Figure 6.1 Locations of dams and major damaged dams

Similar documents
Investigation of Liquefaction Failure in Earthen Dams during Bhuj Earthquake

Address for Correspondence

9. SLOPE AND EMBANKMENT FAILURES

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

Foundations on Deep Alluvial Soils

STRUCTURAL STABILITY ASSESSMENT

Geotechnical damage in rural areas caused by the 2015 Gorkha Nepal Earthquake

Safety analyses of Srinagarind dam induced by earthquakes using dynamic response analysis method.

CCR Rule Annual Inspection Report (cont.) 2

Geology 229 Engineering Geology Lecture 27. Earthquake Engineering (Reference West, Ch. 18)

LIQUEFACTION INDUCED GROUND FAILURES CAUSED BY STRONG GROUND MOTION

Lab 12: Mass Wasting

Important Concepts. Earthquake hazards can be categorized as:

Released Science Inquiry Task Location Grade 11

PROBLEMS AND SOLUTIONS THAT MAY EMERGE IN THE FOUNDATION AND BODY OF A HOMOGENEOUS FILL DAM ON A WEAK CLAYEY-SILTY-SANDY FORMATION ÇIKRIKÇI DAM

Impacts of 2014 Chiangrai Earthquake from Geotechnical Perspectives

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

appendix e: geologic and seismic hazards

Module 8 SEISMIC SLOPE STABILITY (Lectures 37 to 40)

SECTION 3. Housing. EAppendix E GEOLOGIC AND SEISMIC HAZARDS

PERENNIAL PROBLEM OF EARTHEN BUND OF WELLINGDON RESERVOIR. ANALYSIS OF CAUSES AND REMEDIAL MEASURES A CASE STUDY.

NPTEL Online - IIT Kanpur. Course Name Geotechnical Earthquake Engineering. Department IIT Kanpur

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence

Seismic Analysis of Siri Dam Using Pseudo-Static Approach

GG101 Lecture 22: Mass Wasting. Soil, debris, sediment, and broken rock is called regolith.

4.5 GEOLOGY AND SOILS

The 2011 Tohoku earthquake and dams

PREDICTION OF FROST HEAVE INDUCED DEFORMATION OF DYKE KA-7 IN NORTHERN QUEBEC

Mass Wasting. Revisit: Erosion, Transportation, and Deposition

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

PHYSICAL SCIENCE FINAL

High-Precision Strength Evaluation of Rock Materials and Stability Analysis for Rockfill Dams

CONSTRUCTION OF A DATA BASE SYSTEM FOR IRRIGATION DAMS

Fujinuma Dam Performance during 2011 Tohoku Earthquake, Japan and Failure Mechanism by FEM

Nipigon River Landslide, Ontario, Canada

Clyde River Landslide

Earthquake Risk Assessment of Flood Protection Assets in the Wellington Region

The Seismic Performance of Tousheh Dam During the Chi-Chi Earthquake

PREDICTING UNDERSEEPAGE OF MASONRY DAMS Published in Proceedings of 29 th ASDSO Conference, Hollywood, FL, Sept Oct. 1, 2009.

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Geosynthetics Applications and Performance Reviews Select Case Histories

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

A River Runs Through It

Natural hazards in Glenorchy Summary Report May 2010

Elastic Rebound Theory

High Impact Forces of Nature Hazards in and Around Rocky Mountain National Park

Liquefaction and Foundations

Gravity dam and earthquake

GEOLOGY, SOILS, AND SEISMICITY

TSEGI WASH 50% DESIGN REPORT

Earthquake hazards. Aims 1. To know how hazards are classified 2. To be able to explain how the hazards occur 3. To be able to rank order hazards

Rock & Aggregate Drop Inlet Protection

STEVENS CREEK DAM SEISMIC STABILITY EVALUATIONS OF CHESBRO, LENIHAN, STEVENS CREEK, AND UVAS DAMS (SSE2) PHASE A: STEVENS CREEK AND LENIHAN DAMS

2.3 Notes: Earthquake Damage Can Be Reduced

Study of the liquefaction phenomenon due to an earthquake: case study of Urayasu city

