1 Occupational Safety and Health Innovation Awards The Safe Working Practice of Changing Out a Raisebore Reaming Head Underground Brief Overview of Operation Eloise Mine, owned by Amalg Resources, is located 70km south-east of Cloncurry along the Landsborough Highway. Amalg Resources purchased the Eloise deposit and the surrounding exploration tenements, from BHP in The first ore was mined in The Eloise Copper Project is an underground operation, mining approximately 500,000t/annum and producing around 70,000t/annum of copper concentrate containing gold and silver credits. The mine has been operating for five years. Eloise mine consists of several orebodies. The main Levuka and Elrose lodes have been the focus of mining for the past five years and are offset by a main faulting structure (the Middle fault). For the mining operation to continue, a new development was required to access this offset lode known as Levuka South. The existing ventilation infrastructure was unsuitable to ventilate this area. Additional ventilation capacity in the correct location was necessary and a new ventilation shaft formed part of the planned development. A suitable design was agreed upon and work commenced on this stage of the Eloise underground development in May Brief Overview of Ventilation Shaft The ventilation shaft was established with the collaboration of various specialist contractors. These included Major Pontil, Raise Bore Australia (RBA), Townsville Engineering Industries (TEI), Jetcrete, Peabody Mining Services, Piling Contractors, Nortask, Australian Mining Consultants (AMC) and Hard Rock Electrical (HRE). All work was supervised and coordinated by Amalg Resources staff. Development of this shaft begun on the 20 th July, 2000 with Major Pontil drilling the pilot hole from the surface to the 700m Level. A total of 482.5m. An accuracy of 0.35m was achieved. This pilot hole was subsequently reamed to 370mm accommodate the raise bore rods. A foundation pad (incorporating the shaft collar) for the raisebore rig was constructed and the rig set in place to ream a 3.5m diameter shaft. The Eloise deposit is overlain with approximately 60m of cretaceous sediments. The presence of these soft sediments dictated that the shaft excavation be completed in two stages. RBA reamed to within 57m of the surface at the completed diameter of 3.5m and then lowered the reaming head to the 700mLevel and replaced it with a 660mm diameter head. The remaining 57m section was sunk (using the 660mm diameter as a pilot) with a large diameter piling rig (supplied and operated by Piling Contractors) and lined by Jetcrete with their remotely operated shotcreting system. 1

2 The Problem All stages of the ventilation shaft project were broken into identifiable sections. In association with the various contractors, risk assessments were conducted for the presink, pilot drilling, raiseboring, reaming and lining, and fan installation. Very early in these planning stages it was apparent that a significant risk was associated with servicing the raisebore cutter head. The only method of creating a safe environment for the servicing of a raisebore head is to completely isolate any workers or equipment from the potential fatal hazards of falling rocks down the shaft. Recently the use of an oxy acetylene lance had been adopted to cut through the drill string with the operation of the lance being conducted from a distance of at least 3m from shaft brow. With the drill string cut it is possible to remove the head from the shaft for service. After the rods have been lanced the rod string then must be withdrawn to the surface, the cut stabilizer removed, a new stabilizer fitted and then the rod string reinstated in the hole. For the Eloise vent shaft project this procedure would realistically take the best part of a week to complete. At least one such event as described was required at Eloise with others possible dependant upon cutter wear. The costs associated with this method are substantial and the risk of potential delay to the project was an issue. A further complication involved the imminent extinction of the stabilizer rods, which at the time were becoming an endangered species. In short the practice of using an oxy acetylene lance to slice the stabilizer (the rod above the raisebore head) is an expensive, time consuming solution to the problem, which with a little lateral thinking could be resolved in a more effective manner. The Solution Planning at Eloise was for at least one raisebore head replacement and, possibly several services if cutter wear warranted changing any raise bore cutters. Eloise Management and Raisebore Australia personnel discussed this problem and a solution was settled upon. It was decided that Eloise would undertake to design and fabricate an extended pair of breakout spanners to enable the raisebore head to be removed without personnel being exposed to the hazards identified in the risk assessment. The concept allowed for the spanners to be placed using an underground forklift, thus eliminating the need for any person to be within 3m of the shaft brow. The breakout spanners work in such a way that the jaw of the wrap-around spanner locks around the ribs of the stabilizer. The second spanner a conventional spanner is placed on the spanner flats of the stem rod. Once the jaws of the wrap-around spanner contour 2

