SHADOW IMPACT STUDY REPORT

Similar documents
October 16, Dear Mr. Hawkins:

SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP 6 Storey Condominium Louis Saint Laurent Ave & Leger Way Milton, Ontario

SHADOW STUDY REPORT REGARDING

SHADE/SHADOW REPORT. For the Proposed 8777 Washington Project. Culver City, CA. Prepared for:

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS SHADE/SHADOW

Attachment A: Existing Conditions Illustrated by Context

225 Bush Street Suite 1700 San Francisco, CA phone fax

IV.B. VISUAL RESOURCES SHADE SHADOW

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

Re: Draft OPA 320 Recommended Amendments to Various Neighbourhood Policies Statutory Public Meeting to be held on Monday 16 November 2015

Attachment E: CADP Design Shadow Analysis

5.6.2 SHADOW / DAYLIGHT ASSESSMENT

Project No India Basin Shadow Study San Francisco, California, USA

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017

4.A.3 SHADE/SHADOW 1. INTRODUCTION. 2. ENVIRONMENTAL SETTING a. Existing Conditions. (1) Project Vicinity 4.A.3 1

5.0 POPULATION, HOUSEHOLD AND EMPLOYMENT FORECASTS

APPENDIX N View Impact & Shadow Analysis

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

APPENDIX B SHADOW STUDY

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

STAFF REPORT ACTION REQUIRED

Growth Management: Analysis of Comments Received and Responses Comments received as of October 16, 2017

RESIDENTIAL SATISFACTION IN THE CHANGING URBAN FORM IN ADELAIDE: A COMPARATIVE ANALYSIS OF MAWSON LAKES AND CRAIGBURN FARM, SOUTH AUSTRALIA

King City URA 6D Concept Plan

Section 14F Purpose of the Wairakei Residential Zone

Drexel Woods Homeowner s Association, Inc Baltimore National Pike, Box 158 Catonsville, MD 21228

GIS in Community & Regional Planning

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Student Exploration: Seasons in 3D

L.O: EARTH'S 23.5 DEGREE TILT ON ITS AXIS GIVES EARTH ITS SEASONS March 21 (SPRING), June 21(SUMMER), Sept 22 (AUTUMN) & Dec 21(WINTER)

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Tourist-Accommodation (T-A) Zone

APPENDIX I - AREA PLANS

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO

Haslemere Design Statement

VISUALISATION AS A TOOL TO GUIDE STREET TREE PLANTING FOR OPTIMAL BENEFIT GAIN

SUBJECT: 363 6th Street Shadow Analysis with Cumulative Analysis of 345 6th Street

Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario

FINAL REPORT. City of Toronto. Contract Project No: B

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

ZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg

Exercise 6. Solar Panel Orientation EXERCISE OBJECTIVE DISCUSSION OUTLINE. Introduction to the importance of solar panel orientation DISCUSSION

OPEN INFORMATION ITEM


THE EARTH AND ITS REPRESENTATION

Date: March 31, 2014 PATE; fyril 2.3,2 >H

Committee Meeting November 6, 2018

Date: June 19, 2013 Meeting Date: July 5, Consideration of the City of Vancouver s Regional Context Statement

Remote Sensing the Urban Landscape

Earth s Motion. Lesson Outline LESSON 1. A. Earth and the Sun 1. The diameter is more than 100 times greater than

DAYLIGHT, SUNLIGHT AND OVERSHADOWING The EXO Building at Point Village North Wall Quay & East Wall Road, Dublin 1.

For most observers on Earth, the sun rises in the eastern

2267 N o r t h 1500 W C l i n t o n U T 84015

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

City of Camrose Winter Road Maintenance Policy

Dark Sky Initiative Draft Terms of Reference

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

CVS Derwood. Local Area Transportation Review

COUNCIL POLICY MANUAL

GROWTH MANAGEMENT REPORT Wiarton South Settlement Area

LAB: What Events Mark the Beginning of Each Season?

PREAMBLE. Planning and Development staff are available to answer any questions that you may have concerning dark sky principles.

OTTER POINT ADVISORY PLANNING COMMISSION. Notice of Meeting on Tuesday, June 5, 2018 at 7 p.m.