Floods Lecture #21 20

Local Scouring due to Flow Jet at Downstream of Rectangular Sharp-Crested Weirs

Analysis of soil failure modes using flume tests

EARTHQUAKE SAFETY OF AN ARCH-GRAVITY DAM WITH A HORIZONTAL CRACK IN THE UPPER PORTION OF THE DAM

Chapter 11 10/30/2013. Mass Wasting. Introduction. Factors That Influence Mass Wasting. Introduction. Factors That Influence Mass Wasting

SEISMIC RESPONSE OF A SANDY STRATUM WITH A SILT LAYER UNDER STRONG GROUND MOTIONS

A physical feature of the Earth s surface

Connecticut Coastal Management Program

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

Assessment Schedule 2015 Earth and Space Science: Demonstrate understanding of the causes of extreme Earth events in New Zealand (91191)

Earthquakes and Earth s Interior

Chapt pt 15 er EARTHQUAKES! BFRB P 215 ages -226

Soft-sediment deformation in deltaic sediments

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

LANDSLIDE HAZARDS. presented during the. TRAINING-WORKSHOP ON DISASTER RISK MANAGEMENT Rakdell Inn Virac, Catanduanes 03 July 2008

Assessment of the Post-earthquake Safety and the Maximum Anti-Seismic Capability of Zipingpu Concrete Face Rockfill Dam

Earth s Changing Surface

Landslide FE Stability Analysis

Preliminaries to Erosion: Weathering and Mass Wasting

Behaviour of Earth Dam under Seismic Load Considering Nonlinearity of the Soil

Earth s Dynamic Surface

What is fracking? An information flipbook on shale and tight gas drilling and fracking

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Rock Sizing for Waterway & Gully Chutes

December 11, 2006 File:

Session: For more information:

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Assessment of heterogeneity of an internal structure of an earth-fill embankment with 2-D resistivity survey

Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

State the principle of uniformitarianism. Explain how the law of superposition can be used to determine the relative age of rocks.

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Mass Wasting. Mass Wasting. Earth s s External Processes

3.1 GEOLOGY AND SOILS Introduction Definition of Resource

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

CHAPTER 2: GROUND FAILURE GROUND FISSURES

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Sand Storage Dams Performance, cost-efficiency, working principles and constraints

DISTRIBUTION of WATER RESOURCES

Earthquake Notes. Earthquakes occur all the time all over the world, both along plate edges and along faults.

CASE STUDY BINGA, PHILIPPINES

Transcription:

6 DAMS Most of the dams are earth dams except a few which are stone masonary built. The dams are built for irrigational purposes. The list of major medium size dams is given in Table 6.1 There are more than 174 earth dams in the region. Figure 6.1 shows the location of dams. Seven medium sized dams and 14 small sized dams in Kutch were damaged. The major damaged dams are shown in the figure. Figure 6.1 Locations of dams and major damaged dams SUVI DAM: Suvi dam is built nearby Lilpar which is north of the presumed fault. The east-west length of the dam is about 2.7km. The crest of the dam is 3.66m wide and the bottom is 87m wide (Figure 6.2). The crest height is 15m. It is completed in 1666 for irrigation and water supply purposes. The position of the dam is 23 o 36 55 N;70 o 26 64 E. While the upstream side of the dam had multiple longitudinal cracks indicating to movement towards to the reservoir (Figure 6.3 and 6.4), no visible cracks were observed on the downstream side. The longitudinal direction of the dam was EW. The direction of the sliding took place towards the epicenter. Huge sliding occurred along a section, which was the old river course. It seems that the soil below may be liquefied. The foundation is sandstone and the surface deposit thickness should be about 1-2m. Some lateral spreading of ground was observed. Granular sands could be found along the cracks (Figure 6.4). This may be due to soil liquefaction as quartzitic sand with a repose angle of 32 degree are observed along the cracks. A large longitudinal crack appeared at the boulder toe of the dam. Boring and SPT were carried out to restore the damaged part before a rainy season (Figure 6.5). 42

(a) A skectch of dam cross-section Figure 6.2 Damage to Suvi earth dam (b) A sketch of the plan view Figure 6.3 Settlement and slumping of Suvi dam towards upstream side 43