3 themselves around the ribs a tight fit is achieved. With the spanners installed in the correct position, a rod connecting the ends of both spanners is fitted, along with a portapower ram. The ram is extended, forcing the two spanners together applying an anti-clockwise movement to the joint. The greater the force exerted between the wraparound spanner and conventional spanner the tighter the grip of the wrap-around spanner becomes. The force applied is sufficient to overcome the torque applied when initially tensioning the rods. The joint between the stem rod and the stabilizer rod is loosened. With this joint loose it is a simple matter to rotate the drill string in an anti-clockwise direction and remove the reaming head. The reaming head is removed from the shaft using a remote loader. Figure 1 Wrap-around (breakout) spanner around section of stabilizer rod. Concept drawings were completed on site and then forwarded to Amalg s mechanical engineer who performed strength of material calculations and provided several options dependant upon the availability of materials. The next problem was to find a fabricator. After initial consultation with Townsville Engineering Industries preliminary shop drawings of the breakout spanners were developed. As the ideas flowed modifications to these designs were implemented. TEI consulted with Raisebore Australia to confirm the forces that would be acting upon the spanners. It was determined that the spanners would be constructed of Bisalloy 80, 50 mm thick, with additional reinforcement around the jaws of the spanners. The wraparound spanner would be 3.85m in length and the conventional spanner 4.1m in length possibly the biggest spanners to hit North West Queensland! Due to the size of these spanners and the relatively close tolerances required for the system to operate correctly, a section of an old stabilizer rod was sent by RBA to Townsville Engineering Industries for testing. This allowed the system to be checked to ensure that it would work effectively before its arrival to site. The oversize spanners arrived to site in time for the changeout. 3

4 The raisebore cutters did not require service or replacement during the course of the back reaming. Once the shaft was reamed to within 57m of the surface at the finished dimension of 3.5m diameter, reaming was suspended and the raisebore head was lowered to the 700mlevel to replace it with the 660mm reaming head. Several days before changing over the raisebore head a detailed risk assessment was conducted with all the workers that would be carrying out work, both on the surface and at the 700mlevel. On the day of the change out everybody was briefed as to the job at hand and a JSA conducted, agreed upon and signed off by all working parties The procedure was as follows: 1. Establish communications between rig operator on surface and operators underground 2. Lower rods to the floor 3. Forklift hooks up the conventional spanner 4. Rotate rods and spanner around to the right hand wall (allowing sufficient room for the portapower and wrap-around spanner to be fitted) 5. Forklift hooks up second wrap-around spanner 6. Link two spanners together with connecting rod and portapower ram 7. Apply pressure via portapower to loose the rods 8. Spanners removed 9. After disconnecting rods, the stem rod and reaming head ere removed from the rod string 10. Raisebore head is dragged out with loader. 11. Connect 660mm raisebore head The breakout spanners and the work procedures performed as was hoped and the exercise to remove the 3.5m diameter reaming head and replace it with the 660mm diameter head was completed in around 2.5hours. No personnel were exposed to the dangers of falling rocks in the shaft and a delay to the overall project of around five days was avoided. As with any new work plan or system areas of improvement were apparent and should the need ever arise to create a mark two version these improvements would be incorporated. The Benefits and Applicability for Industry There are several benefits from this operation for the industry as a whole. It has been demonstrated that this system is an effective method that can be used to allow safe servicing and replacement of raise bore reaming heads. The Eloise application is not a peculiar situation. This system has application both nationally and internationally. This system provides a safe, economical, and timely solution to a common problem. What previously could have been a dangerous and expensive procedure can now be conducted with a minimum of people and equipment: a forklift and operator, a spotter and an operator for the Raisebore rig (on the surface). The spanners where passed over to Raisebore Australia at the completion of the shaft at Eloise. Since using the spanners at Eloise RBA have successfully used this system elsewhere. RBA used this system at BHP Cannington where again the system operated 4