MEMORANDUM. Date: May 8, Planning & Development Committee. From: Ilidia Sa Melo, Deputy City Clerk. Re: Items Further to the Agenda May 8, 2018

IN THE MATTER. of the Resource Management Act and. the Local Government. (Auckland Transitional Provisions) Act And IN THE MATTER OF

2.2 The Reason for Seasons

A Method for Mapping Settlement Area Boundaries in the Greater Golden Horseshoe

Economic Activity Economic A ctivity

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag

Pedestrian Level Wind Study. West Village 70 Mississauga Road South & 181 Lakeshore Road West. Mississauga, Ontario

Visit our Publications and Open Data Catalogue to find our complete inventory of our freely available information products.

Council Workshop on Neighbourhoods Thursday, October 4 th, :00 to 4:00 p.m. Burlington Performing Arts Centre

The Atmosphere: Structure and Temperature

TOWN OF LOGY BAY-MIDDLE COVE-OUTER COVE MUNICIPAL PLAN

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

THE SOUTHAMPTON MARITIME. at The Lobster Inn

CERTIFIED RESOLUTION. introduction: and dated May 29, 2017, as attached, as appropriate

APPENDIX IV MODELLING

Riocan Centre Study Area Frontenac Mall Study Area Kingston Centre Study Area

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

ENVISIONING OUR CITY: 2041 PUBLIC INFORMATION CENTRE #2 November 16, 2017

Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario

Practice Questions: Seasons #1

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

C) the seasonal changes in constellations viewed in the night sky D) The duration of insolation will increase and the temperature will increase.

APPENDIX (R) Committed Developments Documentation

VOLUME 2 RURAL SETTLEMENT AREA PLANS & SECONDARY PLANS

Albuquerque City-wide Zoning Remapping

Winning Farm of Winchester

SEASONAL AND DAILY TEMPERATURES

Solutions Manual to Exercises for Weather & Climate, 8th ed. Appendix A Dimensions and Units 60 Appendix B Earth Measures 62 Appendix C GeoClock 63

NAME; LAB # SEASONAL PATH OF THE SUN AND LATITUDE Hemisphere Model #3 at the Arctic Circle

Aerial Photography and Imagery Resources Guide

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

C-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63

About Visualizing Density

Transcription:

SHADOW IMPACT STUDY REPORT 175 Zoo Park Road Town of Wasaga Beach Date: September 2017 Prepared for: Simcoe County Housing Corporation Prepared by: MacNaughton Hermsen Britton Clarkson Planning Limited (MHBC) 7050 Weston Road, Suite 230 Woodbridge ON L4L 8G7 T: 905 761 5588 x213 F: 905 761 5589 Our File: 0729F

1.0 INTRODUCTION MHBC has been retained by Simcoe County Housing Corporation (SCHC, hereinafter the Client ) to undertake a Shadow Study in support of a proposal for the development of a site located on lands municipality known as 175 Zoo Park Road in the Town of Wasaga Beach, County of Simcoe, lands which are currently owned by the Town of Wasaga Beach. The proposed development lands (hereinafter as Site ) is 1.76 ha (4.35 ac) in area. The proposal is to provide an affordable housing building in the Town of Wasaga Beach in the form of a four storey apartment building. The proposed development includes surface parking, landscaped areas, a patio, a play area and an open grassed area that may accommodate future development. Surrounding the Site are the following (see Figure 1): North: South: East: West: Public Works Yard, Wooded Area, Residential, Accommodation Commercial Uses Residential Townhouses, Retirement Home, Commercial Uses Public Works Yard, Wooded Area, Cottage and RV Resort, Tourist Commercial Uses Single Detached Residential Homes, Mobile Home Park, Retail Uses In undertaking the evaluation of the Shadow Study, this report has relied on the following information: MHBC Shadow Study provided as Appendix A. City of Toronto Shadow Study Terms of Reference as discussed in Section 2.0 of this Report. 2

Figure 1 Area surrounding the Site. 3

2.0 PURPOSE AND INTENT The purpose of this report is to undertake a Shadow Study to assess the impact of the mid-rise buildings proposed within the Site shown in Figure 2. Figure 2 Proposed Mid-Rise Building on the Site. This shadow study has used shadow study analysis standards from the City of Toronto with adjustments that identify potential on-site shadow impacts. The City of Toronto Terms of Reference was utilized because of its incremental approach to assessing shadow impacts, based on an hour-to hour evaluation for mid-rise buildings. This differs from municipalities such as Richmond Hill or Oakville where terms of references exist, but a less rigours approach to time is used. The City of Toronto Terms of Reference also provides a thorough list of sensitive uses to be tested relative to shadow impacts. The details of these standards are expanded on in Section 3.0 of this report. 4

