Borehole Camera And Extensometers To Study Hanging Wall Stability Case Study Using Voussoir beam - Cuiabá Mine

Size: px
Start display at page:

Download "Borehole Camera And Extensometers To Study Hanging Wall Stability Case Study Using Voussoir beam - Cuiabá Mine"

Transcription

1 Rock Mechanics for Natural Resources and Infrastructure ISRM Specialized Conference September, Goiania, Brazil CBMR/ABMS and ISRM, 2014 Borehole Camera And Extensometers To Study Hanging Wall Stability Case Study Using Voussoir beam - Cuiabá Mine Reuber Ferreira Cota Anglogold Ashanti, Sabará, Brazil, rfcota@angolgoldashanti.com.br Rodrigo Peluci de Figueiredo Federal University of Ouro Preto, Ouro Preto, Brazil, rpfigueiredo@demin.ufop.br SUMMARY: Cuiabá mine, owned by Anglogold Ashanti Córrego do Sítio Mineração, is located in Sabara-MG, with excavations more than 1100m below surface, is one of the most important underground gold mines in Brazil. In recent years, there have been significant problems of instability of the hanging wall (HW) in some stopes (production excavation). In order to understand and anticipate the problems of instability of the hanging wall, a monitoring system was implemented consisting of televised boreholes, in the walls of the excavation. This was in addition to the large number of Multiple Point Borehole Extensometers (MPBX) and SMART cables (Stretch Measurement to Assess Reinforcement Tension) installed in the mine. This paper presents an example of the identification from monitoring, in the Fonte Grande Sul orebody level 10.2 stope (about 680m below surface), with evidence of instability in the hanging wall. The observation of borehole cracks, shears, failures, and displacements, indicated the beginning of instability in the hanging wall, which allowed measures to be taken to stabilize this area. A detailed follow-up confirmed the stabilization after actions have been implemented. In order to exploit the data collected during the process of study and to attempt to validate a simple method for evaluating the stability of the hanging wall in schist, a stability study was performed using the voussoir arch theory. Despite the identification of the thickness of the beams formed within the hanging wall, the geological complexity, evidenced by interbedded rocks with different elastic characteristics and strength, folds and boudinage, which was beyond the simplification of the calculations, did not allow a proper assessment of the stability of the studied area using the voussoir arch theory. KEYWORDS: Underground mine, rock mechanics, borehole camera, extensometers, voussoir beam. 1 INTRODUCTION Cuiabá mine, owned by Anglogold Ashanti Córrego do Sítio Mineração, located in Sabara- MG, with excavations more than 1100m below the surface, is one of the most important underground gold mines in Brazil, with annual production of approximately 9 tons of gold. Following an increase in production in beginning of 2007, problems of instability, mainly in hanging wall, were identified in mining excavations (stopes). A study to understand and predict these problems was implemented comprising of constant monitoring with borehole cameras of boreholes with borehole cameras and extensometers MPBX (Multi Point Borehole Extensometer) and SMART (Stretch Measurement to Assess Reinforcement Tension) cables. A case study was conducted in Fonte Grande Sul (FGS), Level 10.2 stope, located between 700m and 665m below surface, which showed that working with the data collected by extensometers and the filming of boreholes, can be a powerful tool to recognize timely evidence of instability of the hanging wall, allowing that mitigation activities can be implemented to stabilize the area.

2 After processing the data related specifically to filmed boreholes, it was possible to recognize the thicknesses of the beams formed by the shear and cracks identified inside the holes in schistose rock in the hanging wall, thus, together with the identification of other parameters, an assessment was done on the applicability of the analogy of voussoir arch theory for the stability assessment of the hanging wall for the study area. 1.1 Location Cuiabá mine is located close to Sabara city, Minas Gerais state (Figure 1), 35 km from Belo Horizonte. instability. 2 CASE STUDY 10.2 FONTE GRANDE SUL STOPE (FGS) For a better understanding of all the mechanisms involved in this study, site characterization is presented, covering location, geometric characterization of the mining panel as well as the geological and geotechnical characteristics. After describing the study case, the interpretation of data obtained mainly by the filmed holes, it was possible to define the thickness of the beam, caused by the separation of cracks and schistose shears located in the hanging wall. With the geomechanical characterization of the hanging wall, the geometry of the excavation and knowledge of the thicknesses of the beams, it was possible to evaluate the applicability of the method voussoir modified by Diederichs and Kaiser (1999a), for the study of stability of schistose hanging wall. 2.1 Case Study Location Figure 1. Cuiabá mine location. 1.2 Objectives Case study is located in Fonte Grande Sul (FGS) orebody, level 10.2 between 700 and 665m below surface (Figure 2). The main objectives of this work are listed as follows: Study the evolution of deterioration in the stability of the hanging wall during the process of mining activities; Assess the effectiveness of the monitoring systems used, extensometers and filming of boreholes, as tools to identify timeously, the indications of instability in the hanging wall; Evaluate the effectiveness of mitigation activities for the stabilization for area with evidence of instability; To study the applicability of the analogy of voussoir arch theory as a mechanism for the stability of the area with indications of Figure 2. Case Study location. 2.2 Characterization Stope Geometry Stope 10.2 FGS has a vertical height of 35m, strike of 460m, with the predominant dip of the

