1 28 JULY 2016 ASX ANNOUNCEMENT ACTIVITIES AND CASHFLOW REPORT FOR THE MONTH OF JUNE 2016 Global Fortune Investment Limited (ASX: GFI or the Company ) is pleased to provide its monthly activities report and cash flow report for the month of June 2016 in accordance with the ASX Admission Confirmation Letter dated 1 February FINANCIAL HIGHLIGHTS At 30 June 2016, total cash at bank was $2.9M. CORPORATE HIGHLIGHTS Consistent with the previous month, for the month of June 2016, the Company continued to grow sales from the distribution of Infant Formula to clients generating sales before costs of $847,000. SHENZHEN YUHUA XINNONG RESOURCES MANAGEMENT CO LTD ( SYX ) As at the date of this report, no activity has been initiated with SYX. EXPLORATION ACTIVITIES HORSE ROCK PROJECT, WESTERN AUSTRALIA (100%) Figure (1) During the month of June, a field mapping and sampling trip was completed at the Company s Horse Rock Project, Western Australia. The aim of the field trip was: 1. Assess the fertility of potential source intrusions which may contain Gold or Base metal mineralisation 2. Sample possible source rocks within the project area 3. Sample Soil near old workings 4. Develop relationships with local pastoralists 5. Create an accurate track log for future work programs In order to achieve these objectives several days were spent assessing access, meeting with the station owners, assessing the geology in the field and then undertaking a number of soil transects and rock chippings across key geological features and units. Global Fortune Investment Limited ABN: ASX:GFI Level 36, Gateway, 1 Macquarie Place Sydney NSW 2000 T: F: W:

2 Figure (1) Tenement Map showing new applications (ELA31/1121 and ELA31/1122) EXPLORATION ACTIVITIES Geology The objective of the program was to evaluate high priority targets and collect orientation surface measurements. The high priorities targets were derived from historical soil anomalies, magnetic structural interpretations and historical workings. In total 40 soil samples and 33 rock chips samples were collected and submitted for analysis. Results have not yet been returned form the laboratory. Sample location details are provided in Figures 1 3 and Appendix 1 and 2. The high magnetic feature was hypothesised to be either an anticline or intrusion. From field observations, the magnetic high was discovered to be granite cross cut with quartz veins and enriched in oxidised sulphides. Several samples were taken from this area to see if Gold were to be associated with the sulphides. Upon visiting historical workings it was apparent these workings were across a sheer zone. Altered mafic units were observed looking into the shaft void suggesting these shear zoned units were a mineralising target for early prospectors. Soil samples were taken from East West from the old working to indicate the legacy gold can create in soil. Rock chips from varying units were taken from the old workings to help identify the host unit. To the north of this working lay several quartz blows in multiple successions. These quartz blows were rich in sulphides to which some were relatively fresh and unaltered. Rock chip samples of the quartz blows were collected from each location. Historical rock chips in the north of the tenement indicated a content of 1.98g/t Au. Visiting the region, quartz and silicified blows dominated the outcrops, displaying sections of disseminated sulphides and weathered carbonate within the quartz. Several rock chip samples of the silicified bedrock and quartz blows were taken from this section for assaying. Soil anomalies adjacent to the Yarri battery suggested high gold mineralisation. Based on field observations, the anomalies are likely to have been due to contamination from the battery and not a true reading of the soil. 2