5 safely and effectively. Some modifications have been made to the spanners in response to the lessons learned at Eloise. Doubtless further experience and use will promote other modifications. Cost An overall cost summary showing the various alternatives that could have been used follows: Alternative 1 Construct breakout spanners to break stabilizer rod from raise bore head. Changeout 3.5m raisebore head with the 660mm reaming head. Alternative 2 Cut stabilizer rod with oxy-acetylene. After being cut, drill string would have to be brought to the surface fitted with a new stabilizing rod and sent back down the hole to attach 660mm reaming head (At least 5 days standby). Alternative 1 Alternative 2 Spanners $11,124 - Delay Rates ($350/hr) $875 $42,000 Replacement Stabilizer rod - $15,000 Time to complete (hrs) Total Cost $11,999 $57,000 *Note The spanners were available at the completion of the project. Sold to RBA at cost Table 1 Cost Alternatives Alternative 1 was chosen. This alternative was the lowest cost. This alternative offered potential time savings. Early completion of the shaft project was seen to be advantageous. The whole operation ran smoothly and at completion was under budget and finished ahead of time. The result proves that innovations such as this can be implemented if a little thought goes into the initial design stages. 5

6 Figure 2 pulling the two spanners together Figure 3 view of conventional spanner in place Figure 4 spanners set up at the workshop Figure 5 breakout underway note spectators Figure 6 wrap-around spanner in place 6

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

ELOISE COPPER MINE 20 YEARS STRONG

ELOISE COPPER MINE 20 YEARS STRONG ELOISE COPPER MINE 20 YEARS STRONG 1973 Magnetic high anomaly on government air-mag survey Ground magnetic and gravity profiles 1975 Coincident gravity anomaly Savage Exploration s search for magnetite

More information

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NZQA unit standard New US6 to replace and version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able

More information

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland 1 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Axiom Nightflower Drilling Progress

More information

OFFSHORE. Advanced Weather Technology

OFFSHORE. Advanced Weather Technology Contents 3 Advanced Weather Technology 5 Working Safely, While Limiting Downtime 6 Understanding the Weather Forecast Begins at the Tender Stage 7 Reducing Time and Costs on Projects is a Priority Across

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project FOR IMMEDIATE RELEASE August 24 th, 2017 (VTT2017 NR # 9) Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project Vancouver, BC August 24 th, 2017 Vendetta

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

UNDERGROUND BLASTING. There are two reasons to go underground and excavate:

UNDERGROUND BLASTING. There are two reasons to go underground and excavate: UNDERGROUND BLASTING TUNNELING There are two reasons to go underground and excavate: i. to use the excavated space, e.g. for storage, transport etc. ii. to use the excavated material, e.g. mining and quarrying

More information

Practical guidelines for strain burst hazard awareness for development miners

Practical guidelines for strain burst hazard awareness for development miners Practical guidelines for strain burst hazard awareness for development miners Ryan R. Lyle, Sr. Geotechnical Engineer Alun Price Jones, Technical Director John Renaud, Safety and Training Coordinator (Totten)

More information

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling FOR IMMEDIATE RELEASE July 25 th, 2017 (VTT2017 NR # 7) Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling Vancouver, BC July 25 th, 2017 - Vendetta Mining

More information

Fletcher Junction Project Technical Update December 18, 2008

Fletcher Junction Project Technical Update December 18, 2008 Fletcher Junction Project Technical Update December 18, 2008 Disclaimer Warning! The business of Gold Exploration can be FUN, but it can also be hazardous to your physical, emotional, spiritual and financial

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam ASX / Media Release 12 June 2012 Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam HIGHLIGHTS A diamond drilling program will begin this week on the Me Xi Prospect, within the Quang Tri

More information

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016 Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production May 2016 Contents Location and Topography Geology and History Reserves and Strategic Timing Timeline/Mine Overview Conveyor Decline

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018 ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018 TRIAL BULK SAMPLING PROGRAMME COMPLETED AT BLACKRIDGE CONGLOMERATE-HOSTED GOLD PROJECT QUEENSLAND Approx 8.5 tonnes of samples collected covering

More information

Strategies for Combating Rock

Strategies for Combating Rock Strategies for Combating Rock Tod Michael Trenchless Product Manager, Vermeer Corporation Curt Dubbin Sale Manager HDD Division, Mincon Inc. Strategies for Combating Rock This presentation is intended