3 orebody at 30. The mining method applied is cut and fill with backfilling of waste rock and hydraulic fill. all of the hanging wall exposures were classified in bad rock mass with scores between 1 and Geological and Geotechnical Characterization Fonte Grande Sul orebody is located in the normal limb of the large tubular fold in Cuiabá mine. Orebodies located in the normal limb, in general have the following lithological sequence, from bottom to top, schistose metabasalts and schistose meta-andesite, forming foot wall; banded iron formation with sulfides, defining the ore (in the study area the thickness range between 7 and 8m); a layer of graphite phylite and sericite schist, both forming the hanging wall. Two major discontinuity families have been identified in the area. One family is defined by schistosity that is the main structure of the mine; the other family is defined by discontinuities with the same direction of schistosity, but with a 180 o difference of plunge direction (Figure 3). Figure 4. Rock mass map for 10.2 FGS orebody. Laboratory tests were done to characterize hanging wall rocks. These results can be visualized in the table 1. Table 1- Laboratory test results for hanging wall rock. Lithology Amount of samples Uniaxial Compressive Strength (MPa) Minimun Average Maximum Poisson (ν) Elastic Module E (GPa) Grafite phylite ,13-0, Sericite schist ,15-0, Support Characterization Figure 3. Family of discontinuities (Software DIPS 5.0). Geomechanical classification of wall hanging was carried out for 10.2 FGS stope using the Rock Mass Rating (RMR) classification (Bieniawski, 1989) and Q - Rock Tunnelling Quality Index (Barton et al, 1974.). It can be noted that there is little variation in the quality of the rock mass along the wall hanging (See Figure 4). The average hanging wall RMR was rated between 60 and 41. Q values for almost Plain strand Cablebolting, 9.5m in length and maximum axial strength of 25t to 27t were used in the hanging wall on a 1.5x1.5m pattern (Figure 5). Plates and barrels were installed on the cables. Approximately 1500 cables are installed on a monthly basis at Cuiabá mine. Ore Foot Wall Hanging Wall Figure 5. Stope 10.2 FGS with visualization of support.

4 2.3 Visual Scale of Cracks and Shears Borehole camera monitoring was started in Cuiabá mine for the identificiation and classification of cracks and shears. Following the collection of a large dataset, it was possible to make a visual scale of cracks and shears (Figure 6). This scale allow different levels of cracks and shears. Borehole camera monitoring of holes in the hanging wall (HW), with mining evolution, assisted to identify intense shearing in the schistose mainly when the holes were more further from stope face. 8). For stable areas, in general, a typical displacement is of ± 1.5cm near the HW face after blasting. Therefore this high displacement was a first indication of instability in this area. Figure 7. Vertical cross section in 10.2 FGS.. Figure 6. Visual scale of cracks and shears for holes with a diameter of 5 cm. 2.4 Monitoring and Actions Evolution For more adequate understanding of the case study, it is necessary to know the chronology of events that occurred, from the identification of signs of instability to the rehabilitation of the area with mitigation actions. The development of research and interventions are listed as follow: 15/11/ A SMART cable (9.5m long) and an extensometer MPBX (15m long) were installed, about 2m far from each other (along the direction of the layer) on the hanging wall. In this moment the vertical height of the mining panel was about 15.5 m. The geometry of the stope can be seen in Figure 7. 05/12/ Significant displacement was recorded (2.8 to 2.5 cm near the surface of the hanging wall) after the production blast. The behavior of the displacements recorded by the SMART cable and MPBX was similar (Figure Figure 8. Displacement graph (A) SMART cable and (B) MPBX. 29/01/ Monitoring with borehole camera allowed the captuirng of images inside the borehole in the hanging wall. The inspected hole had a length of 15.5m and it was almost perpendicular to the schistosity. Shears of level 1 were identified approximately 7.0, 1.1, 0.5 and 0.05 m, measured from the face of the HW (Figure 9). 07/02/ Another important displacement was recorded by the SMART cable and MPBX (about 3cm near the face of the HW - Figure 10). There was no activity at this location during this period. It indicated, again, that this area was with serious stability problems in the

5 hanging wall (HW). After the identification of the deterioration of rock mass conditions, cablebolting were installed plus the installation of plates and barrels as reinforcement. Hydraulic filling was also done in this stope. 14/03/2008 Borehole 1 was again filmed. Progresses in shears were identified when compared to the previous recording (Figure 12). Figure 9. Vertical section with cracks and shears inside hole 1 on 29/01/08. Figure 12. Vertical section with cracks and shears inside hole 1 on14/03/08. Figure 10. Displacement graph A) SMART cable and B) MPBX. 29/03/2008 Production blasting was done at the study area. 09/04/ Borehole 1 was again filmed to evaluate the condition of the HW after blasting. High level of shearing was identified 7m (measured from the surface) blocking the hole (Figure 13). The extensometer MPBX apparently reached the limit of measurement, not detecting further displacement (Figure 14). 14/02/2008 The borehole camera was used in borehole 1 and level 1 shears were identified approximately 8.0, 7.5, 7.0, 6.1, 4.5, 4.0, 3.5, 3.0, 2.5, 1.1, 0.8., 0.75, 0.6 and 0.5 m measured from the surface of the HW (Figure 11). Figure 11. Vertical section with cracks and shears inside hole 1 on14/02/08. Figure 13. Vertical section with cracks and shears inside hole 1 on 09/04/08.

6 Extensive mechanical rock scaling was required to remove broken rock material. A brow of ± 2.5m was formed in the HW with a length of ± 10m, along the direction of schistosity, and 13m along the dip (Figure 16). Figure 14. MPBX displacement graph with televised hole information. Recordings with the borehole camera allowed the study to gradually evaluate the evolution of shearing over time. Some images of the development of shears can be viewed as a function of time for certain positions within the rock mass in Figure 15. Figure 16. Vertical section with cracks and shears and HW picture with brow after scaler machine working. A new MPBX was installed and other holes were drilled for borehole camera monitoring. The evolution of shear and crack and the identificiation by means of borehole camera filming in holes 1, 2, 3, 4, 5 and 6 can be seen in Figure 17. The quantity and magnitude of cracks and shears decreased after reinforcement with cableblolting was done. This is the most important indicator with respect to the borehole camera information, indicating the improvement of the HW geomechanical rock mass condition. Figure 15. Shear evolution over time for 1.1 and 7 m into the HW. In order to continue monitoring this site more holes were drilled for monitoring of with the borehole camera. Cablebolting were installed on denser pattern of 1.0 x 1.0 m and 9.6m length. Figure 17. Cracks and shear evolution. In the hole 6 there was no cracks or shears.