3 With this in mind, no soil samples were taken from this location. A rock chip sample of granite was taken from nearby as this will not be contaminated. To the mid west of the tenement; a soil sample transect was undertaken across an old historic working. The historical workings in this region were observed to focus on a shallow horizontal horizon. Soil samples were undertaken in an identical manner to as mentioned above in an East West direction. Rock chips were also taken from the dumps created from the historic workings. Rock chip samples taken to the mid east of the tenement were taken from outcrops of quartz blows mottled with carbonate and oxidised sulphides. Further scouting of the region showed more workings on top of the radio hill to the central south of the tenement. Several rock chips samples were taken from this location of surrounding Geology, although no obvious host units were apparent. Sampling Bulk soil samples (2 3 kg) were collected across prospective areas with old workings at 10 20meter intervals in an East West striking transect. Bulk samples were sieved through 200 µm sieves upon return to Perth after being dried. Rock chips were collected at outcrops of interest and 2 3 kg samples were broken off outcrop and put into numbered calico bags. Sample locations were taken with a Garmin hand held GPS and locations were in GDA1994, MGA zone 51 UTM format. Sample descriptions and locations were recorded in a field notebook. Sample locations and descriptions were entered into an excel spread sheet and the track log from the GPS was downloaded. No field standards or duplicates were collected for the purposes of this program. Results Samples were dispatched to Intertek Genalysis upon arrival back in Perth. Contact Information Intertek Genalysis 15 Davidson Street Maddington WA 6109 Frazer Fallens Business Development Manager Rock chip samples were submitted for Li borate fusion / XRF (14 element) and Four Acid Digest / ICP MS (48 elements) and Fire Assay ICP MS (Au, Pt, Pd). The rock chip samples will be analysed by the following codes: LITH/204X & LITH/205X Soil samples were submitted for Pb collection fire assay (Au, Pt, Pd) and Four Acid Digestion / ICP MS (48 elements). The soil samples will be analysed by the following codes: FA25/MS & 4A/OM48 Results are currently pending and should be received early August

4 For personal use only Figure (2) Sample Location Plan on Satellite Photo 4

5 For personal use only Figure (3) Sample Location Plan on Airborne Magnetic Image 5

6 Figure (4) Sample Location Plan on Fact Geology 6

7 TENEMENT SUMMARY During June 2016 a Compulsory Partial Reduction was required for E31/859. The reduction required 8 blocks to be dropped from the existing 21 block tenement (remaining 15 blocks). The least prospective areas were selected for the reduction. Tenement Status Current Holder Area Grant Expiry (Blocks) E31/00859 Granted Global Fortune Investments Limited E31/00887 Granted Global Fortune Investments Limited E31/01121 Application Global Fortune Investments Limited 52 Pending N/A E31/01122 Application Global Fortune Investments Limited 52 Pending N/A For further information, please contact: Corporate matters: Eric Yuan Lin Managing Director, CEO T: E: admin@gfinvest.com.au Technical matters: Peter Langworthy OMNI GeoX Pty. Ltd. T: E: peter.langworthy@omnigeox.com Competent Persons Statement The information in this report that relates to Exploration Results or Mineral Resources is based on information compiled or reviewed by Mr. Peter Langworthy, Managing Director (Principal Consultant) OMNI GeoX Pty Ltd. Mr. Peter Langworthy is a Member of the Australian Institute of Mining and Metallurgy and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Peter Langworthy consents to the inclusion in the report of the matters based on the information in the form and context in which it appears 7

