ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3
|
|
- Barbra Bishop
- 5 years ago
- Views:
Transcription
1 ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3 DAVID SAIANG Principal Consultant SRK Consulting Sweden NEIL MARSHALL Corporate Consultant SRK Consulting UK 1 of XX
2 SRK s REVIEW APPROACH FAMILIARISATION: with the Forsmark Project with the purpose and goals of the project with the significance of the project with the concepts of the KBS-3 repository with reference design parameters and production criteria 2 of XX APPROACHED OBJECTIVELY: By having in mind the purpose and functions of each component of KBS-3 repository Sensitivity of each component with respect to the safety of the repository Consequence of impairing the functions of each component What were the significant factors and how were they addressed? RELEVANCY Focused only on the aspects of Engineering Geology and Rock Engineering during operation and closure.
3 FAMILIARISATION KBS-3 CONCEPT 1 Spent nuclear fuel stored in copper canisters and surrounded by compacted bentonite blocks 2 Access tunnels backfilled by a mixture of bentonite and crushed granite or by Friedland clay 3 of XX
4 KBS-3 4 of XX
5 5 of XX REPOSITORY LAYOUT AT FORSMARK
6 6 of XX MAIN PHASES OF WORK AT FORSMARK
7 OPERATIONS AND CLOSURE SRK Consulting was tasked to review sections of safety reports on the OPERATIONS and CLOSURE of the KBS-3 Repository 7 of XX
8 UG EXCAVATION DESIGN STEPS The basis for the design of underground excavation is the geological information gathered from site investigation. SKB has prepared a site descriptive model (SDM) for Forsmark. The geological information are than translated to guidelines and design parameters, by applying rockmass characterisation and classification techniques The underground excavation is then designed based on these guideliness. In general there are no rules! The choice of the method to carry out the excavation depends the rock mass characteristics. 8 of XX
9 ROCK MASS AS NATURAL BARRIER The rockmass is the main natural barrier in the KBS-3 concept Thus, the knowledge of the rockmass characteristics before and after the excavation as well as during the excavation is critical Any excavation of the rock certainly affects the properties of the rock mass immediately around the excavation, creating what is generally referred to as the Excavation Damaged Zone (EDZ) The rock mass will also be disturbed by installation of rock support during the excavation and operation period. 9 of XX
10 FUNDAMENTALS OF ROCK ENGINEERING After Palmström & Stille, 2007 INTERACTION BETWEEN ROCK AND SUPPORT SYSTEM 10 of XX
11 EXCAVATION PROCESS CHART EXCAVATION (I) Excavation method - Drill & Blast - Mechanical (tunnel boring) (ii) Excavation geometry (iii) Safety PHYSICAL CONSEQUENCES - Development of new cracks (excavation and stress induced) - Opening of pre-exsiting cracks (mainly stress induced) INHERENT AND MECHANICAL CONSEQUENCES Reduction in rock strength Indicators: - Reduction in stiffness and general change in rock mechanical properties - Reduction in seismic wave velocity Increase in hydraulic parameters Indicators: - Increase in void ratio - Increase in permeability constant INPUT PARAMETERS - Purpose of the excavation - Rock mass and hydrogelogical conditions - Insitu stress conditions ASSESSMENT (MAINLY QUALITATIVE) - Structural mapping - Core logging - Borehole image processing - Microscopic examination - Displacement measurements ASSESSMENT (MAINLY QUANTITATIVE) - Seismic and sonic wave velocity measurements using geophysical methods - Variation in mechanical properties derived from velocity measurements - Direct stiffness measurements using for example the Goodman jack - Hydraulic conductivity tests - Saturation tests on samples
12 REFERENCE METHOD OF EXCAVATION AT FORSMARK DRILL & BLAST FOR DRIFTS, RAMPS, TUNNELS CORING FOR DEPOSITION HOLES 12 of XX
13 EXCAVATION IMPLICATIONS ON THE SAFETY OF REPOSITORY Rockmass conditions Hydrogeological conditions In-situ stresses EXCAVATION (I) Excavation method Drill and Blast Mechanical (II) Excavation geometry (III) Safety and Support Purpose of the excavation SITE DESCRIPTION MODEL (SDM) PREMISE/REQUIREMENTS