7 A comparison between the displacements collected by the 1 st MPBX, the phase of instability of HW, and the 2 nd MPBX installed subsequently after installation of cablebolting reinforcement can be seen in Figure 18. Figure 19. Study area after mining activities. 2.5 Voussoir Arch Theory Figure 18. Displacement graphs (A) MPBX with instability indication and (B) MPBX 2 after reinforcement installation. Through the analysis of Figure 18, we can identify significant difference in displacement between the instruments. It is noteworthy that the measuring time for MPBX 2 is much larger than for MPBX 1, furthermore the larger amount of blasting that occurred in the study area. The MPBX 2 installed after the application of reinforcement show typical displacement for areas without signs of instability. Mining activities has been successfully completed in the area. This was due to the identification of signs of instability, the installation of reinforcement and constant monitoring using extensometers and borehole camera. A current photo of the study area can be seen in Figure 19. In order to exploit the data collected during the process of study and to attempt to validate a simple method for evaluating the stability of the hanging wall in schist, a stability study was performed using the voussoir arch theory. First of all it was necessary to find the rigid limit below hydraulic/rockfill floor to be considered. For trying to solve this problem, 6 displacement graphs from MPBX and SMART cables were analyzed after they were covered with hydraulic/rockfill in the same stope; five extensometers did not identify displacement after blast number 3 (Figure 20) after being covered, or 6m along ore dip below the floor. Then span considered was normal span plus 6m. Figure 20. Displacement graph with blasting and moment of covered extensometer. In order to minimize errors related to lithologic recognition in all televising of holes in the study area, the interbedded graphite phylite was recognized immersed in sericite /chlorite schist (Figure 21).

8 Figure 21. Graphite phylite immersed in sericite/chlorite schist. The thickness of the beam to be used is 2.5 m on the graphite phylite which was removed with the scaler equipment. Another simulation used a beam thickness of 4.7 m because of the crack/shear identified in the first and second hole at the same depth within the hanging wall (Figure 22). allowed measurements could be done to stabilize the site. The success achieved after the implementation of stabilization measures, attested by monitoring, demonstrates the efficiency of extensometers and borehole camera as important tools to minimize the risk of fall of ground in the hanging wall. The analysis performed by calculation using the analogy of voussoir indicated a very stable situation. This result disagrees with the data obtained by monitoring. The difference between the stability analyzes, voussoir and monitoring, may be associated with frequent intercalations of rocks with different elastic properties and strengths that were identified within the hanging wall (Figure 23), beyond the possibility of improper choice of the beam thicknesses studied. Figure 21. Beam thickness used. All parameters used in the voussoir analogy e results for both simulation can be visualized in the table 2. The results do not indicate instability for both simulation. Table 2- Parameters used in the voussoir analogy to the simulation 1 and 2 and the results obtained. Parameter Simulation 1 Simulation 2 Span (m) Thickness (m) Rock Mass Elastic Modulus (GPa) Specific Weight (KN/m 3 ) Bedding angle UCS (MPa) Support pressure (KPa) Buckling Limit (<35%) 2% 2% Crush Safety Factor RESULTS The timely detection by the extensometers and the images obtained by borehole camera monitoring in the area with signs of instability, Figure 22. Example of graphite phylite intercalation. REFERENCES Diederichs, M.S., Kaiser, P.K. (1999a). Stability of Large Excavations in Laminated Hard Rock Masses: The Voussoir Analogue Revisited, International Journal of Rock Mechanics and Mining Sciences, Canada, v. 36, p. Diederichs, M.S., Kaiser, P.K. (1999b). Tensile Strength and Abutment Relaxation as Failure Control Mechanisms in Underground Excavations, International Journal of Rock Mechanics and Mining Sciences, Canada, v. 36, 69-96p. Hutchinson, D.J, Diederichs, M.S. (1996). Cablebolting in Underground Mines, Bitech Publishers Ltd, British Columbia, Canadá, 406p.

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

Ground support modelling involving large ground deformation: Simulation of field observations Part 1 Ground Support 2016 E. Nordlund, T.H. Jones and A. Eitzenberger (eds) Ground support modelling involving large ground deformation: Simulation of field observations Part 1 D.Saiang, Luleå University of

More information

Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine

Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine Volume 5, Number 2, April 2009, pp.63-68 [TECHNICAL NOTES] Determination of stope geometry in jointed rock mass at Pongkor Underground Gold Mine Budi SULISTIANTO *, M. Safrudin SULAIMAN **, Ridho Kresna

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information

Haulage Drift Stability Analysis- A Sensitivity Approach

Haulage Drift Stability Analysis- A Sensitivity Approach Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level

More information

Influence of Stope Design on Stability of Hanging Wall Decline in Cibaliung Underground Gold Mine

Influence of Stope Design on Stability of Hanging Wall Decline in Cibaliung Underground Gold Mine International Journal of Geosciences, 2013, 4, 1-8 Published Online December 2013 (http://www.scirp.org/journal/ijg) http://dx.doi.org/10.4236/ijg.2013.410a001 Influence of Stope Design on Stability of

More information

Geotechnical data from optical and acoustic televiewer surveys

Geotechnical data from optical and acoustic televiewer surveys Geotechnical data from optical and acoustic televiewer surveys by Farrin De Fredrick MAusIMM, Senior Geotechnical Engineer; Ta Nguyen AIG, Geotechnical Engineer; Clive Seymour MAusIMM, Principal; and Gary

More information

THE VOUSSOIR BEAM REACTION CURVE

THE VOUSSOIR BEAM REACTION CURVE THE VOUSSOIR BEAM REACTION CURVE Yossef H. Hatzor Ben-Gurion University, Department of Geological and Environmental Sciences Beer-Sheva, Israel, 84105 ABSTRACT: The influence of joint spacing (s) on the