8 APPENDIX (1) ROCK CHIP SAMPLING DETAILS SAMPLE EASTING NORTHING DATE TENEMENT LITHOLOGY YAR ,832 6,705,160 21/06/16 E31/859 Granite with Qtz veins YAR ,897 6,705,174 21/06/16 E31/859 Silicious Granite Pegmatitic with Qtz Vein adjacent YAR ,704 6,705,161 21/06/16 E31/859 Granite with visible biotite YAR ,704 6,705,161 21/06/16 E31/859 Granite with Ox. Py. (Sulfide) cubes on fracture planes YAR ,880 6,705,088 21/06/16 E31/859 YAR ,570 6,704,643 21/06/16 E31/859 Monzogranite YAR ,570 6,704,643 21/06/16 E31/859 Monzogranite "Fresh" granite biotite +fspar medium large grained. Equigranular. YAR ,336 6,701,856 21/06/16 E31/859 Carbonate calcrete w/ mafic around old collapsed shaft YAR ,336 6,701,856 21/06/16 E31/859 Carbonate calcrete w/ mafic around old collapsed shaft YAR ,336 6,701,856 21/06/16 E31/859 Carbonate calcrete w/ mafic around old collapsed shaft YAR ,361 6,701,821 21/06/16 E31/859 Calcrete breccia w/ Greenstone YAR ,749 6,702,832 21/06/16 E31/859 Schist w/ Qtz YAR ,749 6,702,832 21/06/16 E31/859 Qtz w/ oxide (pyrite cubes?) YAR ,770 6,702,766 21/06/16 E31/859 Qtz w/ silicified schist trending NNE oxidixed sulfide YAR ,837 6,702,810 21/06/16 E31/859 Qtz (Opaques brecciated) YAR ,818 6,702,841 21/06/16 E31/859 Silica foliated (Chl + Cte Jasp?) YAR ,031 6,702,247 21/06/16 E31/859 Biotite granite Qz veins YAR ,442 6,705,773 22/06/16 E31/859 Qtz Slag YAR ,143 6,706,695 22/06/16 E31/859 Silicious + Qz veined w/ mafics + Qtz blow. YAR ,143 6,706,734 22/06/16 E31/859 Silicious + Qz veined w/ mafics + Qtz blow. YAR ,125 6,706,760 22/06/16 E31/859 Silicious + Qz veined w/ mafics + Qtz blow. w/ oxidised sulphide. YAR ,075 6,706,809 22/06/16 E31/859 Silicifed w/ mica veins & oxides. YAR ,075 6,706,809 22/06/16 E31/859 Silicifed w/ mica veins & oxides. YAR ,978 6,706,850 22/06/16 E31/859 Silicified veins (felsic?) YAR ,852 6,706,906 22/06/16 E31/859 YAR ,987 6,707,425 22/06/16 E31/859 Qtz w/ Fe ox messy. YAR ,987 6,707,425 22/06/16 E31/859 Schist Yellow Qtz blow w/ sulfide (fresh) & oxidized. Potential start to shaft? YAR ,572 6,705,696 22/06/16 E31/859 Qtz vein trends 65* w/sulfide YAR ,572 6,705,696 22/06/16 E31/859 Qtz vein trends 65* w/sulfide YAR ,783 6,705,496 22/06/16 E31/859 Old working silificied rock w/ veins & oxides. YAR ,783 6,705,496 22/06/16 E31/859 Old working silificied rock w/ veins & oxides. YAR ,783 6,705,497 22/06/16 E31/859 Mafic, then alt from Dump YAR ,550 6,703,568 22/06/16 E31/859 Old workings mafics from the Dump 8

9 APPENDIX (2) SOIL SAMPLING DETAILS SAMPLE_ID EASTING NORTHING DATE TENEMENT YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 YARS /06/16 E31/859 9

10 MONTHLY CASH FLOW REPORT Mining exploration entity monthly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity Global Fortune Investment Limited ABN Month ended ( current month ) June 2016 Consolidated statement of cash flows Cash flows related to operating activities Current month $A 000 Year to date (12 months) $A Receipts from product sales and related debtors Payments for (a) exploration and evaluation (87) (b) development (c) production (d) administration (121) (995) 1.3 Dividends received 1.4 Interest and other items of a similar nature received Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other payments for stock (193) (226) Net operating cash flows 535 (366) Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets (72) 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other Office lese security deposit (3) Net investing cash flows (75) 1.13 Total operating and investing cash flows (carried forward) 535 (441) 10

11 1.13 Total operating and investing cash flows (brought forward) 535 (441) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, capital raising etc. 4, Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings Repayment of borrowings (29) (881) 1.18 Dividends paid 1.19 Other capital raising costs (333) Net financing cash flows (29) 3,333 Net increase (decrease) in cash held 506 2, Cash at beginning of month/year to date 2, Exchange rate adjustments to item Cash at end of month 2,931 2,931 Payments to directors of the entity and associates of the directors, related entities of the entity and associates of the related entities Current month $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Item 1.23: Director s fees and salaries $38K Noncash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows None 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest None 11