14 PHYSICAL CONSEQUENCES DRILL AND BLAST (reference excavation technique, except deposition holes will be cored) Natural cracks Natural cracks Half-casts or Half-casts half-pipes PHYSICAL CONSEQUENCES New cracks (excavation and stress induced) Opening of pre-existing cracks Irregular tunnel profile Impact on the reference tunnel geometry Stress-induced cracks Blast-induced Stress-induced cracks cracks Blast-induced cracks Half-pipes or half-casts Undamaged rock mass Undamaged rock EDZ Damaged BIDZrock 14 of XX
15 PHYSICAL CONSEQUENCES Impact of drill and blast on reference tunnel geometry Backfilling the disposal tunnels becomes a challenge because of irregular tunnel surface 15 of XX
16 MECHANICAL AND HYDRAULIC CONSEQUENCES (OF EDZ) MECHANICAL AND HYDRAULIC CONSEQUENCES Reduction in rock mechanical properties Indicators: Reduction stiffness Reduction in strength Reduction in seismic wave velocities Increase in hydraulic conductivity Increase in void ratio Increase in permeability constant Undamaged rock rock mass EDZ BIDZ Damaged rock Pre-existing fractures outside the vicinity of the EDZ is also affected 16 of XX Damaged zone
17 BEHAVIOUR OF EDZ ROCK MODULUS DEVIATORIC STRESS TRANSMISSIVITY Distance from excavation boundary EFFECTS: The rock within the EDZ may deform due to low stiffness, thus may impact the functionality of the backfill. High transmissivity may permit circulation of water through the EDZ 17 of XX
18 EXCAVATION PROCESS CHART EXCAVATION (I) Excavation method - Drill & Blast - Mechanical (tunnel boring) (ii) Excavation geometry (iii) Safety PHYSICAL CONSEQUENCES - Development of new cracks (excavation and stress induced) - Opening of pre-exsiting cracks (mainly stress induced) INHERENT AND MECHANICAL CONSEQUENCES Reduction in rock strength Indicators: - Reduction in stiffness and general change in rock mechanical properties - Reduction in seismic wave velocity Increase in hydraulic parameters Indicators: - Increase in void ratio - Increase in permeability constant INPUT PARAMETERS - Purpose of the excavation - Rock mass and hydrogelogical conditions - Insitu stress conditions ASSESSMENT (MAINLY QUALITATIVE) - Structural mapping - Core logging - Borehole image processing - Microscopic examination - Displacement measurements ASSESSMENT (MAINLY QUANTITATIVE) - Seismic and sonic wave velocity measurements using geophysical methods - Variation in mechanical properties derived from velocity measurements - Direct stiffness measurements using for example the Goodman jack - Hydraulic conductivity tests - Saturation tests on samples
19 LIKELY ROCK MECHANICAL PARAMETERS THAT MAY IMPAIR THE FUNCTION DISPOSAL HOLES 1 SPALLING 19 of XX After Andersson, 2007
20 LIKELY ROCK MECHANICAL PARAMETERS THAT MAY IMPAIR THE FUNCTION DISPOSAL HOLES 2 DEFORMATION ZONES OR STRUCTURES INTERSECTING THE DISPOSAL HOLES 20 of XX Disposal holes impaired by the structures are rejected using the Extend Full Perimeter Criterion (EFPC)
21 GROUND SUPPORT In order to assist in the design of the ground support system, SKB has domained the rock mass into different ground types (GT) according to the Q- values: GT 1: Q > 100 GT2: Q = GT3: Q = GT4: Q = of XX
22 GROUND BEHAVIOUR The main ground behaviour (GB) identified for the forsmark area are: GB1: Gravity driven fallout of rock blocks GB2: Stress induced gravity assisted failures GB3: Fractures by water pressure GB 1: has been identified as the main instability in Forsmark. 22 of XX
23 SEALING AND CLOSURE SEALING IS THE BACKFILLING AND PLUGGING OF DEPOSITION HOLES (REVERSIBLE PROCESS) CLOSURE IS THE BACKFILLING AND PLUGGING OF ACCESS, SHAFTS, RAMPS TO THE DISPOSAL SITE TO MAKE IT INACCESSIBLE (IRREVERSIBLE) 23 of XX
24 SEALING AND CLOSURE 24 of XX
25 25 of XX REPOSITORY EXCAVATION AND CANISTER DEPOSITION SEQUENCE DURING OPERATION PHASE
26 26 of XX TRIAL EXCAVATION AND DEPOSITION SEQUENCING
27 SEALING SEALING OF DEPOSITION HOLES & TUNNELS WITH REFERENCE SEALING MATERIALS WHICH ARE SPEFICALLY DEFINED FOR LOW PH AND LOW HYDRAULIC CONDUCTIVITY 27 of XX
28 CLOSURE CLOSURE OF ACCESS DRIFTS, RAMPS, SHAFTS, WITH REFERENCE BACKFILL MATERIALS AND CLAY Specifications of backfill materials vary for top sealing and bottom sealing 28 of XX
29 PLUG PERMENTANTLY SEALS OFF A DEPOSITION TUNNELFROM THE MAIN TUNNEL PLUG ANCHORED IN A ROCK AROUND THE TUNNEL 29 of XX
30 BACKFILL BLOCKS AND PELLETS MANUFACTURED FROM SPECIFIED BENTONITE CLAY (WITH LOW PH AND LOW HYDRAULIC CONDUCTIVITY) 30 of XX