More information

Dugald River trial stoping, overall hanging wall behaviour

Dugald River trial stoping, overall hanging wall behaviour Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_08_hassell/ Dugald River trial stoping, overall

More information

Excavation method in Goushfill mine

Excavation method in Goushfill mine International Journal of Engineering and Technology, 2 (3) (2013) 225-229 Science Publishing Corporation www.sciencepubco.com/index.php/ijet Excavation method in Goushfill mine Masoud Cheraghi Seifabad*,

More information

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998 CHAMBER OF MINES OF SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE METALLIFEROUS MINING OPTION Updated November 1998 1 PART 1 : THEORY 1.1 Basic principles of rock engineering

More information

Quality Assessment of Backfill Performance for an Underground Iron Mine in Turkey

Quality Assessment of Backfill Performance for an Underground Iron Mine in Turkey Ground Support 2016 A.A. Editor and B. Editor (eds) ISBN 978-0-98709xx-x-x Quality Assessment of Backfill Performance for an Underground Iron Mine in Turkey A.G. YARDIMCI, Middle East Technical University,

More information

In situ fracturing mechanics stress measurements to improve underground quarry stability analyses

In situ fracturing mechanics stress measurements to improve underground quarry stability analyses In situ fracturing mechanics stress measurements to improve underground quarry stability analyses Anna M. Ferrero, Maria R. Migliazza, Andrea Segalini University of Parma, Italy Gian P. Giani University

More information

Mining method optimisation of Bayi gold mine based on the value engineering principle

Mining method optimisation of Bayi gold mine based on the value engineering principle Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_41_cai/ Mining method optimisation

More information

ON THE FACE STABILITY OF TUNNELS IN WEAK ROCKS

ON THE FACE STABILITY OF TUNNELS IN WEAK ROCKS 33 rd 33 Annual rd Annual General General Conference conference of the Canadian of the Canadian Society for Society Civil Engineering for Civil Engineering 33 e Congrès général annuel de la Société canadienne

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

Some issues in modelling of ground support using the three-dimensional distinct element method

Some issues in modelling of ground support using the three-dimensional distinct element method Deep Mining 2017: Eighth International Conference on Deep and High Stress Mining J Wesseloo (ed.) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-6-3 https://papers.acg.uwa.edu.au/p/1704_24_bahrani/

More information

Geotechnical approach to stope and pillar optimisation at Granny Smith Mine

Geotechnical approach to stope and pillar optimisation at Granny Smith Mine Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 Geotechnical approach to stope and pillar optimisation at Granny Smith Mine L Machuca

More information

Initial effects of improved drill and blast practices on stope stability at Acacia s Bulyanhulu Mine

Initial effects of improved drill and blast practices on stope stability at Acacia s Bulyanhulu Mine Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_12_chilala/ Initial effects of improved drill

More information

Open Stoping at Golden Grove Under High Stress Conditions

Open Stoping at Golden Grove Under High Stress Conditions Open Stoping at Golden Grove Under High Stress Conditions Colin Thomson & Ernesto Villaescusa Western Australian School of Mines, Curtin University. ABSTRACT: Mining at Minerals and Metals Group s Gossan

More information

Uniaxial Compressive Strength Variation for Multi-point Support Design and Discontinuity..

Uniaxial Compressive Strength Variation for Multi-point Support Design and Discontinuity.. IOSR Journal of Applied Geology and Geophysics (IOSR-JAGG) e-issn: 2321 0990, p-issn: 2321 0982.Volume 5, Issue 4 Ver. I (Jul. Aug. 2017), PP 53-62 www.iosrjournals.org Uniaxial Compressive Strength Variation

More information

Flin Flon Mining Belt

Flin Flon Mining Belt EOSC433: Geotechnical Engineering Practice & Design Lecture 7: Stress Analysis around Underground Openings 1 of 40 Erik Eberhardt UBC Geological Engineering EOSC 433 (2007) Flin Flon Mining Belt Since

More information

Building on Past Experiences Worker Safety

Building on Past Experiences Worker Safety EOSC433: Geotechnical Engineering Practice & Design Lecture 11: Rock Stabilization Principles 1 of 43 Erik Eberhardt UBC Geological Engineering EOSC 433 (2016) Building on Past Experiences Worker Safety

More information

Stability Analysis of Pastefill Used in Underground Gold Mining by Underhand Cut and Fill Method in The Kencana Halmahera Island - Indonesia

Stability Analysis of Pastefill Used in Underground Gold Mining by Underhand Cut and Fill Method in The Kencana Halmahera Island - Indonesia Stability Analysis of Pastefill Used in Underground Gold Mining by Underhand Cut and Fill Method in The Kencana Halmahera Island - Indonesia 1 Budi SULISTIANTO, 2 Razak KARIM, 3 T. KARIAN 4 Arnol LOPULALAN

More information

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME:

MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY SUBJECT CODE: COMRMC MODERATOR: H YILMAZ EXAMINATION DATE: OCTOBER 2017 TIME: MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 1 : THEORY EXAMINER: WM BESTER SUBJECT CODE: COMRMC EXAMINATION DATE: OCTOBER 2017 TIME: MODERATOR: H YILMAZ TOTAL MARKS: [100] PASS MARK: (60%)

More information

Risk assessment of collapse in shallow caverns using numerical modeling of block interactions with DDA: Suggested approach and case studies

Risk assessment of collapse in shallow caverns using numerical modeling of block interactions with DDA: Suggested approach and case studies Risk assessment of collapse in shallow caverns using numerical modeling of block interactions with DDA: Suggested approach and case studies Yossef H. Hatzor Professor and Chair in Rock Mechanics, BGU,

More information

Underground Excavation Design Classification

Underground Excavation Design Classification Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index