12 Financing facilities available Add notes as necessary for an understanding of the position. Amount available $A 000 Amount used $A Loan facilities 3.2 Credit standby arrangements Estimated cash outflows for next month $A Exploration and evaluation Development 4.3 Production 4.4 Administration 150 Total 186 Reconciliation of cash Reconciliation of cash at the end of the month (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current month $A 000 Previous month $A Cash on hand and at bank Deposits at call 1, Bank overdraft 5.4 Other (Term deposit): 1,000 2,000 Total: cash at end of month (item 1.22) 2,931 2,425 Changes in interests in mining tenements Tenement reference Nature of interest Interest at beginning of month Interest at end of month 6.1 Interests in mining tenements relinquished, reduced or lapsed None 6.2 Interests in mining tenements acquired or increased None 12

13 Issued and quoted securities at end of current month Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted Issue price per security (see note 3) Amount paid up per security (see note 3) 7.1 Preference + securities(description) 7.2 Changes during month (a) Increases through issues (b) Decreases through returns of capital, buybacks, redemptions Ordinary securities Fully Paid 63,360,296 13,360,295 N/A N/A 7.4 Changes during month (a) Increases through issues (b) Decreases through returns of capital,buybacks 7.5 Convertible debt securities (description) 7.6 Changes during month (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (description and conversion factor) Exercise price Expiry date 850,000 $ Jan Issued during month 7.9 Exercised during month 7.10 Expired during month 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) 13

14 Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5). 2 This statement does give a true and fair view of the matters disclosed. Sign here: Date: 28 July 2016 Company Secretary Print name: Anne Adaley Notes 1 The monthly report provides a basis for informing the market how the entity s activities have been financed for the past month and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. 14

QUARTERLY ACTIVITIES REPORT. For the period ended 30 June 2014

QUARTERLY ACTIVITIES REPORT. For the period ended 30 June 2014 31 July 2014 QUARTERLY ACTIVITIES REPORT For the period ended 30 June 2014 COMPANY OVERVIEW Regalpoint Resources Limited was formed to utilise the best available science to explore the Australian continent

More information

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2014

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2014 29 April 2014 QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2014 COMPANY OVERVIEW Regalpoint Resources Limited was formed to utilise the best available science to explore the Australian continent

More information

Quarterly Activities Report for the Period Ended 31 March 2013

Quarterly Activities Report for the Period Ended 31 March 2013 Quarterly Activities Report for the Period Ended 31 March 2013 HIGHLIGHTS Reconnaissance mapping and sampling program completed at the Deflector Extended Gold Project. 30 samples are being analysed for

More information

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2016

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2016 ASX ANNOUNCEMENT AND MEDIA RELEASE 6 July 2016 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2016 HIGHLIGHTS Wide mineralised zones at Namdini Project between 190 and 310m widths Mineralisation

More information

For personal use only

For personal use only WAVENET INTERNATIONAL LIMITED ABN 50 087 139 428 Wavenet International is an exploration company with coal tenements in Queensland as well as gold concessions in West Kalimantan, Indonesia. Update In Queensland

More information

TRAKA RESOURCES LTD (A.B.N )

TRAKA RESOURCES LTD (A.B.N ) TRAKA RESOURCES LTD (A.B.N. 63 103 323 173) Quarterly Activity Report for the three months ended 31 st March 2008 Highlights Ravensthorpe Nickel Project A heliborne VTEM program has been completed and

More information

QUARTERLY REPORT Ending 30 June 2014

QUARTERLY REPORT Ending 30 June 2014 QUARTERLY REPORT Ending 30 June 2014 HIGHLIGHTS Melton coppergold project (SA): High grade copper intersections up to 2.92% Cu discovered from drilling on owned West Melton Mineralisation intercepted from

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2018

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2018 HIGHLIGHTS ~1.4km Myhree-Boundary Corridor Strong drilling results from both initial and extensional drilling at Boundary, including the discovery of the offset position to the south with a result of 12m

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

Early drill results include wide and high-grade intersections of cobalt mineralisation at Offset and Railway Prospects.