31 BACKFILLING DEPOSITION HOLES 31 of XX
32 MATTERS ARISING It is not entirely clear whether the backfill will purely perform a closure function only or it will also perform some support functions. The interaction between backfill and the surrounding rock could play an important role in defining function of the backfill. Frequent of use of the words such as can be, may be gives an impression that the ideas are still suggestions. Standard reference coordinate system for modeling exercise, perhaps with respect to the orientation of the deposition tunnels Backfilling process is rather tedious with the profiles created by drill and blast. Is there any series for alternatives? Backfilling report (R-08-59, Chapter 8) have raised a number of important issues, which need attention and incorporation into design. No indication of reliability engineering. This branch of engineering takes into account uncertanties in design. ca. in the safety reports means approximately in English. Needs to corrected for non-english readers. 32 of XX
33 CONFIDENCE Learning from others Continuous research and development Monitoring during operation and closure stages Update design as new information becomes available Unlike in mining and some civil engineering projects the site is specifically selected after assessing its suitability. 33 of XX
34 UNCERTAINITIES Rockmass and hydrological parameters have a 3-dimensional and spatial characteristics. Majority of the measurement techniques we use today are 2-dimensional. In that respect there will remain the uncertainty over the accuracy of the measured parameter. The rockmass and hydrological properties we seek to define are generally tensor quantities. Nevertheless, we try to relate them with vector quantities. For example, the mathematics of relating velocity, a vector quantity, to rockmass modulus, a tensor quantity, must be more complicated then what we have today. There is no experience to rely upon for the performance of an engineered system, such as for a repository, over long periods (1000 years or more). However, extensive research and development will give us some confidence over its long term performance. 34 of XX
35 OVERALL REMARK SKB leadership in research and development to ensure the safety of the repositories have clearly led to some of the well driven objective driven work and safety reports with well defined scopes. Such work have also been recognized by international rock mechanics community, in for example, awarding two candidates, Daniel Ask and Christer Andersson, the Rocha Medal by ISRM within the last 5 years for their work in geological engineering with SKB s repository research facilities 35 of XX
36 36 of XX THANK YOU
37 Backfill in disposal tunnel The concept of backfilling of a KBS-3V deposition tunnel is the transport of dissolved matter is by difussion and not by waterflow, which requires that the hydraulic conductivity of the backfill does not exceed e-10m/s The density of backfill is 1,950 kg/m 3. The back should exert an effective pressure of at least 100 kpa on the rock, in order to provide support to the rock to spalling To resist compression caused by upward expansion of the buffer Three methods of backfiling have been stated Block manual method, tedious and will cause unacceptable delays REFERENCE METHOD Robot method is rational but may be difficult to apply PROPOSED FOR FURTHER EVALUATION Module method Superior - PROPOSED Disposition will be 1 canister per day, which means backfilling will be at a rate of 6. of XX 37 to 8 m per day (canister is spaced 6 to 8 m apart) Any interruptions with the procedure will cause problems, especially in areas where water inflow is significant.
Underground nuclear waste storage
Underground nuclear waste storage Groundwater flow and radionuclide transport Jan-Olof Selroos Cargese Summer School, July 5, 2018 Contents: Concept for geological disposal of nuclear waste A few words
More informationIn-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme
In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme H. Matsui, K. Sugihara and T. Sato Japan Nuclear Cycle Development Institute, Japan Summary The HLW disposal program
More informationWITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles.