More information

Ground Support in Mining and Underground Construction

Ground Support in Mining and Underground Construction Ground Support in Mining and Underground Construction Proceedings of the Fifth International Symposium on Ground Support 28-30 September 2004, Perth, Western Australia Edited by Ernesto Villaescusa Yves

More information

Ore-Skin Design to Control Sloughage in Underground Open Stope Mining

Ore-Skin Design to Control Sloughage in Underground Open Stope Mining Ore-Skin Design to Control Sloughage in Underground Open Stope Mining by Virginie Urli A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Graduate Department

More information

Patrick Andrieux Principal Engineer

Patrick Andrieux Principal Engineer Patrick Andrieux Principal Engineer Patrick is a mining engineer with over thirty years of experience at operating mine sites (both on surface and underground), as well as in research and development,

More information

EXAMINATION PAPER MEMORANDUM

EXAMINATION PAPER MEMORANDUM EXAMINATION PAPER MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 3.1 : HARD ROCK TABULAR EXAMINER: PJ LE ROUX SUBJECT CODE: COMRMC EXAMINATION DATE: MAY 2015 TIME: MODERATOR: WM BESTER TOTAL MARKS:

More information

Stress arch bunch and its formation mechanism in blocky stratified rock masses

Stress arch bunch and its formation mechanism in blocky stratified rock masses Journal of Rock Mechanics and Geotechnical Engineering. 2012, 4 (1): 19 27 Stress arch bunch and its formation mechanism in blocky stratified rock masses Xin Huang 1, 2 1, 2*, Zixin Zhang 1 State Key Laboratory

More information

1. Rock Mechanics and mining engineering

1. Rock Mechanics and mining engineering 1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned

More information

Empirical Design in Geotechnical Engineering

Empirical Design in Geotechnical Engineering EOSC433: Geotechnical Engineering Practice & Design Lecture 5: Empirical Design (Rock Mass Classification & Characterization) 1of 42 Erik Eberhardt UBC Geological Engineering EOSC 433 (2013) Empirical

More information

Influence of foliation on excavation stability at Rampura Agucha underground mine

Influence of foliation on excavation stability at Rampura Agucha underground mine Recent Advances in Rock Engineering (RARE 2016) Influence of foliation on excavation stability at Rampura Agucha underground mine P Yadav, A Panda, M Sonam, B Banerjee, S Parihar, and DC Paneri Geotechnical

More information

2 Open Stoping Using Vertical Retreat

2 Open Stoping Using Vertical Retreat Open Stoping Using Vertical Retreat 2-1 2 Open Stoping Using Vertical Retreat 2.1 Problem Statement A distinct element simulation of a large blasthole, open stoping operation is shown to demonstrate the

More information

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition

1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition Rock Engineering Practice & Design Lecture 12: Rock Stabilization Principles 1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition Author s Note: The lecture slides provided here are taken from

More information

The effect of discontinuities on stability of rock blocks in tunnel

The effect of discontinuities on stability of rock blocks in tunnel International Journal of the Physical Sciences Vol. 6(31), pp. 7132-7138, 30 November, 2011 Available online at http://www.academicjournals.org/ijps DOI: 10.5897/IJPS11.777 ISSN 1992-1950 2011 Academic

More information

Design and implementation of a damage assessment system at Argyle Diamond s block cave project

Design and implementation of a damage assessment system at Argyle Diamond s block cave project Caving 2010 Y. Potvin (ed) 2010 Australian Centre for Geomechanics, Perth, ISBN 978-0-9806154-1-8 https://papers.acg.uwa.edu.au/p/1002_1_fernandez/ Design and implementation of a damage assessment system

More information

Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine

Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine Mike Yao Chief Ground Control Engineer, Mine Technical Services, Vale Inco, Sudbury, Canada D. Reddy

More information

I. Hulls E. Woods A. Creighton

I. Hulls E. Woods A. Creighton Slope Stability 2013 P.M. Dight (ed) 2013 Australian Centre for Geomechanics, Perth, ISBN 978-0-9870937-5-2 https://papers.acg.uwa.edu.au/p/1308_40_wines/ D.R. Wines Itasca Australia Pty Ltd, Australia

More information

Finite difference modelling in underground coal mine roadway

Finite difference modelling in underground coal mine roadway University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2017 Finite difference modelling in underground coal mine roadway Ali Akbar Sahebi University

More information

Instructional Objectives. Why use mass classification? What is rock mass classification? 3 Pillars of empirical design and rock mass classification

Instructional Objectives. Why use mass classification? What is rock mass classification? 3 Pillars of empirical design and rock mass classification GE 6477 DISCONTINUOUS ROCK 5. Rock Mass Classification and Empirical Design Dr. Norbert H. Maerz Missouri University of Science and Technology (573) 341-6714 norbert@mst.edu Instructional Objectives 1.

More information

Application of Core Logging Data to generate a 3D Geotechnical Block Model

Application of Core Logging Data to generate a 3D Geotechnical Block Model Application of Core Logging Data to generate a 3D Geotechnical Block Model Engineering Geology and Innovation: Research Infrastructure - Sustainable Development (I.A.E.G) Eleftheria Vagkli, M.Sc. Senior

More information

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling

More information

UNDERGROUND DESIGN AND DEFORMATION BASED ON SURFACE GEOMETRY DOUGLAS MATTHEW MILNE

UNDERGROUND DESIGN AND DEFORMATION BASED ON SURFACE GEOMETRY DOUGLAS MATTHEW MILNE UNDERGROUND DESIGN AND DEFORMATION BASED ON SURFACE GEOMETRY By DOUGLAS MATTHEW MILNE B.A.Sc, The University of British Columbia, 1977 M.Sc, The University of London, 1988 DIC, Imperial College, 1988 A

More information

The effect of stope inclination and wall rock roughness on backfill free face stability