This shadow study meets the Town of Wasaga Beach Official Plan (Consolidated in February 2017) requirement to undertake a Shadow Study within Section 19.21.3 which states the following: In order for a development application to be considered complete in accordance with the Planning Act, in regards to official plan amendments, zoning by-law amendments, draft plans of subdivision and condominium, site plan and consent applications, the Town may require that reports, plans, and/or studies be prepared to the satisfaction of the Town and relevant commenting or approval agencies. These studies may include but are not limited to the following topics and issues: 41. Shadow Analysis Further, a Shadow Analysis was requested by the Town as part of the pre-consultation process. 5

3.0 METHODOLOGY In undertaking and evaluating potential shadows on the Site, this report applied the following methodology and approach. 3.1 Shadow Study Guidelines Currently the Town of Wasaga Beach does not provide a Shadow Study term of reference that outlines what is required for these studies. In order to undertake the Shadow Study we relied on best practices of other municipalities to develop a method for analysis. The testing timeframes are based on the City of Toronto Shadow Study Terms of Reference because the hourly increments allow for a rigours assessment of the impact throughout the day. The testing date and evaluation method from the City of Toronto allow for the ability to quantify the shadow impact as it moves across a property. Together, these testing times and evaluation method are appropriate and comprehensive for the evaluation of shadow impact for mid-rise development in Town of Wasaga Beach. 3.2 Testing Times The evaluation of acceptable solar access will rely on hourly increments between the timeframes from 9:18 a.m. to 6:18 p.m. These time frames will be applied equally to the following dates: March 21 st (Spring Equinox) June 21 st (Summer Solstice) September 21 st (Fall Equinox) It is noted that the analysis of shadow impact during the winter season is not required in the City of Toronto Terms of Reference. In general, the winter season have short days in this geographic area. Furthermore, due to seasonal climate and low temperatures, the use of the public realm and outdoor spaces is limited. As such the shadow casted during winter is not considered a key indicator of the shadow impact of the proposed development. 3.3 Evaluation of Potential Impacts The evaluation of the Shadow Study will determine whether at least a minimum of 5 consecutive hours of full sunlight is available on sensitive uses namely: Neighbouring streets, parks and open space, natural areas, privately managed publically accessible spaces and other properties; and Planned amenity areas on the development site. In circumstances where less than 5 hours of solar access is provided, an evaluation of the site-specific context can be taken into consideration to determine reasonable protection of solar access. 6

4.0 EVALUATION After reviewing the shadow analysis for the proposed development, the following are the findings of the analysis. The image documentation of the Shadow Impact Analysis can be found in Appendix A of this report. The evaluations of shadow impact on sensitive uses focuses on: A) the impact on the proposed on-site play area and open space east of the proposed building, B) the public sidewalk along Zoo Park Road west of the building, and, C) the existing medium-rise residential buildings south of the site. The lands to the north are occupied by a Public Works Yard and are not deemed to be a sensitive use. OUTDOOR AMENITY AREA The proposed development will have minimal shadow impact on the on-site outdoor amenity area. During the Spring Equinox, full solar access is provided for 4 consecutive hours between 9:18 am to 12:18 pm. For 2 hours from 1:18 pm to 2:18 pm, less than 10% of the outdoor amenity area has shadow cast upon it. The shadow impact gradually increases to 15% and 22% of the outdoor amenity area for 3:18 pm and 4:18 pm. The shadow peaks to 29% at 5:18 pm and reduces to 23% at 6:18 pm. Full solar access is provided for 4 consecutive hours between 9:18 am to 12:18 pm during the Summer Solstice. Shadow impact remains less than 10% for 4 hours between 1:18 pm and 4:18 pm. For one hour at 5:18 pm 10% of outdoor amenity area is impacted by shadow and is reduced to 9% at 6:18 pm. During the Fall Equinox, 3 consecutive hours of full solar access is provided for between 9:18 am to 11:18 am. Between 12:18 pm to 2:18 pm, 10% or less of the outdoor amenity area has shadow cast upon it. The shadow impact increases to less than 25% of the outdoor amenity area for 2 hours between 3:18 pm and 4:18 pm and peaks to 31% at 5:18 pm. Finally the shadow impact is reduced to 20% at 6:18 pm. The shadow impacts to the outdoor amenity area are minimal as 4 consecutive hours of sunlight are provided for during the Spring Equinox, 4 consecutive hours during the Summer Solstice, and 3 hours during the Fall Equinox. Additionally, due to the well-design L-shaped floor plate, shadow impact is minimized to less than 31% of the outdoor amenity area. The shadows constantly move across the outdoor amenity area, thereby further lessening the shadow impact. PUBLIC ROAD The proposed development will have minimal shadow impact on Zoo Park Road and will provide full solar access to the proposed public sidewalk during all four seasons. During the Fall Equinox, Spring Equinox and Summer Solstice shadow is only cast onto Zoo Park Road for one hour at 9:18 am. The one hour of shadow experienced during the Fall Equinox, Spring Equinox and Summer Solstice is acceptable and represents minimal impact. The proposed development will maintain a minimum of 5 consecutive hours of sunlight on the west side of the building for all season. The impact of shadows on the low density residential on the opposite side of Zoo Park Road is therefore also minimal. 7