Early drill results include wide and high-grade intersections of cobalt mineralisation at Offset and Railway Prospects. 27 April 2012 Australian Stock Exchange Limited Exchange Centre, Level 6, 20 Bridge Street, SYDNEY, NSW 2000 BROKEN HILL PROSPECTING LTD QUARTERLY REPORT FOR THE PERIOD TO 31 March 2012 ( BPL ) is pleased

More information

29 April 2013 COMPANY OVERVIEW CAPITAL DETAILS. ASX Code: RGU, RGUO. As 26 April 2013 Share Price: 1.3 cents. Option price: 0.

29 April 2013 COMPANY OVERVIEW CAPITAL DETAILS. ASX Code: RGU, RGUO. As 26 April 2013 Share Price: 1.3 cents. Option price: 0. 29 April 2013 COMPANY OVERVIEW CAPITAL DETAILS Regalpoint Resources Limited was formed to utilise the best available science to explore the Australian continent for large scale or high grade mineral deposits.

More information

For personal use only

For personal use only ASX Release: 28 January, 2011 Quarterly Activities Report for the period ended 31 December 2010 ASX Code: WRM Shares on Issue: 56.8 million Options on Issue: 6.1 million Cash on hand as at 31 Dec: $9.1M

More information

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6

More information

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary ASX announcement 27 November 2017 Andromeda Metals Limited ABN: 75 061 503 375 Mylo-Frontier Pilbara Gold Project acquisition Corporate details: Summary ASX Code: ADN Cash: $0.546 million (at 30 June 2017)

More information

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects ASX Release 14 th September 2010 Corporate Update Divestment of Gold, Copper and Nickel Projects The Directors of ADX Energy Ltd (ASX Code: ADX) are pleased to provide an update in relation to the proposed

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

For personal use only

For personal use only Quarterly Report FOR PERIOD ENDING 30 SEPTEMBER 2011 ASX Code: FAS Contact Details Unit 3, 136 Main Street, Osborne Park WA 6017 PO Box 1520 Osborne Park WA 6916 T: 08 9242 5111 F: 08 9242 5677 E: admin@fairstarresources.com

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2012

QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2012 QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2012 HIGHLIGHTS EXPLORATION Chuminga CopperGold Project First core hole (SB2) of Initial Diamond Drilling Program returned 61metres @ 0.90% Cu and 0.15 g/t

More information

September 2014 Quarterly Activities Report

September 2014 Quarterly Activities Report September 2014 Quarterly Activities Report Musgrave Minerals Ltd is a dedicated exploration Company focused on base metals, silver and gold in the highly prospective Musgrave and Southern Gawler Craton

More information

QUARTERLY REPORT OF OPERATIONS FOR THE PERIOD ENDED 31 MARCH Highlights of the Quarter s Activities

QUARTERLY REPORT OF OPERATIONS FOR THE PERIOD ENDED 31 MARCH Highlights of the Quarter s Activities QUARTERLY REPORT OF OPERATIONS FOR THE PERIOD ENDED 31 MARCH 2008 Highlights of the Quarter s Activities OLOROZ LITHIUM/POTASH First sampling programme commences. Results are expected to be available shortly.

More information

SUMBA EPITHERMAL GOLD SYSTEM

SUMBA EPITHERMAL GOLD SYSTEM Monday, 7 September 2009 Highlights: SUMBA EPITHERMAL GOLD SYSTEM On ground exploration has recommenced targeting drilling in early 2010. Compilation of exploration work completed by BHP has outlined a

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 29 th January 2016 Electronic lodgement COMPANY SNAPSHOT LODESTAR MINERALS LIMITED ABN: 32 127 026 528 CONTACT DETAILS Bill Clayton, Managing Director +61 8 9423 3200 HIGHLIGHTS CAMEL

More information

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT ABN 17 124 444 122 10 June 2009 The Manager Company Announcements Office Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam HIGHLIGHTS TWO HIGH-GRADE GOLD ZONES DISCOVERED AT

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

Remaining assay results Tisová Co Au Cu Project Czech Republic

Remaining assay results Tisová Co Au Cu Project Czech Republic 8 January 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Remaining assay results Tisová Co Au Cu Project Czech Republic Auroch Minerals Limited (Auroch

