Flood and Stream Restoration

Similar documents
APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Assessment. Assessment

CASE STUDIES. Introduction

Why Geomorphology for Fish Passage

NORTHUMBERLAND COUNTY, PA

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Appendix F Channel Grade Control Structures

Instream Erosion Control General

Appendix F. Fluvial Geomorphology Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix 5 Fluvial Geomorphological Detailed Information

Why Stabilizing the Stream As-Is is Not Enough

Rapid Geomorphic Assessments: RGA s

Tom Ballestero University of New Hampshire. 1 May 2013

Rock Sizing for Small Dam Spillways

Rock Sizing for Multi-Pipe & Culvert Outlets

Fish Passage at Road Crossings

C. STUDENT FIELD DATA SHEETS

Rock Sizing for Waterway & Gully Chutes

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

Degradation Concerns related to Bridge Structures in Alberta

Fluvial Driven Alluvial Fans

Four Mile Run Levee Corridor Stream Restoration

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Working with Natural Stream Systems

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Field Trip Number One. By: Pat Dryer. Geography 360

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

Rock Sizing for Batter Chutes

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

BUREAU OF CLEAN WATER. Appendix C Biological Field Methods C1. Habitat Assessment DECEMBER 2013

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Chapter 3 Erosion in the Las Vegas Wash

Clyde River Landslide

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

Do you think sediment transport is a concern?

Materials. Use materials meeting the following.

Countermeasure Calculations and Design

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

TPDES: Soil, Erosion and Sedimentation Methods

Black Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2007 Vail Pass, Colorado

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

APPENDIX B WORKSHEETS & EXHIBITS

Step 5: Channel Bed and Planform Changes

Geomorphic Assessment of City Center Athletic Club Development Impacts on Existing Stream Channel Stability, Lenexa, KS.

The last three sections of the main body of this report consist of:

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Case Study 14. Rocky Creek Vented Box Culvert Ford

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Forest Service AOP Meeting Objectives of Stream Simulation: Examples and Talking Points

Sherman Falls -Virtual Field Trip-

2. Background/Overview of Conditions

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

Stony Creek Drain System Geomorphic Maintenance Assessment

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

Rock Sizing for Bank Stabilisation

3. MARINE HABITAT RESTORATION

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Urfe Creek Geomorphic Assessment William Jackson Drive and Earl Grey Avenue City of Pickering Regional Municipality of Durham

Garner State Park Pavilion Preservation Study

Upper Mississippi River Basin Environmental Management Program Workshop

Appendix E Methods for Streambed Mobility/Stability Analysis

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

December 11, 2006 File:

Erosion Surface Water. moving, transporting, and depositing sediment.

6.11 Naas River Management Unit

GEOL 652. Poudre River Fieldtrip

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A

Long Valley Meadow Restoration Project

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Ways To Identify Background Verses Accelerated Erosion

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Black Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2008 Vail Pass, Colorado. Prepared for: Eagle River Watershed Council

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Important Copyright Information

Flooding in Dolgellau

SELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

3.12 Geology and Topography Affected Environment

FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

STRUCTURAL STABILITY ASSESSMENT

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

Appendix S Geomorphic Assessment

Session 1 Healthy Streams Stream Hydraulics Natural Channel Design

Fish Passage and Abundance around Grade Control Structures on Incised Streams in Western Iowa

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Griswold Creek August 22, 2013

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Appendix E Rosgen Classification

Transcription:

2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure 5 6 7 8 Slumping gabions exposing bridge support, scouring in channel at base Crib wall (RB) large sand bar along LB Concrete pad crossing flush with bed, water flows across Bottom layer of gabions scroued out at bridge and US 9 0 2 Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation Gabion failure scoured at base and pushed away from bank by flow from US 3 Failed gabions creating mid-channe bar, LB has exposed till in bank and bed 4 Slope instability large armoutstone protecting, some blocks failing, manhole potentially at risk 5 Gabions leaning, slumping and scoured throughout downstream of the reach 6 Concrete pad crossing flush with bed, overlapping by flow 7 Lower level of gabions has eroded away resulting in slumping of upper level exposing bridge support 8 Combined pipe exposed in bed from mid-channel to right bank 9 Beneath left part of bridge gabions scoured at base first level is empty of material 20 Bridge currently being replaced 2 Bank top has eroded back to edge of trail, gabions at base of bank are entact 22 Small CSP partially eroded out of bank 23 Bank blown out, eroding, trail potentailly at risk 24 Loss of material near bridge desk where it connects to trail 25 CSP discharging from LB, crossing is covered with gravel material, possibly previously exposed 26 Gabions failed bank blown out across from outfall 27 Bridge currently being replaced 28 Outfall elevated with concrete pad for dissipation, rip rap leading to channel. A large piped coming from the parking lot lies on top of the outfall. Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 2 3 4 5 6 7 8 0 9 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures 5-0 years 208-2020 completed Taylor Creek ESA Boundary Area Area & 2 unknown 3, 207

