Nailed Slope Failures Liew, Shaw-Shong 1 & Liong, Chee-How 2 1 Director, Gue & Partners Sdn Bhd, Kuala Lumpur, Malaysia 2 Senior Engineer, Gue & Partners Sdn Bhd, Kuala Lumpur,

More information