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER ASX / MEDIA RELEASE 6 MAY 2011 4-MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER Highlights: Silver-lead-zinc discovery at 4-Mile; mineralisation intersected in all

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts MARCH 2012 QUARTERLY REPORT Highlights Magnetic and radiometric survey acquired for Wyloo Anomalous gold zones identified at Wyloo from desktop study Ongoing exploration program completed at Wyloo Application

More information

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from

More information

Quarterly. Activities Report. For Quarter ended 31 March Exploration Activities. Corporate Activities

Quarterly. Activities Report. For Quarter ended 31 March Exploration Activities. Corporate Activities Quarterly Drummond Gold Limited Activities Report ABN 98 124 562 849 ASX: DGO Shares on issue 235,688,642 Directors: Chairman Eduard Eshuys Director Brice Mutton Director Ross Hutton Coy Secretary Michael

More information

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA 17 November 2010 Company Announcements Office Australian Stock Exchange Limited 20 Bridge Street SYDNEY NSW 2000 HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

More information

For personal use only

For personal use only ASX Announcement 2 June 2015 STRONG GOLD ANOMALIES DEFINED AT ST PIERRE Soil sampling defines two strong gold-in-soil anomalies within the St Pierre exploration licence. Soil sampling conducted to follow

More information

Drilling Commences at Telfer West Gold Project

Drilling Commences at Telfer West Gold Project Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 17 November 2016 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

Hampton Hill Mining NL

Hampton Hill Mining NL Hampton Hill Mining NL Second Floor, 9 Havelock Street West Perth WA 6005 Mailing Address: PO Box 689 West Perth WA 6872 ABN 60 606 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email:

More information

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, 20 June 2008 Companies Announcement Office Via Electronic Lodgement GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, Fiji. (Geopacific

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

New Zone of High Grade Gold Discovered at Balogo

New Zone of High Grade Gold Discovered at Balogo ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA Thursday, 10 December 2009 TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA Work has highlighted high grade gold in trenches in the Western Vein system at the Pahandanjal Prospect, with multiple veins striking

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

For personal use only

For personal use only 16 May 2014 Market Announcements Platform ASX Limited Exchange Centre, 20 Bridge Street Sydney NSW 2000 ASX Code: SEG SEGUE IDENTIFIES THREE NEW GROUND EM CONDUCTORS AT PLUMRIDGE NICKEL PROJECT Segue Resources

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate 29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK ASX Release ASX code: MAU 27 April 2012 Level 2, 16 Ord St West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au ABN 34 121

More information

ASX ANNOUNCEMENT 30th September 2015 ASX: EPM ASX ANNOUNCEMENT Australian Securities Exchange Companies Announcements Office ASX Limited Level 40, Central Park 152-158 St Georges Terrace PERTH WA 6000

More information

DISCOVERY OF MINERALISED PORPHYRY & MAGNETITE-COPPER-GOLD AT KAMARANGAN

DISCOVERY OF MINERALISED PORPHYRY & MAGNETITE-COPPER-GOLD AT KAMARANGAN MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

NEW COBAR-STYLE COPPER DISCOVERY IN NSW ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc

More information

ASX Announcement & Media Release 26 October 2010

ASX Announcement & Media Release 26 October 2010 ASX Announcement & Media Release 26 October 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash: $5.0 million (30 Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing

More information

Sepola Project Area in Mali Extended

Sepola Project Area in Mali Extended ASX Release 4 June 2009 Golden Rim Resources Ltd ABN 39 006 710 774 www.goldenrim.com.au Head Office Level 2 10 Outram Street WEST PERTH WA 6872 AUSTRALIA T: + 61 8 9481 5758 F: + 61 8 9481 5759 Exploration

More information

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

Victory plans gravity survey for Bonaparte after encouraging rock-chip results ASX ANNOUNCEMENT 18 September 2017 Victory plans gravity survey for Bonaparte after encouraging rock-chip results Highlights Rock-chip sampling program at Bonaparte Project returns highly encouraging results