High-Level Radioactive Waste (HLW) Disposal WITPRESS WIT Press publishes leading books in Science and Technology. Visit our website for the current list of titles. www.witpress.com WITeLibrary Home of
More informationBehaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Objectives
Behaviour of Blast-Induced Damaged Zone Around Underground Excavations in Hard Rock Mass Problem statement Blast-induced damaged zone can affect the affect stability and performance of tunnel. But, we
More informationExperimental program in the URL
Experimental program in the URL Jacques Delay Deputy Scientific Director July 21-24 th 2009 AGENCE NATIONALE POUR LA GESTION DES DÉCHETS RADIOACTIFS URL First construction step (2000 2006) Experimental
More informationDeep Borehole Disposal Performance Assessment and Criteria for Site Selection
Deep Borehole Disposal Performance Assessment and Criteria for Site Selection Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department
More information1. Rock Mechanics and mining engineering
1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned
More informationPresentations at NEA IRT hearing 12 December, 13:30 17:00. Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry
Presentations at NEA IRT hearing 12 December, 13:30 17:00 Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry NEA IRT hearing 12 December 2 Example question #1 Geology Can
More informationHydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste
SAND2014-18615C Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste Geological Society of America Annual Meeting October 20, 2014 Bill W. Arnold, W. Payton Gardner, and Patrick V. Brady
More informationA25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation
A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation C. Cosma* (Vibrometric Oy), N. Enescu (Vibrometric Oy) & E. Heikkinen (Pöyry Finland Oy) SUMMARY Seismic and
More informationClays in Geological Disposal Systems
Clays in Natural and Engineered Barriers for Radioactive Waste Confinement Clays in Geological Disposal Systems A brochure edited by ONDRAF/NIRAS (Belgium) and Andra (France), in collaboration with COVRA
More informationENGINEERING GEOLOGY AND ROCK ENGINEERING
1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:
More informationHaulage Drift Stability Analysis- A Sensitivity Approach
Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level
More informationAn introduction to the Rock Mass index (RMi) and its applications
Reference: A. Palmström, www.rockmass.net An introduction to the Rock Mass index (RMi) and its applications by Arild Palmström, Ph.D. 1 Introduction Construction materials commonly used in civil engineering
More informationGround support modelling involving large ground deformation: Simulation of field observations Part 1
Ground Support 2016 E. Nordlund, T.H. Jones and A. Eitzenberger (eds) Ground support modelling involving large ground deformation: Simulation of field observations Part 1 D.Saiang, Luleå University of
More informationRock Suitability Classification for POPLU
The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Seventh Framework Programme FP7/2011-2013, 2013, under Grant Agreement
More informationCollaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH)
SELFRAC Fractures and self-healing within the excavationdisturbed zone in clays Type of test: Clay characterisation Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS
More informationDeep Borehole Field Test Overview. Presentation Overview
Deep Borehole Field Test Overview David C. Sassani Sandia National Laboratories Used Fuel Disposition R&D Campaign The Institute for Nuclear Materials Management 32nd Spent Fuel Management Seminar Washington,
More informationUnderground Storage & Disposal - The Salt Concept. Thomas Brasser - GRS
Underground Storage & Disposal - The Salt Concept Thomas Brasser - GRS Who is GRS ( Plant & Reactor Safety Ltd. ) Non-profit, independent expert and research organisation Assess and improve safety of technical
More informationConstruction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures
DL Electric Power Industry Standard of the People's Republic of China P DL I T 5389-- Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures DL/T 5389-
More informationIAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6
IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and
More informationR T-H-M couplings in rock. Overview of results of importance to the SR-Can safety assessment. Harald Hökmark, Billy Fälth, Clay Technology AB
R-6-88 T-H-M couplings in rock Overview of results of importance to the SR-Can safety assessment Harald Hökmark, Billy Fälth, Clay Technology AB Thomas Wallroth, BERGAB September 26 Svensk Kärnbränslehantering
More informationEOSC433: Geotechnical Engineering Practice & Design
EOSC433: Geotechnical Engineering Practice & Design Lecture 1: Introduction 1 of 31 Dr. Erik Eberhardt EOSC 433 (Term 2, 2005/06) Overview This course will examine different principles, approaches, and
More informationAn approach for the host rock assessment methodology. based on URLs site investigation data
1 An approach for the host rock assessment methodology development tin JAEA, based on URLs site investigation data Workshop on Assessing the suitability of host rock Yokohama Minato Mirai, Landmark Tower
More informationTHE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE
THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE N. Müller-Hoeppe, M. Jobmann, M. Polster, H. Schmidt DBE TECHNOLOGY GmbH SAFETY CASES
More informationCNSC Review of the Long-Term Safety Case for a Deep Geologic Repository
CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository T. Son Nguyen Geoscience Specialist Brugg, Switzerland May 13, 2016 e-doc 4972224 nuclearsafety.gc.ca Content Ontario Power Generation
More informationGround Support in Mining and Underground Construction
Ground Support in Mining and Underground Construction Proceedings of the Fifth International Symposium on Ground Support 28-30 September 2004, Perth, Western Australia Edited by Ernesto Villaescusa Yves
More informationThermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste
Presented at the COMSOL Conference 2008 Hannover Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste, Markus Olin, Veli-Matti Pulkkanen,
More informationTournemire Underground Laboratory: Geophysical Monitoring of Claystone Desaturation in a Ventilated Borehole.