The effect of stope inclination and wall rock roughness on backfill free face stability The effect of stope inclination and wall rock roughness on backfill free face stability Dirige, A. P. E., McNearny, R. L., and Thompson, D. S. Montana Tech of the University of Montana, Butte, Montana,

More information

Open Pit Rockslide Runout

Open Pit Rockslide Runout EOSC433/536: Geological Engineering Practice I Rock Engineering Lecture 5: Empirical Design & Rock Mass Characterization 1of 46 Erik Eberhardt UBC Geological Engineering EOSC 433 (2017) Open Pit Rockslide

More information

The influence of change in mining and ground support practice on the frequency and severity of rockbursts

The influence of change in mining and ground support practice on the frequency and severity of rockbursts Deep Mining 2014 M Hudyma and Y Potvin (eds) 2014 Australian Centre for Geomechanics, Perth, ISBN 978-0-9870937-9-0 https://papers.acg.uwa.edu.au/p/1410_09_hadjigeorgiou/ The influence of change in mining

More information

Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL)

Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL) Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL) Amirreza Ghasemi 1. Introduction Deformability is recognized as one of the most important parameters governing the behavior of rock

More information

An introduction to the Rock Mass index (RMi) and its applications

An introduction to the Rock Mass index (RMi) and its applications Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering

More information

Canada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia

Canada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia Canada Line Project Stability of the Twin Bored Tunnels Under False Creek Vancouver, British Columbia By: Catherine Paul, Jen Ramesch, Matt Gellis, Matthew Yip, and Rhaul Sharma Canada Line Canada Line

More information

Rock Mass Classification Applied to Volta Grande Underground Mine Site in Brazil

Rock Mass Classification Applied to Volta Grande Underground Mine Site in Brazil Journal of Geological Resource and Engineering 4 (2015) 194-202 doi:10.17265/2328-2193/2015.04.004 D DAVID PUBLISHING Rock Mass Classification Applied to Volta Grande Underground Mine Site in Brazil Daniel

More information

Mining. Slope stability analysis at highway BR-153 using numerical models. Mineração. Abstract. 1. Introduction

Mining. Slope stability analysis at highway BR-153 using numerical models. Mineração. Abstract. 1. Introduction Mining Mineração http://dx.doi.org/10.1590/0370-44672015690040 Ricardo Hundelshaussen Rubio Engenheiro Industrial / Doutorando Universidade Federal do Rio Grande do Sul - UFRS Departamento de Engenharia

More information

Entrance exam Master Course

Entrance exam Master Course - 1 - Guidelines for completion of test: On each page, fill in your name and your application code Each question has four answers while only one answer is correct. o Marked correct answer means 4 points

More information

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum

Curriculum Document Mining Technician: Strata Control Practitioner (Surface) Occupational Curriculum Curriculum Document Curriculum Code Curriculum Title 311701-008 Mining Technician: Strata Control Practitioner (Surface) TABLE OF CONTENTS SECTION 1: CURRICULUM OVERVIEW 1 Occupational Information 1 Associated

More information

Improving slope stability at Kışladağ Gold Mine

Improving slope stability at Kışladağ Gold Mine Improving slope stability at Kışladağ Gold Mine S. Ergun, E. Gungor & B. Ozdemir Eldorado Gold Corporation / Tuprag, Usak, Turkey S. Esen Drill and Blast Consultant, Sydney, Australia ABSTRACT: This paper

More information

1. classic definition = study of deformed rocks in the upper crust

1. classic definition = study of deformed rocks in the upper crust Structural Geology I. Introduction 1. classic definition = study of deformed rocks in the upper crust deformed includes translation, rotation, and strain (change of shape) All rocks are deformed in some

More information

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification Table of Contents 1 Development of rock engineering...1 1.1 Introduction...1 1.2 Rockbursts and elastic theory...4 1.3 Discontinuous rock masses...6 1.4 Engineering rock mechanics...7 1.5 Geological data

More information

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives

Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Blast-induced damaged zone can affect the affect stability and performance of tunnel. But, we

More information

Numerical modelling for estimation of first weighting distance in longwall coal mining - A case study

Numerical modelling for estimation of first weighting distance in longwall coal mining - A case study University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Numerical modelling for estimation of first weighting distance in longwall coal

More information

DEVELOPMENT OF AUTOMATIC CONTROL OF MULTI-STAGE TRIAXIAL TESTS AT THE UNIVERSITY OF MISKOLC

DEVELOPMENT OF AUTOMATIC CONTROL OF MULTI-STAGE TRIAXIAL TESTS AT THE UNIVERSITY OF MISKOLC Geosciences and Engineering, Vol. 2, No. 3 (2013), pp. 37 43. DEVELOPMENT OF AUTOMATIC CONTROL OF MULTI-STAGE TRIAXIAL TESTS AT THE UNIVERSITY OF MISKOLC BALÁZS CSUHANICS ÁKOS DEBRECZENI Institute of Mining

More information

Estimation of Rock Mass Parameters using Intact Rock Parameters

Estimation of Rock Mass Parameters using Intact Rock Parameters Estimation of Rock Mass Parameters using Intact Rock Parameters Pawan K.Sah 1, A. Murali Krishna 2 Research Scholar, Civil Engineering, Indian Institute of Technology, Guwahati, Assam, India 1 Assistant

More information

ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE

ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE Paul MARINOS NTUA, School of Civil Engineering, 9 Iroon Polytechniou str., Athens, 157 80, Greece, e-mail : marinos@central.ntua.gr ROCK MASS CHARACTERISATION IN ENGINEERING PRACTICE 1. INTRODUCTION The

More information

STABILITY CHECK AND SUPPORT DESIGNING FOR THE GR-2011 EXPLORATION DRIFT

STABILITY CHECK AND SUPPORT DESIGNING FOR THE GR-2011 EXPLORATION DRIFT UNDERGROUND MINING ENGINEERING 19 (2011) 83-91 UDK 62 FACULTY OF MINING AND GEOLOGY, BELGRADE YU ISSN 03542904 Professional paper STABILITY CHECK AND SUPPORT DESIGNING FOR THE GR-2011 EXPLORATION DRIFT