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information

University of Saskatchewan

University of Saskatchewan University of Saskatchewan Geological Engineering GEOE 498.3 Introduction to Mineral Engineering Lecture 2 Underground Mining Methods Bulk vs. Selective Reasons for Selection (Geotechnical, Geometry, Value,

More information

DECEMBER QUARTERLY REPORT

DECEMBER QUARTERLY REPORT DECEMBER QUARTERLY REPORT Resource Mining Corporation Limited ( RMC ) For the period ended 31 st December 2011 HIGHLIGHTS: Resource Mining Corporation Limited ABN: 97 008 045 083 Updated Mineral Resource

More information

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

SILVER CITY MINERALS LIMITED ABN Silver City Minerals ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 20 November 2014 SILVER CITY MINERALS SNAPSHOT BROKEN HILL (Ag-Pb-Zn) Project Review and Prioritization: Focus and Plan Razorback

More information

LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE

LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE During the first week of July 2018 work was completed by our Geologist, Richard Morris, and support personnel to stake the Lucky Ben vein structure at surface

More information

Portia Gold Mine Update

Portia Gold Mine Update 1 Portia Gold Mine Update South Australian Resources & Energy Investment Conference 20 April 2016 Dr Chris Giles Managing Director Havilah Resources LimitedDr Chris Giles, MD 20 April 2016 Dr Chris Giles

More information

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling

More information

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED December 6, 2004 IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland, Deputy

More information

Geotechnical Geotechnical Assessment

Geotechnical Geotechnical Assessment Site Investigation Site Investigation Pile Probing Pile Probing Geotechnical Logging Geotechnical and Sampling Logging and Sampling Streetworks and Utilities Streetworks Avoidance and Utilities Avoidance

More information

Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine

Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine Mitigation Plans for Mining in Highly Burst-Prone Ground Conditions at Vale Inco Copper Cliff North Mine Mike Yao Chief Ground Control Engineer, Mine Technical Services, Vale Inco, Sudbury, Canada D. Reddy

More information

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA 28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company

H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company RISK MANAGEMENT: H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S Tyler Sandell The Robbins Company PRESENTATION OUTLINE RISK MANAGEMENT IN DIFFICULT

More information

Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the Sorpresa Project

Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the Sorpresa Project 23 rd May 2013 Company Announcements Platform Australian Securities Exchange Diamond and RC Drilling Completed, RAB drilling extended - RAB holes show important geology continues to the south west at the

More information

PROGRESS GALLERY Advancing our projects

PROGRESS GALLERY Advancing our projects November 23, 2017. Ignition of the detonating cord for the first blast marked the start of development of the twin declines to access the ultra-high-grade Kakula Copper Discovery on the Tier One Kamoa-Kakula

More information

Saving on the Geotechnical Investigation A False Economy

Saving on the Geotechnical Investigation A False Economy Saving on the Geotechnical Investigation A False Economy G. S. Young 1, BE, MEngSc, FIEAust and W. Ellis 2. 1 Douglas Partners Pty Ltd, 96 Hermitage Road, West Ryde, NSW 2114 PH (02) 9809 0666; email:

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

PATENT PENDING. Easy Gripper product range. #94060 Easy Gripper #94095 Easy Gripper Compact Accessories. Improve SAFETY and efficiency

PATENT PENDING. Easy Gripper product range. #94060 Easy Gripper #94095 Easy Gripper Compact Accessories. Improve SAFETY and efficiency PATENT PENDING By Easy Gripper product range #94060 Easy Gripper #94095 Easy Gripper Compact Accessories Improve SAFETY and efficiency STANDARD OPTIONAL Your Easy Gripper Contact us to find out which Easy

More information

Early Exploration Plan Activity Information

Early Exploration Plan Activity Information Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of

More information

DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL

DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL Part No: 10-0550 OPERATING INSTRUCTIONS Congratulations! You ve just purchased one of the industry s top plow systems. The DRIFTER Plow System works great

More information

DUGALD RIVER. Expected mine life: 16 + years Resource (contained metal): 5.8 million tonnes zinc 1.0 million tonnes lead 67.8 million ounces silver

DUGALD RIVER. Expected mine life: 16 + years Resource (contained metal): 5.8 million tonnes zinc 1.0 million tonnes lead 67.8 million ounces silver DUGALD RIVER Location: Queensland, Australia Ore body type: Sediment-hosted zinc lead silver mineralisation Primary metal: Zinc Proposed mining method: Mechanised underground open stoping Expected mine