Tournemire Underground Laboratory: Geophysical Monitoring of Claystone Desaturation in a Ventilated Borehole. U.Zimmer, A. Genty, T. Rothfuchs, B. Bonin, J. Cabrera 1 Introduction With this paper, we will
More informationSELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK
SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK Peter M. Meier (1), Thomas Trick (), Peter Blümling (3) and Geert Vockaert () (1)
More informationStress measurements a Scandinavian perspective. Jonny Sjöberg Itasca Consultants AB (Sweden)
Stress measurements a Scandinavian perspective Jonny Sjöberg Itasca Consultants AB (Sweden) Scandinavian experiences Deep overcoring the Borre probe OC experiences & quality control A new LVDT overcoring
More information1. Introduction. 2. Model Description and Assumptions
Excerpt from the Proceedings of the COMSOL Conference 2010 Boston The Dissolution and Transport of Radionuclides from Used Nuclear Fuel in an Underground Repository Y. Beauregard *1, M. Gobien 2, F. Garisto
More informationGUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO. J x PUBLISHING
GUIDELINES FOR OPEN PIT SLOPE DESIGN EDITORS: JOHN READ, PETER STACEY # & CSIRO J x PUBLISHING S Contents Preface and acknowledgments xiii 1 Fundamentals of slope design 1 Peter Stacey 1.1 Introduction
More informationBuilding on Past Experiences Worker Safety
EOSC433: Geotechnical Engineering Practice & Design Lecture 11: Rock Stabilization Principles 1 of 43 Erik Eberhardt UBC Geological Engineering EOSC 433 (2016) Building on Past Experiences Worker Safety
More informationGeotechnical & Mining Engineering Services
Geotechnical & Mining Engineering Services Southwest Research Institute San Antonio, Texas A s an independent, nonprofit research and development organization, Southwest Research Institute (SwRI ) uses
More informationPit Slope Optimization Based on Hydrogeologic Inputs
Pit Slope Optimization Based on Hydrogeologic Inputs G. Evin, F. Henriquez, V. Ugorets SRK Consulting (U.S.), Inc., Lakewood, Colorado, USA ABSTRACT With the variability of commodity prices and the constant
More informationAssessment of releases from a nuclear waste repository in crystalline rock
Future Groundwater Resources at Risk (Proceedings of the Helsinki Conference, June 1994). IAHS Publ. no. 222, 1994. 37 Assessment of releases from a nuclear waste repository in crystalline rock AIMO HAUTOJÀRVI
More informationInterpretation of Pile Integrity Test (PIT) Results
Annual Transactions of IESL, pp. 78-84, 26 The Institution of Engineers, Sri Lanka Interpretation of Pile Integrity Test (PIT) Results H. S. Thilakasiri Abstract: A defect present in a pile will severely
More informationTreatment of Colloids in the Safety Case
Treatment of Colloids in the Safety Case Clay Colloids in Aqueous Systems 3 4 February 2016, Berlin Dr Amy Shelton, Radioactive Waste Management (RWM) KBS-3 Concept Based on the multi- barrier principles
More informationGeotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,
More informationSafety assessment for disposal of hazardous waste in abandoned underground mines
Safety assessment for disposal of hazardous waste in abandoned underground mines A. Peratta & V. Popov Wessex Institute of Technology, Southampton, UK Abstract Disposal of hazardous chemical waste in abandoned
More informationGeotechnical Engineering and Dams
Geotechnical Engineering and Dams Solving Geotechnical Challenges for Hydropower and Water Resources Projects Geological and geotechnical challenges are often very demanding when planning hydraulic structures.