More information

Influence of the undercut height on the behaviour of pillars at the extraction level in block and panel caving operations

Influence of the undercut height on the behaviour of pillars at the extraction level in block and panel caving operations Caving 2018 Y Potvin and J Jakubec (eds) 2018 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-9-4 https://papers.acg.uwa.edu.au/p/1815_24_alvarez/ Influence of the undercut height on the

More information

Application of a transversely isotropic brittle rock mass model in roof support design

Application of a transversely isotropic brittle rock mass model in roof support design University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Application of a transversely isotropic brittle rock mass model in roof support

More information

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS

COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS COMPARING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS PART 2: CORRELATIONS OF THE THREE SYSTEMS by Arild Palmström, Ph.D. RockMass AS, Oslo, Norway In Part 1, it was shown how the input parameters to the

More information

A Unique Metro Accident in Brazil Caused by Multiple Factors

A Unique Metro Accident in Brazil Caused by Multiple Factors A Unique Metro Accident in Brazil Caused by Multiple Factors 1 MAIN CAUSES OF ACCIDENT Ridge of jointed rock exactly along cavern roof Ridge of rock missed by drilling due to low spot Weathering of sides

More information

ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS. G P Dyke AngloGold Ashanti 1

ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS. G P Dyke AngloGold Ashanti 1 ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS AngloGold Ashanti 1 Synopsis The MRMR Classification System was developed specifically for mining applications, namely

More information

Supplementary Uniaxial Compressive Strength Testing of DGR-3 and DGR-4 Core

Supplementary Uniaxial Compressive Strength Testing of DGR-3 and DGR-4 Core Technical Report Title: Document ID: Authors: Supplementary Uniaxial Compressive Strength Testing of DGR-3 and DGR-4 Core TR-08-39 B. Gorski, T. Anderson and D. Rodgers CANMET Mining and Mineral Sciences

More information

The University of Melbourne Engineering Mechanics

The University of Melbourne Engineering Mechanics The University of Melbourne 436-291 Engineering Mechanics Tutorial Four Poisson s Ratio and Axial Loading Part A (Introductory) 1. (Problem 9-22 from Hibbeler - Statics and Mechanics of Materials) A short

More information

Rock Mass Characterization of Ajabanoko Iron Ore Deposit, Kogi State Nigeria

Rock Mass Characterization of Ajabanoko Iron Ore Deposit, Kogi State Nigeria Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) 4(3): 427-431 Scholarlink Research Institute Journals, 2013 (ISSN: 2141-7016) jeteas.scholarlinkresearch.org Journal of Emerging

More information

Strengths and weaknesses of using elastic numerical modelling in mine design at the Callie underground mine

Strengths and weaknesses of using elastic numerical modelling in mine design at the Callie underground mine Deep Mining 2017: Eighth International Conference on Deep and High Stress Mining J Wesseloo (ed.) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-6-3 https://papers.acg.uwa.edu.au/p/1704_59_arbi/

More information

Rock parameters for blasting on the highway Split-Dubrovnik

Rock parameters for blasting on the highway Split-Dubrovnik Rock Engineering in Difficult Ground Conditions Soft Rocks and Karst Vrkljan (ed) 2010 Taylor & Francis Group, London, ISBN 978-0-415-80481-3 Rock parameters for blasting on the highway Split-Dubrovnik

More information

Pillar strength estimates for foliated and inclined pillars in schistose material

Pillar strength estimates for foliated and inclined pillars in schistose material Pillar strength estimates for foliated and inclined pillars in schistose material L.J. Lorig Itasca Consulting Group, Inc., Minneapolis, MN, USA A. Cabrera Itasca S.A., Santiago, Chile ABSTRACT: Pillar

More information

Unwedge Geometry and Stability Analysis of Underground Wedges. Sample Problems

Unwedge Geometry and Stability Analysis of Underground Wedges. Sample Problems Unwedge Geometry and Stability Analysis of Underground Wedges Sample Problems TABLE OF CONTENTS TABLE OF CONTENTS... UNWEDGE SAMPLE PROBLEM #1... Calculate the weight of the maximum wedge formed... UNWEDGE

More information

Weak Rock - Controlling Ground Deformations

Weak Rock - Controlling Ground Deformations EOSC 547: Tunnelling & Underground Design Topic 7: Ground Characteristic & Support Reaction Curves 1 of 35 Tunnelling Grad Class (2014) Dr. Erik Eberhardt Weak Rock - Controlling Ground Deformations To

More information

Flin Flon Mining Belt

Flin Flon Mining Belt EOSC433: Geotechnical Engineering Practice & Design Lecture 8: Stress Analysis around Underground Openings 1 of 45 Erik Eberhardt UBC Geological Engineering EOSC 433 (2017) Flin Flon Mining Belt Since

More information

ENGINEERING GEOLOGY AND ROCK MECHANICS

ENGINEERING GEOLOGY AND ROCK MECHANICS ENGINEERING GEOLOGY AND ROCK MECHANICS SKAA 2712 ENGINEERING PROPERTIES OF ROCK MASSES PROF. MADYA DR. EDY TONNIZAM BIN MOHAMAD DEPT. OF GEOTECHNICS AND TRANSPORTATION FACULTY OF CIVIL ENGINEERING UTM

More information

Underground metal mine crown pillar stability analysis

Underground metal mine crown pillar stability analysis University of Wollongong Research Online University of Wollongong Thesis Collection University of Wollongong Thesis Collections 1994 Underground metal mine crown pillar stability analysis M. Tavakoli University

More information

C-2. Eagle Project Geotechnical Study. LJS\J:\scopes\04w018\10000\FVD reports\final MPA\r-Mine Permit App appendix.doc