More information

African Mining and Exploration plc. ( AME or the Company ) Acquisition of Caracal Gold Mali SARL

African Mining and Exploration plc. ( AME or the Company ) Acquisition of Caracal Gold Mali SARL African Mining and Exploration plc. ( AME or the Company ) Acquisition of Caracal Gold Mali SARL African Mining & Exploration plc (AME), the AIM listed company focusing on exploration in West Africa, is

More information

For personal use only

For personal use only AVZ Minerals Limited 19 September 2016 ACQUISITION OF MANONO EXTENSION LITHIUM, TIN AND TANTALUM PROJECT IN THE DEMOCRATIC REPUBLIC OF CONGO Company to acquire, subject to due diligence, the Manono Extension

More information

KINGSTON RESOURCES LIMITED

KINGSTON RESOURCES LIMITED KINGSTON RESOURCES LIMITED ASX Announcement 26 September 2018 ASX Code: KSN Share Price: A$0.022 Shares Outstanding: 1,223,198,383 Market Capitalisation: A$26.9m Cash: A$4.4m (30 June 2018) Visible gold

More information

HIGH GRADE GOLD FROM RC DRILLING AT BARLEE

HIGH GRADE GOLD FROM RC DRILLING AT BARLEE HIGH GRADE GOLD FROM RC DRILLING AT BARLEE 11th March 2008 ASX Release Issued Capital 34.2 million shares 16.6 million listed options 6 million unlisted options Share Price 10 cents Market Capitalisation

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

For personal use only

For personal use only ASX Announcement 23 May 2014 DORAY FARMS IN TO EXCITING NEW GOLD PROJECT Doray to explore highly prospective Horse Well Gold Project in north-eastern Goldfields through Joint Venture with Alloy Resources

More information

For personal use only

For personal use only Tellus Resources Ltd ABN: 35 144 733 595 Suite 301, Level 3 66 Hunter Street, SYDNEY NSW 2001 21 NOVEMBER 2011 HIGHLIGHTS TELLUS RESOURCES TO ACQUIRE ADVANCED NORTH QUEENSLAND GOLD PROJECT Chillagoe Project

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: WIN 16 January 2014 Six- Month Work Programme For Immediate Release Programme CORPORATE DIRECTORY Non Executive Chairman George Cameron- Dow Managing Director & CEO David J Frances

More information

June 2017 Quarterly Report

June 2017 Quarterly Report ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western

More information

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results ASX Release 6 February 2013 ASX Code: GMD Issued Capital 122.1 million shares 53.8 million options Current Share Price $0.04 Market Capitalisation $5 million Board Members Michael Haynes Chairman Michael

More information

Diamond Drilling Extends the Netiana Lodes at Depth

Diamond Drilling Extends the Netiana Lodes at Depth ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m

More information

For personal use only

For personal use only ASX/Media Announcement 16 May 2011 Major Copper-Gold Discovery at Balogo in Burkina Faso Broad high grade copper and gold intercepts obtained from reverse circulation drilling program at the Balogo Project.

More information

For personal use only

For personal use only 15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

For personal use only

For personal use only ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide

More information

For personal use only

For personal use only 29 July 2011 The Manager Company Announcements Office Australian Securities Exchange Exchange Centre 20 Bridge Street SYDNEY NSW 2000 Dear Sir Quarterly Activities Report for the period ended 30 June 2011

More information

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005 ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,

More information

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam ASX Announcement 28 January 2010 Drill results indicate large Porphyry Copper Gold System at Peenam Highlights: 270 metres of visible copper (gold) mineralisation in first diamond core hole at Peenam Prospect

More information

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN

More information

For personal use only

For personal use only WAVENET INTERNATIONAL LIMITED ABN 50 087 139 428 Wavenet International is an exploration company with a portfolio of coal tenements in Queensland as well as gold and polymetallic concessions in West Kalimantan,