More informationA PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS
A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS D. SAIANG 1 and E. NORDLUND 1 1 Division of Rock Mechanics and Rock Engineering, Luleå University of Technology, Sweden.
More informationImplications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr
Implications of Host Rock Selection for a HLW Repository System in Germany - Consequences for Repository Design and Safety - Wilhelm Bollingerfehr 31224 Peine, Germany 1 Outline of Presentation Repository
More informationM035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland
M035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland C. Cosma* (Vibrometric), N. Enescu (Vibrometric), M. Lahti (Posiva Oy), E. Heikkinen (Poyry Oy) & T. Ahokas (Poyry Oy) SUMMARY ONKALO
More informationIn situ fracturing mechanics stress measurements to improve underground quarry stability analyses
In situ fracturing mechanics stress measurements to improve underground quarry stability analyses Anna M. Ferrero, Maria R. Migliazza, Andrea Segalini University of Parma, Italy Gian P. Giani University
More informationAbstract. Roland Pusch 1, Sven Knutsson 1, Laith Al-Taie 1
Journal of Earth Sciences and Geotechnical Engineering, vol. 2, no. 1, 2012, 89-112 ISSN: 1792-9040(print), 1792-9660 (online) International Scientific Press, 2012 The impact of hydraulic gradients and
More informationP Jon Haycox, Damion Duckworth ASC, Applied Seismology Consultants. June 2009
P-11-29 Acoustic emission and ultrasonic monitoring results from deposition hole DA3545G1 in the Prototype Repository between October 28 and March 29 Jon Haycox, Damion Duckworth ASC, Applied Seismology
More informationEXAMINATION PAPER MEMORANDUM
EXAMINATION PAPER MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 3.1 : HARD ROCK TABULAR EXAMINER: PJ LE ROUX SUBJECT CODE: COMRMC EXAMINATION DATE: MAY 2015 TIME: MODERATOR: WM BESTER TOTAL MARKS:
More informationFurther Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY
EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit
More informationBLOCK SIZE AND BLOCK SIZE DISTRIBUTION
Paper presented at the Workshop on "Reliablity of classification systems" in connection with the GeoEng000 conference, Melbourne, 8 November 000 BLOCK SIZE AND BLOCK SIZE DISTRIBUTION by Arild Palmström,
More informationGotechnical Investigations and Sampling
Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of
More informationModule 9 : Foundation on rocks. Content
FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing
More informationThe volunteer process of site selection for radwaste disposal in Canada:
The volunteer process of site selection for radwaste disposal in Canada: why it may be suitable for Canada, but is inappropriate for the UK David Smythe January 2013 V4 2 April 2013 Quick summary Canada
More informationSuccessful Construction of a Complex 3D Excavation Using 2D and 3D Modelling
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2015 Successful Construction of a Complex 3D Excavation Using 2D and 3D Modelling Yvette
More informationNNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers
NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling
More informationPROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE WASTE DISPOSAL FACILITIES
th International Conference on Probabilistic Safety Assessment and Management (PSAM ) PROBABILISTIC TRANSPORT PATH ANALYSIS THROUGH THREE-DIMENSIONAL DISCRETE FRACTURE NETWORKS FOR UNDERGROUND RADIOACTIVE
More informationSUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN
SUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN PREFACE This thesis summary consists of detailed description of the thesis presenting the full impact of the thesis accompanied by selected tables and figures.