C-2. Eagle Project Geotechnical Study. LJS\J:\scopes\04w018\10000\FVD reports\final MPA\r-Mine Permit App appendix.doc C-2 Eagle Project Geotechnical Study LJS\J:\scopes\04w018\10000\FVD reports\final MPA\r-Mine Permit App appendix.doc Golder Associates Ltd. 662 Falconbridge Road Sudbury, Ontario, Canada P3A 4S4 Telephone:

More information

Calculation of periodic roof weighting interval in longwall mining using finite element method

Calculation of periodic roof weighting interval in longwall mining using finite element method Calculation of periodic roof weighting interval in longwall mining using finite element method Navid Hosseini 1, Kamran Goshtasbi 2, Behdeen Oraee-Mirzamani 3 Abstract The state of periodic loading and

More information

Mining in extreme squeezing conditions at the Henty mine

Mining in extreme squeezing conditions at the Henty mine Ground Support 2016 E. Nordlund, T.H. Jones and A. Eitzenberger (eds) Mining in extreme squeezing conditions at the Henty mine B. Roache, Mining One Consultants Pty Ltd, Australia Abstract Squeezing conditions

More information

Stress distribution in inclined backfilled stopes

Stress distribution in inclined backfilled stopes MINEFILL 2007 Montreal, Qc, Canada Stress distribution in inclined backfilled stopes L. Li 1, M. Aubertin 1,3, A. Shirazi 1,T. Belem 2, R. Simon 1 1 École Polytechnique de Montréal 2 Université du Québec

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

An integrated approach for the design of stable mine backfill sillmats

An integrated approach for the design of stable mine backfill sillmats An integrated approach for the design of stable mine backfill sillmats E. De Souza & A.P. Dirige Department of Mining Engineering Queen s University, Canada Abstract Sillmats are structural elements used

More information

Chapter I 1 FRACTURING AROUND A ROCK BOLT ANCHOR. by Richard S. Culver and Tron Jorstad

Chapter I 1 FRACTURING AROUND A ROCK BOLT ANCHOR. by Richard S. Culver and Tron Jorstad Chapter I 1 FRACTURING AROUND A ROCK BOLT ANCHOR by Richard S. Culver and Tron Jorstad In spite of the widespread interest in rock bolt research, relatively little is known about the critical region surrounding

More information

A PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN OF THE NEW METRO DO PORTO

A PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN OF THE NEW METRO DO PORTO AITES-ITA 2001 World Tunnel Congress PROGRESS IN TUNNELING AFTER 2000 Milano, June 10-13, 2001 Volume III, pp. 463-470 A PROBABILISTIC APPROACH FOR CHARACTERIZING THE COMPLEX GEOLOGIC ENVIRONMENT FOR DESIGN

More information

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme H. Matsui, K. Sugihara and T. Sato Japan Nuclear Cycle Development Institute, Japan Summary The HLW disposal program

More information

Structurally controlled instability in tunnels

Structurally controlled instability in tunnels Structurally controlled instability in tunnels Introduction In tunnels excavated in jointed rock masses at relatively shallow depth, the most common types of failure are those involving wedges falling

More information

Session 3: Geology and Rock Mechanics Fundamentals

Session 3: Geology and Rock Mechanics Fundamentals Session 3: Geology and Rock Mechanics Fundamentals Geotechnical Engineering Appreciation Course (Jointly organised by IES Academy and GeoSS) Dr Zhou Yingxin, Senior Principal Engineer, DSTA Adjuct Associate

More information

Geoscientific Instrumentation in River Valley Projects

Geoscientific Instrumentation in River Valley Projects J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon

More information

ME 354, MECHANICS OF MATERIALS LABORATORY COMPRESSION AND BUCKLING

ME 354, MECHANICS OF MATERIALS LABORATORY COMPRESSION AND BUCKLING ME 354, MECHANICS OF MATERIALS LABATY COMPRESSION AND BUCKLING PURPOSE 01 January 2000 / mgj The purpose of this exercise is to study the effects of end conditions, column length, and material properties

More information

Evaluation of Structural Geology of Jabal Omar

Evaluation of Structural Geology of Jabal Omar International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 11, Issue 01 (January 2015), PP.67-72 Dafalla Siddig Dafalla * and Ibrahim Abdel

More information

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling

Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling Yvette

More information

A new design approach for highway rock slope cuts based on ecological environment protection

A new design approach for highway rock slope cuts based on ecological environment protection A new design approach for highway rock slope cuts based on ecological environment protection T. Lian-jin, Z. Li, W. Yunjie, W. Guang-yuan & Z. Yin-tao College of Architecture and Civil Engineering, Beijing

More information

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION

SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION CHAMBER OF MINES OS SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE COAL MINING OPTION 1. PART 1 : THEORY 1.1 Basic principles of rock engineering 1.1.1 Terms, definitions and basic

More information

Mining the South Reef at Doornkop

Mining the South Reef at Doornkop Mining the South Reef at Doornkop Mark Grave. Chief Rock Engineer Brentley Lucas & Associates Doornkop Gold Mine, Harmony Gold Mining Co Ltd. Johannesburg, South Africa This paper was prepared for presentation

More information

Application of rock mass classification systems as a tool for rock mass strength determination

Application of rock mass classification systems as a tool for rock mass strength determination Deep Mining 217: Eighth International Conference on Deep and High Stress Mining J Wesseloo (ed.) 217 Australian Centre for Geomechanics, Perth, ISBN 978--992481-6-3 https://papers.acg.uwa.edu.au/p/174_38_moser/

More information

Rock slope rock wedge stability

Rock slope rock wedge stability Engineering manual No. 28 Updated: 02/2018 Rock slope rock wedge stability Program: Rock stability File: Demo_manual_28.gsk The aim of the chapter of this engineering manual is to explain a rock slope

More information