More information

SAMPLE ASSESSMENT TASKS PHYSICS ATAR YEAR 11

SAMPLE ASSESSMENT TASKS PHYSICS ATAR YEAR 11 SAMPLE ASSESSMENT TASKS PHYSICS ATAR YEAR Copyright School Curriculum and Standards Authority, 204 This document apart from any third party copyright material contained in it may be freely copied, or communicated

More information

For personal use only

For personal use only 15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill

More information

Structurally controlled instability in tunnels

Structurally controlled instability in tunnels Structurally controlled instability in tunnels Introduction In tunnels excavated in jointed rock masses at relatively shallow depth, the most common types of failure are those involving wedges falling

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

COMPARISON OF DIFFERENT HARD ROCK DRILLING METHODS FOR BORED PILES

COMPARISON OF DIFFERENT HARD ROCK DRILLING METHODS FOR BORED PILES COMPARISON OF DIFFERENT HARD ROCK DRILLING METHODS FOR BORED PILES ABSTRACT Martin Larisch 1 Piling Contractors Pty Ltd, Brisbane, Australia Drilling penetration into rock becomes more difficult with increasing

More information

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018 Periodic Inspection and Testing of Electrical Installations Sample Test (2391-051) Version 1.3 July 2018 Sample Questions Version and date Change detail Section 1.3 July 2018 Modified questions/answers

More information

Module 1 : Site Exploration and Geotechnical Investigation

Module 1 : Site Exploration and Geotechnical Investigation Objectives In this section you will learn the following Displacement borings Wash boring Auger boring Rotary drilling Percussion drilling Continuous sampling Boring methods of exploration The boring methods

More information

Sample Header for slide

Sample Header for slide Sample Header for slide Consultants in Geology and Engineering North Rim Strategic Sourcing Tabetha Stirrett, P. Geo. October 22, 2014 Outline Exploration Phases in the mining industry How North Rim is

More information

Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit

Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit FOR IMMEDIATE RELEASE September 19 th, 2017 (VTT2017 NR # 10) Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit Vancouver, BC September 19 th, 2017 Vendetta Mining Corp. (the

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

Facilities and Recreation Department Cemetery Division

Facilities and Recreation Department Cemetery Division Facilities and Recreation Department Cemetery Division A Pictorial Essay and Guide to the inner workings of the Forest Hill Cemetery Derry, New Hampshire Welcome to Forest Hill Cemetery. The Cemetery is

More information

For personal use only

For personal use only 1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements

More information

Tornado Drill Exercise Plan (EXPLAN)

Tornado Drill Exercise Plan (EXPLAN) Tornado Drill Exercise Plan (EXPLAN) As part of the National Weather Service s (NWS) Severe Weather Preparedness Week in Indiana Purdue University March 19, 2019 As of Feb 19, 2019 TABLE OF CONTENTS Introduction...

More information

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G

IODP Expedition 341S: SCIMPI and 858G ReCORK. Week 1 Report (19 27 May 2013) Operations. Victoria Port Call and Transit to Hole 858G IODP Expedition 341S: SCIMPI and 858G ReCORK Week 1 Report (19 27 May 2013) Operations Victoria Port Call and Transit to Hole 858G IODP SCIMPI and 858G ReCORK Expedition (341S) officially began when the

More information

ITASCA Consulting Canada Inc.

ITASCA Consulting Canada Inc. Forward Thinking Engineering World leaders in geomechanics, hydrogeology and microseismicity. Solving problems for clients in the mining industry. Itasca offers advanced, first-hand knowledge of mining

More information

Building on Past Experiences Worker Safety

Building on Past Experiences Worker Safety EOSC433: Geotechnical Engineering Practice & Design Lecture 11: Rock Stabilization Principles 1 of 43 Erik Eberhardt UBC Geological Engineering EOSC 433 (2016) Building on Past Experiences Worker Safety

More information

DRIFTER PLOW-IN-A-BOX

DRIFTER PLOW-IN-A-BOX DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL Part No: 10-0550 OPERATING INSTRUCTIONS Congratulations! You ve just purchased one of the industry s top plow systems. The DRIFTER Plow System works great

More information

Example. 6.6 Fixed-Level Testing 6.7 Power ( )

Example. 6.6 Fixed-Level Testing 6.7 Power ( ) 6.6 Fixed-Level Testing 6.7 Power ( ) Example Suppose you are writing a contract between the producer of spliced ropes and the consumer, a parachute maker needing lines to attach a canopy to a harness.