More informationNumerical Simulation of Unsaturated Infilled Joints in Shear
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Numerical Simulation of Unsaturated Infilled Joints in Shear Libin Gong University
More information7. Foundation and Slope Stability
The Asian Nuclear Safety Network 7. Foundation and Slope Stability (SER 2.5.4 & 2.5.5) Taek-Mo SHIM k147stm@kins.re.kr Korea Institute of Nuclear Safety Structural Systems and Site Evaluation Department
More informationSandia National Laboratories
Photos placed in horizontal position with even amount of white space between photos and header The U.S. Deep Borehole Field Test Patrick V. Brady, Kristopher L. Kuhlman, David L. Sassani, Geoffrey A. Freeze,
More informationIntroduction and Background
Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern
More informationChapter 12 Subsurface Exploration
Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface
More informationHydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository
Presented at the COMSOL Conference 2010 Boston Hydro-Mechanical Modeling of a Shaft Seal in a Deep Geological Repository D. G. Priyanto Presented at COMSOL Conference 2010 Boston, 2010 October 7-9 Background
More informationCritical Borehole Orientations Rock Mechanics Aspects
Critical Borehole Orientations Rock Mechanics Aspects By R. BRAUN* Abstract This article discusses rock mechanics aspects of the relationship between borehole stability and borehole orientation. Two kinds
More informationChapter 1 Introduction
Chapter 1 Introduction 1.1 Statement of the Problem Engineering properties of geomaterials are very important for civil engineers because almost everything we build - tunnels, bridges, dams and others
More informationGEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1
GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding
More informationA new design approach for highway rock slope cuts based on ecological environment protection
A new design approach for highway rock slope cuts based on ecological environment protection T. Lian-jin, Z. Li, W. Yunjie, W. Guang-yuan & Z. Yin-tao College of Architecture and Civil Engineering, Beijing
More information10. GEOTECHNICAL EXPLORATION PROGRAM
Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in
More informationEngineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer
Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical
More informationUnderground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE
Underground Risk Management Course Marina Del Rey, California November, 2018 Geotechnical Data Reports Greg Raines, PE Gregory.Raines@Stantec.com Introduction What is a Geotechnical Data Report? The GDR
More information3D simulations of an injection test done into an unsaturated porous and fractured limestone
3D simulations of an injection test done into an unsaturated porous and fractured limestone A. Thoraval *, Y. Guglielmi, F. Cappa INERIS, Ecole des Mines de Nancy, FRANCE *Corresponding author: Ecole des
More informationNumerical investigation of EDZ development around a deep polymetallic ore mine
Paper No. 198 ISMS 2016 Numerical investigation of EDZ development around a deep polymetallic ore mine Mountaka Souley a *, Marwan Al Heib a, Vincent Renaud a a INERIS, c/o Ecole des Mines de Nancy, Campus
More informationDevelopment of the NUMO pre-selection, site-specific safety case
P.0 Development of the NUMO pre-selection, site-specific safety case 24 th November 2016, Vienna, Austria International Conference on the Safety of Radioactive Waste Management, IAEA Nuclear Waste Management
More informationThe Mine Geostress Testing Methods and Design
Open Journal of Geology, 2014, 4, 622-626 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojg http://dx.doi.org/10.4236/ojg.2014.412046 The Mine Geostress Testing Methods and Design
More informationTAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES
TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65
More informationENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods
ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design
More information1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition
Rock Engineering Practice & Design Lecture 12: Rock Stabilization Principles 1 of 46 Erik Eberhardt UBC Geological Engineering ISRM Edition Author s Note: The lecture slides provided here are taken from
More informationGeotechnical Models and Data Confidence in Mining Geotechnical Design
Geotechnical Models and Data Confidence in Mining Geotechnical Design Michael Dunn Principal Consultant (Geotechnical Engineering) Overview Geotechnical models Geotechnical model and design Data reliability
More informationHYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX
R. Gebrekristos, P.Cheshire HYDROGEOLOGICAL PROPERTIES OF THE UG2 PYROXENITE AQUIFERS OF THE BUSHVELD COMPLEX R. Gebrekristos Digby Wells Environmental P. Cheshire Groundwater Monitoring Services Abstract
More informationExpertise from Surface to Great Depths