leigh-notley Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures Stormwater Management Facility 0-5 years 5-0 years 208-2020 completed Taylor Creek ESA Boundary Warden Woods ESA Boundary Area 3 & 4 Area 2 unknown 3, 207

08 07 77 78 79 80 8 82 83 Corrugated steel retaining wall to protect outfalls Slope eroding next to culvert Culvert creating scour pool Failed gabions and bank erosion Rip-rap bank protection Lateral bar and sand deposition Eroding bank throughout full extent of bend approaching trail 94 95 Failed gabions, debris jams, bend is severely eroded Pedestrian bridge, undersized both footings exposed, right bank more severely 96 Bank erosion 97 98 99 Manhole casing exposed at edge of channel bed On downstream side of bridge, slope is eroding on either side exposing sides of bridge Manhole casing exposed on channel bank 84 Large lateral bar 00 Bank erosion 04 06 02 0 03 05 85 86 87 88 89 Steel weir to protect sewer crossing; erosion along LB DS of weir Large log/debris jam Bank erosion and undercutting US and DS of outfall on RB Undersized pedestrian bridge will need replacing Outfall elevated approx. m above bed, scour pool 0 Severely eroding valley wal contact 02 Manhole casing exposed at base of bank 03 Eroding valley wall contact, woody debris jam in channel 04 Eroding bank, scour pool, lateral sand bar 05 Bank eroding, concrete rubble in channel, woody debris 93 94 95 96 97 99 00 98 90 9 92 93 Amourstone and concrete retaining wall Woody debris in channel Scour pools at base of outfalls, dissipation structures old and decaying Exposed sanitary sewer in channel bed, concrete/urban debris jams 06 Manhole casing exposed at top of bank 07 Gabion wall (both banks) 08 Localized bank failure Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 9 92 83 84 85 86 87 88 89 90 8 82 78 79 80 77 Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures Stormwater Management Facility 0-5 years 5-0 years unknown Warden Woods ESA Boundary Area 5 & 6 Area 3 3, 207

09 0 Storm outfall with gabion wall (RB) Storm outfall, bank stability Gabion wall (RB) outflanked, 2 Pedestrian bridge 3 Utility pole near bank failure 9 Concrete-lined channel (Birchmount to Eglinton) 20 2 Some rock in channel creating minimal bed features Channel bed is interlock pieces of concrete and low concrete banks beyond which banks are embankments 26 27 28 29 Outfall eroded out of bank broken piece in channel Outfall creating scour pool Natural channel bed throughout upstream portion of reach Elevated concrete spillway 4 5 Gabion wall (LB) Pedestrian bridge with exposed footings 6 Perched culverts 7 Exposed geoweb and failed gabion 8 Localized slope failure 22 23 Some gravel material on channel bed creating poorly formed riffles or bars Paved concrete bed natural bank vegetation 24 Natural channel bed 25 Severe slope erosion trail at risk 30 Concrete along base of bank across from outfalls 3 Bank erosion 32 Elecated outfall Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 6 5 4 8 7 2 3 0 09 9 32 3 29 30 20 28 27 26 24 25 23 22 2 TRCA Erosion Control Structures 0-5 years 5-0 years Area 7 Area 4 unknown. April 3, 207

Taylor Massy Creek Sub-Watershed 33 Small elevation drop in concrete 34 Exposed manholes along banks 35 Vegetation in channel on banks 36 Small lateral bar forming 37 Small areas of gravel deposition 38 Vegetated bar upstream of rail crossing 39 40 4 42 Vegetated bar upstream of crossing Vegetated bar downstream of crossing Channel is heavily vegetated with cattails and phragmites through extent of hydro corridor Small amount of bank erosion downstream of pedestrian bridge 43 Some sand accumulation Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 35 34 33 36 42 4 40 39 38 37 43 Stormwater Management Facility Area 8 Area 5. April 3, 207