2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure 5 6 7 8 Slumping gabions exposing bridge support, scouring in channel at base Crib wall (RB) large sand bar along LB Concrete pad crossing flush with bed, water flows across Bottom layer of gabions scroued out at bridge and US 9 0 2 Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation Gabion failure scoured at base and pushed away from bank by flow from US 3 Failed gabions creating mid-channe bar, LB has exposed till in bank and bed 4 Slope instability large armoutstone protecting, some blocks failing, manhole potentially at risk 5 Gabions leaning, slumping and scoured throughout downstream of the reach 6 Concrete pad crossing flush with bed, overlapping by flow 7 Lower level of gabions has eroded away resulting in slumping of upper level exposing bridge support 8 Combined pipe exposed in bed from mid-channel to right bank 9 Beneath left part of bridge gabions scoured at base first level is empty of material 20 Bridge currently being replaced 2 Bank top has eroded back to edge of trail, gabions at base of bank are entact 22 Small CSP partially eroded out of bank 23 Bank blown out, eroding, trail potentailly at risk 24 Loss of material near bridge desk where it connects to trail 25 CSP discharging from LB, crossing is covered with gravel material, possibly previously exposed 26 Gabions failed bank blown out across from outfall 27 Bridge currently being replaced 28 Outfall elevated with concrete pad for dissipation, rip rap leading to channel. A large piped coming from the parking lot lies on top of the outfall. Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 2 3 4 5 6 7 8 0 9 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures 5-0 years 208-2020 completed Taylor Creek ESA Boundary Area Area & 2 unknown 3, 207
leigh-notley Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures Stormwater Management Facility 0-5 years 5-0 years 208-2020 completed Taylor Creek ESA Boundary Warden Woods ESA Boundary Area 3 & 4 Area 2 unknown 3, 207
08 07 77 78 79 80 8 82 83 Corrugated steel retaining wall to protect outfalls Slope eroding next to culvert Culvert creating scour pool Failed gabions and bank erosion Rip-rap bank protection Lateral bar and sand deposition Eroding bank throughout full extent of bend approaching trail 94 95 Failed gabions, debris jams, bend is severely eroded Pedestrian bridge, undersized both footings exposed, right bank more severely 96 Bank erosion 97 98 99 Manhole casing exposed at edge of channel bed On downstream side of bridge, slope is eroding on either side exposing sides of bridge Manhole casing exposed on channel bank 84 Large lateral bar 00 Bank erosion 04 06 02 0 03 05 85 86 87 88 89 Steel weir to protect sewer crossing; erosion along LB DS of weir Large log/debris jam Bank erosion and undercutting US and DS of outfall on RB Undersized pedestrian bridge will need replacing Outfall elevated approx. m above bed, scour pool 0 Severely eroding valley wal contact 02 Manhole casing exposed at base of bank 03 Eroding valley wall contact, woody debris jam in channel 04 Eroding bank, scour pool, lateral sand bar 05 Bank eroding, concrete rubble in channel, woody debris 93 94 95 96 97 99 00 98 90 9 92 93 Amourstone and concrete retaining wall Woody debris in channel Scour pools at base of outfalls, dissipation structures old and decaying Exposed sanitary sewer in channel bed, concrete/urban debris jams 06 Manhole casing exposed at top of bank 07 Gabion wall (both banks) 08 Localized bank failure Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 9 92 83 84 85 86 87 88 89 90 8 82 78 79 80 77 Planned Stream Projects ( S year horizon) TRCA Erosion Control Structures Stormwater Management Facility 0-5 years 5-0 years unknown Warden Woods ESA Boundary Area 5 & 6 Area 3 3, 207
09 0 Storm outfall with gabion wall (RB) Storm outfall, bank stability Gabion wall (RB) outflanked, 2 Pedestrian bridge 3 Utility pole near bank failure 9 Concrete-lined channel (Birchmount to Eglinton) 20 2 Some rock in channel creating minimal bed features Channel bed is interlock pieces of concrete and low concrete banks beyond which banks are embankments 26 27 28 29 Outfall eroded out of bank broken piece in channel Outfall creating scour pool Natural channel bed throughout upstream portion of reach Elevated concrete spillway 4 5 Gabion wall (LB) Pedestrian bridge with exposed footings 6 Perched culverts 7 Exposed geoweb and failed gabion 8 Localized slope failure 22 23 Some gravel material on channel bed creating poorly formed riffles or bars Paved concrete bed natural bank vegetation 24 Natural channel bed 25 Severe slope erosion trail at risk 30 Concrete along base of bank across from outfalls 3 Bank erosion 32 Elecated outfall Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 6 5 4 8 7 2 3 0 09 9 32 3 29 30 20 28 27 26 24 25 23 22 2 TRCA Erosion Control Structures 0-5 years 5-0 years Area 7 Area 4 unknown. April 3, 207
Taylor Massy Creek Sub-Watershed 33 Small elevation drop in concrete 34 Exposed manholes along banks 35 Vegetation in channel on banks 36 Small lateral bar forming 37 Small areas of gravel deposition 38 Vegetated bar upstream of rail crossing 39 40 4 42 Vegetated bar upstream of crossing Vegetated bar downstream of crossing Channel is heavily vegetated with cattails and phragmites through extent of hydro corridor Small amount of bank erosion downstream of pedestrian bridge 43 Some sand accumulation Source: Geomorphic and Habitat Systems Study, Parrish Engineering 203 35 34 33 36 42 4 40 39 38 37 43 Stormwater Management Facility Area 8 Area 5. April 3, 207