Figure 6.4 Lateral spreading of the ground due to the liquefaction Figure 6.5 Large crack at the boulder toe. 44

CHANG DAM: The Chang Dam with a height of 20m was built for irrigation purpose and it is an earth dam. The dam is mostly aligned in the EW direction with a curvature at its west end. The curved part of the dam failed (Figure 6.6). The downstream side of the dam moved northward while its upstream side moved southward. The failed part coincided with the old river stream. Although the base rock is mudstone with almost horizontal layering, the old river course may be consisted of sandy material. In the upstream side the sand boiling can be clearly observed even more than 50 days passed from the earthquake. A sketch of the dam failure is shown in Figure 6.7. It seems that the failure of the dam is due to liquefaction at its base as shown in Figure 6.8 and it resembles to the failure of San Fernandes dam. Furthermore, some lateral spreading could be observed at many locations around the reservoir. Water intake of this was masonry and it was totally collapsed (Figure 6.9). Figure 6.6 Settlement and slumping of Chang dam Settlement and Slumping 20m liquefactio Max 4.5m heaving Cracks Figure 6.7 A sketch of failure of Chang earth dam 45

Figure 6.8 Upstream slope failure due to liquefaction Figure 6.9 Failure of water intake tower RUDRAMATA DAM: The dam was also earth-fill with a height of 20m. The downstream side of the dam was not damaged while the upstream side of the dam has cracks running along the longitudinal axis of the dam near the toe of the dam. The cracked section was removed and new soil placement was under construction. The water-intake tower is masonary and it was slightly damaged (Figures 6.10 & 6.11). In the dam reservoir some bulging of sandstone layers were visible. However, the cause of bulging was not well understood. Figure 6.10 Rudramata dam 46

Table 6.1 Characteristics of Major dams in Kutch Name Type River Height Slope Year Distance Comment Sanandhro Masonary Kali 1657 Kankawati Earthen Kankawati 1656 Nagmati Masonary Nagmati 1656 Kaila Earthen Kaila 1616 Rudramata Earthen Pur(Khari) 60 Damaged Nirona Earthen Bhurud Gajansar Earthen Panjora Suvi Earthen Suvi 15 16 1666 30 Damaged Nara Earthen Lakhpat 1681 Fatehgarh Earthen Malan 1687 57 Damaged Godhatad Earthen Lakhpat 1683 Tapar Earthen Sakara 33 28 Damaged Bhuki Earthen Bhuki Mathal Earthen Dhadodh Jangadia Earthen Khari Don Earthen Kharod Berachia Earthen Nayara Mitti Earthen Mitti Kaswati Earthen Kaswati 1676 45 Damaged Kalaghoga Earthen Phoi 1687 Chang Earthen 20 15 Damaged Nilpar Earthen Damaged Shiviakha Earthen 28 Damaged Figure 6.11 Water intake tower of Rudramata dam 47

TAPPAR DAM:The 33m high Tappar dam blocks the flow of the rivers into Banni. The water from this dam go for the municipal and industrial use of Kutch's emerging industrial town of Gandhidham. Big dams, namely Ranasagar, Jawaharsagar and Kota barrage, built on the Chambal river, in the Rajastan State (500km from the USGS epicenter) were not affected by the earthquake. The main conclusions made during the inspection of dams are given below: Parallel longitudinal cracks were observed on the crest and upstream face of the dams which are apparently very deep and wide. The settlement of upstream face and crest of the dams was observed in most of the cases. In some dams, it was very large in gorge portion of the river and in few cases, a complete damage of earth dam in the gorge portion of river was observed. Such settlements are thought to be liquefaction of soil at the base of the dam. Transverse cracks were also found in most of the dams. These are mostly observed at the junction at spillway and earth dam. Cracks were seen in head regulator structure of many dams. In some dams, head regulator structure has completely collapsed. Water ponding was observed at downstream toe of some dams. Incidentally, all these dams were near empty due to the second successive year of drought so that the dam failures did not cause any problem at downstream side. Several dams such as Chang and Suvie were sustained severe damage, so that the rapid restoration is needed before the rainy season. 48