Expertise from Surface to Great Depths Helsinki, Railway Line15 m Stockholm Waste Water Plant 45 m Tosbotn, Hydro Power tunnel 200 m ONKALO & Äspö HRL from 160 to 440 m Kylylahti Mine 400 m and 650 m Tara
More informationEmpirical Design in Geotechnical Engineering
EOSC433: Geotechnical Engineering Practice & Design Lecture 5: Empirical Design (Rock Mass Classification & Characterization) 1of 42 Erik Eberhardt UBC Geological Engineering EOSC 433 (2013) Empirical
More informationPredicting rock conditions ahead of the face
Predicting rock conditions ahead of the face Dr Thomas Dickmann, Product Manager Geophysics, Amberg Technologies AG Seismic methods of predicting rock conditions ahead of the tunnel face have developed
More informationAPPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE
APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE Calum Baker Applied Seismology Consultants Ltd., 10 Belmont, Shrewsbury, United Kingdom R. Paul
More informationHuaman A., Cabrera J. and Samaniego A. SRK Consulting (Peru) Introduction ABSTRACT
Managing and validating limited borehole geotechnical information for rock mass characterization purposes experience in Peruvian practice for open pit mine projects Huaman A., Cabrera J. and Samaniego
More informationNumerical modelling for estimation of first weighting distance in longwall coal mining - A case study
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Numerical modelling for estimation of first weighting distance in longwall coal
More informationCavity Expansion Methods in Geomechanics
Cavity Expansion Methods in Geomechanics by Hai-Sui Yu School of Civil Engineering, University of Nottingham, U. K. KLUWER ACADEMIC PUBLISHERS DORDRECHT / BOSTON / LONDON TABLE OF CONTENTS Foreword Preface
More informationCentral Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement
Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT
More information5.1 Conceptual Rock Mechanics Model and Its Component Parts
123 5 ROCK MECHANICS This chapter describes the Rock Mechanics Descriptive Modelling. The modelling uses the characterisation data listed in Section 2.3 and the resulting rock mechanics model will then
More information25th International Conference on Ground Control in Mining
ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris
More informationRock slope rock wedge stability
Engineering manual No. 28 Updated: 02/2018 Rock slope rock wedge stability Program: Rock stability File: Demo_manual_28.gsk The aim of the chapter of this engineering manual is to explain a rock slope
More informationImpact of permafrost on repository safety
Impact of permafrost on repository safety IGD TP Exchange Forum, Prague, 29 October 2013 Ton Wildenborg (TNO) Richard Shaw (BGS) Simon Norris (NDA) My presentation Uncertainties Permafrost related processes
More informationractical Geomechanics for Oil & Gas Industry
P ractical Geomechanics for Oil & Gas Industry Practical Geomechanics for Oil and Gas Industry The integrity of the wellbore plays an important role in petroleum operations including drilling, completion
More informationBorehole radar measurements aid structure geological interpretations
Ž. Journal of Applied Geophysics 43 2000 www.elsevier.nlrlocaterjappgeo Borehole radar measurements aid structure geological interpretations S. Wanstedt ), S. Carlsten, S. Tiren GEOSIGMA, Box 894, S-751
More informationN.Nikolaev Antech TFA ltd, Sofia, Bulgaria. V.Parushev University of Mining and Geology, Sofia, Bulgaria. S.Nikolaev Antech TFA Ltd.
17th International Mining Congress and Exhibition of Turkey- IMCET 2001, 2001, ISBN 975-395-417-4 An Approach for Selection and Design of Rock Bolting Systems N.Nikolaev Antech TFA ltd, Sofia, Bulgaria
More informationThermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface
Thermal and Mechanical Influence of a Deep Geological Repository in Crystalline Rock on the Ground Surface NWMO-TR-2016-15 October 2016 Ruiping Guo Nuclear Waste Management Organization Nuclear Waste Management
More informationHYDRAULIC INVESTIGATION OF THE EXCAVATION DISTURBED ZONE AROUND DRIFTS IN ROCK SALT
HYDRAULIC INVESTIGATION OF THE EXCAVATION DISTURBED ZONE AROUND DRIFTS IN ROCK SALT ABSTRACT Johannes Droste, Klaus Wieczorek, Ulrich Zimmer Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mbh D-381
More informationReliable in situ rock stress measurement from the excavation surface
Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_38_perras/ Reliable in situ rock
More informationFlin Flon Mining Belt
EOSC433: Geotechnical Engineering Practice & Design Lecture 7: Stress Analysis around Underground Openings 1 of 40 Erik Eberhardt UBC Geological Engineering EOSC 433 (2007) Flin Flon Mining Belt Since
More informationSYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE. METALLIFEROUS MINING OPTION Updated November 1998
CHAMBER OF MINES OF SOUTH AFRICA SYLLABUS AND REFERENCES FOR THE STRATA CONTROL CERTIFICATE METALLIFEROUS MINING OPTION Updated November 1998 1 PART 1 : THEORY 1.1 Basic principles of rock engineering
More information