More information

Oposura Scoping Study Nearing Completion

Oposura Scoping Study Nearing Completion 20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near

More information

GERDA TG4 - Cryogenic Vessel. Status Report

GERDA TG4 - Cryogenic Vessel. Status Report GERDA TG4 - Cryogenic Vessel Status Report K.T.Knöpfle MPI Kernphysik, Heidelberg ktkno@mpi-hd.mpg.de GERDA Collaboration Meeting at Tübingen 9-11 November 2005 Outline Safety Review Impact on / Update

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

Provincial Standards for Early Exploration

Provincial Standards for Early Exploration Introduction Provincial Standards for Early Exploration Effective April 10, 2018 These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early

More information

For personal use only

For personal use only Madagascar Graphite Project Update Drilling Continuing on Main Zone New SW Zone Confirmed Trenching Programme Commenced Cougar Metals NL (ASX Code: CGM) is pleased to provide an update on its exploration

More information

Installation instructions, accessories. Snow chains

Installation instructions, accessories. Snow chains Instruction No 30664147 Version 1.0 Part. No. Snow chains R7700468 страница 1 / 15 Equipment A0000162 R7700458 страница 2 / 15 R7700448 страница 3 / 15 INTRODUCTION Read through all of the instructions

More information

Market Release October

Market Release October Market Release October 21 2009 Extremely High-grade Molybdenite Zone Christened Little Wizard High-Value JORC Resource Defined Near Merlin Decline Drilling Extends New High-grade Molybdenum Discovery at

More information

3-3 Using Tables and Equations of Lines

3-3 Using Tables and Equations of Lines 3-3 Using Tables and Equations of Lines Objectives Students will understand that linear models are appropriate when the situation has a constant increase/decrease. slope is the rate of change. the rate

More information

confront fury

confront fury confront WINTER S fury WITH A COTECH SNOW PLOW www.cotech.ca table of content mission...2 Snow Removal Equipment...4 Snow plows with a trip system... 4 Extendable Reversible Snow Plows... 6 Inverted Snow

More information

Hope Brook gold mine, NL - Copper, then switched to gold

Hope Brook gold mine, NL - Copper, then switched to gold Chapter 12 : Mining in NL Defined as the extraction of valuable minerals from Earth from an ore body, vein, or seam. A mineral is any chemical substance arranged in some crystalline structure. - must have

More information

Optimising the economic impact of 3D Laser scanning in Copper mining. by Kalumba Bwale, Lubambe Copper Mine Ltd

Optimising the economic impact of 3D Laser scanning in Copper mining. by Kalumba Bwale, Lubambe Copper Mine Ltd Optimising the economic impact of 3D Laser scanning in Copper mining by Kalumba Bwale, Lubambe Copper Mine Ltd Characteristics of Lasers Gain and Inverse Population For four-level laser Boltzmann distribution

More information

7 Years of Cutting Edge Technology for the Mining Industry in Canada

7 Years of Cutting Edge Technology for the Mining Industry in Canada 7 Years of Cutting Edge Technology for the Mining Industry in Canada Verena Schreiner, BAUER Resources Canada Ltd The Bauer Group The Bauer Group The Bauer Group Segment Resources Three Main Competences

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

Saskatchewan s Mineral Resources Lesson: Exploring for Minerals in Saskatchewan: Stream Sediment and Soil Sampling

Saskatchewan s Mineral Resources Lesson: Exploring for Minerals in Saskatchewan: Stream Sediment and Soil Sampling Saskatchewan s Mineral Resources Lesson: Exploring for Minerals in Saskatchewan: Stream Sediment and Soil Sampling Overview In this activity, students use information from geochemical surveys (stream sediment

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project

Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 1st August, 2013 Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project ABM Resources NL ( ABM or The Company ) presents an update on the Trial

More information

CONFERENCE STATEMENT

CONFERENCE STATEMENT Final draft CONFERENCE STATEMENT We, the elected representatives of Canada, Denmark/Greenland, the European Parliament, Finland, Iceland, Norway, Russia, Sweden and the United States of America; In collaboration