More information

For personal use only

For personal use only Kaili Resources Limited (formerly Omnitech Holdings Limited) ABN 39 077 559 525 7 Darley Street, Darlinghurst Sydney NSW 2010, Australia T: +61 2 9267 5988 F: +612 9283 7166 E: contact@kailigroup.com.au

More information

Additional Significant Gold Intercepts Obtained in Sweden

Additional Significant Gold Intercepts Obtained in Sweden ASX/Media Announcement 18 November 2009 Additional Significant Gold Intercepts Obtained in Sweden Golden Rim Resources Ltd (ASX: GMR, Golden Rim) today announced it had received additional significant

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ACN 123 567 073 3 July 2014 NEW FRASER RANGE PROJECT AREA AT KITCHENER New 100%-owned exploration licence application covers 203km 2, situated on the Fraser Range Gravity High Enterprise

More information

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION 27 October 2009 FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION Drake Resources (ASX: DRK, Drake ) is pleased to announce that the first assays for the drilling programme at Falun,

More information

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT March 1, 2012 INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT TriAusMin Limited (ASX: TRO) (TSX: TOR) ( TriAusMin or the Company ) is pleased to present the attached announcement of drill results by

More information

27 metres Grading 66.8 g/t Gold and

27 metres Grading 66.8 g/t Gold and ADDRESS PHONE EMAIL PO Box 35 +61 (8) 9295 0388 info@frontierresources.com.au North Perth FAX WEBSITE WA 6906 Australia +61 (8) 9295 3480 www.frontierresources.com.au ASX Limited Company Announcements

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS 1 November 2007 MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS Highlights Very high gold-in-soil sample results up to 17.3 g/t gold have been received from the Banana Creek Prospect.

More information

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent.

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent. QUARTERLY REPORT for the Quarter Ended 31 December 2010 HIGHLIGHTS Magnetic Resources NL ABN 34 121 370 232 IRON ORE ASX Codes: MAU and MAUCA Level 2, 16 Ord Street West Perth WA 6005 T +61 8 9226 1777

More information

SUMBA EXPLORATION UPDATE

SUMBA EXPLORATION UPDATE ASX RELEASE Tuesday, 23 November 2010 SUMBA EXPLORATION UPDATE Hillgrove Resources Limited (ASX:HGO) today announces a planned airborne geophysical survey, Pelitalira prospect progress and final results

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS ASX Announcement 23 November 2017 DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS Planning completed for two diamond holes to drill test the new conductor at Wodger and the interpreted eastern

More information

For personal use only

For personal use only 28 th November 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 AMENDMENT ANNOUCEMENT AUROCH STAKES HIGHLY-PROSPECTIVE IOCG PROJECT AT LAKE TORRENS Auroch

More information

Exploration targets identified to increase Browns Range Project s mine life

Exploration targets identified to increase Browns Range Project s mine life Exploration targets identified to increase Browns Range Project s mine life Highlights Exploration Target estimate demonstrates the potential for very significant increases in Total Mineral Resource at

More information

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season 29 th October 2010 September December Quarterly 2010 Quarterly Report 2008 Report Highlights RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season Major drill programs

More information

For personal use only

For personal use only ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 TH FEBRUARY 2014. EXPLORATION ACTIVITIES Following senior management changes late 2013, a new highly experienced exploration team

More information

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

ASX Release ASX Code: RLC

ASX Release ASX Code: RLC Reedy Lagoon Corporation Limited ABN 41 006 639 514 ASX Release ASX Code: RLC October 2012 Quarterly Report for the period ended 30 September 2012 SUMMARY Bullamine Joint venture Magnetite iron ore (WA):

More information

REPORT FOR THE QUARTER ENDING 30 SEPTEMBER 2008

REPORT FOR THE QUARTER ENDING 30 SEPTEMBER 2008 ACN 099 883 922 REPORT FOR THE QUARTER ENDING 30 SEPTEMBER 2008 HIGHLIGHTS Huckitta Project, NT Mithril has discovered a nickel-copper prospect on the Harts Range JV of the Huckitta Project called Blackadder.