MEDIUM DENSITY RESIDENTIAL There is minimal shadow impact on the existing medium-density residential development to the south of the proposed development. Full solar access is maintained during the Summer. During the Spring and Fall Equinox the proposed development will have shadow impact on the rear yard of the adjacent lots in the evening from 6:18 pm to sunset (approximately 1 hour). At these times, the shadows are limited to the rear yard of 3 lots during the Spring Equinox and 4 lots during the Fall Equinox. The proposed development will provide 5 consecutive hours of sunlight on the south side of the building for all season. It is noted that an 8-foot fence will be installed, replacing the existing 10-foot fence, along the south property line shared with the medium density residential properties. The shadow impact of accessory structures, such as the 8-foot fence is not included in the shadow impact study. However, it is noted that fence s shadow impact is likely minimal and likely overlaps with portions of the shadow casted by the proposed building. 8

5.0 CONCLUSION Based on the evaluation undertaken in this report, it is concluded that there is an acceptable level of shadow impact from the proposed development relative to the adjacent residential lots to the south, Zoo Park Road to the west and the proposed Outdoor Amenity Area to the east of the building. These impacts are minimal on the Site, the public street, and area residential lots. Furthermore, of the shadows that are cast on the residential lots to the south, it is limited to a maximum of 4 lots during Fall Equinox and 1 lot during Spring Equinox. In addition, these shadows are limited to portions of the rear yard. The shadow impact of accessory structures, such as fences, is not included but the shadow impact is likely minimal and likely overlaps with the shadow casted by the proposed building. As such, the proposed development orientation maximizes compatibility with the residential area in terms of mitigating shadow impacts. It is our opinion that the proposed development will result in acceptable levels of shadow on the Site and surrounding land uses, and acceptable solar access has been maintained for outdoor amenities, the boulevard, and residential lots. Yours truly, MHBC Eldon C. Theodore MUDS, MCIP, RPP, LEED AP Partner and Urban Designer Helen Huang BA (arch), MscPl, MCIP, RPP Planner and Urban Designer 9

APPENDIX A

March 21 9:18 am March 21 10:18 am March 21 11:18 am March 21 12:18 pm March 21 1:18 pm March 21 2:18 pm March 21 3:18 pm March 21 4:18 pm March 21 5:18 pm March 21 6:18 pm 175 ZOO PARK ROAD WASAGA BEACH, ON SHADOW IMPACT STUDY 0729G

June 21 9:18 am June 21 10:18 am June 21 11:18 am June 21 12:18 pm June 21 1:18 pm June 21 2:18 pm June 21 3:18 pm June 21 4:18 pm June 21 5:18 pm June 21 6:18 pm 175 ZOO PARK ROAD WASAGA BEACH, ON SHADOW IMPACT STUDY 0729G

September 21 9:18 am September 21 10:18 am September 21 11:18 am September 21 12:18 pm September 21 1:18 pm September 21 2:18 pm September 21 3:18 pm September 21 4:18 pm September 21 5:18 pm September 21 6:18 pm 175 ZOO PARK ROAD WASAGA BEACH, ON SHADOW IMPACT STUDY 0729G

MHBC PLANNING URBAN DESIGN & LANDSCAPE ARCHITECTURE KITCHENER WOODBRIDGE LONDON KINGSTON BARRIE BURLINGTON Request for Proposal / Town of Halton Hills 43