More information

ISTANBUL STRAIT ROAD TUBE CROSSING

ISTANBUL STRAIT ROAD TUBE CROSSING ISTANBUL STRAIT ROAD TUBE CROSSING One of the three major projects at cross path of Europe and Asia 3 rd Bosphorous Bridge Crossing New International Airport Eurasia Tunnel Total Length 14.6 km Part 1

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Laboratory Chemical Hood Hibernation

Laboratory Chemical Hood Hibernation 1.0 Purpose Fume hoods that are candidates for temporary decommissioning are those that are not being used and can be shut off for at least 3 months. The purpose of this document is to define the temporary

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

Dilution and ore loss A short practical guide

Dilution and ore loss A short practical guide Dilution and ore loss A short practical guide Following are a few helpful pointers when dealing with dilution and ore loss. Please refer to the suggested reading list that is at the bottom of this paper

More information

Drilling program commences on Cloncurry and Mount Isa projects

Drilling program commences on Cloncurry and Mount Isa projects 1P P May UASX/Media Announcement st 2009 Drilling program commences on Cloncurry and Mount Isa projects Key Points 1,700 metres reverse circulation drilling program over two prospects on untested geochemical,

More information

Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street, Mobile, Alabama Prepared by:

Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street, Mobile, Alabama Prepared by: Final Site-Specific Unexploded Ordnance Safety Plan Attachment Site Investigation at Artillery and Mortar Impact Areas South of Bains Gap Road, Parcels 138Q-X, 139Q-X, 140Q-X, 141Q-X, and 142Q-X Fort McClellan,

More information

Mining method optimisation of Bayi gold mine based on the value engineering principle

Mining method optimisation of Bayi gold mine based on the value engineering principle Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_41_cai/ Mining method optimisation

More information

Service Information Letter SIL # 017

Service Information Letter SIL # 017 Service Information Letter SIL # 017 Trunnion Adjustment - Double Barrels Only Equipment: Double Barrels With Sloped Trunnions Date Issued: 9-24-03 Additional Reference: SIL # 016 Revised: Revision #:

More information

For personal use only

For personal use only Citadel Project LandTEM Electromagnetic Survey Detailed Update No. 1 Magnum Unlocked Corker Unearthed Highlights The LandTEM electromagnetic survey showed the Magnum Deposit to have a significant electromagnetic

More information

For personal use only

For personal use only ASX Announcement ASX: ERM ABN: 53 117 086 745 June 18, 2015 Seismic Survey to underpin future gold discoveries at Tennant Creek First application of seismic geophysics to the Tennant Creek Mineral Field

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 August 2012 DRILLING SUCCESS CONTINUES AT GUCHAB Near surface copper mineralisation in drill core from GCDD0002 HIGHLIGHTS The pilot programme of diamond drilling at Guchab continues

More information

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Summary The main shaft at the Prestwood mine has been fully rehabilitated to 4

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

BARBERTON GOLD MINES OPERATIONS AT SA S OLDEST GOLD MINE

BARBERTON GOLD MINES OPERATIONS AT SA S OLDEST GOLD MINE BARBERTON GOLD MINES OPERATIONS AT SA S OLDEST GOLD MINE DISCLAIMER This presentation is provided on a confidential basis. The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries

More information

Forces in Earth s Crust

Forces in Earth s Crust Name Date Class Earthquakes Section Summary Forces in Earth s Crust Guide for Reading How does stress in the crust change Earth s surface? Where are faults usually found, and why do they form? What land

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

For personal use only

For personal use only ASX Announcement 7 February 2017 ASX Code: VKA High grade soil and rock chip anomaly identified at Khao Soon Tungsten Project, Thailand 24 soil samples averaging 1300ppm or 0.13% WO3. 9 soil samples average

More information

CHEMICAL SAFETY. 2.1 DOE O 231.1, Environment, Safety, and Health Reporting

CHEMICAL SAFETY. 2.1 DOE O 231.1, Environment, Safety, and Health Reporting Chemical Safety Page 1 of 9 1.0 Objective The objective of this surveillance is to ensure that practices for handling, using and storing dangerous or toxic chemicals provide effective protection of the

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information